Print icon

Enrolled Bill (the bill as presented to the President for signature) H.R. 3


[SEC. 1928. SENSE OF CONGRESS House Bills]
[From the U.S. Government Printing Office via GPO Access]
[Enrolled Bill]
[DOCID: f:h3enr.txt]

        H.R.3

                       One Hundred Ninth Congress

                                 of the

                        United States of America


                          AT THE FIRST SESSION

          Begun and held at the City of Washington on Tuesday,
            the fourth day of January, two thousand and five


                                 An Act



 To authorize funds for Federal-aid highways, highway safety programs,
              and transit programs, and for other purposes.

    Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,

SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

    (a) Short Title.--This Act may be cited as the ``Safe, Accountable,
Flexible, Efficient Transportation Equity Act: A Legacy for Users'' or
``SAFETEA-LU''.
    (b) Table of Contents.--The table of contents for this Act is as
follows:
Sec. 1. Short title; table of contents.
Sec. 2. General definitions.

                      TITLE I--FEDERAL-AID HIGHWAYS

                  Subtitle A--Authorization of Programs

Sec. 1101. Authorization of appropriations.
Sec. 1102. Obligation ceiling.
Sec. 1103. Apportionments.
Sec. 1104. Equity bonus program.
Sec. 1105. Revenue aligned budget authority.
Sec. 1106. Future Interstate System routes.
Sec. 1107. Metropolitan planning.
Sec. 1108. Transfer of highway and transit funds.
Sec. 1109. Recreational trails.
Sec. 1110. Temporary traffic control devices.
Sec. 1111. Set-asides for Interstate discretionary projects.
Sec. 1112. Emergency relief.
Sec. 1113. Surface transportation program.
Sec. 1114. Highway bridge program.
Sec. 1115. Highway use tax evasion projects.
Sec. 1116. Appalachian development highway system.
Sec. 1117. Transportation, community, and system preservation program.
Sec. 1118. Territorial highway program.
Sec. 1119. Federal lands highways.
Sec. 1120. Puerto Rico highway program.
Sec. 1121. HOV facilities.
Sec. 1122. Definitions.

                      Subtitle B--Congestion Relief

Sec. 1201. Real-time system management information program.

                   Subtitle C--Mobility and Efficiency

Sec. 1301. Projects of national and regional significance.
Sec. 1302. National corridor infrastructure improvement program.
Sec. 1303. Coordinated border infrastructure program.
Sec. 1304. High priority corridors on the National Highway System.
Sec. 1305. Truck parking facilities.
Sec. 1306. Freight intermodal distribution pilot grant program.
Sec. 1307. Deployment of magnetic levitation transportation projects.
Sec. 1308. Delta region transportation development program.
Sec. 1309. Extension of public transit vehicle exemption from axle
          weight restrictions.
Sec. 1310. Interstate oasis program.

                       Subtitle D--Highway Safety

Sec. 1401. Highway safety improvement program.
Sec. 1402. Worker injury prevention and free flow of vehicular traffic.
Sec. 1403. Toll facilities workplace safety study.
Sec. 1404. Safe routes to school program.
Sec. 1405. Roadway safety improvements for older drivers and
          pedestrians.
Sec. 1406. Safety incentive grants for use of seat belts.
Sec. 1407. Safety incentives to prevent operation of motor vehicles by
          intoxicated persons.
Sec. 1408. Improvement or replacement of highway features on National
          Highway System.
Sec. 1409. Work zone safety grants.
Sec. 1410. National Work Zone Safety Information Clearinghouse.
Sec. 1411. Roadway safety.
Sec. 1412. Idling reduction facilities in Interstate rights-of-way.

            Subtitle E--Construction and Contract Efficiency

Sec. 1501. Program efficiencies.
Sec. 1502. Highways for LIFE pilot program.
Sec. 1503. Design build.

                           Subtitle F--Finance

Sec. 1601. Transportation Infrastructure Finance and Innovation Act
          amendments.
Sec. 1602. State infrastructure banks.
Sec. 1603. Use of excess funds and funds for inactive projects.
Sec. 1604. Tolling.

                   Subtitle G--High Priority Projects

Sec. 1701. High Priority Projects program.
Sec. 1702. Project authorizations.
Sec. 1703. Technical amendments to transportation projects.

                         Subtitle H--Environment

Sec. 1801. Construction of ferry boats and ferry terminal facilities.
Sec. 1802. National Scenic Byways Program.
Sec. 1803. America's Byways Resource Center.
Sec. 1804. National historic covered bridge preservation.
Sec. 1805. Use of debris from demolished bridges and overpasses.
Sec. 1806. Additional authorization of contract authority for States
          with Indian reservations.
Sec. 1807. Nonmotorized transportation pilot program.
Sec. 1808. Addition to CMAQ-eligible projects.

                        Subtitle I--Miscellaneous

Sec. 1901. Inclusion of requirements for signs identifying funding
          sources in title 23.
Sec. 1902. Donations and credits.
Sec. 1903. Inclusion of Buy America requirements in title 23.
Sec. 1904. Stewardship and oversight.
Sec. 1905. Transportation development credits.
Sec. 1906. Grant program to prohibit racial profiling.
Sec. 1907. Pavement marking systems demonstration projects.
Sec. 1908. Inclusion of certain route segments on Interstate System and
          NHS.
Sec. 1909. Future of surface transportation system.
Sec. 1910. Motorist information concerning full service restaurants.
Sec. 1911. Approval and funding for certain construction projects.
Sec. 1912. Lead agency designation.
Sec. 1913. Bridge construction, North Dakota.
Sec. 1914. Motorcyclist Advisory Council.
Sec. 1915. Loan forgiveness.
Sec. 1916. Treatment of off-ramp.
Sec. 1917. Opening of Interstate ramps.
Sec. 1918. Credit to State of Louisiana for State matching funds.
Sec. 1919. Road user fees.
Sec. 1920. Transportation and local workforce investment.
Sec. 1921. Update of obsolete text.
Sec. 1922. Technical amendments to nondiscrimination section.
Sec. 1923. Transportation assets and needs of Delta region.
Sec. 1924. Alaska Way Viaduct study.
Sec. 1925. Community enhancement study.
Sec. 1926. Budget justification.
Sec. 1927. 14th Amendment Highway and 3rd Infantry Division Highway.
Sec. 1928. Sense of Congress regarding Buy America.
Sec. 1929. Designation of Daniel Patrick Moynihan Interstate Highway.
Sec. 1930. Designation of Thomas P. ``Tip'' O'Neill, Jr. Tunnel.
Sec. 1931. Richard Nixon Parkway, California.
Sec. 1932. Amo Houghton Bypass.
Sec. 1933. Billy Tauzin Energy Corridor.
Sec. 1934. Transportation improvements.
Sec. 1935. Project flexibility.
Sec. 1936. Advances.
Sec. 1937. Roads in closed basins.
Sec. 1938. Technology.
Sec. 1939. BIA Indian Road Program.
Sec. 1940. Going-to-the-Sun Road, Glacier National Park, Montana.
Sec. 1941. Beartooth Highway, Montana.
Sec. 1943. Great Lakes ITS implementation.
Sec. 1944. Transportation construction and remediation, Ottawa County,
          Oklahoma.
Sec. 1945. Infrastructure awareness program.
Sec. 1946. Gateway rural improvement pilot program.
Sec. 1947. Eligible safety improvements.
Sec. 1948. Emergency service route.
Sec. 1949. Knik Arm Bridge funding clarification.
Sec. 1950. Lincoln Parish, LA/I-20 Transportation Corridor Program.
Sec. 1951. Bonding assistance program.
Sec. 1952. Congestion relief.
Sec. 1953. Authorization of appropriations.
Sec. 1954. Bicycle transportation and pedestrian walkways.
Sec. 1955. Conveyance to the City of Ely, Nevada.
Sec. 1956. Brownfields grants.
Sec. 1957. Traffic circle construction, Clarendon, Vermont.
Sec. 1958. Limitation on project approval.
Sec. 1959. Cross harbor freight movement project.
Sec. 1960. Denali access system program.
Sec. 1961. I-95/Contee Road interchange study.
Sec. 1962. Multimodal facility improvements.
Sec. 1963. Apollo Theater leases.
Sec. 1964. Project Federal share.

                        TITLE II--HIGHWAY SAFETY

Sec. 2001. Authorization of appropriations.
Sec. 2002. Highway safety programs.
Sec. 2003. Highway safety research and outreach programs.
Sec. 2004. Occupant protection incentive grants.
Sec. 2005. Grants for primary safety belt use laws.
Sec. 2006. State traffic safety information system improvements.
Sec. 2007. Alcohol-impaired driving countermeasures.
Sec. 2008. NHTSA accountability.
Sec. 2009. High visibility enforcement program.
Sec. 2010. Motorcyclist safety.
Sec. 2011. Child safety and child booster seat incentive grants.
Sec. 2012. Safety data.
Sec. 2013. Drug-impaired driving enforcement.
Sec. 2014. First responder vehicle safety program.
Sec. 2015. Driver performance study.
Sec. 2016. Rural State emergency medical services optimization pilot
          program.
Sec. 2017. Older driver safety; law enforcement training.
Sec. 2018. Safe intersections.
Sec. 2019. National Highway Safety Advisory Committee technical
          correction.
Sec. 2020. Presidential Commission on Alcohol-Impaired Driving.
Sec. 2021. Sense of the Congress in support of increased public
          awareness of blood alcohol concentration levels and dangers of
          alcohol-impaired driving.
Sec. 2022. Effective date.

                    TITLE III--PUBLIC TRANSPORTATION

Sec. 3001. Short title.
Sec. 3002. Amendments to title 49, United States Code; updated
          terminology.
Sec. 3003. Policies, findings, and purposes.
Sec. 3004. Definitions.
Sec. 3005. Metropolitan transportation planning.
Sec. 3006. Statewide transportation planning.
Sec. 3007. Planning programs.
Sec. 3008. Private enterprise participation.
Sec. 3009. Urbanized area formula grants.
Sec. 3010. Clean fuels grant program.
Sec. 3011. Capital investment grants.
Sec. 3012. Formula grants for special needs of elderly individuals and
          individuals with disabilities.
Sec. 3013. Formula grants for other than urbanized areas.
Sec. 3014. Research, development, demonstration, and deployment
          projects.
Sec. 3015. Transit cooperative research program.
Sec. 3016. National research and technology programs.
Sec. 3017. National Transit Institute.
Sec. 3018. Job access and reverse commute formula grants.
Sec. 3019. New Freedom Program.
Sec. 3020. Bus testing facility.
Sec. 3021. Alternative transportation in parks and public lands.
Sec. 3022. Human resources programs.
Sec. 3023. General provisions on assistance.
Sec. 3024. Special provisions for capital projects.
Sec. 3025. Contract requirements.
Sec. 3026. Project management oversight and review.
Sec. 3027. Project review.
Sec. 3028. Investigations of safety hazards and security risks.
Sec. 3029. State safety oversight.
Sec. 3030. Controlled substances and alcohol misuse testing.
Sec. 3031. Employee protective arrangements.
Sec. 3032. Administrative procedures.
Sec. 3033. National transit database.
Sec. 3034. Apportionments of formula grants.
Sec. 3035. Apportionments based on fixed guideway factors.
Sec. 3036. Authorizations.
Sec. 3037. Alternatives analysis program.
Sec. 3038. Apportionments based on growing States formula factors.
Sec. 3039. Over-the-road bus accessibility program.
Sec. 3040. Obligation ceiling.
Sec. 3041. Adjustments for fiscal year 2005.
Sec. 3042. Terrorist attacks and other acts of violence against public
          transportation systems.
Sec. 3043. Project authorizations for new fixed guideway capital
          projects.
Sec. 3044. Projects for bus and bus-related facilities and clean fuels
          grant program.
Sec. 3045. National fuel cell bus technology development program.
Sec. 3046. Allocations for national research and technology programs.
Sec. 3047. Forgiveness of grant agreement.
Sec. 3048. Cooperative procurement.
Sec. 3049. Transportation fringe benefits.
Sec. 3050. Commuter rail.
Sec. 3051. Paratransit service in Illinois.

                     TITLE IV--MOTOR CARRIER SAFETY

Sec. 4001. Short title.

               Subtitle A--Commercial Motor Vehicle Safety

Sec. 4101. Authorization of appropriations.
Sec. 4102. Increased penalties for out-of-service violations and false
          records.
Sec. 4103. Penalty for denial of access to records.
Sec. 4104. Revocation of operating authority.
Sec. 4105. State laws relating to vehicle towing.
Sec. 4106. Motor carrier safety grants.
Sec. 4107. High priority activities and new entrants audits.
Sec. 4108. Data quality improvement.
Sec. 4109. Performance and registration information system management.
Sec. 4110. Border enforcement grants.
Sec. 4111. Motor carrier research and technology program.
Sec. 4112. Nebraska custom harvesters length exemption.
Sec. 4113. Pattern of safety violations by motor carrier management.
Sec. 4114. Intrastate operations of interstate motor carriers.
Sec. 4115. Transfer provision.
Sec. 4116. Medical program.
Sec. 4117. Safety performance history screening.
Sec. 4118. Roadability.
Sec. 4119. International cooperation.
Sec. 4120. Financial responsibility for private motor carriers.
Sec. 4121. Deposit of certain civil penalties into Highway Trust Fund.
Sec. 4122. CDL learner's permit program.
Sec. 4123. Commercial driver's license information system modernization.
Sec. 4124. Commercial driver's license improvements.
Sec. 4125. Hobbs Act.
Sec. 4126. Commercial vehicle information systems and networks
          deployment.
Sec. 4127. Outreach and education.
Sec. 4128. Safety data improvement program.
Sec. 4129. Operation of commercial motor vehicles by individuals who use
          insulin to treat diabetes mellitus.
Sec. 4130. Operators of vehicles transporting agricultural commodities
          and farm supplies.
Sec. 4131. Maximum hours of service for operators of ground water well
          drilling rigs.
Sec. 4132. Hours of service for operators of utility service vehicles.
Sec. 4133. Hours of service rules for operators providing transportation
          to movie production sites.
Sec. 4134. Grant program for commercial motor vehicle operators.
Sec. 4135. CDL task force.
Sec. 4136. Interstate van operations.
Sec. 4137. Decals.
Sec. 4138. High risk carrier compliance reviews.
Sec. 4139. Foreign commercial motor vehicles.
Sec. 4140. School bus driver qualifications and endorsement knowledge
          test.
Sec. 4141. Driveaway saddlemount vehicles.
Sec. 4142. Registration of motor carriers and freight forwarders.
Sec. 4143. Authority to stop commercial motor vehicles.
Sec. 4144. Motor Carrier Safety Advisory Committee.
Sec. 4145. Technical corrections.
Sec. 4146. Exemption during harvest periods.
Sec. 4147. Emergency condition requiring immediate response.
Sec. 4148. Substance abuse professionals.
Sec. 4149. Office of intermodalism.

               Subtitle B--Household Goods Transportation

Sec. 4201. Short title.
Sec. 4202. Definitions; application of provisions.
Sec. 4203. Payment of rates.
Sec. 4204. Additional registration requirements for motor carriers of
          household goods.
Sec. 4205. Household goods carrier operations.
Sec. 4206. Enforcement of regulations related to transportation of
          household goods.
Sec. 4207. Liability of carriers under receipts and bills of lading.
Sec. 4208. Arbitration requirements.
Sec. 4209. Civil penalties relating to household goods brokers and
          unauthorized transportation.
Sec. 4210. Penalties for holding household goods hostage.
Sec. 4211. Consumer handbook on DOT web site.
Sec. 4212. Release of household goods broker information.
Sec. 4213. Working group for development of practices and procedures to
          enhance Federal-State relations.
Sec. 4214. Consumer complaint information.
Sec. 4215. Review of liability of carriers.
Sec. 4216. Application of State consumer protection laws to certain
          household goods carriers.

          Subtitle C--Unified Carrier Registration Act of 2005

Sec. 4301. Short title.
Sec. 4302. Relationship to other laws.
Sec. 4303. Inclusion of motor private and exempt carriers.
Sec. 4304. Unified Carrier Registration System.
Sec. 4305. Registration of motor carriers by States.
Sec. 4306. Identification of vehicles.
Sec. 4307. Use of UCR Agreement revenues as matching funds.
Sec. 4308. Regulations.

                  Subtitle D--Miscellaneous Provisions

Sec. 4401. Technical adjustment.
Sec. 4402. Transfer.
Sec. 4403. Extension of assistance.
Sec. 4404. Designations.
Sec. 4405. Limited exception.
Sec. 4406. Airport land amendment.
Sec. 4407. Rights-of-way.
Sec. 4408. Rialto Municipal Airport.
Sec. 4409. Conforming amendments.
Sec. 4410. Ralph M. Bartholomew Veterans' Memorial Bridge.
Sec. 4411. Don Young's Way.
Sec. 4412. Quality bank adjustments.
Sec. 4413. Technical amendment.
Sec. 4414. Airport certification.

                            TITLE V--RESEARCH

                           Subtitle A--Funding

Sec. 5101. Authorization of appropriations.
Sec. 5102. Obligation ceiling.
Sec. 5103. Findings.

             Subtitle B--Research, Technology, and Education

Sec. 5201. Research, technology, and education.
Sec. 5202. Long-term bridge performance program; innovative bridge
          research and deployment program.
Sec. 5203. Technology deployment.
Sec. 5204. Training and education.
Sec. 5205. State planning and research.
Sec. 5206. International highway transportation outreach program.
Sec. 5207. Surface transportation environment and planning cooperative
          research program.
Sec. 5208. Transportation research and development strategic planning.
Sec. 5209. National cooperative freight transportation research program.
Sec. 5210. Future strategic highway research program.
Sec. 5211. Multistate corridor operations and management.

         Subtitle C--Intelligent Transportation System Research

Sec. 5301. National ITS program plan.
Sec. 5302. Use of funds.
Sec. 5303. Goals and purposes.
Sec. 5304. Infrastructure development.
Sec. 5305. General authorities and requirements.
Sec. 5306. Research and development.
Sec. 5307. National architecture and standards.
Sec. 5308. Road weather research and development program.
Sec. 5309. Centers for surface transportation excellence.
Sec. 5310. Definitions.

      Subtitle D--University Transportation Research; Scholarship
                              Opportunities

Sec. 5401. National university transportation centers.
Sec. 5402. University transportation research.

                       Subtitle E--Other Programs

Sec. 5501. Transportation safety information management system project.
Sec. 5502. Surface transportation congestion relief solutions research
          initiative.
Sec. 5503. Motor carrier efficiency study.
Sec. 5504. Center for Transportation Advancement and Regional
          Development.
Sec. 5505. Transportation scholarship opportunities program.
Sec. 5506. Commercial remote sensing products and spatial information
          technologies.
Sec. 5507. Rural interstate corridor communications study.
Sec. 5508. Transportation technology innovation and demonstration
          program.
Sec. 5509. Repeal.
Sec. 5510. Notice.
Sec. 5511. Motorcycle crash causation study grants.
Sec. 5512. Advanced travel forecasting procedures program.
Sec. 5513. Research grants.
Sec. 5514. Competition for specification of alternative types of culvert
          pipes.

             Subtitle F--Bureau of Transportation Statistics

Sec. 5601. Bureau of Transportation Statistics.

         TITLE VI--TRANSPORTATION PLANNING AND PROJECT DELIVERY

Sec. 6001. Transportation planning.
Sec. 6002. Efficient environmental reviews for project decisionmaking.
Sec. 6003. State assumption of responsibilities for certain programs and
          projects.
Sec. 6004. State assumption of responsibility for categorical
          exclusions.
Sec. 6005. Surface transportation project delivery pilot program.
Sec. 6006. Environmental restoration and pollution abatement; control of
          noxious weeds and aquatic noxious weeds and establishment of
          native species.
Sec. 6007. Exemption of Interstate System.
Sec. 6008. Integration of natural resource concerns into transportation
          project planning.
Sec. 6009. Parks, recreation areas, wildlife and waterfowl refuges, and
          historic sites.
Sec. 6010. Environmental review of activities that support deployment of
          intelligent transportation systems.
Sec. 6011. Transportation conformity.
Sec. 6012. Federal Reference Method.
Sec. 6013. Air quality monitoring data influenced by exceptional events.
Sec. 6014. Federal procurement of recycled coolant.
Sec. 6015. Clean school bus program.
Sec. 6016. Special designation.
Sec. 6017. Increased use of recovered mineral component in federally
          funded projects involving procurement of cement or concrete.
Sec. 6018. Use of granular mine tailings.

              TITLE VII--HAZARDOUS MATERIALS TRANSPORTATION

Sec. 7001. Short title.
Sec. 7002. Amendment of title 49, United States Code.

Subtitle A--General Authorities on Transportation of Hazardous Materials

Sec. 7101. Findings and purpose.
Sec. 7102. Definitions.
Sec. 7103. General regulatory authority.
Sec. 7104. Limitation on issuance of hazmat licenses.
Sec. 7105. Background checks for drivers hauling hazardous materials.
Sec. 7106. Representation and tampering.
Sec. 7107. Technical amendments.
Sec. 7108. Training of certain employees.
Sec. 7109. Registration.
Sec. 7110. Shipping papers and disclosure.
Sec. 7111. Rail tank cars.
Sec. 7112. Unsatisfactory safety ratings.
Sec. 7113. Training curriculum for the public sector.
Sec. 7114. Planning and training grants; Hazardous Materials Emergency
          Preparedness Fund.
Sec. 7115. Special permits and exclusions.
Sec. 7116. Uniform forms and procedures.
Sec. 7117. International uniformity of standards and requirements.
Sec. 7118. Administrative authority.
Sec. 7119. Enforcement.
Sec. 7120. Civil penalty.
Sec. 7121. Criminal penalty.
Sec. 7122. Preemption.
Sec. 7123. Judicial review.
Sec. 7124. Relationship to other laws.
Sec. 7125. Authorization of appropriations.
Sec. 7126. References to the Secretary of Transportation.
Sec. 7127. Criminal matters.
Sec. 7128. Additional civil and criminal penalties.
Sec. 7129. Hazardous material transportation plan requirement.
Sec. 7130. Determining amount of undeclared shipments of hazardous
          materials entering the United States.
Sec. 7131. Hazardous materials research projects.
Sec. 7132. National first responder transportation incident response
          system.
Sec. 7133. Common carrier pipeline system.

                Subtitle B--Sanitary Food Transportation

Sec. 7201. Short title.
Sec. 7202. Responsibilities of Secretary of Health and Human Services.
Sec. 7203. Department of Transportation requirements.
Sec. 7204. Effective date.

      Subtitle C--Research and Innovative Technology Administration

Sec. 7301. Administrative authority.

       TITLE VIII--TRANSPORTATION DISCRETIONARY SPENDING GUARANTEE

Sec. 8001. Discretionary spending limits for the highway and mass
          transit categories.
Sec. 8002. Adjustments to align highway spending with revenues.
Sec. 8003. Level of obligation limitations.
Sec. 8004. Enforcement of guarantee.
Sec. 8005. Transfer of Federal transit administrative expenses.

                      TITLE IX--RAIL TRANSPORTATION

Sec. 9001. High-speed rail corridor development.
Sec. 9002. Capital grants for rail line relocation projects.
Sec. 9003. Rehabilitation and improvement financing.
Sec. 9004. Report regarding impact on public safety of train travel in
          communities without grade separation.
Sec. 9005. Welded rail and tank car safety improvements.
Sec. 9006. Alaska Railroad.
Sec. 9007. Study of rail transportation and regulation.
Sec. 9008. Hawaii port infrastructure expansion program.

                    TITLE X--MISCELLANEOUS PROVISIONS

        Subtitle A--Sportfishing and Recreational Boating Safety

Sec. 10101. Short title.

    Chapter 1--Dingell-Johnson Sport Fish Restoration Act amendments

Sec. 10111. Amendment of Dingell-Johnson Sport Fish Restoration Act.
Sec. 10112. Authorization of appropriations.
Sec. 10113. Division of annual appropriations.
Sec. 10114. Maintenance of projects.
Sec. 10115. Boating infrastructure.
Sec. 10116. Requirements and restrictions concerning use of amounts for
          expenses for Administration.
Sec. 10117. Payments of funds to and cooperation with Puerto Rico, the
          District of Columbia, Guam, American Samoa, the Commonwealth
          of the Northern Mariana Islands, and the Virgin Islands.
Sec. 10118. Multistate conservation grant program.
Sec. 10119. Expenditure of remaining balance in Boat Safety Account.

             Chapter 2--Clean Vessel Act of 1992 amendments

Sec. 10131. Grant program.

        Chapter 3--Recreational boating safety program amendments

Sec. 10141. Technical correction.
Sec. 10142. Availability of allocations.
Sec. 10143. Authorization of appropriations for State recreational
          boating safety programs.

               Subtitle B--Other Miscellaneous Provisions

Sec. 10201. Notice regarding participation of small business concerns.
Sec. 10202. Emergency medical services.
Sec. 10203. Hubzone program.
Sec. 10204. Catastrophic hurricane evacuation plans.
Sec. 10205. Intermodal transportation facility expansion.
Sec. 10206. Eligibility to participate in western Alaska community
          development quota program.
Sec. 10207. Rail rehabilitation and bridge repair.
Sec. 10208. Rented or leased motor vehicles.
Sec. 10209. Midway Island.
Sec. 10210. Demonstration of digital project simulation.
Sec. 10211. Environmental programs.
Sec. 10212. Rescission of unobligated balances.
Sec. 10213. Tribal land.

           Subtitle C--Specific Vehicle Safety-related Rulings

Sec. 10301. Vehicle rollover prevention and crash mitigation.
Sec. 10302. Side-impact crash protection rulemaking.
Sec. 10303. Tire research.
Sec. 10304. Vehicle backover avoidance technology study.
Sec. 10305. Nontraffic incident data collection.
Sec. 10306. Study of safety belt use technologies.
Sec. 10307. Amendment of Automobile Information Disclosure Act.
Sec. 10308. Power window switches.
Sec. 10309. 15-Passenger van safety.
Sec. 10310. Authorization of appropriations.

     TITLE XI--HIGHWAY REAUTHORIZATION AND EXCISE TAX SIMPLIFICATION

Sec. 11100. Amendment of 1986 Code.

                 Subtitle A--Trust Fund Reauthorization

Sec. 11101. Extension of highway-related taxes and trust funds.
Sec. 11102. Modification of adjustments of apportionments.

            Subtitle B--Excise Tax Reform and Simplification

                      Part 1--Highway excise taxes

Sec. 11111. Modification of gas guzzler tax.
Sec. 11112. Exclusion for tractors weighing 19,500 pounds or less from
          Federal excise tax on heavy trucks and trailers.
Sec. 11113. Volumetric excise tax credit for alternative fuels.

                      Part 2--Aquatic excise taxes

Sec. 11115. Elimination of Aquatic Resources Trust Fund and
          transformation of Sport Fish Restoration Account.
Sec. 11116. Repeal of harbor maintenance tax on exports.
Sec. 11117. Cap on excise tax on certain fishing equipment.

                       Part 3--Aerial excise taxes

Sec. 11121. Clarification of excise tax exemptions for agricultural
          aerial applicators and exemption for Fixed-Wing aircraft
          engaged in forestry operations.
Sec. 11122. Modification of rural airport definition.
Sec. 11123. Exemption from taxes on transportation provided by
          seaplanes.
Sec. 11124. Certain sightseeing flights exempt from taxes on air
          transportation.

                    Part 4--Taxes relating to alcohol

Sec. 11125. Repeal of special occupational taxes on producers and
          marketers of alcoholic beverages.
Sec. 11126. Income tax credit for distilled spirits wholesalers and for
          distilled spirits in control State bailment warehouses for
          costs of carrying Federal excise taxes on bottled distilled
          spirits.
Sec. 11127. Quarterly excise tax filing for small alcohol excise
          taxpayers.

                       Part 5--Sport excise taxes

Sec. 11131. Custom gunsmiths.

                  Subtitle C--Miscellaneous Provisions

Sec. 11141. Motor Fuel Tax Enforcement Advisory Commission.
Sec. 11142. National Surface Transportation Infrastructure Financing
          Commission.
Sec. 11143. Tax-exempt financing of highway projects and rail-truck
          transfer facilities.
Sec. 11144. Treasury study of highway fuels used by trucks for non-
          transportation purposes.
Sec. 11145. Diesel fuel tax evasion report.
Sec. 11146. Tax treatment of State ownership of railroad real estate
          investment trust.
Sec. 11147. Limitation on transfers to the Leaking Underground Storage
          Tank Trust Fund.

            Subtitle D--Highway-Related Technical Corrections

Sec. 11151. Highway-related technical corrections.

                    Subtitle E--Preventing Fuel Fraud

Sec. 11161. Treatment of kerosene for use in aviation.
Sec. 11162. Repeal of ultimate vendor refund claims with respect to
          farming.
Sec. 11163. Refunds of excise taxes on exempt sales of fuel by credit
          card.
Sec. 11164. Reregistration in event of change in ownership.
Sec. 11165. Reconciliation of on-loaded cargo to entered cargo.
Sec. 11166. Treatment of deep-draft vessels.
Sec. 11167. Penalty with respect to certain adulterated fuels.

SEC. 2. GENERAL DEFINITIONS.

    In this Act, the following definitions apply:
        (1) Department.--The term ``Department'' means the Department
    of Transportation.
        (2) Secretary.--The term ``Secretary'' means the Secretary of
    Transportation.

                     TITLE I--FEDERAL-AID HIGHWAYS
                 Subtitle A--Authorization of Programs

SEC. 1101. AUTHORIZATION OF APPROPRIATIONS.

    (a) In General.--The following sums are authorized to be
appropriated out of the Highway Trust Fund (other than the Mass Transit
Account):
        (1) Interstate maintenance program.--For the Interstate
    maintenance program under section 119 of title 23, United States
    Code--
            (A) $4,883,759,623 for fiscal year 2005;
            (B) $4,960,788,917 for fiscal year 2006;
            (C) $5,039,058,556 for fiscal year 2007;
            (D) $5,118,588,513 for fiscal year 2008; and
            (E) $5,199,399,081 for fiscal year 2009.
        (2) National highway system.--For the National Highway System
    under section 103 of such title--
            (A) $5,911,200,104 for fiscal year 2005;
            (B) $6,005,256,569 for fiscal year 2006;
            (C) $6,110,827,556 for fiscal year 2007;
            (D) $6,207,937,450 for fiscal year 2008; and
            (E) $6,306,611,031 for fiscal year 2009.
        (3) Bridge program.--For the bridge program under section 144
    of such title--
            (A) $4,187,708,821 for fiscal year 2005;
            (B) $4,253,530,131 for fiscal year 2006;
            (C) $4,320,411,313 for fiscal year 2007;
            (D) $4,388,369,431 for fiscal year 2008; and
            (E) $4,457,421,829 for fiscal year 2009.
        (4) Surface transportation program.--For the surface
    transportation program under section 133 of such title--
            (A) $6,860,096,662 for fiscal year 2005;
            (B) $6,269,833,394 for fiscal year 2006;
            (C) $6,370,469,775 for fiscal year 2007;
            (D) $6,472,726,628 for fiscal year 2008; and
            (E) $6,576,630,046 for fiscal year 2009.
        (5) Congestion mitigation and air quality improvement
    program.--For the congestion mitigation and air quality improvement
    program under section 149 of such title--
            (A) $1,667,255,304 for fiscal year 2005;
            (B) $1,694,101,866 for fiscal year 2006;
            (C) $1,721,380,718 for fiscal year 2007;
            (D) $1,749,098,821 for fiscal year 2008; and
            (E) $1,777,263,247 for fiscal year 2009.
        (6) Highway safety improvement program.--For the highway safety
    improvement program under section 148 of such title--
            (A) $1,235,810,000 for fiscal year 2006;
            (B) $1,255,709,322 for fiscal year 2007;
            (C) $1,275,929,067 for fiscal year 2008; and
            (D) $1,296,474,396 for fiscal year 2009.
        (7) Appalachian development highway system program.--For the
    Appalachian development highway system program under subtitle IV of
    title 40, United States Code, $470,000,000 for each of fiscal years
    2005 through 2009.
        (8) Recreational trails program.--For the recreational trails
    program under section 206 of title 23, United States Code--
            (A) $60,000,000 for fiscal year 2005;
            (B) $70,000,000 for fiscal year 2006;
            (C) $75,000,000 for fiscal year 2007;
            (D) $80,000,000 for fiscal year 2008; and
            (E) $85,000,000 for fiscal year 2009.
        (9) Federal lands highways program.--
            (A) Indian reservation roads.--For Indian reservation roads
        under section 204 of such title--
                (i) $300,000,000 for fiscal year 2005;
                (ii) $330,000,000 for fiscal year 2006;
                (iii) $370,000,000 for fiscal year 2007;
                (iv) $410,000,000 for fiscal year 2008; and
                (v) $450,000,000 for fiscal year 2009.
            (B) Park roads and parkways.--
                (i) In general.--For park roads and parkways under
            section 204 of such title--

                    (I) $180,000,000 for fiscal year 2005;
                    (II) $195,000,000 for fiscal year 2006;
                    (III) $210,000,000 for fiscal year 2007;
                    (IV) $225,000,000 for fiscal year 2008; and
                    (V) $240,000,000 for fiscal year 2009.

                (ii) Minimum allocation to certain states.--A State
            containing more than 50 percent of the total acreage of the
            National Park System shall receive not less than 3 percent
            of any funds appropriated under this subparagraph.
            (C) Refuge roads.--For refuge roads under section 204 of
        such title, $29,000,000 for each of fiscal years 2005 through
        2009.
            (D) Public lands highways.--For Federal lands highways
        under section 204 of such title--
                (i) $260,000,000 for fiscal year 2005;
                (ii) $280,000,000 for fiscal year 2006;
                (iii) $280,000,000 for fiscal year 2007;
                (iv) $290,000,000 for fiscal year 2008; and
                (v) $300,000,000 for fiscal year 2009.
        (10) National corridor infrastructure improvement program.--For
    the national corridor infrastructure improvement program under
    section 1302 of this Act--
            (A) $194,800,000 for fiscal year 2005;
            (B) $389,600,000 for fiscal year 2006;
            (C) $487,000,000 for fiscal year 2007;
            (D) $487,000,000 for fiscal year 2008; and
            (E) $389,600,000 for fiscal year 2009.
        (11) Coordinated border infrastructure program.--For the
    coordinated border infrastructure program under section 1303 of
    this Act--
            (A) $123,000,000 for fiscal year 2005;
            (B) $145,000,000 for fiscal year 2006;
            (C) $165,000,000 for fiscal year 2007;
            (D) $190,000,000 for fiscal year 2008; and
            (E) $210,000,000 for fiscal year 2009.
        (12) National scenic byways program.--For the national scenic
    byways program under section 162 of such title--
            (A) $26,500,000 for fiscal year 2005;
            (B) $30,000,000 for fiscal year 2006;
            (C) $35,000,000 for fiscal year 2007;
            (D) $40,000,000 for fiscal year 2008; and
            (E) $43,500,000 for fiscal year 2009.
        (13) Construction of ferry boats and ferry terminal
    facilities.--For construction of ferry boats and ferry terminal
    facilities under section 147 of such title--
            (A) $38,000,000 for fiscal year 2005;
            (B) $55,000,000 for fiscal year 2006;
            (C) $60,000,000 for fiscal year 2007;
            (D) $65,000,000 for fiscal year 2008; and
            (E) $67,000,000 for fiscal year 2009.
        (14) Puerto rico highway program.--For the Puerto Rico highway
    program under section 165 of such title--
            (A) $115,000,000 for fiscal year 2005;
            (B) $120,000,000 for fiscal year 2006;
            (C) $135,000,000 for fiscal year 2007;
            (D) $145,000,000 for fiscal year 2008; and
            (E) $150,000,000 for fiscal year 2009.
        (15) Projects of national and regional significance program.--
    For the projects of national and regional significance program
    under section 1301 of this Act--
            (A) $177,900,000 for fiscal year 2005;
            (B) $355,800,000 for fiscal year 2006;
            (C) $444,750,000 for fiscal year 2007;
            (D) $444,750,000 for fiscal year 2008; and
            (E) $355,800,000 for fiscal year 2009.
        (16) High priority projects program.--For the high priority
    projects program under section 117 of title 23, United States Code,
    $2,966,400,000 for each of fiscal years 2005 through 2009.
        (17) Safe routes to school program.--For the safe routes to
    school program under section 1404 of this Act--
            (A) $54,000,000 for fiscal year 2005;
            (B) $100,000,000 for fiscal year 2006;
            (C) $125,000,000 for fiscal year 2007;
            (D) $150,000,000 for fiscal year 2008; and
            (E) $183,000,000 for fiscal year 2009.
        (18) Deployment of magnetic levitation transportation
    projects.--For the deployment of magnetic levitation projects under
    section 1307 of this Act--
            (A) $15,000,000 for each of fiscal years 2006 and 2007; and
            (B) $30,000,000 for each of fiscal years 2008 and 2009.
        (19) National corridor planning and development and coordinated
    border infrastructure programs.--For the national corridor planning
    and development and coordinated border infrastructure programs
    under sections 1118 and 1119 of the Transportation Equity Act for
    the 21st Century (112 Stat. 161, 163) $140,000,000 for fiscal year
    2005.
        (20) Highways for life.--For the Highways for LIFE Program
    under section 1502 of this Act--
            (A) $15,000,000 for fiscal year 2006; and
            (B) $20,000,000 for each of fiscal years 2007 through 2009.
        (21) Highway use tax evasion projects.--For highway use tax
    evasion projects under section 1115 of this Act--
            (A) $5,000,000 for fiscal year 2005;
            (B) $44,800,000 for fiscal year 2006;
            (C) $53,300,000 for fiscal year 2007; and
            (D) $12,000,000 for each of fiscal years 2008 and 2009.
    (b) Disadvantaged Business Enterprises.--
        (1) Definitions.--In this subsection, the following definitions
    apply:
            (A) Small business concern.--The term ``small business
        concern'' has the meaning that term has under section 3 of the
        Small Business Act (15 U.S.C. 632), except that the term shall
        not include any concern or group of concerns controlled by the
        same socially and economically disadvantaged individual or
        individuals which has average annual gross receipts over the
        preceding 3 fiscal years in excess of $19,570,000, as adjusted
        annually by the Secretary for inflation.
            (B) Socially and economically disadvantaged individuals.--
        The term ``socially and economically disadvantaged
        individuals'' has the meaning that term has under section 8(d)
        of the Small Business Act (15 U.S.C. 637(d)) and relevant
        subcontracting regulations issued pursuant to that Act, except
        that women shall be presumed to be socially and economically
        disadvantaged individuals for purposes of this subsection.
        (2) General rule.--Except to the extent that the Secretary
    determines otherwise, not less than 10 percent of the amounts made
    available for any program under titles I, III, and V of this Act
    and section 403 of title 23, United States Code, shall be expended
    through small business concerns owned and controlled by socially
    and economically disadvantaged individuals.
        (3) Annual listing of disadvantaged business enterprises.--Each
    State shall annually--
            (A) survey and compile a list of the small business
        concerns referred to in paragraph (1) and the location of the
        concerns in the State; and
            (B) notify the Secretary, in writing, of the percentage of
        the concerns that are controlled by women, by socially and
        economically disadvantaged individuals (other than women), and
        by individuals who are women and are otherwise socially and
        economically disadvantaged individuals.
        (4) Uniform certification.--The Secretary shall establish
    minimum uniform criteria for State governments to use in certifying
    whether a concern qualifies for purposes of this subsection. The
    minimum uniform criteria shall include, but not be limited to, on-
    site visits, personal interviews, licenses, analysis of stock
    ownership, listing of equipment, analysis of bonding capacity,
    listing of work completed, resume of principal owners, financial
    capacity, and type of work preferred.
        (5) Compliance with court orders.--Nothing in this subsection
    limits the eligibility of an entity or person to receive funds made
    available under titles I, III, and V of this Act and section 403 of
    title 23, United States Code, if the entity or person is prevented,
    in whole or in part, from complying with paragraph (1) because a
    Federal court issues a final order in which the court finds that
    the requirement of paragraph (1), or the program established under
    paragraph (1), is unconstitutional.

SEC. 1102. OBLIGATION CEILING.

    (a) General Limitation.--Subject to subsections (g) and (h), and
notwithstanding any other provision of law, the obligations for
Federal-aid highway and highway safety construction programs shall not
exceed--
        (1) $34,422,400,000 for fiscal year 2005;
        (2) $36,032,343,903 for fiscal year 2006;
        (3) $38,244,210,516 for fiscal year 2007;
        (4) $39,585,075,404 for fiscal year 2008; and
        (5) $41,199,970,178 for fiscal year 2009.
    (b) Exceptions.--The limitations under subsection (a) shall not
apply to obligations under or for--
        (1) section 125 of title 23, United States Code;
        (2) section 147 of the Surface Transportation Assistance Act of
    1978 (23 U.S.C. 144 note; 92 Stat. 2714);
        (3) section 9 of the Federal-Aid Highway Act of 1981 (Public
    Law 97-134; 95 Stat. 1701);
        (4) subsections (b) and (j) of section 131 of the Surface
    Transportation Assistance Act of 1982 (Public Law 97-424; 96 Stat.
    2119);
        (5) subsections (b) and (c) of section 149 of the Surface
    Transportation and Uniform Relocation Assistance Act of 1987
    (Public Law 100-17; 101 Stat. 198);
        (6) sections 1103 through 1108 of the Intermodal Surface
    Transportation Efficiency Act of 1991 (Public Law 102-240; 105
    Stat. 2027);
        (7) section 157 of title 23, United States Code (as in effect
    on June 8, 1998);
        (8) section 105 of title 23, United States Code (as in effect
    for fiscal years 1998 through 2004, but only in an amount equal to
    $639,000,000 for each of those fiscal years);
        (9) Federal-aid highway programs for which obligation authority
    was made available under the Transportation Equity Act for the 21st
    Century (Public Law 105-178; 112 Stat. 107) or subsequent public
    laws for multiple years or to remain available until used, but only
    to the extent that the obligation authority has not lapsed or been
    used;
        (10) section 105 of title 23, United States Code (but, for each
    of fiscal years 2005 through 2009, only in an amount equal to
    $639,000,000 per fiscal year); and
        (11) section 1603 of this Act, to the extent that funds
    obligated in accordance with that section were not subject to a
    limitation on obligations at the time at which the funds were
    initially made available for obligation.
    (c) Distribution of Obligation Authority.--For each of fiscal years
2005 through 2009, the Secretary--
        (1) shall not distribute obligation authority provided by
    subsection (a) for the fiscal year for--
            (A) amounts authorized for administrative expenses and
        programs by section 104(a) of title 23, United States Code;
            (B) programs funded from the administrative takedown
        authorized by section 104(a)(1) of title 23, United States Code
        (as in effect on the date before the date of enactment of this
        Act); and
            (C) amounts authorized for the highway use tax evasion
        program and the Bureau of Transportation Statistics;
        (2) shall not distribute an amount of obligation authority
    provided by subsection (a) that is equal to the unobligated balance
    of amounts made available from the Highway Trust Fund (other than
    the Mass Transit Account) for Federal-aid highway and highway
    safety programs for previous fiscal years the funds for which are
    allocated by the Secretary;
        (3) shall determine the ratio that--
            (A) the obligation authority provided by subsection (a) for
        the fiscal year, less the aggregate of amounts not distributed
        under paragraphs (1) and (2); bears to
            (B) the total of the sums authorized to be appropriated for
        the Federal-aid highway and highway safety construction
        programs (other than sums authorized to be appropriated for
        provisions of law described in paragraphs (1) through (9) of
        subsection (b) and sums authorized to be appropriated for
        section 105 of title 23, United States Code, equal to the
        amount referred to in subsection (b)(10) for the fiscal year),
        less the aggregate of the amounts not distributed under
        paragraphs (1) and (2);
        (4)(A) shall distribute the obligation authority provided by
    subsection (a) less the aggregate amounts not distributed under
    paragraphs (1) and (2), for sections 1301, 1302, and 1934 of this
    Act, sections 117 but individually for each of project numbered 1
    through 3676 listed in the table contained in section 1702 of this
    Act and 144(g) of title 23, United States Code, and section 14501
    of title 40, United States Code, and, during fiscal year 2005,
    amounts for programs, projects, and activities authorized by
    section 117 of title I of division H of the Consolidated
    Appropriations Act, 2005 (Public Law 108-447; 118 Stat. 3212), so
    that the amount of obligation authority available for each of such
    sections is equal to the amount determined by multiplying--
            (i) the ratio determined under paragraph (3); by
            (ii) the sums authorized to be appropriated for that
        section for the fiscal year; and
        (B) shall distribute $2,000,000,000 for section 105 of title
    23, United States Code;
        (5) shall distribute among the States the obligation authority
    provided by subsection (a), less the aggregate amounts not
    distributed under paragraphs (1) and (2), for each of the programs
    that are allocated by the Secretary under this Act and title 23,
    United States Code (other than to programs to which paragraph (1)
    applies), by multiplying--
            (A) the ratio determined under paragraph (3); by
            (B) the amounts authorized to be appropriated for each such
        program for the fiscal year; and
        (6) shall distribute the obligation authority provided by
    subsection (a), less the aggregate amounts not distributed under
    paragraphs (1) and (2) and the amounts distributed under paragraphs
    (4) and (5), for Federal-aid highway and highway safety
    construction programs (other than the amounts apportioned for the
    equity bonus program, but only to the extent that the amounts
    apportioned for the equity bonus program for the fiscal year are
    greater than $2,639,000,000, and the Appalachian development
    highway system program) that are apportioned by the Secretary under
    this Act and title 23, United States Code, in the ratio that--
            (A) amounts authorized to be appropriated for the programs
        that are apportioned to each State for the fiscal year; bear to
            (B) the total of the amounts authorized to be appropriated
        for the programs that are apportioned to all States for the
        fiscal year.
    (d) Redistribution of Unused Obligation Authority.--Notwithstanding
subsection (c), the Secretary shall, after August 1 of each of fiscal
years 2005 through 2009--
        (1) revise a distribution of the obligation authority made
    available under subsection (c) if an amount distributed cannot be
    obligated during that fiscal year; and
        (2) redistribute sufficient amounts to those States able to
    obligate amounts in addition to those previously distributed during
    that fiscal year, giving priority to those States having large
    unobligated balances of funds apportioned under sections 104 and
    144 of title 23, United States Code.
    (e) Applicability of Obligation Limitations to Transportation
Research Programs.--
        (1) In general.--Except as provided in paragraph (2),
    obligation limitations imposed by subsection (a) shall apply to
    contract authority for transportation research programs carried out
    under--
            (A) chapter 5 of title 23, United States Code; and
            (B) title V (research title) of this Act.
        (2) Exception.--Obligation authority made available under
    paragraph (1) shall--
            (A) remain available for a period of 3 fiscal years; and
            (B) be in addition to the amount of any limitation imposed
        on obligations for Federal-aid highway and highway safety
        construction programs for future fiscal years.
    (f) Redistribution of Certain Authorized Funds.--
        (1) In general.--Not later than 30 days after the date of
    distribution of obligation authority under subsection (c) for each
    of fiscal years 2005 through 2009, the Secretary shall distribute
    to the States any funds that--
            (A) are authorized to be appropriated for the fiscal year
        for Federal-aid highway programs; and
            (B) the Secretary determines will not be allocated to the
        States, and will not be available for obligation, in the fiscal
        year due to the imposition of any obligation limitation for the
        fiscal year.
        (2) Ratio.--Funds shall be distributed under paragraph (1) in
    the same ratio as the distribution of obligation authority under
    subsection (c)(6).
        (3) Availability.--Funds distributed under paragraph (1) shall
    be available for any purpose described in section 133(b) of title
    23, United States Code.
    (g) Special Limitation Characteristics.--Obligation authority
distributed for a fiscal year under subsection (c)(4) for the provision
specified in subsection (c)(4) shall--
        (1) remain available until used for obligation of funds for
    that provision; and
        (2) be in addition to the amount of any limitation imposed on
    obligations for Federal-aid highway and highway safety construction
    programs for future fiscal years.
    (h) Adjustment in Obligation Limit.--
        (1) In general.--Subject to the last sentence of section
    110(a)(2) of title 23, United States Code, a limitation on
    obligations imposed by subsection (a) for a fiscal year shall be
    adjusted by an amount equal to the amount determined in accordance
    with section 251(b)(1)(B) of the Balanced Budget and Emergency
    Deficit Control Act of 1985 (2 U.S.C. 901(b)(1)(B)) for the fiscal
    year.
        (2) Distribution.--An adjustment under paragraph (1) shall be
    distributed in accordance with this section.
    (i) Special Rule for Fiscal Year 2005.--
        (1) In general.--Obligation authority distributed under
    subsection (c)(4) for fiscal year 2005 for sections 1301, 1302, and
    1934 of this Act and sections 117 and 144(g) of title 23, United
    States Code, may be used in fiscal year 2005 for purposes of
    obligation authority distributed under subsection (c)(6).
        (2) Restoration.--Obligation authority used as described in
    paragraph (1) shall be restored to the original purpose on the date
    on which obligation authority is distributed under this section for
    fiscal year 2006.
    (j) High Priority Project Flexibility.--
        (1) In general.--Subject to paragraph (2), obligation authority
    distributed for a fiscal year under subsection (c)(4) for each
    project numbered 1 through 3676 listed in the table contained in
    section 1702 of this Act may be obligated for any other project in
    such section in the same State.
        (2) Restoration.--Obligation authority used as described in
    paragraph (1) shall be restored to the original purpose on the date
    on which obligation authority is distributed under this section for
    the next fiscal year following obligation under paragraph (1).
    (k) Limitation on Statutory Construction.--Nothing in this section
shall be construed to limit the distribution of obligation authority
under subsection (c)(4)(A) for each of the individual projects numbered
greater than 3676 listed in the table contained in section 1702 of this
Act.

SEC. 1103. APPORTIONMENTS.

    (a) Administrative Expenses.--
        (1) In general.--Section 104(a) of title 23, United States
    Code, is amended to read as follows:
    ``(a) Administrative Expenses.--
        ``(1) In general.--There are authorized to be appropriated from
    the Highway Trust Fund (other than the Mass Transit Account) to be
    made available to the Secretary for administrative expenses of the
    Federal Highway Administration--
            ``(A) $353,024,000 for fiscal year 2005;
            ``(B) $370,613,540 for fiscal year 2006;
            ``(C) $389,079,500 for fiscal year 2007;
            ``(D) $408,465,500 for fiscal year 2008; and
            ``(E) $423,717,460 for fiscal year 2009.
        ``(2) Purposes.--The funds authorized by this subsection shall
    be used--
            ``(A) to administer the provisions of law to be financed
        from appropriations for the Federal-aid highway program and
        programs authorized under chapter 2; and
            ``(B) to make transfers of such sums as the Secretary
        determines to be appropriate to the Appalachian Regional
        Commission for administrative activities associated with the
        Appalachian development highway system.
        ``(3) Availability.--The funds made available under paragraph
    (1) shall remain available until expended.''.
        (2) Conforming amendments.--Section 104 of such title is
    amended--
            (A) in the matter preceding paragraph (1) of subsection
        (b), by striking ``the deduction authorized by subsection (a)
        and the set-aside authorized by subsection (f)'' and inserting
        ``the set-asides authorized by subsections (d) and (f) and
        section 130(e)'';
            (B) in the first sentence of subsection (e)(1), by striking
        ``, and also'' and all that follows through ``this section'';
        and
            (C) in subsection (i), by striking ``deducted'' and
        inserting ``made available''.
    (b) Alaska Highway.--Section 104(b)(1)(A) of such title is amended
by striking ``$18,800,000 for each of fiscal years 1998 through 2002''
and inserting ``$30,000,000 for each of fiscal years 2005 through
2009''.
    (c) National Highway System Component.--Section 104(b)(1)(A) of
such title is amended by striking ``$36,400,000 for each fiscal year''
and inserting ``$40,000,000 for each of fiscal years 2005 and 2006 and
$50,000,000 for each of fiscal years 2007 through 2009''.
    (d)  CMAQ Apportionment.--Section 104(b)(2) of such title is
amended--
        (1) in subparagraph (B)--
            (A) by striking clause (i) and inserting the following:
                ``(i) 1.0 if, at the time of apportionment, the area is
            a maintenance area;'';
            (B) by striking ``or'' at the end of clause (vi);
            (C) by striking the period at the end of clause (vii) and
        inserting ``; or''; and
            (D) by adding at the end the following:
                ``(viii) 1.0 if, at the time of apportionment, an area
            is designated as nonattainment for ozone under subpart 1 of
            part D of title I of such Act (42 U.S.C. 7512 et seq.).'';
            and
        (2) by striking subparagraph (C) and inserting the following:
            ``(C) Additional adjustment for carbon monoxide areas.--If,
        in addition to being designated as a nonattainment or
        maintenance area for ozone as described in section 149(b), any
        county within the area was also classified under subpart 3 of
        part D of title I of the Clean Air Act (42 U.S.C. 7512 et seq.)
        as a nonattainment or maintenance area described in section
        149(b) for carbon monoxide, the weighted nonattainment or
        maintenance area population of the county, as determined under
        clauses (i) through (vi) or clause (viii) of subparagraph (B),
        shall be further multiplied by a factor of 1.2.''.
    (e) Report.--Section 104(j) of such title is amended by striking
``submit to Congress a report'' and inserting ``submit to Congress a
report, and also make such report available to the public in a user-
friendly format via the Internet,''.
    (f) Operation Lifesaver.--Section 104(d) of such title is amended--
        (1) by striking paragraph (1) and all that follows through the
    period at the end of paragraph (2)(A) and inserting the following:
        ``(1) Operation lifesaver.--To carry out a public information
    and education program to help prevent and reduce motor vehicle
    accidents, injuries, and fatalities and to improve driver
    performance at railway-highway crossings--
            ``(A) before making an apportionment under subsection
        (b)(3) for fiscal year 2005, the Secretary shall set aside
        $560,000 for such fiscal year; and
            ``(B) there is authorized to be appropriated from the
        Highway Trust Fund (other than the Mass Transit Account)
        $560,000 for each of fiscal years 2006 through 2009.
        ``(2) Railway-highway crossing hazard elimination in high speed
    rail corridors.--
            ``(A) Funding.--To carry out the elimination of hazards at
        railway-highway crossings--
                ``(i) before making an apportionment under subsection
            (b)(3) for fiscal year 2005, the Secretary shall set aside
            $5,250,000 for such fiscal year; and
                ``(ii) there is authorized to be appropriated from the
            Highway Trust Fund (other than the Mass Transit Account)
            $7,250,000 for fiscal year 2006, $10,000,000 for fiscal
            year 2007, $12,500,000 for fiscal year 2008, and
            $15,000,000 for fiscal year 2009.''; and
        (2) in paragraph (2)(E)--
            (A) by striking ``Not less than $250,000 of such set-
        aside'' and inserting ``Of such set-aside, not less than
        $250,000 for fiscal year 2005, $1,000,000 for fiscal year 2006,
        $1,750,000 for fiscal year 2007, $2,250,000 for fiscal year
        2008, and $3,000,000 for fiscal year 2009''; and
            (B) by striking ``per fiscal year''.

SEC. 1104. EQUITY BONUS PROGRAM.

    (a) In General.--Section 105 of title 23, United States Code, is
amended to read as follows:

``Sec. 105. Equity bonus program

    ``(a) Program.--
        ``(1) In general.--Subject to subsections (c) and (d), for each
    of fiscal years 2005 through 2009, the Secretary shall allocate
    among the States amounts sufficient to ensure that no State
    receives a percentage of the total apportionments for the fiscal
    year for the programs specified in paragraph (2) that is less than
    the percentage calculated under subsection (b).
        ``(2) Specific programs.--The programs referred to in
    subsection (a) are--
            ``(A) the Interstate maintenance program under section 119;
            ``(B) the national highway system program under section
        103;
            ``(C) the highway bridge replacement and rehabilitation
        program under section 144;
            ``(D) the surface transportation program under section 133;
            ``(E) the highway safety improvement program under section
        148;
            ``(F) the congestion mitigation and air quality improvement
        program under section 149;
            ``(G) metropolitan planning programs under section 104(f);
            ``(H) the high priority projects program under section 117;
            ``(I) the equity bonus program under this section;
            ``(J) the Appalachian development highway system program
        under subtitle IV of title 40;
            ``(K) the recreational trails program under section 206;
            ``(L) the safe routes to school program under section 1404
        of the SAFETEA-LU;
            ``(M) the rail-highway grade crossing program under section
        130; and
            ``(N) the coordinated border infrastructure program under
        section 1303 of the SAFETEA-LU.
    ``(b) State Percentage.--
        ``(1) In general.--The percentage referred to in subsection (a)
    for each State shall be--
            ``(A) for each of fiscal years 2005 and 2006, 90.5 percent,
        for fiscal year 2007, 91.5 percent, and for each of fiscal
        years 2008 and 2009, 92 percent, of the quotient obtained by
        dividing--
                ``(i) the estimated tax payments attributable to
            highway users in the State paid into the Highway Trust Fund
            (other than the Mass Transit Account) in the most recent
            fiscal year for which data are available; by
                ``(ii) the estimated tax payments attributable to
            highway users in all States paid into the Highway Trust
            Fund (other than the Mass Transit Account) for the fiscal
            year; or
            ``(B) for a State with a total population density of less
        than 40 persons per square mile (as reported in the decennial
        census conducted by the Federal Government in 2000) and of
        which at least 1.25 percent of the total acreage is under
        Federal jurisdiction, based on the report of the General
        Services Administration entitled `Federal Real Property
        Profile' and dated September 30, 2004, a State with a total
        population of less than 1,000,000 (as reported in that
        decennial census), a State with a median household income of
        less than $35,000 (as reported in that decennial census), a
        State with a fatality rate during 2002 on Interstate highways
        that is greater than one fatality for each 100,000,000 vehicle
        miles traveled on Interstate highways, or a State with an
        indexed, State motor fuels excise tax rate higher than 150
        percent of the Federal motor fuels excise tax rate as of the
        date of enactment of the SAFETEA-LU, the greater of--
                ``(i) the applicable percentage under subparagraph (A);
            or
                ``(ii) the average percentage of the State's share of
            total apportionments for the period of fiscal years 1998
            through 2003 for the programs specified in paragraph (2).
        ``(2) Specific programs.--The programs referred to in paragraph
    (1)(B)(ii) are (as in effect on the day before the date of
    enactment of the SAFETEA-LU)--
            ``(A) the Interstate maintenance program under section 119;
            ``(B) the national highway system program under section
        103;
            ``(C) the highway bridge replacement and rehabilitation
        program under section 144;
            ``(D) the surface transportation program under section 133;
            ``(E) the recreational trails program under section 206;
            ``(F) the high priority projects program under section 117;
            ``(G) the minimum guarantee provided under this section;
            ``(H) revenue aligned budget authority amounts provided
        under section 110;
            ``(I) the congestion mitigation and air quality improvement
        program under section 149;
            ``(J) the Appalachian development highway system program
        under subtitle IV of title 40; and
            ``(K) metropolitan planning programs under section 104(f).
    ``(c) Special Rules.--
        ``(1) Minimum combined allocation.--For each fiscal year,
    before making the allocations under subsection (a)(1), the
    Secretary shall allocate among the States amounts sufficient to
    ensure that no State receives a combined total of amounts allocated
    under subsection (a)(1), apportionments for the programs specified
    in subsection (a)(2), and amounts allocated under this subsection,
    that is less than the following percentages of the average for
    fiscal years 1998 through 2003 of the annual apportionments for the
    State for all programs specified in subsection (b)(2):
            ``(A) For fiscal year 2005, 117 percent.
            ``(B) For fiscal year 2006, 118 percent.
            ``(C) For fiscal year 2007, 119 percent.
            ``(D) For fiscal year 2008, 120 percent.
            ``(E) For fiscal year 2009, 121 percent.
        ``(2) No negative adjustment.--No negative adjustment shall be
    made under subsection (a)(1) to the apportionment of any State.
    ``(d) Treatment of Funds.--
        ``(1) Programmatic distribution.--The Secretary shall apportion
    the amounts made available under this section that exceed
    $2,639,000,000 so that the amount apportioned to each State under
    this paragraph for each program referred to in subparagraphs (A)
    through (F) of subsection (a)(2) is equal to the amount determined
    by multiplying the amount to be apportioned under this paragraph by
    the ratio that--
            ``(A) the amount of funds apportioned to each State for
        each program referred to in subparagraphs (A) through (F) of
        subsection (a)(2) for a fiscal year; bears to
            ``(B) the total amount of funds apportioned to such State
        for all such programs for such fiscal year.
        ``(2) Remaining distribution.--The Secretary shall administer
    the remainder of funds made available under this section to the
    States in accordance with section 104(b)(3), except that paragraphs
    (1) through (3) of section 133(d) shall not apply to amounts
    administered pursuant to this paragraph.
    ``(e) Metro Planning Set Aside.--Notwithstanding section 104(f), no
set aside provided for under that section shall apply to funds
allocated under this section.
    ``(f) Authorization of Appropriations.--There are authorized to be
appropriated from the Highway Trust Fund (other than the Mass Transit
Account) such sums as are necessary to carry out this section for each
of fiscal years 2005 through 2009.''.
    (b) Clerical Amendment.--The analysis for subchapter I of chapter 1
of such title is amended by striking the item relating to section 105
and inserting the following:

``105. Equity bonus program.''.

SEC. 1105. REVENUE ALIGNED BUDGET AUTHORITY.

    (a) Allocation.--Section 110(a)(1) of title 23, United States Code,
is amended--
        (1) by striking ``2000'' and inserting ``2007'';
        (2) by inserting after ``such fiscal year'' the first place it
    appears: ``and the succeeding fiscal year''.
    (b) Reduction.--Section 110(a)(2) of such title is amended--
        (1) by striking ``2000'' and inserting ``2007'';
        (2) by striking ``October 1 of the succeeding'' and inserting
    ``October 15 of such'';
        (3) by inserting after ``Account)'' the following: ``for such
    fiscal year and the succeeding fiscal year''; and
        (4) by adding at the end the following: ``No reduction under
    this paragraph and no reduction under section 1102(h), and no
    reduction under title VIII or any amendment made by title VIII, of
    the SAFETEA-LU shall be made for a fiscal year if, as of October 1
    of such fiscal year the balance in the Highway Trust Fund (other
    than the Mass Transit Account) exceeds $6,000,000,000.''.
    (c) General Distribution.--Section 110(b)(1)(A) of such title is
amended--
        (1) by striking ``minimum guarantee'' and inserting ``equity
    bonus''; and
        (2) by striking ``Transportation Equity Act for the 21st
    Century'' and inserting ``SAFETEA-LU''.
    (d) Addition of Highway Safety Improvement Program.--Section 110(c)
of such title is amended by inserting ``the highway safety improvement
program,'' after ``the surface transportation program,''.
    (e) Technical Amendment.--Section 110(b)(1)(A) of such title is
amended by striking ``for'' the second place it appears.
    (f) Special Rule.--If the amount available pursuant to section 110
of title 23, United States Code, for fiscal year 2007 is greater than
zero, the Secretary shall--
        (1) determine the total amount necessary to increase each
    State's rate of return (as determined under section 105(b)(1)(A) of
    title 23, United States Code) to 92 percent, excluding amounts
    provided under this paragraph;
        (2) allocate to each State the lesser of--
            (A) the amount computed for that State under paragraph (1);
        or
            (B) an amount determined by multiplying the total amount
        calculated under section 110 of title 23, United States Code,
        for fiscal year 2007 by the ratio that--
                (i) the amount determined for such State under
            paragraph (1); bears to
                (ii) the total amount computed for all States in
            paragraph (1); and
        (3) allocate amounts remaining in excess of the amounts
    allocated in paragraph (2) to all States in accordance with section
    110 of title 23, United States Code.

SEC. 1106. FUTURE INTERSTATE SYSTEM ROUTES.

    (a) Extension of Date.--Section 103(c)(4)(B)(ii) of title 23,
United States Code, is amended by striking ``12'' and inserting ``25''.
    (b) Removal of Designation.--Section 103(c)(4)(B)(iii) of such
title is amended--
        (1) in subclause (I) by striking ``in the agreement between the
    Secretary and the State or States''; and
        (2) by adding at the end the following:

                    ``(III) Existing agreements.--An agreement
                described in clause (ii) that is entered into before
                the date of enactment of this subclause shall be deemed
                to include the 25-year time limitation described in
                that clause, regardless of any earlier construction
                completion date in the agreement.''.

SEC. 1107. METROPOLITAN PLANNING.

    Section 104(f) of title 23, United States Code, is amended--
        (1) by striking paragraph (1) and inserting the following:
        ``(1) Set-aside.--On October 1 of each fiscal year, the
    Secretary shall set aside 1.25 percent of the funds authorized to
    be appropriated for the Interstate maintenance, national highway
    system, surface transportation, congestion mitigation and air
    quality improvement, and highway bridge replacement and
    rehabilitation programs authorized under this title to carry out
    the requirements of section 134.'';
        (2) in paragraph (2) by striking ``per centum'' and inserting
    ``percent'';
        (3) in paragraph (3)--
            (A) by striking ``The funds'' and inserting the following:
            ``(A) In general.--The funds''; and
            (B) by striking ``These funds'' and all that follows and
        inserting the following:
            ``(B) Unused funds.--Any funds that are not used to carry
        out section 134 may be made available by a metropolitan
        planning organization to the State to fund activities under
        section 135.''; and
        (4) in paragraph (4)--
            (A) by striking ``The distribution'' and inserting the
        following:
            ``(A) In general.--The distribution''; and
            (B) by adding at the end the following:
            ``(B) Reimbursement.--Not later than 30 days after the date
        of receipt by a State of a request for reimbursement of
        expenditures made by a metropolitan planning organization for
        carrying out section 134, the State shall reimburse, from funds
        distributed under this paragraph to the metropolitan planning
        organization by the State, the metropolitan planning
        organization for those expenditures.''.

SEC. 1108. TRANSFER OF HIGHWAY AND TRANSIT FUNDS.

    Section 104(k) of title 23, United States Code, is amended to read
as follows:
    ``(k) Transfer of Highway and Transit Funds.--
        ``(1) Transfer of highway funds for transit projects.--
            ``(A) In general.--Subject to subparagraph (B), funds made
        available for transit projects or transportation planning under
        this title may be transferred to and administered by the
        Secretary in accordance with chapter 53 of title 49.
            ``(B) Non-federal share.--The provisions of this title
        relating to the non-Federal share shall apply to the funds
        transferred under subparagraph (A).
        ``(2) Transfer of transit funds for highway projects.--
            ``(A) In general.--Subject to subparagraph (B), funds made
        available for highway projects or transportation planning under
        chapter 53 of title 49 may be transferred to and administered
        by the Secretary in accordance with this title.
            ``(B) Non-federal share.--The provisions of chapter 53 of
        title 49 relating to the non-Federal share shall apply to funds
        transferred under subparagraph (A).
        ``(3) Transfer of funds among states or to federal highway
    administration.--
            ``(A) In general.--Subject to subparagraphs (B) and (C),
        the Secretary may, at the request of a State, transfer funds
        apportioned or allocated under this title to the State to
        another State, or to the Federal Highway Administration, for
        the purpose of funding one or more projects that are eligible
        for assistance with funds so apportioned or allocated.
            ``(B) Apportionment.--The transfer shall have no effect on
        any apportionment of funds to a State under this section or
        section 105 or 144.
            ``(C) Surface transportation program.--Funds that are
        apportioned or allocated to a State under subsection (b)(3) and
        attributed to an urbanized area of a State with a population of
        over 200,000 individuals under section 133(d)(3) may be
        transferred under this paragraph only if the metropolitan
        planning organization designated for the area concurs, in
        writing, with the transfer request.
        ``(4) Transfer of obligation authority.--Obligation authority
    for funds transferred under this subsection shall be transferred in
    the same manner and amount as the funds for the projects that are
    transferred under this subsection.''.

SEC. 1109. RECREATIONAL TRAILS.

    (a) Recreational Trails Program Formula.--Section 104(h) of title
23, United States Code, is amended--
        (1) in paragraph (1) by striking the first sentence and
    inserting the following: ``Before apportioning sums authorized to
    be appropriated to carry out the recreational trails program under
    section 206, the Secretary shall deduct for administrative,
    research, technical assistance, and training expenses for such
    program $840,000 for each of fiscal years 2005 through 2009.''; and
        (2) in paragraph (2) by striking ``After'' and all that follows
    through ``remainder of the sums'' and inserting ``The Secretary
    shall apportion the sums''.
    (b) Permissible Uses.--Section 206(d)(2) of such title is amended
to read as follows:
        ``(2) Permissible uses.--Permissible uses of funds apportioned
    to a State for a fiscal year to carry out this section include--
            ``(A) maintenance and restoration of existing recreational
        trails;
            ``(B) development and rehabilitation of trailside and
        trailhead facilities and trail linkages for recreational
        trails;
            ``(C) purchase and lease of recreational trail construction
        and maintenance equipment;
            ``(D) construction of new recreational trails, except that,
        in the case of new recreational trails crossing Federal lands,
        construction of the trails shall be--
                ``(i) permissible under other law;
                ``(ii) necessary and recommended by a statewide
            comprehensive outdoor recreation plan that is required by
            the Land and Water Conservation Fund Act of 1965 (16 U.S.C.
            460l-4 et seq.) and that is in effect;
                ``(iii) approved by the administering agency of the
            State designated under subsection (c)(1); and
                ``(iv) approved by each Federal agency having
            jurisdiction over the affected lands under such terms and
            conditions as the head of the Federal agency determines to
            be appropriate, except that the approval shall be
            contingent on compliance by the Federal agency with all
            applicable laws, including the National Environmental
            Policy Act of 1969 (42 U.S.C. 4321 et seq.), the Forest and
            Rangeland Renewable Resources Planning Act of 1974 (16
            U.S.C. 1600 et seq.), and the Federal Land Policy and
            Management Act of 1976 (43 U.S.C. 1701 et seq.);
            ``(E) acquisition of easements and fee simple title to
        property for recreational trails or recreational trail
        corridors;
            ``(F) assessment of trail conditions for accessibility and
        maintenance;
            ``(G) development and dissemination of publications and
        operation of educational programs to promote safety and
        environmental protection, (as those objectives relate to one or
        more of the use of recreational trails, supporting non-law
        enforcement trail safety and trail use monitoring patrol
        programs, and providing trail-related training), but in an
        amount not to exceed 5 percent of the apportionment made to the
        State for the fiscal year; and
            ``(H) payment of costs to the State incurred in
        administering the program, but in an amount not to exceed 7
        percent of the apportionment made to the State for the fiscal
        year.''.
    (c) Use of Apportionments.--Section 206(d)(3) of such title is
amended--
        (1) by striking subparagraph (C);
        (2) by redesignating subparagraph (D) as subparagraph (C); and
        (3) in subparagraph (C) (as so redesignated) by striking
    ``(2)(F)'' and inserting ``(2)(H)''.
    (d) Federal Share.--Section 206(f) of such title is amended--
        (1) in paragraph (1)--
            (A) by inserting ``and the Federal share of the
        administrative costs of a State'' after ``project''; and
            (B) by striking ``not exceed 80 percent'' and inserting
        ``be determined in accordance with section 120(b)'';
        (2) in paragraph (2)(A) by striking ``80 percent of'' and
    inserting ``the amount determined in accordance with section 120(b)
    for'';
        (3) in paragraph (2)(B) by inserting ``sponsoring the project''
    after ``Federal agency'';
        (4) by striking paragraph (5);
        (5) by redesignating paragraph (4) as paragraph (5);
        (6) in paragraph (5) (as so redesignated) by striking ``80
    percent'' and inserting ``the Federal share as determined in
    accordance with section 120(b)''; and
        (7) by inserting after paragraph (3) the following:
        ``(4) Use of recreational trails program funds to match other
    federal program funds.--Notwithstanding any other provision of law,
    funds made available under this section may be used toward the non-
    Federal matching share for other Federal program funds that are--
            ``(A) expended in accordance with the requirements of the
        Federal program relating to activities funded and populations
        served; and
            ``(B) expended on a project that is eligible for assistance
        under this section.''.
    (e) Planning and Environmental Assessment Costs Incurred Prior to
Project Approval.--Section 206(h)(1) of such title is amended by adding
at the end the following:
            ``(C) Planning and environmental assessment costs incurred
        prior to project approval.--The Secretary may allow preapproval
        planning and environmental compliance costs to be credited
        toward the non-Federal share of the cost of a project described
        in subsection (d)(2) (other than subparagraph (H)) in
        accordance with subsection (f), limited to costs incurred less
        than 18 months prior to project approval.''.
    (f) Encouragement of Use of Youth Conservation or Service Corps.--
The Secretary shall encourage the States to enter into contracts and
cooperative agreements with qualified youth conservation or service
corps to perform construction and maintenance of recreational trails
under section 206 of title 23, United States Code.

SEC. 1110. TEMPORARY TRAFFIC CONTROL DEVICES.

    (a) Standards.--Section 109(e) of title 23, United States Code, is
amended--
        (1) by striking ``(e) No funds'' and inserting the following:
    ``(e) Installation of Safety Devices.--
        ``(1) Highway and railroad grade crossings and drawbridges.--No
    funds''; and
        (2) by adding at the end the following:
        ``(2) Temporary traffic control devices.--No funds shall be
    approved for expenditure on any Federal-aid highway, or highway
    affected under chapter 2, unless proper temporary traffic control
    devices to improve safety in work zones will be installed and
    maintained during construction, utility, and maintenance operations
    on that portion of the highway with respect to which such
    expenditures are to be made. Installation and maintenance of the
    devices shall be in accordance with the Manual on Uniform Traffic
    Control Devices.''.
    (b) Letting of Contracts.--Section 112 of such title is amended--
        (1) by striking subsection (f);
        (2) by redesignating subsection (g) as subsection (f); and
        (3) by adding at the end the following:
    ``(g) Temporary Traffic Control Devices.--
        ``(1) Issuance of regulations.--The Secretary, after
    consultation with appropriate Federal and State officials, shall
    issue regulations establishing the conditions for the appropriate
    use of, and expenditure of funds for, uniformed law enforcement
    officers, positive protective measures between workers and
    motorized traffic, and installation and maintenance of temporary
    traffic control devices during construction, utility, and
    maintenance operations.
        ``(2) Effects of regulations.--Based on regulations issued
    under paragraph (1), a State shall--
            ``(A) develop separate pay items for the use of uniformed
        law enforcement officers, positive protective measures between
        workers and motorized traffic, and installation and maintenance
        of temporary traffic control devices during construction,
        utility, and maintenance operations; and
            ``(B) incorporate such pay items into contract provisions
        to be included in each contract entered into by the State with
        respect to a highway project to ensure compliance with section
        109(e)(2).
        ``(3) Limitation.--Nothing in the regulations shall prohibit a
    State from implementing standards that are more stringent than
    those required under the regulations.
        ``(4) Positive protective measures defined.--In this
    subsection, the term `positive protective measures' means temporary
    traffic barriers, crash cushions, and other strategies to avoid
    traffic accidents in work zones, including full road closures.''.
    (c) Clarification of Date.--Section 109(g) of such title is amended
in the first sentence by striking ``The Secretary'' and all that
follows through ``of 1970'' and inserting ``Not later than January 30,
1971, the Secretary shall issue''.

SEC. 1111. SET-ASIDES FOR INTERSTATE DISCRETIONARY PROJECTS.

    (a) In General.--Section 118(c)(1) of title 23, United States Code,
is amended by striking ``$50,000,000'' and all that follows through
``2003'' and inserting ``$100,000,000 for each of fiscal years 2005
through 2009''.
    (b) Technical Amendments.--
        (1) Section 116.--Section 116(b) of such title is amended by
    striking ``highway department'' and inserting ``transportation
    department''.
        (2) Section 120.--Section 120(e) of such title is amended in
    the first sentence by striking ``such system'' and inserting ``such
    highway''.
        (3) Section 127.--Section 127(a) of such title is amended by
    striking ``118(b)(1)'' and inserting ``118(b)(2)''.
        (4) Bicycle and pedestrian safety grants.--Section 1212(i) of
    the Transportation Equity Act for the 21st Century (112 Stat. 196-
    197) is amended by redesignating subparagraphs (D) and (E) as
    paragraphs (2) and (3), respectively, and moving such paragraphs 2
    ems to the left.

SEC. 1112. EMERGENCY RELIEF.

    There are authorized to be appropriated for each fiscal year such
sums as may be necessary for allocations by the Secretary described in
subsections (a) and (b) of section 125 of title 23, United States Code,
if the total of those allocations in such fiscal year are in excess of
$100,000,000.

SEC. 1113. SURFACE TRANSPORTATION PROGRAM.

    (a) Program Eligibility.--Section 133(b) of title 23, United States
Code, is amended--
        (1) in paragraph (6) by inserting ``, including advanced truck
    stop electrification systems'' before the period at the end; and
        (2) by inserting after paragraph (11) the following:
        ``(12) Projects relating to intersections that--
            ``(A) have disproportionately high accident rates;
            ``(B) have high levels of congestion, as evidenced by--
                ``(i) interrupted traffic flow at the intersection; and
                ``(ii) a level of service rating that is not better
            than `F' during peak travel hours, calculated in accordance
            with the Highway Capacity Manual issued by the
            Transportation Research Board; and
            ``(C) are located on a Federal-aid highway.''.
    (b) Repeal of Safety Programs Set-aside.--
        (1) Repeal.--Section 133(d)(1) of such title is repealed.
        (2) Technical amendments.--Section 133(d) of such title is
    amended--
            (A) in the first sentence of paragraph (3)(A)--
                (i) by striking ``subparagraphs (C) and (D)'' and
            inserting ``subparagraph (C)''; and
                (ii) by striking ``80 percent'' and inserting ``90
            percent'';
            (B) in paragraph (3)(B) by striking ``tobe'' and inserting
        ``to be''; and
            (C) in paragraph (3)--
                (i) by striking subparagraph (C);
                (ii) by redesignating subparagraphs (D) and (E) as
            subparagraphs (C) and (D), respectively; and
                (iii) in subparagraph (C) (as redesignated by clause
            (ii)) by adding a period at the end.
        (3) Effective date.--Paragraph (1) and paragraph (2)(A)(ii) of
    this subsection shall take effect October 1, 2005.
    (c) Transportation Enhancement Activities.--Effective October 1,
2005, section 133(d)(2) of such title is amended by striking ``10
percent'' and all that follows through ``section 104(b)(3) for a fiscal
year'' and inserting the following: ``In a fiscal year, the greater of
10 percent of the funds apportioned to a State under section 104(b)(3)
for such fiscal year, or the amount set aside under this paragraph with
respect to the State for fiscal year 2005,''.
    (d) Obligation Authority.--Section 133(f)(1) of such title is
amended--
        (1) by striking ``1998 through 2000'' and inserting ``2004
    through 2006''; and
        (2) by striking ``2001 through 2003'' and inserting ``2007
    through 2009''.
    (e) Technical Correction.--Effective June 9, 1998, section 1108(e)
of the Transportation Equity Act for the 21st Century (112 Stat. 140)
is amended by striking ``Section 133'' and inserting ``Section
133(f)''.

SEC. 1114. HIGHWAY BRIDGE PROGRAM.

    (a) Finding and Declaration.--Section 144(a) of title 23, United
States Code, is amended to read as follows:
    ``(a) Finding and Declaration.--Congress finds and declares that it
is in the vital interest of the United States that a highway bridge
program be carried out to enable States to improve the condition of
their highway bridges over waterways, other topographical barriers,
other highways, and railroads through replacement and rehabilitation of
bridges that the States and the Secretary determine are structurally
deficient or functionally obsolete and through systematic preventive
maintenance of bridges.''.
    (b) Participation.--Section 144(d) of such title is amended to read
as follows:
    ``(d) Participation.--
        ``(1) Bridge replacement and rehabilitation.--On application by
    a State or States to the Secretary for assistance for a highway
    bridge that has been determined to be eligible for replacement or
    rehabilitation under subsection (b) or (c), the Secretary may
    approve Federal participation in--
            ``(A) replacing the bridge with a comparable facility; or
            ``(B) rehabilitating the bridge.
        ``(2) Types of assistance.--On application by a State or States
    to the Secretary, the Secretary may approve Federal assistance for
    any of the following activities for a highway bridge that has been
    determined to be eligible for replacement or rehabilitation under
    subsection (b) or (c):
            ``(A) Painting.
            ``(B) Seismic retrofit.
            ``(C) Systematic preventive maintenance.
            ``(D) Installation of scour countermeasures.
            ``(E) Application of calcium magnesium acetate, sodium
        acetate/formate, or other environmentally acceptable, minimally
        corrosive anti-icing and de-icing compositions.
        ``(3) Basis for determination.--The Secretary shall determine
    the eligibility of highway bridges for replacement or
    rehabilitation for each State based on structurally deficient and
    functionally obsolete highway bridges in the State.
        ``(4) Special rule for preventive maintenance.--Notwithstanding
    any other provision of this subsection, a State may carry out a
    project under paragraph (2)(B), (2)(C), or (2)(D) for a highway
    bridge without regard to whether the bridge is eligible for
    replacement or rehabilitation under this section.''.
    (c) Apportionment of Funds.--Section 144(e) of such title is
amended--
        (1) in the third sentence by striking ``square footage'' and
    inserting ``deck area'';
        (2) in the fourth sentence by striking ``the total cost of
    deficient bridges in a State and in all States shall be reduced by
    the total cost of any highway bridges constructed under subsection
    (m) in such State, relating to replacement of destroyed bridges and
    ferryboat services, and,''; and
        (3) in the seventh sentence by striking ``for the same period
    as funds apportioned for projects on the Federal-aid primary system
    under this title'' and inserting ``for the period specified in
    section 118(b)(2)''.
    (d) Off-System Bridges.--Section 144(g)(3) of such title is amended
to read as follows:
        ``(3) Off-system bridges.--
            ``(A) In general.--Not less than 15 percent of the amount
        apportioned to each State in each of fiscal years 2005 through
        2009 shall be expended for projects to replace, rehabilitate,
        paint, perform systematic preventive maintenance or seismic
        retrofit of, or apply calcium magnesium acetate, sodium
        acetate/formate, or other environmentally acceptable, minimally
        corrosive anti-icing and de-icing compositions to, or install
        scour countermeasures to, highway bridges located on public
        roads, other than those on a Federal-aid highway, or to
        complete the Warwick Intermodal Station (including the
        construction of a people mover between the Station and the T.F.
        Green Airport).
            ``(B) Reduction of expenditures.--The Secretary, after
        consultation with State and local officials, may reduce the
        requirement for expenditure for bridges not on a Federal-aid
        highway under subparagraph (A) with respect to the State if the
        Secretary determines that the State has inadequate needs to
        justify the expenditure.''.
    (e) Bridge Set-aside.--
        (1) Fiscal year 2005.--Section 144(g)(1)(C) of such title is
    amended--
            (A) in the subsection heading by striking ``2003'' and
        inserting ``2005''; and
            (B) in the first sentence by striking ``2003'' and
        inserting ``2005''.
        (2) Fiscal years 2006 through 2009.--Effective October 1, 2005,
    section 144(g) of such title (as amended by subsection (d) of this
    section) is amended--
            (A) by striking the subsection designation and all that
        follows through the period at the end of paragraph (2) and
        inserting the following:
    ``(g) Bridge Set-asides.--
        ``(1) Designated projects.--
            ``(A) In general.--Of the amounts authorized to be
        appropriated to carry out the bridge program under this section
        for each of the fiscal years 2006 through 2009, all but
        $100,000,000 shall be apportioned as provided in subsection
        (e). Such $100,000,000 shall be available as follows:
                ``(i) $12,500,000 per fiscal year for the Golden Gate
            Bridge.
                ``(ii) $18,750,000 per fiscal year for the construction
            of a bridge joining the Island of Gravina to the community
            of Ketchikan in Alaska.
                ``(iii) $12,500,000 per fiscal year to the State of
            Nevada for construction of a replacement of the federally
            owned bridge over the Hoover Dam in the Lake Mead National
            Recreation Area.
                ``(iv) $12,500,000 per fiscal year to the State of
            Missouri for construction of a structure over the
            Mississippi River to connect the City of St. Louis,
            Missouri, to the State of Illinois.
                ``(v) $12,500,000 per fiscal year for replacement and
            reconstruction of State maintained bridges in the State of
            Oklahoma.
                ``(vi) $4,500,000 per fiscal year for replacement of
            the Missisquoi Bay Bridge, Vermont.
                ``(vii) $8,000,000 per fiscal year for replacement and
            reconstruction of State-maintained bridges in the State of
            Vermont.
                ``(viii) $8,750,000 per fiscal year for design,
            planning, and right-of-way acquisition for the Interstate
            Route 74 bridge from Bettendorf, Iowa, to Moline, Illinois.
                ``(ix) $10,000,000 per fiscal year for replacement and
            reconstruction of State-maintained bridges in the State of
            Oregon.
            ``(B) Gravina access scoring.--The project described in
        subparagraph (A)(ii) shall not be counted for purposes of the
        reduction set forth in the fourth sentence of subsection (e).
            ``(C) Period of availability.--Amounts made available to a
        State under this paragraph shall remain available until
        expended.'';
            (B) by striking paragraph (2); and
            (C) by redesignating paragraph (3) as paragraph (2).
    (f) Continuation of Report; Federal Share.--Section 144 of such
title is amended by adding at the end the following:
    ``(r) Annual Materials Report on New Bridge Construction and Bridge
Rehabilitation.--Not later than 1 year after the date of enactment of
this subsection, and annually thereafter, the Secretary shall publish
in the Federal Register a report describing construction materials used
in new Federal-aid bridge construction and bridge rehabilitation
projects.
    ``(s) Federal Share.--
        ``(1) In general.--Except as provided under paragraph (2), the
    Federal share of the cost of a project payable from funds made
    available to carry out this section shall be determined under
    section 120(b).
        ``(2) Interstate system.--The Federal share of the cost of a
    project on the Interstate System payable from funds made available
    to carry out this section shall be determined under section
    120(a).''.
    (g) Technical Amendment.--Section 144(i) of such title is amended
by striking ``at the same time'' and all that follows through
``Congress''.

SEC. 1115. HIGHWAY USE TAX EVASION PROJECTS.

    (a) Eligible Activities.--
        (1) Intergovernmental enforcement efforts.--Section 143(b)(2)
    of title 23, United States Code, is amended by inserting before the
    period the following: ``; except that of funds so made available
    for each of fiscal years 2005 through 2009, $2,000,000 shall be
    available only to carry out intergovernmental enforcement efforts,
    including research and training''.
        (2) Conditions on funds allocated to internal revenue
    service.--Section 143(b)(3) of such title is amended by striking
    ``The'' and inserting ``Except as otherwise provided in this
    section, the''.
        (3) Limitation on use of funds.--Section 143(b)(4) of such
    title is amended--
            (A) by striking ``and'' at the end of subparagraph (F);
            (B) by striking the period at the end of subparagraph (G)
        and inserting a semicolon; and
            (C) by adding at the end the following:
            ``(H) to support efforts between States and Indian tribes
        to address issues relating to State motor fuel taxes; and
            ``(I) to analyze and implement programs to reduce tax
        evasion associated with foreign imported fuel.''.
        (4) Reports.--Section 143(b) of such title is amended by adding
    at the end the following:
        ``(9) Reports.--The Commissioner of the Internal Revenue
    Service and each State shall submit to the Secretary an annual
    report that describes the projects, examinations, and criminal
    investigations funded by and carried out under this section. Such
    report shall specify the estimated annual yield from such projects,
    examinations, and criminal investigations.''.
    (b) Excise Fuel Reporting System.--Section 143(c) of such title is
amended to read as follows:
    ``(c) Excise Tax Fuel Reporting.--
        ``(1) In general.--Not later than 90 days after the date of
    enactment of the SAFETEA-LU, the Secretary shall enter into a
    memorandum of understanding with the Commissioner of the Internal
    Revenue Service for the purposes of--
            ``(A) the additional development of capabilities needed to
        support new reporting requirements and databases established
        under such Act and the American Jobs Creation Act of 2004
        (Public Law 108-357), and such other reporting requirements and
        database development as may be determined by the Secretary, in
        consultation with the Commissioner of the Internal Revenue
        Service, to be useful in the enforcement of fuel excise taxes,
        including provisions recommended by the Fuel Tax Enforcement
        Advisory Committee,
            ``(B) the completion of requirements needed for the
        electronic reporting of fuel transactions from carriers and
        terminal operators,
            ``(C) the operation and maintenance of an excise summary
        terminal activity reporting system and other systems used to
        provide strategic analyses of domestic and foreign motor fuel
        distribution trends and patterns,
            ``(D) the collection, analysis, and sharing of information
        on fuel distribution and compliance or noncompliance with fuel
        taxes, and
            ``(E) the development, completion, operation, and
        maintenance of an electronic claims filing system and database
        and an electronic database of heavy vehicle highway use
        payments.
        ``(2) Elements of memorandum of understanding.--The memorandum
    of understanding shall provide that--
            ``(A) the Internal Revenue Service shall develop and
        maintain any system under paragraph (1) through contracts,
            ``(B) any system under paragraph (1) shall be under the
        control of the Internal Revenue Service, and
            ``(C) any system under paragraph (1) shall be made
        available for use by appropriate State and Federal revenue,
        tax, and law enforcement authorities, subject to section 6103
        of the Internal Revenue Code of 1986.
        ``(3) Funding.--Of the amounts made available to carry out this
    section for each of fiscal years 2005 through 2009, the Secretary
    shall make available to the Internal Revenue Service such funds as
    may be necessary to complete, operate, and maintain the systems
    under paragraph (1) in accordance with this subsection.
        ``(4) Reports.--Not later than September 30 of each year, the
    Commissioner of the Internal Revenue Service shall provide reports
    to the Secretary on the status of the Internal Revenue Service
    projects funded under this subsection.''.
    (c) Allocations.--Of the amounts authorized to be appropriated
under section 1101(a)(21) of this Act for highway use tax evasion
projects for each of the fiscal years 2005 through 2009, the following
amounts shall be allocated to the Internal Revenue Service to carry out
section 143 of title 23, United States Code:
        (1) $5,000,000 for fiscal year 2005.
        (2) $44,800,000 for fiscal year 2006.
        (3) $53,300,000 for fiscal year 2007.
        (4) $12,000,000 for each of fiscal years 2008 and 2009.

SEC. 1116. APPALACHIAN DEVELOPMENT HIGHWAY SYSTEM.

    (a) Apportionment.--The Secretary shall apportion funds made
available by section 1101(a)(7) of this Act for fiscal years 2005
through 2009 among the States based on the latest available cost to
complete estimate for the Appalachian development highway system under
section 14501 of title 40, United States Code.
    (b) Applicability of Title 23.--Funds made available by section
1101(a)(7) of this Act for the Appalachian development highway system
shall be available for obligation in the same manner as if such funds
were apportioned under chapter 1 of title 23, United States Code;
except that the Federal share of the cost of any project under this
section shall be determined in accordance with section 14501 of title
40, United States Code, and such funds shall be available to construct
highways and access roads under such section and shall remain available
until expended.
    (c) Use of Toll Credits.--Section 120(j)(1) of title 23, United
States Code, is amended by inserting ``and the Appalachian development
highway system program under section 14501 of title 40'' after
``section 125''.

SEC. 1117. TRANSPORTATION, COMMUNITY, AND SYSTEM PRESERVATION PROGRAM.

    (a) Establishment.--In cooperation with appropriate State, tribal,
regional, and local governments, the Secretary shall establish a
comprehensive program to address the relationships among
transportation, community, and system preservation plans and practices
and identify private sector-based initiatives to improve such
relationships.
    (b) Purpose.--Through the program under this section, the Secretary
shall facilitate the planning, development, and implementation of
strategies to integrate transportation, community, and system
preservation plans and practices that address one or more of the
following:
        (1) Improve the efficiency of the transportation system of the
    United States.
        (2) Reduce the impacts of transportation on the environment.
        (3) Reduce the need for costly future investments in public
    infrastructure.
        (4) Provide efficient access to jobs, services, and centers of
    trade.
        (5) Examine community development patterns and identify
    strategies to encourage private sector development that achieves
    the purposes identified in paragraphs (1) through (4).
    (c) General Authority.--The Secretary shall allocate funds made
available to carry out this section to States, metropolitan planning
organizations, local governments, and tribal governments to carry out
eligible projects to integrate transportation, community, and system
preservation plans and practices.
    (d) Eligibility.--A project described in subsection (c) is an
eligible project under this section if the project--
        (1) is eligible for assistance under title 23 or chapter 53 of
    title 49, United States Code; or
        (2) is to conduct any other activity relating to
    transportation, community, and system preservation that the
    Secretary determines to be appropriate, including corridor
    preservation activities that are necessary to implement one or more
    of the following:
            (A) Transit-oriented development plans.
            (B) Traffic calming measures.
            (C) Other coordinated transportation, community, and system
        preservation practices.
    (e) Criteria.--In allocating funds made available to carry out this
section, the Secretary shall give priority consideration to applicants
that--
        (1) have instituted preservation or development plans and
    programs that--
            (A) are coordinated with State and local preservation or
        development plans, including transit-oriented development
        plans;
            (B) promote cost-effective and strategic investments in
        transportation infrastructure that minimize adverse impacts on
        the environment; or
            (C) promote innovative private sector strategies;
        (2) have instituted other policies to integrate transportation,
    community, and system preservation practices, such as--
            (A) spending policies that direct funds to high-growth
        areas;
            (B) urban growth boundaries to guide metropolitan
        expansion;
            (C) ``green corridors'' programs that provide access to
        major highway corridors for areas targeted for efficient and
        compact development; or
            (D) other similar programs or policies as determined by the
        Secretary;
        (3) have preservation or development policies that include a
    mechanism for reducing potential impacts of transportation
    activities on the environment;
        (4) demonstrate a commitment to public and private involvement,
    including the involvement of nontraditional partners in the project
    team; and
        (5) examine ways to encourage private sector investments that
    address the purposes of this section.
    (f) Equitable Distribution.--In allocating funds to carry out this
section, the Secretary shall ensure the equitable distribution of funds
to a diversity of populations and geographic regions.
    (g) Funding.--
        (1) In general.--There is authorized to be appropriated from
    the Highway Trust Fund (other than the Mass Transit Account) to
    carry out this section $25,000,000 for fiscal year 2005 and
    $61,250,000 for each of fiscal years 2006 through 2009.
        (2) Contract authority.--Funds made available to carry out this
    section shall be available for obligation in the same manner as if
    the funds were apportioned under chapter 1 of title 23, United
    States Code; except that such funds shall not be transferable, and
    the Federal share for projects and activities carried out with such
    funds shall be determined in accordance with section 120(b) of
    title 23, United States Code.
    (h) Conforming Amendment.--Section 1221 of the Transportation
Equity Act for the 21st Century (23 U.S.C. 101 note; 112 Stat. 221) is
repealed.

SEC. 1118. TERRITORIAL HIGHWAY PROGRAM.

    (a) In General.--Chapter 2 of title 23, United States Code, is
amended by striking section 215 and inserting the following:

``Sec. 215. Territorial highway program

    ``(a) Definitions.--In this section, the following definitions
apply:
        ``(1) Program.--The term `program' means the territorial
    highway program established under subsection (b).
        ``(2) Territory.--The term `territory' means any of the
    following territories of the United States:
            ``(A) American Samoa.
            ``(B) The Commonwealth of the Northern Mariana Islands.
            ``(C) Guam.
            ``(D) The United States Virgin Islands.
    ``(b) Program.--
        ``(1) In general.--Recognizing the mutual benefits that will
    accrue to the territories and the United States from the
    improvement of highways in the territories, the Secretary may carry
    out a program to assist each government of a territory in the
    construction and improvement of a system of arterial and collector
    highways, and necessary inter-island connectors, that is--
            ``(A) designated by the Governor or chief executive officer
        of each territory; and
            ``(B) approved by the Secretary.
        ``(2) Federal share.--The Federal share of Federal financial
    assistance provided to territories under this section shall be in
    accordance with section 120(h).
    ``(c) Technical Assistance.--
        ``(1) In general.--To continue a long-range highway development
    program, the Secretary may provide technical assistance to the
    governments of the territories to enable the territories to, on a
    continuing basis--
            ``(A) engage in highway planning;
            ``(B) conduct environmental evaluations;
            ``(C) administer right-of-way acquisition and relocation
        assistance programs; and
            ``(D) design, construct, operate, and maintain a system of
        arterial and collector highways, including necessary inter-
        island connectors.
        ``(2) Form and terms of assistance.--Technical assistance
    provided under paragraph (1), and the terms for the sharing of
    information among territories receiving the technical assistance,
    shall be included in the agreement required by subsection (e).
    ``(d) Nonapplicability of Certain Provisions.--
        ``(1) In general.--Except to the extent that provisions of
    chapter 1 are determined by the Secretary to be inconsistent with
    the needs of the territories and the intent of the program, chapter
    1 (other than provisions of chapter 1 relating to the apportionment
    and allocation of funds) shall apply to funds authorized to be
    appropriated for the program.
        ``(2) Applicable provisions.--The agreement required by
    subsection (e) for each territory shall identify the sections of
    chapter 1 that are applicable to that territory and the extent of
    the applicability of those sections.
    ``(e) Agreement.--
        ``(1) In general.--Except as provided in paragraph (4), none of
    the funds made available for the program shall be available for
    obligation or expenditure with respect to any territory until the
    chief executive officer of the territory enters into an agreement
    with the Secretary (not later than 1 year after the date of
    enactment of SAFETEA-LU), providing that the government of the
    territory shall--
            ``(A) implement the program in accordance with applicable
        provisions of chapter 1 and subsection (d);
            ``(B) design and construct a system of arterial and
        collector highways, including necessary inter-island
        connectors, in accordance with standards that are--
                ``(i) appropriate for each territory; and
                ``(ii) approved by the Secretary;
            ``(C) provide for the maintenance of facilities constructed
        or operated under this section in a condition to adequately
        serve the needs of present and future traffic; and
            ``(D) implement standards for traffic operations and
        uniform traffic control devices that are approved by the
        Secretary.
        ``(2) Technical assistance.--The agreement required by
    paragraph (1) shall--
            ``(A) specify the kind of technical assistance to be
        provided under the program;
            ``(B) include appropriate provisions regarding information
        sharing among the territories; and
            ``(C) delineate the oversight role and responsibilities of
        the territories and the Secretary.
        ``(3) Review and revision of agreement.--The agreement entered
    into under paragraph (1) shall be reevaluated and, as necessary,
    revised, at least every 2 years.
        ``(4) Existing agreements.--With respect to an agreement under
    the section between the Secretary and the chief executive officer
    of a territory that is in effect as of the date of enactment of the
    SAFETEA-LU--
            ``(A) the agreement shall continue in force until replaced
        by an agreement entered into in accordance with paragraph (1);
        and
            ``(B) amounts made available for the program under the
        existing agreement shall be available for obligation or
        expenditure so long as the agreement, or the existing agreement
        entered into under paragraph (1), is in effect.
    ``(f) Permissible Uses of Funds.--
        ``(1) In general.--Funds made available for the program may be
    used only for the following projects and activities carried out in
    a territory:
            ``(A) Eligible surface transportation program projects
        described in section 133(b).
            ``(B) Cost-effective, preventive maintenance consistent
        with section 116(d).
            ``(C) Ferry boats, terminal facilities, and approaches, in
        accordance with subsections (b) and (c) of section 129.
            ``(D) Engineering and economic surveys and investigations
        for the planning, and the financing, of future highway
        programs.
            ``(E) Studies of the economy, safety, and convenience of
        highway use.
            ``(F) The regulation and equitable taxation of highway use.
            ``(G) Such research and development as are necessary in
        connection with the planning, design, and maintenance of the
        highway system.
        ``(2) Prohibition on use of funds for routine maintenance.--
    None of the funds made available for the program shall be obligated
    or expended for routine maintenance.
    ``(g) Location of Projects.--Territorial highway projects (other
than those described in paragraphs (1), (3), and (4) of section 133(b))
may not be undertaken on roads functionally classified as local.''.
    (b) Conforming Amendments.--
        (1) Eligible projects.--Section 103(b) of such title is
    amended--
            (A) in the heading for paragraph (6) by striking
        ``Eligible'' and inserting ``State eligible'';
            (B) in paragraph (6) by striking subparagraph (P); and
            (C) by adding at the end the following:
        ``(7) Territory eligible projects.--Subject to approval by the
    Secretary, funds set aside for this program under section 104(b)(1)
    for the National Highway System may be obligated for projects
    eligible for assistance under the territorial highway program under
    section 215.''.
        (2) Funding.--Section 104(b)(1)(A) of such title is amended by
    striking ``to the Virgin Islands, Guam, American Samoa, and the
    Commonwealth of Northern Mariana Islands'' and inserting ``for the
    territorial highway program under section 215''.
        (3) Clerical amendment.--The analysis for chapter 2 of such
    title is amended by striking the item relating to section 215 and
    inserting the following:

``215. Territorial highway program.''.

SEC. 1119. FEDERAL LANDS HIGHWAYS.

    (a) Federal Share Payable.--
        (1) In general.--Section 120(k) of title 23, United States
    Code, is amended--
            (A) by striking ``Federal-aid highway''; and
            (B) by striking ``section 104'' and inserting ``this title
        or chapter 53 of title 49''.
        (2) Technical references.--Section 120(l) of such title is
    amended by striking ``section 104'' and inserting ``this title or
    chapter 53 of title 49''.
    (b) Payments to Federal Agencies for Federal-Aid Projects.--Section
132 of such title is amended--
        (1) by striking the first two sentences and inserting the
    following:
    ``(a) In General.--In a case in which a proposed Federal-aid
project is to be undertaken by a Federal agency in accordance with an
agreement between a State and the Federal agency, the State may--
        ``(1) direct the Secretary to transfer the funds for the
    Federal share of the project directly to the Federal agency; or
        ``(2) make such deposit with, or payment to, the Federal agency
    as is required to meet the obligation of the State under the
    agreement for the work undertaken or to be undertaken by the
    Federal agency.
    ``(b) Reimbursement.--On execution with a State of a project
agreement described in subsection (a), the Secretary may reimburse the
State, using any available funds, for the estimated Federal share under
this title of the obligation of the State deposited or paid under
subsection (a)(2).''; and
        (2) in the last sentence by striking ``Any sums'' and inserting
    the following:
    ``(c) Recovery and Crediting of Funds.--Any sums''.
    (c)  Allocations.--Section 202 of such title is amended--
        (1) in subsection (a) by striking ``(a) On October 1'' and all
    that follows through ``Such allocation'' and inserting the
    following:
    ``(a) Allocation Based on Need.--
        ``(1) In general.--On October 1 of each fiscal year, the
    Secretary shall allocate sums authorized to be appropriated for the
    fiscal year for forest development roads and trails according to
    the relative needs of the various national forests and grasslands.
        ``(2) Planning.--The allocation under paragraph (1)'';
        (2) in subsection (d)(2)--
            (A) by adding at the end the following:
            ``(E) Transferred funds.--
                ``(i) In general.--Not later than 30 days after the
            date on which funds are made available to the Secretary of
            the Interior under this paragraph, the funds shall be
            distributed to, and available for immediate use by, the
            eligible Indian tribes, in accordance with the formula for
            distribution of funds under the Indian reservation roads
            program.
                ``(ii) Use of funds.--Notwithstanding any other
            provision of this section, funds available to Indian tribes
            for Indian reservation roads shall be expended on projects
            identified in a transportation improvement program approved
            by the Secretary.''; and
            (B) in subsection (d)(3)(A) by striking ``under this
        title'' and inserting ``under this chapter and section
        125(e)''.
    (d) Federal Lands Highways Program.--Section 202 of such title is
amended by striking subsection (b) and inserting the following:
    ``(b) Allocation for Public Lands Highways.--
        ``(1) Public lands highways.--
            ``(A) In general.--On October 1 of each fiscal year, the
        Secretary shall allocate 34 percent of the sums authorized to
        be appropriated for that fiscal year for public lands highways
        among those States having unappropriated or unreserved public
        lands, nontaxable Indian lands, or other Federal reservations,
        on the basis of need in the States, respectively, as determined
        by the Secretary, on application of the State transportation
        departments of the respective States.
            ``(B) Preference.--In making the allocation under
        subparagraph (A), the Secretary shall give preference to those
        projects that are significantly impacted by Federal land and
        resource management activities that are proposed by a State
        that contains at least 3 percent of the total public land in
        the United States.
        ``(2) Forest highways.--
            ``(A) In general.--On October 1 of each fiscal year, the
        Secretary shall allocate 66 percent of the funds authorized to
        be appropriated for public lands highways for forest highways
        in accordance with section 134 of the Federal-Aid Highway Act
        of 1987 (23 U.S.C. 202 note; 101 Stat. 173).
            ``(B) Public access to and within national forest system.--
        In making the allocation under subparagraph (A), the Secretary
        shall give equal consideration to projects that provide access
        to and within the National Forest System, as identified by the
        Secretary of Agriculture through--
                ``(i) renewable resource and land use planning; and
                ``(ii) assessments of the impact of that planning on
            transportation facilities.''.
    (e) BIA Administrative Expenses.--Section 202(d)(2) of such title
(as amended by subsection (c)(2) of this section) is amended by adding
at the end the following:
            ``(F) Administrative expenses.--
                ``(i) In general.--Of the funds authorized to be
            appropriated for Indian reservation roads, $20,000,000 for
            fiscal year 2006, $22,000,000 for fiscal year 2007,
            $24,500,000 for fiscal year 2008, and $27,000,000 for
            fiscal year 2009 may be used by the Secretary of the
            Interior for program management and oversight and project-
            related administrative expenses.
                ``(ii) Health and safety assurances.--Notwithstanding
            any other provision of law, an Indian tribal government may
            approve plans, specifications, and estimates and commence
            road and bridge construction with funds made available for
            Indian reservation roads under the Transportation Equity
            Act for the 21st Century (Public Law 105-178) and SAFETEA-
            LU through a contract or agreement under the Indian Self-
            Determination and Education Assistance Act (25 U.S.C. 450b
            et seq.) if the Indian tribal government--

                    ``(I) provides assurances in the contract or
                agreement that the construction will meet or exceed
                applicable health and safety standards;
                    ``(II) obtains the advance review of the plans and
                specifications from a State-licensed civil engineer
                that has certified that the plans and specifications
                meet or exceed the applicable health and safety
                standards; and
                    ``(III) provides a copy of the certification under
                subclause (I) to the Deputy Assistant Secretary for
                Tribal Government Affairs or the Assistant Secretary
                for Indian Affairs, as appropriate.''.

    (f) National Tribal Transportation Facility Inventory.--Section
202(d)(2) of such title (as amended by subsection (e)) is amended by
adding at the end the following:
            ``(G) National tribal transportation facility inventory.--
                ``(i) In general.--Not later than 2 years after the
            date of enactment of the SAFETEA-LU, the Secretary, in
            cooperation with the Secretary of the Interior, shall
            complete a comprehensive national inventory of
            transportation facilities that are eligible for assistance
            under the Indian reservation roads program.
                ``(ii) Transportation facilities included in the
            inventory.--For purposes of identifying the tribal
            transportation system and determining the relative
            transportation needs among Indian tribes, the Secretary
            shall include, at a minimum, transportation facilities that
            are eligible for assistance under the Indian reservation
            roads program that a tribe has requested, including
            facilities that--

                    ``(I) were included in the Bureau of Indian Affairs
                system inventory for funding formula purposes in 1992
                or any subsequent fiscal year;
                    ``(II) were constructed or reconstructed with funds
                from the Highway Trust Funds (other than the Mass
                Transit Account) under the Indian reservation roads
                program since 1983;
                    ``(III) are owned by an Indian tribal government;
                or
                    ``(IV) are community streets or bridges within the
                exterior boundary of Indian reservations, Alaska Native
                villages, and other recognized Indian communities
                (including communities in former Indian reservations in
                Oklahoma) in which the majority of residents are
                American Indians or Alaska Natives; or
                    ``(V) are primary access routes proposed by tribal
                governments, including roads between villages, roads to
                landfills, roads to drinking water sources, roads to
                natural resources identified for economic development,
                and roads that provide access to intermodal termini,
                such as airports, harbors, or boat landings.

                ``(iii) Limitation on primary access routes.--For
            purposes of this subparagraph, a proposed primary access
            route is the shortest practicable route connecting 2 points
            of the proposed route.
                ``(iv) Additional facilities.--Nothing in this
            subparagraph shall preclude the Secretary from including
            additional transportation facilities that are eligible for
            funding under the Indian reservation roads program in the
            inventory used for the national funding allocation if such
            additional facilities are included in the inventory in a
            uniform and consistent manner nationally.
                ``(v) Report to congress.--Not later than 90 days after
            the date of completion of the inventory under this
            subparagraph, the Secretary shall prepare and submit a
            report to Congress that includes the data gathered and the
            results of the inventory.''.
    (g) Indian Reservation Road Bridges.--Section 202(d)(4) of such
title is amended--
        (1) in subparagraph (B)--
            (A) by striking ``(B) Reservation.--Of the amounts'' and
        all that follows through ``to replace,'' and inserting the
        following:
            ``(B) Funding.--
                ``(i) Authorization of appropriations.--In addition to
            any other funds made available for Indian reservation roads
            for each fiscal year, there is authorized to be
            appropriated from the Highway Trust Fund (other than the
            Mass Transit Account) $14,000,000 for each of fiscal years
            2005 through 2009 to carry out planning, design,
            engineering, preconstruction, construction, and inspection
            of projects to replace,''; and
            (B) by adding at the end the following:
                ``(ii) Availability.--Funds made available to carry out
            this subparagraph shall be available for obligation in the
            same manner as if such funds were apportioned under chapter
            1.'';
        (2) in subparagraph (C) by striking clause (iii) and inserting
    the following:
                ``(iii) be structurally deficient or functionally
            obsolete; and''; and
        (3) by striking subparagraph (D) and inserting the following:
            ``(D) Approval requirement.--
                ``(i) In general.--Subject to clause (ii), on request
            by an Indian tribe or the Secretary of the Interior, the
            Secretary may make funds available under this subsection
            for preliminary engineering for Indian reservation road
            bridge projects.
                ``(ii) Construction and construction engineering.--The
            Secretary may make funds available under clause (i) for
            construction and construction engineering after approval of
            applicable plans, specifications, and estimates in
            accordance with this title.''.
        (4) Contracts and agreements with indian tribes.--Section
    202(d) of such title is amended by adding at the end the following:
        ``(5) Contracts and agreements with indian tribes.--
            ``(A) In general.--Notwithstanding any other provision of
        law or any interagency agreement, program guideline, manual, or
        policy directive, all funds made available to an Indian tribal
        government under this chapter for a highway, road, bridge,
        parkway, or transit facility program or project that is located
        on an Indian reservation or provides access to the reservation
        or a community of the Indian tribe shall be made available, on
        the request of the Indian tribal government, to the Indian
        tribal government for use in carrying out, in accordance with
        the Indian Self-Determination and Education Assistance Act (25
        U.S.C. 450 et seq.), contracts and agreements for the planning,
        research, design, engineering, construction, and maintenance
        relating to the program or project.
            ``(B) Exclusion of agency participation.--In accordance
        with subparagraph (A), all funds for a program or project to
        which subparagraph (A) applies shall be paid to the Indian
        tribal government without regard to the organizational level at
        which the Department of the Interior has previously carried
        out, or the Department of Transportation has previously carried
        out under the Federal lands highway programs, the programs,
        functions, services, or activities involved.
            ``(C) Consortia.--Two or more Indian tribes that are
        otherwise eligible to participate in a program or project to
        which this chapter applies may form a consortium to be
        considered as a single Indian tribe for the purpose of
        participating in the project under this section.
            ``(D) Secretary as signatory.--Notwithstanding any other
        provision of law, the Secretary is authorized to enter into a
        funding agreement with an Indian tribal government to carry out
        a highway, road, bridge, parkway, or transit program or project
        under subparagraph (A) that is located on an Indian reservation
        or provides access to the reservation or a community of the
        Indian tribe.
            ``(E) Funding.--The amount an Indian tribal government
        receives for a program or project under subparagraph (A) shall
        equal the sum of the funding that the Indian tribal government
        would otherwise receive for the program or project in
        accordance with the funding formula established under this
        subsection and such additional amounts as the Secretary
        determines equal the amounts that would have been withheld for
        the costs of the Bureau of Indian Affairs for administration of
        the program or project.
            ``(F) Eligibility.--
                ``(i) In general.--Subject to clause (ii), funds may be
            made available under subparagraph (A) to an Indian tribal
            government for a program or project in a fiscal year only
            if the Indian tribal government requesting such funds
            demonstrates to the satisfaction of the Secretary financial
            stability and financial management capability during the 3
            fiscal years immediately preceding the fiscal year for
            which the request is being made.
                ``(ii) Criteria for determining financial stability and
            financial management capability.--An Indian tribal
            government that had no uncorrected significant and material
            audit exceptions in the required annual audit of the Indian
            tribal government self-determination contracts or self-
            governance funding agreements with any Federal agency
            during the 3-fiscal year period referred in clause (i)
            shall be conclusive evidence of the financial stability and
            financial management capability for purposes of clause (i).
            ``(G) Assumption of functions and duties.--An Indian tribal
        government receiving funding under subparagraph (A) for a
        program or project shall assume all functions and duties that
        the Secretary of the Interior would have performed with respect
        to a program or project under this chapter, other than those
        functions and duties that inherently cannot be legally
        transferred under the Indian Self-Determination and Education
        Assistance Act (25 U.S.C. 450b et seq.).
            ``(H) Powers.--An Indian tribal government receiving
        funding under subparagraph (A) for a program or project shall
        have all powers that the Secretary of the Interior would have
        exercised in administering the funds transferred to the Indian
        tribal government for such program or project under this
        section if the funds had not been transferred, except to the
        extent that such powers are powers that inherently cannot be
        legally transferred under the Indian Self-Determination and
        Education Assistance Act (25 U.S.C. 450b et seq.).
            ``(I) Dispute resolution.--In the event of a disagreement
        between the Secretary or the Secretary of the Interior and an
        Indian tribe over whether a particular function, duty, or power
        may be lawfully transferred under the Indian Self-Determination
        and Education Assistance Act (25 U.S.C. 450b et seq.), the
        Indian tribe shall have the right to pursue all alternative
        dispute resolutions and appeal procedures authorized by such
        Act, including regulations issued to carry out such Act.
            ``(J) Termination of contract or agreement.--On the date of
        the termination of a contract or agreement under this section
        by an Indian tribal government, the Secretary shall transfer
        all funds that would have been allocated to the Indian tribal
        government under the contract or agreement to the Secretary of
        the Interior to provide continued transportation services in
        accordance with applicable law.''.
    (h) Planning and Agency Coordination.--Section 204 of such title is
amended--
        (1) in subsection (a)(1) by inserting ``refuge roads,'' after
    ``parkways,''; and
        (2) by striking subsection (b) and inserting the following:
    ``(b) Use of Funds.--
        ``(1) In general.--Funds made available for public lands
    highways, park roads and parkways, and Indian reservation roads
    shall be used by the Secretary and the Secretary of the appropriate
    Federal land management agency to pay the cost of--
            ``(A) transportation planning, research, and engineering
        and construction of, highways, roads, parkways, and transit
        facilities located on public lands, national parks, and Indian
        reservations; and
            ``(B) operation and maintenance of transit facilities
        located on public lands, national parks, and Indian
        reservations.
        ``(2) Contract.--In connection with an activity described in
    paragraph (1), the Secretary and the Secretary of the appropriate
    Federal land management agency may enter into a contract or other
    appropriate agreement with respect to such activity with--
            ``(A) a State (including a political subdivision of a
        State); or
            ``(B) an Indian tribe.
        ``(3) Indian reservation roads.--In the case of an Indian
    reservation road--
            ``(A) Indian labor may be employed, in accordance with such
        rules and regulations as may be promulgated by the Secretary of
        the Interior, to carry out any construction or other activity
        described in paragraph (1); and
            ``(B) funds made available to carry out this section may be
        used to pay bridge preconstruction costs (including planning,
        design, and engineering).
        ``(4) Federal employment.--No maximum limitation on Federal
    employment shall be applicable to construction or improvement of
    Indian reservation roads.
        ``(5) Availability of funds.--Funds made available under this
    section for each class of Federal lands highways shall be available
    for any transportation project eligible for assistance under this
    title that is within or adjacent to, or that provides access to,
    the areas served by the particular class of Federal lands highways.
        ``(6) Reservation of funds.--The Secretary of the Interior may
    reserve funds from administrative funds of the Bureau of Indian
    Affairs that are associated with the Indian reservation roads
    program to finance Indian technical centers under section
    504(b).''.
    (i) Maintenance of Indian Reservation Roads.--Section 204(c) of
such title is amended by striking the second and third sentences and
inserting the following: ``Notwithstanding any other provision of this
title, of the amount of funds allocated for Indian reservation roads
from the Highway Trust Fund, not more than 25 percent of the funds
allocated to an Indian tribe may be expended for the purpose of
maintenance, excluding road sealing which shall not be subject to any
limitation. The Bureau of Indian Affairs shall continue to retain
primary responsibility, including annual funding request
responsibility, for road maintenance programs on Indian reservations.
The Secretary shall ensure that funding made available under this
subsection for maintenance of Indian reservation roads for each fiscal
year is supplementary to and not in lieu of any obligation of funds by
the Bureau of Indian Affairs for road maintenance programs on Indian
reservations.''.
    (j) Refuge Roads.--Section 204(k)(1) of such title is amended--
        (1) in subparagraph (B)--
            (A) by striking ``(2), (5),'' and inserting ``(2), (3),
        (5),''; and
            (B) by striking ``and'' after the semicolon;
        (2) in subparagraph (C) by striking the period at the end and
    inserting a semicolon; and
        (3) by adding at the end the following:
            ``(D) the non-Federal share of the cost of any project
        funded under this title or chapter 53 of title 49 that provides
        access to or within a wildlife refuge; and
            ``(E) maintenance and improvement of recreational trails;
        except that expenditures on trails under this subparagraph
        shall not exceed 5 percent of available funds for each fiscal
        year.''.
    (k) Tribal-State Road Maintenance Agreements.--Section 204 of such
title is amended by adding at the end the following:
    ``(l) Tribal-State Road Maintenance Agreements.--
        ``(1) In general.--An Indian tribe and a State may enter into a
    road maintenance agreement under which an Indian tribe assumes the
    responsibilities of the State for--
            ``(A) Indian reservation roads; and
            ``(B) roads providing access to Indian reservation roads.
        ``(2) Tribal-state agreements.--Agreements entered into under
    paragraph (1)--
            ``(A) shall be negotiated between the State and the Indian
        tribe; and
            ``(B) shall not require the approval of the Secretary.
        ``(3) Annual report.--Effective beginning with fiscal year
    2005, the Secretary shall prepare and submit to Congress an annual
    report that identifies--
            ``(A) the Indian tribes and States that have entered into
        agreements under paragraph (1);
            ``(B) the number of miles of roads for which Indian tribes
        have assumed maintenance responsibilities; and
            ``(C) the amount of funding transferred to Indian tribes
        for the fiscal year under agreements entered into under
        paragraph (1).''.
    (l) Deputy Assistant Secretary of Transportation for Tribal
Government Affairs.--Section 102 of title 49, United States Code, is
amended--
        (1) by redesignating subsections (f) and (g) as subsections (g)
    and (h), respectively; and
        (2) by inserting after subsection (e) the following:
    ``(f) Deputy Assistant Secretary for Tribal Government Affairs.--
        ``(1) Establishment.--In accordance with Federal policies
    promoting Indian self determination, the Department of
    Transportation shall have, within the office of the Secretary, a
    Deputy Assistant Secretary for Tribal Government Affairs appointed
    by the President to plan, coordinate, and implement the Department
    of Transportation policy and programs serving Indian tribes and
    tribal organizations and to coordinate tribal transportation
    programs and activities in all offices and administrations of the
    Department and to be a participant in any negotiated rulemaking
    relating to, or having an impact on, projects, programs, or funding
    associated with the tribal transportation program.
        ``(2) Reservation of trust obligations.--
            ``(A) Responsibility of secretary.--In carrying out this
        title, the Secretary shall be responsible to exercise the trust
        obligations of the United States to Indians and Indian tribes
        to ensure that the rights of a tribe or individual Indian are
        protected.
            ``(B) Preservation of united states responsibility.--
        Nothing in this title shall absolve the United States from any
        responsibility to Indians and Indian tribes, including
        responsibilities derived from the trust relationship and any
        treaty, executive order, or agreement between the United States
        and an Indian tribe.''.
    (m) Forest Highways.--Of the amounts made available for public
lands highways under section 1101--
        (1) not to exceed $20,000,000 per fiscal year may be used for
    the maintenance of forest highways;
        (2) not to exceed $1,000,000 per fiscal year may be used for
    signage identifying public hunting and fishing access; and
        (3) not to exceed $10,000,000 per fiscal year shall be used by
    the Secretary of Agriculture to pay the costs of facilitating the
    passage of aquatic species beneath roads in the National Forest
    System, including the costs of constructing, maintaining,
    replacing, or removing culverts and bridges, as appropriate.
    (n) Wildlife Vehicle Collision Reduction Study.--
        (1) In general.--The Secretary shall conduct a study of methods
    to reduce collisions between motor vehicles and wildlife (in this
    subsection referred to as ``wildlife vehicle collisions'').
        (2) Contents.--
            (A) Areas of study.--The study shall include an assessment
        of the causes and impacts of wildlife vehicle collisions and
        solutions and best practices for reducing such collisions.
            (B) Methods for conducting the study.--In carrying out the
        study, the Secretary shall--
                (i) conduct a thorough literature review; and
                (ii) survey current practices of the Department of
            Transportation.
        (3) Consultation.--In carrying out the study, the Secretary
    shall consult with appropriate experts in the field of wildlife
    vehicle collisions.
        (4) Report.--
            (A) In general.--Not later than 2 years after the date of
        enactment of this Act, the Secretary shall submit to Congress a
        report on the results of the study.
            (B) Contents.--The report shall include a description of
        each of the following:
                (i) Causes of wildlife vehicle collisions.
                (ii) Impacts of wildlife vehicle collisions.
                (iii) Solutions to and prevention of wildlife vehicle
            collisions.
        (5) Manual.--
            (A) Development.--Based upon the results of the study, the
        Secretary shall develop a best practices manual to support
        State efforts to reduce wildlife vehicle collisions.
            (B) Availability.--The manual shall be made available to
        States not later than 1 year after the date of transmission of
        the report under paragraph (4).
            (C) Contents.--The manual shall include, at a minimum, the
        following:
                (i) A list of best practices addressing wildlife
            vehicle collisions.
                (ii) A list of information, technical, and funding
            resources for addressing wildlife vehicle collisions.
                (iii) Recommendations for addressing wildlife vehicle
            collisions.
                (iv) Guidance for developing a State action plan to
            address wildlife vehicle collisions.
        (6) Training.--Based upon the manual developed under paragraph
    (5), the Secretary shall develop a training course on addressing
    wildlife vehicle collisions for transportation professionals.
    (o) Limitation on Applicability.--The requirements of the January
4, 2005, Federal Highway Administration, a final rule on the
implementation of the Uniform Relocation Assistance and Real Property
Acquisition policy Act of 1970 (42 U.S.C. 4601 et seq.) shall not apply
to the voluntary conservation easement activities of the Department of
Agriculture or the Department of the Interior.

SEC. 1120. PUERTO RICO HIGHWAY PROGRAM.

    (a) In General.--Subchapter I of chapter 1 of title 23, United
States Code, is amended by adding at the end the following:

``Sec. 165. Puerto Rico highway program

    ``(a) In General.--The Secretary shall allocate funds made
available to carry out this section for each of fiscal years 2005
through 2009 to the Commonwealth of Puerto Rico to carry out a highway
program in the Commonwealth.
    ``(b) Applicability of Title.--Amounts made available by section
1101(a)(14) of the SAFETEA-LU shall be available for obligation in the
same manner as if such funds were apportioned under this chapter.
    ``(c) Treatment of Funds.--Amounts made available to carry out this
section for a fiscal year shall be administered as follows:
        ``(1) Apportionment.--For the purpose of imposing any penalty
    under this title or title 49, the amounts shall be treated as being
    apportioned to Puerto Rico under sections 104(b) and 144, for each
    program funded under those sections in an amount determined by
    multiplying--
            ``(A) the aggregate of the amounts for the fiscal year; by
            ``(B) the ratio that--
                ``(i) the amount of funds apportioned to Puerto Rico
            for each such program for fiscal year 1997; bears to
                ``(ii) the total amount of funds apportioned to Puerto
            Rico for all such programs for fiscal year 1997.
        ``(2) Penalty.--The amounts treated as being apportioned to
    Puerto Rico under each section referred to in paragraph (1) shall
    be deemed to be required to be apportioned to Puerto Rico under
    that section for purposes of the imposition of any penalty under
    this title or title 49.
    ``(d) Effect on Allocations and Apportionments.--Subject to
subsection (c)(2), nothing in this section affects any allocation under
section 105 and any apportionment under sections 104 and 144.''.
    (b) Conforming Amendment.--The analysis for subchapter I of chapter
1 of such title is amended by adding at the end the following:

``165. Puerto Rico highway program.''.

    (c) Definition of State.--For the purposes of apportioning funds
under sections 104, 105, 130, 144, and 206 of title 23, United States
Code, and section 1404, relating to the safe routes to school program,
the term ``State'' means any of the 50 States and the District of
Columbia.

SEC. 1121. HOV FACILITIES.

    (a) In General.--Subchapter I of chapter 1 of title 23, United
States Code (as amended by section 1120 of this Act), is amended by
adding at the end the following:

``Sec. 166. HOV facilities

    ``(a) In General.--
        ``(1) Authority of state agencies.--A State agency that has
    jurisdiction over the operation of a HOV facility shall establish
    the occupancy requirements of vehicles operating on the facility.
        ``(2) Occupancy requirement.--Except as otherwise provided by
    this section, no fewer than two occupants per vehicle may be
    required for use of a HOV facility.
    ``(b) Exceptions.--
        ``(1) In general.--Notwithstanding the occupancy requirement of
    subsection (a)(2), the exceptions in paragraphs (2) through (5)
    shall apply with respect to a State agency operating a HOV
    facility.
        ``(2) Motorcycles and bicycles.--
            ``(A) In general.--Subject to subparagraph (B), the State
        agency shall allow motorcycles and bicycles to use the HOV
        facility.
            ``(B) Safety exception.--
                ``(i) In general.--A State agency may restrict use of
            the HOV facility by motorcycles or bicycles (or both) if
            the agency certifies to the Secretary that such use would
            create a safety hazard and the Secretary accepts the
            certification.
                ``(ii) Acceptance of certification.--The Secretary may
            accept a certification under this subparagraph only after
            the Secretary publishes notice of the certification in the
            Federal Register and provides an opportunity for public
            comment.
        ``(3) Public transportation vehicles.--The State agency may
    allow public transportation vehicles to use the HOV facility if the
    agency--
            ``(A) establishes requirements for clearly identifying the
        vehicles; and
            ``(B) establishes procedures for enforcing the restrictions
        on the use of the facility by the vehicles.
        ``(4) High occupancy toll vehicles.--The State agency may allow
    vehicles not otherwise exempt pursuant to this subsection to use
    the HOV facility if the operators of the vehicles pay a toll
    charged by the agency for use of the facility and the agency--
            ``(A) establishes a program that addresses how motorists
        can enroll and participate in the toll program;
            ``(B) develops, manages, and maintains a system that will
        automatically collect the toll; and
            ``(C) establishes policies and procedures to--
                ``(i) manage the demand to use the facility by varying
            the toll amount that is charged; and
                ``(ii) enforce violations of use of the facility.
        ``(5) Low emission and energy-efficient vehicles.--
            ``(A) Inherently low emission vehicle.--Before September
        30, 2009, the State agency may allow vehicles that are
        certified as inherently low-emission vehicles pursuant to
        section 88.311-93 of title 40, Code of Federal Regulations (or
        successor regulations), and are labeled in accordance with
        section 88.312-93 of such title (or successor regulations), to
        use the HOV facility if the agency establishes procedures for
        enforcing the restrictions on the use of the facility by the
        vehicles.
            ``(B) Other low emission and energy-efficient vehicles.--
        Before September 30, 2009, the State agency may allow vehicles
        certified as low emission and energy-efficient vehicles under
        subsection (e), and labeled in accordance with subsection (e),
        to use the HOV facility if the operators of the vehicles pay a
        toll charged by the agency for use of the facility and the
        agency--
                ``(i) establishes a program that addresses the
            selection of vehicles under this paragraph; and
                ``(ii) establishes procedures for enforcing the
            restrictions on the use of the facility by the vehicles.
            ``(C) Amount of tolls.--Under subparagraph (B), a State
        agency may charge no toll or may charge a toll that is less
        than tolls charged under paragraph (3).
    ``(c) Requirements Applicable to Tolls.--
        ``(1) In general.--Tolls may be charged under paragraphs (4)
    and (5) of subsection (b) notwithstanding section 301 and, except
    as provided in paragraphs (2) and (3), subject to the requirements
    of section 129.
        ``(2) HOV facilities on the interstate system.--Notwithstanding
    section 129, tolls may be charged under paragraphs (4) and (5) of
    subsection (b) on a HOV facility on the Interstate System.
        ``(3) Excess toll revenues.--If a State agency makes a
    certification under section 129(a)(3) with respect to toll revenues
    collected under paragraphs (4) and (5) of subsection (b), the
    State, in the use of toll revenues under that sentence, shall give
    priority consideration to projects for developing alternatives to
    single occupancy vehicle travel and projects for improving highway
    safety.
    ``(d) HOV Facility Management, Operation, Monitoring, and
Enforcement.--
        ``(1) In general.--A State agency that allows vehicles to use a
    HOV facility under paragraph (4) or (5) of subsection (b) in a
    fiscal year shall certify to the Secretary that the agency will
    carry out the following responsibilities with respect to the
    facility in the fiscal year:
            ``(A) Establishing, managing, and supporting a performance
        monitoring, evaluation, and reporting program for the facility
        that provides for continuous monitoring, assessment, and
        reporting on the impacts that the vehicles may have on the
        operation of the facility and adjacent highways.
            ``(B) Establishing, managing, and supporting an enforcement
        program that ensures that the facility is being operated in
        accordance with the requirements of this section.
            ``(C) Limiting or discontinuing the use of the facility by
        the vehicles if the presence of the vehicles has degraded the
        operation of the facility.
        ``(2) Degraded facility.--
            ``(A) Definition of minimum average operating speed.--In
        this paragraph, the term `minimum average operating speed'
        means--
                ``(i) 45 miles per hour, in the case of a HOV facility
            with a speed limit of 50 miles per hour or greater; and
                ``(ii) not more than 10 miles per hour below the speed
            limit, in the case of a HOV facility with a speed limit of
            less than 50 miles per hour.
            ``(B) Standard for determining degraded facility.--For
        purposes of paragraph (1), the operation of a HOV facility
        shall be considered to be degraded if vehicles operating on the
        facility are failing to maintain a minimum average operating
        speed 90 percent of the time over a consecutive 180-day period
        during morning or evening weekday peak hour periods (or both).
            ``(C) Management of low emission and energy-efficient
        vehicles.--In managing the use of HOV lanes by low emission and
        energy-efficient vehicles that do not meet applicable occupancy
        requirements, a State agency may increase the percentages
        described in subsection (f)(3)(B)(i).
    ``(e) Certification of Low Emission and Energy-Efficient
Vehicles.--Not later than 180 days after the date of enactment of this
section, the Administrator of the Environmental Protection Agency
shall--
        ``(1) issue a final rule establishing requirements for
    certification of vehicles as low emission and energy-efficient
    vehicles for purposes of this section and requirements for the
    labeling of the vehicles; and
        ``(2) establish guidelines and procedures for making the
    vehicle comparisons and performance calculations described in
    subsection (f)(3)(B), in accordance with section 32908(b) of title
    49.
    ``(f) Definitions.--In this section, the following definitions
apply:
        ``(1) Alternative fuel vehicle.--The term `alternative fuel
    vehicle' means a vehicle that is operating on--
            ``(A) methanol, denatured ethanol, or other alcohols;
            ``(B) a mixture containing at least 85 percent of methanol,
        denatured ethanol, and other alcohols by volume with gasoline
        or other fuels;
            ``(C) natural gas;
            ``(D) liquefied petroleum gas;
            ``(E) hydrogen;
            ``(F) coal derived liquid fuels;
            ``(G) fuels (except alcohol) derived from biological
        materials;
            ``(H) electricity (including electricity from solar
        energy); or
            ``(I) any other fuel that the Secretary prescribes by
        regulation that is not substantially petroleum and that would
        yield substantial energy security and environmental benefits,
        including fuels regulated under section 490 of title 10, Code
        of Federal Regulations (or successor regulations).
        ``(2) HOV facility.--The term `HOV facility' means a high
    occupancy vehicle facility.
        ``(3) Low emission and energy-efficient vehicle.--The term `low
    emission and energy-efficient vehicle' means a vehicle that--
            ``(A) has been certified by the Administrator as meeting
        the Tier II emission level established in regulations
        prescribed by the Administrator under section 202(i) of the
        Clean Air Act (42 U.S.C. 7521(i)) for that make and model year
        vehicle; and
            ``(B)(i) is certified by the Administrator of the
        Environmental Protection Agency, in consultation with the
        manufacturer, to have achieved not less than a 50-percent
        increase in city fuel economy or not less than a 25-percent
        increase in combined city-highway fuel economy (or such greater
        percentage of city or city-highway fuel economy as may be
        determined by a State under subsection (d)(2)(C)) relative to a
        comparable vehicle that is an internal combustion gasoline
        fueled vehicle (other than a vehicle that has propulsion energy
        from onboard hybrid sources); or
            ``(ii) is an alternative fuel vehicle.
        ``(4) Public transportation vehicle.--The term `public
    transportation vehicle' means a vehicle that--
            ``(A) provides designated public transportation (as defined
        in section 221 of the Americans with Disabilities Act of 1990
        (42 U.S.C. 12141) or provides public school transportation (to
        and from public or private primary, secondary, or tertiary
        schools); and
            ``(B)(i) is owned or operated by a public entity;
            ``(ii) is operated under a contract with a public entity;
        or
            ``(iii) is operated pursuant to a license by the Secretary
        or a State agency to provide motorbus or school vehicle
        transportation services to the public.
        ``(5) State agency.--
            ``(A) In general.--The term `State agency', as used with
        respect to a HOV facility, means an agency of a State or local
        government having jurisdiction over the operation of the
        facility.
            ``(B) Inclusion.--The term `State agency' includes a State
        transportation department.''.
    (b) Conforming Amendments.--
        (1) Program efficiencies.--Section 102 of title 23, United
    States Code, is amended--
            (A) by striking subsection (a); and
            (B) by redesignating subsections (b) and (c) as subsections
        (a) and (b), respectively.
        (2) Chapter analysis.--The analysis for such subchapter (as
    amended by section 1120 of this Act) is amended by adding at the
    end the following:

``166. HOV facilities.''.

    (c) Sense of Congress.--It is the sense of Congress that the
Secretary and the States should provide additional incentives
(including the use of high occupancy vehicle lanes on State and
Interstate highways) for the purchase and use of hybrid and other fuel
efficient vehicles, which have been proven to minimize air emissions
and decrease consumption of fossil fuels.

SEC. 1122. DEFINITIONS.

    (a) Transportation Enhancement Activity.--Section 101(a)(35) of
title 23, United States Code, is amended to read as follows:
        ``(35) Transportation enhancement activity.--The term
    `transportation enhancement activity' means, with respect to any
    project or the area to be served by the project, any of the
    following activities as the activities relate to surface
    transportation:
            ``(A) Provision of facilities for pedestrians and bicycles.
            ``(B) Provision of safety and educational activities for
        pedestrians and bicyclists.
            ``(C) Acquisition of scenic easements and scenic or
        historic sites (including historic battlefields).
            ``(D) Scenic or historic highway programs (including the
        provision of tourist and welcome center facilities).
            ``(E) Landscaping and other scenic beautification.
            ``(F) Historic preservation.
            ``(G) Rehabilitation and operation of historic
        transportation buildings, structures, or facilities (including
        historic railroad facilities and canals).
            ``(H) Preservation of abandoned railway corridors
        (including the conversion and use of the corridors for
        pedestrian or bicycle trails).
            ``(I) Inventory, control, and removal of outdoor
        advertising.
            ``(J) Archaeological planning and research.
            ``(K) Environmental mitigation--
                ``(i) to address water pollution due to highway runoff;
            or
                ``(ii) reduce vehicle-caused wildlife mortality while
            maintaining habitat connectivity.
            ``(L) Establishment of transportation museums.''.
    (b) Advanced Truck Stop Electrification System.--Such section
101(a) is amended by adding at the end the following:
        ``(38) Advanced truck stop electrification system.--The term
    `advanced truck stop electrification system' means a system that
    delivers heat, air conditioning, electricity, or communications to
    a heavy duty vehicle.''.

                     Subtitle B--Congestion Relief

SEC. 1201. REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM.

    (a) Establishment.--
        (1) In general.--The Secretary shall establish a real-time
    system management information program to provide, in all States,
    the capability to monitor, in real-time, the traffic and travel
    conditions of the major highways of the United States and to share
    that information to improve the security of the surface
    transportation system, to address congestion problems, to support
    improved response to weather events and surface transportation
    incidents, and to facilitate national and regional highway traveler
    information.
        (2) Purposes.--The purposes of the real-time system management
    information program are to--
            (A) establish, in all States, a system of basic real-time
        information for managing and operating the surface
        transportation system;
            (B) identify longer range real-time highway and transit
        monitoring needs and develop plans and strategies for meeting
        such needs; and
            (C) provide the capability and means to share that data
        with State and local governments and the traveling public.
    (b) Data Exchange Formats.--Not later than 2 years after the date
of enactment of this Act, the Secretary shall establish data exchange
formats to ensure that the data provided by highway and transit
monitoring systems, including statewide incident reporting systems, can
readily be exchanged across jurisdictional boundaries, facilitating
nationwide availability of information.
    (c) Regional Intelligent Transportation System Architecture.--
        (1) Addressing information needs.--As State and local
    governments develop or update regional intelligent transportation
    system architectures, described in section 940.9 of title 23, Code
    of Federal Regulations, such governments shall explicitly address
    real-time highway and transit information needs and the systems
    needed to meet such needs, including addressing coverage,
    monitoring systems, data fusion and archiving, and methods of
    exchanging or sharing highway and transit information.
        (2) Data exchange.--States shall incorporate the data exchange
    formats established by the Secretary under subsection (b) to ensure
    that the data provided by highway and transit monitoring systems
    may readily be exchanged with State and local governments and may
    be made available to the traveling public.
    (d) Eligibility.--Subject to project approval by the Secretary, a
State may obligate funds apportioned to the State under sections
104(b)(1), 104(b)(2), and 104(b)(3) of title 23, United States Code,
for activities relating to the planning and deployment of real-time
monitoring elements that advance the goals and purposes described in
subsection (a).
    (e) Limitation on Statutory Construction.--Nothing in this section
shall be construed as altering or otherwise affecting the applicability
of the requirements of chapter 1 of title 23, United States Code
(including requirements relating to the eligibility of a project for
assistance under the program, the location of the project, and the
Federal-share payable on account of the project), to amounts
apportioned to a State for a program under section 104(b) that are
obligated by the State for activities and projects under this section.
    (f) Statewide Incident Reporting System Defined.--In this section,
the term ``statewide incident reporting system'' means a statewide
system for facilitating the real-time electronic reporting of surface
transportation incidents to a central location for use in monitoring
the event, providing accurate traveler information, and responding to
the incident as appropriate.

                  Subtitle C--Mobility and Efficiency

SEC. 1301. PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE.

    (a) Findings.--Congress finds the following:
        (1) Under current law, surface transportation programs rely
    primarily on formula capital apportionments to States.
        (2) Despite the significant increase for surface transportation
    program funding in the Transportation Equity Act of the 21st
    Century, current levels of investment are insufficient to fund
    critical high-cost transportation infrastructure facilities that
    address critical national economic and transportation needs.
        (3) Critical high-cost transportation infrastructure facilities
    often include multiple levels of government, agencies, modes of
    transportation, and transportation goals and planning processes
    that are not easily addressed or funded within existing surface
    transportation program categories.
        (4) Projects of national and regional significance have
    national and regional benefits, including improving economic
    productivity by facilitating international trade, relieving
    congestion, and improving transportation safety by facilitating
    passenger and freight movement.
        (5) The benefits of projects described in paragraph (4) accrue
    to local areas, States, and the Nation as a result of the effect
    such projects have on the national transportation system.
        (6) A program dedicated to constructing projects of national
    and regional significance is necessary to improve the safe, secure,
    and efficient movement of people and goods throughout the United
    States and improve the health and welfare of the national economy.
    (b) Establishment of Program.--The Secretary shall establish a
program to provide grants to States for projects of national and
regional significance.
    (c) Definitions.--In this section, the following definitions apply:
        (1) Eligible project costs.--The term ``eligible project
    costs'' means the costs of--
            (A) development phase activities, including planning,
        feasibility analysis, revenue forecasting, environmental
        review, preliminary engineering and design work, and other
        preconstruction activities; and
            (B) construction, reconstruction, rehabilitation, and
        acquisition of real property (including land related to the
        project and improvements to land), environmental mitigation,
        construction contingencies, acquisition of equipment, and
        operational improvements.
        (2) Eligible project.--The term ``eligible project'' means any
    surface transportation project eligible for Federal assistance
    under title 23, United States Code, including freight railroad
    projects and activities eligible under such title.
        (3) State.--The term ``State'' has the meaning such term has in
    section 101(a) of title 23, United States Code.
    (d) Eligibility.--To be eligible for assistance under this section,
a project shall have eligible project costs that are reasonably
anticipated to equal or exceed the lesser of--
        (1) $500,000,000; or
        (2) 75 percent of the amount of Federal highway assistance
    funds apportioned for the most recently completed fiscal year to
    the State in which the project is located.
    (e) Applications.--Each State seeking to receive a grant under this
section for an eligible project shall submit to the Secretary an
application in such form and in accordance with such requirements as
the Secretary shall establish.
    (f) Competitive Grant Selection and Criteria for Grants.--
        (1) In general.--The Secretary shall--
            (A) establish criteria for selecting among projects that
        meet the eligibility criteria specified in subsection (d);
            (B) conduct a national solicitation for applications; and
            (C) award grants on a competitive basis.
        (2) Criteria for grants.--The Secretary may approve a grant
    under this section for a project only if the Secretary determines
    that the project--
            (A) is based on the results of preliminary engineering;
            (B) is justified based on the ability of the project--
                (i) to generate national economic benefits, including
            creating jobs, expanding business opportunities, and
            impacting the gross domestic product;
                (ii) to reduce congestion, including impacts in the
            State, region, and Nation;
                (iii) to improve transportation safety, including
            reducing transportation accidents, injuries, and
            fatalities;
                (iv) to otherwise enhance the national transportation
            system; and
                (v) to garner support for non-Federal financial
            commitments and provide evidence of stable and dependable
            financing sources to construct, maintain, and operate the
            infrastructure facility; and
            (C) is supported by an acceptable degree of non-Federal
        financial commitments, including evidence of stable and
        dependable financing sources to construct, maintain, and
        operate the infrastructure facility.
        (3) Selection considerations.--In selecting a project under
    this section, the Secretary shall consider the extent to which the
    project--
            (A) leverages Federal investment by encouraging non-Federal
        contributions to the project, including contributions from
        public-private partnerships;
            (B) uses new technologies, including intelligent
        transportation systems, that enhance the efficiency of the
        project; and
            (C) helps maintain or protect the environment.
        (4) Preliminary engineering.--In evaluating a project under
    paragraph (2)(A), the Secretary shall analyze and consider the
    results of preliminary engineering for the project.
        (5) Non-federal financial commitment.--
            (A) Evaluation of project.--In evaluating a project under
        paragraph (2)(C), the Secretary shall require that--
                (i) the proposed project plan provides for the
            availability of contingency amounts that the Secretary
            determines to be reasonable to cover unanticipated cost
            increases; and
                (ii) each proposed non-Federal source of capital and
            operating financing is stable, reliable, and available
            within the proposed project timetable.
            (B) Considerations.--In assessing the stability,
        reliability, and availability of proposed sources of non-
        Federal financing under subparagraph (A), the Secretary shall
        consider--
                (i) existing financial commitments;
                (ii) the degree to which financing sources are
            dedicated to the purposes proposed;
                (iii) any debt obligation that exists or is proposed by
            the recipient for the proposed project; and
                (iv) the extent to which the project has a non-Federal
            financial commitment that exceeds the required non-Federal
            share of the cost of the project.
        (6) Regulations.--Not later than 180 days after the date of
    enactment of this Act, the Secretary shall issue regulations on the
    manner in which the Secretary will evaluate and rate the projects
    based on the results of preliminary engineering, project
    justification, and the degree of non-Federal financial commitment,
    as required under this subsection.
        (7) Project evaluation and rating.--
            (A) In general.--A proposed project may advance from
        preliminary engineering to final design and construction only
        if the Secretary finds that the project meets the requirements
        of this subsection and there is a reasonable likelihood that
        the project will continue to meet such requirements.
            (B) Evaluation and rating.--In making such findings, the
        Secretary shall evaluate and rate the project as ``highly
        recommended'', ``recommended'', or ``not recommended'' based on
        the results of preliminary engineering, the project
        justification criteria, and the degree of non-Federal financial
        commitment, as required under this subsection. In rating the
        projects, the Secretary shall provide, in addition to the
        overall project rating, individual ratings for each of the
        criteria established under the regulations issued under
        paragraph (6).
    (g) Letters of Intent and Full Funding Grant Agreements.--
        (1) Letter of intent.--
            (A) In general.--The Secretary may issue a letter of intent
        to an applicant announcing an intention to obligate, for a
        project under this section, an amount from future available
        budget authority specified in law that is not more than the
        amount stipulated as the financial participation of the
        Secretary in the project.
            (B) Notification.--At least 60 days before issuing a letter
        under subparagraph (A) or entering into a full funding grant
        agreement, the Secretary shall notify in writing the Committee
        on Transportation and Infrastructure of the House of
        Representatives and the Committee on Environment and Public
        Works of the Senate of the proposed letter or agreement. The
        Secretary shall include with the notification a copy of the
        proposed letter or agreement as well as the evaluations and
        ratings for the project.
            (C) Not an obligation.--The issuance of a letter is deemed
        not to be an obligation under sections 1108(c), 1108(d), 1501,
        and 1502(a) of title 31, United States Code, or an
        administrative commitment.
            (D) Obligation or commitment.--An obligation or
        administrative commitment may be made only when contract
        authority is allocated to a project.
        (2) Full funding grant agreement.--
            (A) In general.--A project financed under this subsection
        shall be carried out through a full funding grant agreement.
        The Secretary shall enter into a full funding grant agreement
        based on the evaluations and ratings required under subsection
        (f)(7).
            (B) Terms.--If the Secretary makes a full funding grant
        agreement with an applicant, the agreement shall--
                (i) establish the terms of participation by the United
            States Government in a project under this section;
                (ii) establish the maximum amount of Government
            financial assistance for the project;
                (iii) cover the period of time for completing the
            project, including a period extending beyond the period of
            an authorization; and
                (iv) make timely and efficient management of the
            project easier according to the laws of the United States.
            (C) Agreement.--An agreement under this paragraph obligates
        an amount of available budget authority specified in law and
        may include a commitment, contingent on amounts to be specified
        in law in advance for commitments under this paragraph, to
        obligate an additional amount from future available budget
        authority specified in law. The agreement shall state that the
        contingent commitment is not an obligation of the Government.
        Interest and other financing costs of efficiently carrying out
        a part of the project within a reasonable time are a cost of
        carrying out the project under a full funding grant agreement,
        except that eligible costs may not be more than the cost of the
        most favorable financing terms reasonably available for the
        project at the time of borrowing. The applicant shall certify,
        in a way satisfactory to the Secretary, that the applicant has
        shown reasonable diligence in seeking the most favorable
        financing terms.
        (3) Amounts.--The total estimated amount of future obligations
    of the Government and contingent commitments to incur obligations
    covered by all outstanding letters of intent and full funding grant
    agreements may be not more than the greater of the amount
    authorized to carry out this section or an amount equivalent to the
    last 2 fiscal years of funding authorized to carry out this section
    less an amount the Secretary reasonably estimates is necessary for
    grants under this section not covered by a letter. The total amount
    covered by new letters and contingent commitments included in full
    funding grant agreements may be not more than a limitation
    specified in law.
    (h) Grant Requirements.--
        (1) In general.--A grant for a project under this section shall
    be subject to all of the requirements of title 23, United States
    Code.
        (2) Other terms and conditions.--The Secretary shall require
    that all grants under this section be subject to all terms,
    conditions, and requirements that the Secretary decides are
    necessary or appropriate for purposes of this section, including
    requirements for the disposition of net increases in value of real
    property resulting from the project assisted under this section.
    (i) Government's Share of Project Cost.--Based on engineering
studies, studies of economic feasibility, and information on the
expected use of equipment or facilities, the Secretary shall estimate
the cost of a project receiving assistance under this section. A grant
for the project is for 80 percent of the project cost, unless the grant
recipient requests a lower grant percentage. A refund or reduction of
the remainder may be made only if a refund of a proportional amount of
the grant of the Government is made at the same time.
    (j) Fiscal Capacity Considerations.--If the Secretary gives
priority consideration to financing projects that include more than the
non-Government share required under subsection (i) the Secretary shall
give equal consideration to differences in the fiscal capacity of State
and local governments.
    (k) Reports.--
        (1) Annual report.--Not later than the first Monday in February
    of each year, the Secretary shall submit to the Committee on
    Transportation and Infrastructure of the House of Representatives
    and the Committee on Environment and Public Works of the Senate a
    report that includes a proposal on the allocation of amounts to be
    made available to finance grants under this section.
        (2) Recommendations on funding.--The annual report under this
    paragraph shall include evaluations and ratings, as required under
    subsection (f). The report shall also include recommendations of
    projects for funding based on the evaluations and ratings and on
    existing commitments and anticipated funding levels for the next 3
    fiscal years and for the next 10 fiscal years based on information
    currently available to the Secretary.
    (l) Applicability of Title 23.--Funds made available to carry out
this section shall be available for obligation in the same manner as if
such funds were apportioned under chapter 1 of title 23, United States
Code; except that such funds shall not be transferable and shall remain
available until expended and the Federal share of the cost of a project
under this section shall be as provided in this section.
    (m) Designated Projects.--Notwithstanding any other provision of
this section, the Secretary shall allocate for each of fiscal years
2005, 2006, 2007, 2008, and 2009, from funds made available to carry
out this section, 10 percent, 20 percent, 25 percent, 25 percent, and
20 percent respectively, of the following amounts for grants to carry
out the following projects under this section:


------------------------------------------------------------------------
     No.           State          Project Description         Amount
------------------------------------------------------------------------
1.            CA              Bakersfield Beltway System    $140,000,000

2.            VA, WV, OH      Heartland Corridor Project     $90,000,000
                               including multiple
                               intermodal facility
                               improvements and
                               improvements to
                               facilitate the movement
                               of intermodal freight
                               from VA to OH............

3.            CA              Roadway improvements in        $55,000,000
                               and around the former
                               Norton Air Force Base as
                               part of the Inland Empire
                               Goods Movement Gateway
                               project..................

4.            MI              Planning, design, and          $20,000,000
                               construction of a new
                               American border plaza at
                               the Blue Water Bridge in
                               or near Port Huron, MI...

5.            IL              Construction of O'Hare        $140,000,000
                               Bypass/Elgin O'Hare
                               Extension................

6.            WI              Reconstruction of the          $30,000,000
                               Marquette Interchange,
                               Milwaukee WI.............

7.            IL              CREATE....................    $100,000,000

8.            OR              I-5 Bridge repair,            $160,000,000
                               replacement and
                               associated improvements
                               in the I-5 corridor......

9.            CA              Alameda Corridor East.....    $125,000,000

10.           IL              Mississippi River Bridge      $150,000,000
                               and related roads........

11.           CA              Transbay Terminal.........     $27,000,000

12.           NY              Cross Harbor Freight          $100,000,000
                               Movement Project, New
                               York.....................

13.           WA              Alaska Way Viaduct and        $100,000,000
                               Seawall Replacement......

14.           CA              Gerald Desmond/I-710          $100,000,000
                               Gateway Project..........

15.           CO              Denver's Union Station....     $50,000,000

16.           MN              Union Depot Multimodal         $50,000,000
                               Transit Facility.........

17.           CA              Sacramento Intermodal           $3,000,000
                               Station..................

18.           NJ              Liberty Corridor..........    $100,000,000

19.           NM              Relocate the El Paso, TX       $14,000,000
                               rail yard to Santa Teresa

20.           PA              Route 23/US 422                $20,000,000
                               Interchange Modernization
                               and Route 363/US 422
                               Interchange Improvement
                               Project and U.S. 422
                               Widening, Montgomery
                               County, PA...............

21.           PA              Route 28 Widening and          $15,000,000
                               improvements, Allegheny
                               County, PA...............

22.           PA              Improvements to I-80,          $15,000,000
                               Monroe County, PA........

23.           SC              I-73, Construction of I-73     $40,000,000
                               from Myrtle Beach, SC to
                               I-95, ending at the North
                               Carolina State line......

24.           VA              Rail Relocation to route       $15,000,000
                               164/I-664 rail corridor,
                               Portsmouth...............

25.           WA              Replacement of the Alaskan    $120,000,000
                               Way Viaduct and Seawall
                               in Seattle...............
------------------------------------------------------------------------

SEC. 1302. NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROGRAM.

    (a) In General.--The Secretary shall establish and implement a
program to make allocations to States for highway construction projects
in corridors of national significance to promote economic growth and
international or interregional trade pursuant to the selection factors
provided in this section. A State must submit an application to the
Secretary in order to receive an allocation under this section.
    (b) Selection Process.--
        (1) Priority.--In the selection process under this section, the
    Secretary shall give priority to projects in corridors that are a
    part of, or will be designated as part of, the Dwight D. Eisenhower
    National System of Interstate and Defense Highways after completion
    of the work described in the application received by the Secretary
    and to any project that will be completed within 5 years of the
    date of the allocation of funds for the project.
        (2) Selection factors.--In making allocations under this
    section, the Secretary shall consider the following factors:
            (A) The extent to which the corridor provides a link
        between two existing segments of the Interstate System.
            (B) The extent to which the project will facilitate major
        multistate or regional mobility and economic growth and
        development in areas underserved by existing highway
        infrastructure.
            (C) The extent to which commercial vehicle traffic in the
        corridor--
                (i) has increased since the date of enactment of the
            North American Free Trade Agreement Implementation Act (16
            U.S.C. 4401 et seq.); and
                (ii) is projected to increase in the future.
            (D) The extent to which international truck-borne
        commodities move through the corridor.
            (E) The extent to which the project will make improvements
        to an existing segment of the Interstate System that will
        result in a decrease in congestion.
            (F) The reduction in commercial and other travel time
        through a major freight corridor expected as a result of the
        project.
            (G) The value of the cargo carried by commercial vehicle
        traffic in the corridor and the economic costs arising from
        congestion in the corridor.
            (H) The extent of leveraging of Federal funds provided to
        carry out this section, including--
                (i) use of innovative financing;
                (ii) combination with funding provided under other
            sections of this Act and title 23, United States Code; and
                (iii) combination with other sources of Federal, State,
            local, or private funding.
    (c) Applicability of Title 23.--Funds made available by section
1101(a)(10) of this Act to carry out this section shall be available
for obligation in the same manner as if such funds were apportioned
under chapter 1 of title 23, United States Code; except that such funds
shall remain available until expended, and the Federal share of the
cost of a project under this section shall be determined in accordance
with section 120 of such title.
    (d) State Defined.--In this section, the term ``State'' has the
meaning such term has in section 101(a) of title 23, United States
Code.
    (e) Designated Projects.--The Secretary shall allocate for each of
fiscal years 2005, 2006, 2007, 2008, and 2009, from funds made
available to carry out this section, 10 percent, 20 percent, 25
percent, 25 percent, and 20 percent respectively, of the following
amounts for grants to carry out the following projects under this
section:


------------------------------------------------------------------------
     No.           State          Project Description         Amount
------------------------------------------------------------------------
1.            TX, AR, MS,     Planning, Design, and          $50,000,000
               TN, KY, IN      Construction of I-69 in
                               TX, LA, AR, MS, TN, KY,
                               and IN...................

2.            LA              Improvements to Louisiana      $20,000,000
                               Highway 1 between the
                               Caminada Bridge and the
                               intersection of LA
                               Highway 1 and U.S. 90....

3.            MD              Planning, design, and          $10,000,000
                               construction of the Inter
                               County Connector in
                               Montgomery and Prince
                               Georges County in
                               Maryland.................

4.            CA              Centennial Corridor Loop      $330,000,000
                               in Bakersfield...........

5.            VA              Construction of dedicated     $100,000,000
                               truck lanes on additional
                               capacity in I-81 in VA...

6.            CA              Design, Planning and          $100,000,000
                               Construction of State
                               Route 178 in Bakersfield.

7.            CA              Widening of Rosedale           $60,000,000
                               Highway between SR 43 and
                               SR 99 in Bakersfield and
                               widening of SR 178
                               between SR 99 and D
                               street in Bakersfield....

8.            LA              Construction of the 36        $150,000,000
                               mile segment of I-49 in
                               LA between the Arkansas
                               State line and I-220 in
                               Shreveport...............

9.            AR              Construction of an             $40,000,000
                               extension of I-530 from
                               Pine Bluff, Arkansas to
                               Wilmar, Arkansas to
                               interstate specifications

10.           IL              Construction of the U.S. I-   $152,000,000
                               80 to I-88 North-South
                               Connector in Illinois....

11.           WI              Construction and               $30,000,000
                               reconstruction of the
                               U.S. Highway 41 corridor
                               between Milwaukee and
                               Green Bay, Wisconsin.....

12.           IL              Construction of Route 34       $55,000,000
                               Interchange and
                               improvements in Illinois.

13.           CA              Increase capacity on I-80      $50,000,000
                               between Sacrament/Placer
                               County Line and SR 65....

14.           AK              Planning, design, and          $30,000,000
                               construction of Knik Arm
                               Bridge...................

15.           IA, IL          Planning, design, right-of-    $15,000,000
                               way acquisition and
                               construction of the
                               Interstate Route 74
                               bridge from Bettendorf,
                               Iowa, to Moline, Illinois

16.           AR              Planning, design, and          $20,000,000
                               construction of the I-49/
                               Bella Vista Bypass in
                               Arkansas.................

17.           SC              Planning, design, and          $10,000,000
                               construction of the I-73
                               corridor of national
                               significance in South
                               Carolina.................

18.           CA              I-405 HOV lane............    $100,000,000

19.           AR              I-69 Corridor, including       $75,000,000
                               the Great River Bridge...

20.           MN              Falls-to-Falls Corridor...     $50,000,000

21.           DC              Frederick Douglass             $75,000,000
                               Memorial Bridge..........

22.           CT              Pearl Harbor Memorial          $35,000,000
                               Bridge...................

23.           IN              I-80 Improvements.........     $10,000,000

24.           CA              State Route 4 East Upgrade     $20,000,000

25.           LA              LA 1 Replacement..........      $5,000,000

26.           AZ              State Route 85 Upgrade....      $3,000,000

27.           WV              I-73/I-74 Corridor........     $50,000,000

28.           LA              Construction of I-49 North     $27,500,000
                               from Shreveport,
                               Louisiana to Arkansas
                               State line (I-220 to AR
                               Line)....................

29.           LA              Transportation                 $27,500,000
                               improvements to I-49
                               South....................

30.           OK              Ports to Plain Corridor in     $35,000,000
                               Oklahoma.................

31.           TN              For design, ROW and           $100,000,000
                               construction of
                               Interstate 69............

32.           CO              U.S. 287, Ports-to-Plains       $3,000,000
                               Corridor.................

33.           OK              State of Oklahoma I-44        $110,000,000
                               from Riverside to Yale
                               Avenue in Tulsa..........
------------------------------------------------------------------------

SEC. 1303. COORDINATED BORDER INFRASTRUCTURE PROGRAM.

    (a) General Authority.--The Secretary shall implement a coordinated
border infrastructure program under which the Secretary shall
distribute funds to border States to improve the safe movement of motor
vehicles at or across the border between the United States and Canada
and the border between the United States and Mexico.
    (b) Eligible Uses.--Subject to subsection (d), a State may use
funds apportioned under this section only for--
        (1) improvements in a border region to existing transportation
    and supporting infrastructure that facilitate cross-border motor
    vehicle and cargo movements;
        (2) construction of highways and related safety and safety
    enforcement facilities in a border region that facilitate motor
    vehicle and cargo movements related to international trade;
        (3) operational improvements in a border region, including
    improvements relating to electronic data interchange and use of
    telecommunications, to expedite cross border motor vehicle and
    cargo movement;
        (4) modifications to regulatory procedures to expedite safe and
    efficient cross border motor vehicle and cargo movements; and
        (5) international coordination of transportation planning,
    programming, and border operation with Canada and Mexico relating
    to expediting cross border motor vehicle and cargo movements.
    (c) Apportionment of Funds.--On October 1 of each fiscal year, the
Secretary shall apportion among border States sums authorized to be
appropriated to carry out this section for such fiscal year as follows:
        (1) 20 percent in the ratio that--
            (A) the total number of incoming commercial trucks that
        pass through the land border ports of entry within the
        boundaries of a border State, as determined by the Secretary;
        bears to
            (B) the total number of incoming commercial trucks that
        pass through such ports of entry within the boundaries of all
        the border States, as determined by the Secretary.
        (2) 30 percent in the ratio that--
            (A) the total number of incoming personal motor vehicles
        and incoming buses that pass through land border ports of entry
        within the boundaries of a border State, as determined by the
        Secretary; bears to
            (B) the total number of incoming personal motor vehicles
        and incoming buses that pass through such ports of entry within
        the boundaries of all the border States, as determined by the
        Secretary.
        (3) 25 percent in the ratio that--
            (A) the total weight of incoming cargo by commercial trucks
        that pass through land border ports of entry within the
        boundaries of a border State, as determined by the Secretary;
        bears to
            (B) the total weight of incoming cargo by commercial trucks
        that pass through such ports of entry within the boundaries of
        all the border States, as determined by the Secretary.
        (4) 25 percent of the ratio that--
            (A) the total number of land border ports of entry within
        the boundaries of a border State, as determined by the
        Secretary; bears to
            (B) the total number of land border ports of entry within
        the boundaries of all the border States, as determined by the
        Secretary.
    (d) Projects in Canada or Mexico.--A project in Canada or Mexico,
proposed by a border State to directly and predominantly facilitate
cross-border motor vehicle and cargo movements at an international port
of entry into the border region of the State, may be constructed using
funds apportioned to the State under this section if, before obligation
of those funds, Canada or Mexico, or the political subdivision of
Canada or Mexico that is responsible for the operation of the facility
to be constructed, provides assurances satisfactory to the Secretary
that any facility constructed under this subsection will be--
        (1) constructed in accordance with standards equivalent to
    applicable standards in the United States; and
        (2) properly maintained and used over the useful life of the
    facility for the purpose for which the Secretary is allocating such
    funds to the project.
    (e) Transfer of Funds to the General Services Administration.--
        (1) State funds.--At the request of a border State, funds
    apportioned to the State under this section may be transferred to
    the General Services Administration for the purpose of funding one
    or more projects described in subsection (b) if--
            (A) the Secretary determines, after consultation with the
        transportation department of the border State, that the General
        Services Administration should carry out the project; and
            (B) the General Services Administration agrees to accept
        the transfer of, and to administer, those funds in accordance
        with this section.
        (2) Non-federal share.--
            (A) In general.--A border State that makes a request under
        paragraph (1) shall provide directly to the General Services
        Administration, for each project covered by the request, the
        non-Federal share of the cost of the project.
            (B) No augmentation of appropriations.--Funds provided by a
        border State under subparagraph (A)--
                (i) shall not be considered to be an augmentation of
            the appropriations made available to the General Services
            Administration; and
                (ii) shall be--

                    (I) administered, subject to paragraph (1)(B), in
                accordance with the procedures of the General Services
                Administration; but
                    (II) available for obligation in the same manner as
                if the funds were apportioned under chapter 1 of title
                23, United States Code.

        (3) Obligation authority.--Obligation authority shall be
    transferred to the General Services Administration for a project in
    the same manner and amount as the funds provided for the project
    under paragraph (1).
        (4) Limitation on transfer of funds.--No State may transfer to
    the General Services Administration under this subsection an amount
    that is more than the lesser of--
            (A) 15 percent of the aggregate amount of funds apportioned
        to the State under this section for such fiscal year; or
            (B) $5,000,000.
    (f) Applicability of Title 23.--Funds made available to carry out
this section shall be available for obligation in the same manner as if
such funds were apportioned under chapter 1 of title 23, United States
Code; except that, subject to subsection (e), such funds shall not be
transferable and shall remain available until expended, and the Federal
share of the cost of a project under this section shall be determined
in accordance with section 120 of such title.
    (g) Definitions.--In this section, the following definitions apply:
        (1) Border region.--The term ``border region'' means any
    portion of a border State within 100 miles of an international land
    border with Canada or Mexico.
        (2) Border state.--The term ``border State'' means any State
    that has an international land border with Canada or Mexico.
        (3) Commercial truck.--The term ``commercial truck'' means a
    commercial motor vehicle as defined in section 31301(4) (other than
    subparagraph (B)) of title 49, United States Code.
        (4) Motor vehicle.--The term ``motor vehicle'' has the meaning
    such term has under section 101(a) of title 23, United States Code.
        (5) State.--The term ``State'' has the meaning such term has in
    section 101(a) of such title 23.

SEC. 1304. HIGH PRIORITY CORRIDORS ON THE NATIONAL HIGHWAY SYSTEM.

    (a) Evacuation Routes.--Section 1105(b) of the Intermodal Surface
Transportation Efficiency Act of 1991 (Public Law 102-240; 105 Stat.
2032) is amended in the first sentence by inserting ``and evacuation
routes'' after ``corridors'' the first place it appears.
    (b) Corridors.--Section 1105(c) of the Intermodal Surface
Transportation Efficiency Act of 1991 (105 Stat. 2032) is amended--
        (1) by striking paragraph (14) and inserting the following:
        ``(14) Heartland Expressway from Denver, Colorado, through
    Scottsbluff, Nebraska, to Rapid City, South Dakota as follows:
            ``(A) In the State of Colorado, the Heartland Expressway
        Corridor shall generally follow--
                ``(i) Interstate 76 from Denver to Brush; and
                ``(ii) Colorado Highway 71 from Limon to the border
            between the States of Colorado and Nebraska.
            ``(B) In the State of Nebraska, the Heartland Expressway
        Corridor shall generally follow--
                ``(i) Nebraska Highway 71 from the border between the
            States of Colorado and Nebraska to Scottsbluff;
                ``(ii) United States Route 26 from Scottsbluff to the
            intersection with State Highway L62A;
                ``(iii) State Highway L62A from the intersection with
            United States Route 26 to United States Route 385 north of
            Bridgeport;
                ``(iv) United States Route 385 to the border between
            the States of Nebraska and South Dakota; and
                ``(v) United States Highway 26 from Scottsbluff to the
            border of the States of Nebraska and Wyoming.
            ``(C) In the State of Wyoming, the Heartland Expressway
        Corridor shall generally follow United States Highway 26 from
        the border of the States of Nebraska and Wyoming to the
        termination at Interstate 25 at Interchange number 94.
            ``(D) In the State of South Dakota, the Heartland
        Expressway Corridor shall generally follow--
                ``(i) United States Route 385 from the border between
            the States of Nebraska and South Dakota to the intersection
            with State Highway 79; and
                ``(ii) State Highway 79 from the intersection with
            United States Route 385 to Rapid City.'';
        (2) in paragraph (23) by inserting before the period at the end
    the following: ``and the connection from Wichita, Kansas, to Sioux
    City, Iowa, which includes I-135 from Wichita, Kansas to Salina,
    Kansas, United States Route 81 from Salina, Kansas, to Norfolk,
    Nebraska, Nebraska State Route 35 from Norfolk, Nebraska, to South
    Sioux City, Nebraska, and the connection to I-29 in Sioux City,
    Iowa'';
        (3) in paragraph (33) by striking ``I-395'' and inserting ``and
    including the I-395 corridor'';
        (4) by striking paragraph (34) and inserting the following:
        ``(34) The Alameda Corridor-East and Southwest Passage,
    California. The Alameda Corridor-East is generally described as the
    corridor from East Los Angeles (terminus of Alameda Corridor)
    through Los Angeles, Orange, San Bernardino, and Riverside
    Counties, to termini at Barstow in San Bernardino County and
    Coachella in Riverside County. The Southwest Passage shall follow
    I-10 from San Bernardino to the Arizona State line.'';
        (5) by adding at the end the following:
        ``(46) Interstate Route 710 between the terminus at Long Beach,
    California, to California State Route 60.
        ``(47) Interstate Route 87 from the Quebec border to New York
    City.
        ``(48) The Route 50 High Plains Corridor along the United
    States Route 50 corridor from Newton, Kansas, to Pueblo, Colorado.
        ``(49) The Atlantic Commerce Corridor on Interstate Route 95
    from Jacksonville, Florida, to Miami, Florida.
        ``(50) The East-West Corridor commencing in Watertown, New
    York, continuing northeast through New York, Vermont, New
    Hampshire, and Maine, and terminating in Calais, Maine.
        ``(51) The SPIRIT Corridor on United States Route 54 from El
    Paso, Texas, through New Mexico, Texas, and Oklahoma to Wichita,
    Kansas.
        ``(52) The route in Arkansas running south of and parallel to
    Arkansas State Highway 226 from the relocation of United States
    Route 67 to the vicinity of United States Route 49 and United
    States Route 63.
        ``(53) United States Highway Route 6 from Interstate Route 70
    to Interstate Route 15, Utah.
        ``(54) The California Farm-to-Market Corridor, California State
    Route 99 from south of Bakersfield to Sacramento, California.
        ``(55) In Texas, Interstate Route 20 from Interstate Route 35E
    in Dallas County, east to the intersection of Interstate Route 635,
    north to the intersection of Interstate Route 30, northeast through
    Texarkana to Little Rock, Arkansas, Interstate Route 40 northeast
    from Little Rock east to the proposed Interstate Route 69 corridor.
        ``(56) In the State of Texas, the La Entrada al Pacifico
    Corridor consisting of the following highways and any portion of a
    highway in a corridor on 2 miles of either side of the center line
    of the highway:
            ``(A) State Route 349 from Lamesa to the point on that
        highway that is closest to 32 degrees, 7 minutes, north
        latitude, by 102 degrees, 6 minutes, west longitude.
            ``(B) The segment or any roadway extending from the point
        described by subparagraph (A) to the point on Farm-to-Market
        Road 1788 closest to 32 degrees, 0 minutes, north latitude, by
        102 degrees, 16 minutes, west longitude.
            ``(C) Farm-to-Market Road 1788 from the point described by
        subparagraph (B) to its intersection with Interstate Route 20.
            ``(D) Interstate Route 20 from its intersection with Farm-
        to-Market Road 1788 to its intersection with United States
        Route 385.
            ``(E) United States Route 385 from Odessa to Fort Stockton,
        including those portions that parallel United States Route 67
        and Interstate Route 10.
            ``(F) United States Route 67 from Fort Stockton to
        Presidio, including those portions that parallel Interstate
        Route 10 and United States Route 90.
        ``(57) United States Route 41 corridor between Interstate Route
    94 via Interstate Route 894 and Highway 45 near Milwaukee and
    Interstate Route 43 near Green Bay in the State of Wisconsin.
        ``(58) The Theodore Roosevelt Expressway from Rapid City, South
    Dakota, north on United States Route 85 to Williston, North Dakota,
    west on United States Route 2 to Culbertson, Montana, and north on
    Montana Highway 16 to the international border with Canada at the
    port of Raymond, Montana.
        ``(59) The Central North American Trade Corridor from the
    border between North Dakota and South Dakota, north on United
    States Route 83 through Bismark and Minot, North Dakota, to the
    international border with Canada.
        ``(60) The Providence Beltline Corridor beginning at Interstate
    Route 95 in the vicinity of Hope Valley, Rhode Island, traversing
    eastwardly intersecting and merging into Interstate Route 295,
    continuing northeastwardly along Interstate Route 95, and
    terminating at the Massachusetts border, and including the western
    bypass of Providence, Rhode Island, from Interstate Route 295 to
    the Massachusetts border.
        ``(61) In the State of Missouri, the corridors consisting of
    the following highways:
            ``(A) Interstate Route 70, from Interstate Route 29/35 to
        United States Route 61/Avenue of the Saints.
            ``(B) Interstate Route 72/United States Route 36, from the
        intersection with Interstate Route 29 to United States Route
        61/Avenue of the Saints.
            ``(C) United States Route 67, from Interstate Route 55 to
        the Arkansas State line.
            ``(D) United States Route 65, from United States Route 36/
        Interstate Route 72 to the East-West TransAmerica corridor, at
        the Arkansas State line.
            ``(E) United States Route 63, from United States Route 36
        and the proposed Interstate Route 72 to the East-West
        TransAmerica corridor, at the Arkansas State line.
            ``(F) United States Route 54, from the Kansas State line to
        United States Route 61/Avenue of the Saints.
        ``(62) The Georgia Developmental Highway System Corridors
    identified in section 32-4-22 of the Official Code of Georgia,
    Annotated.
        ``(63) The Liberty Corridor, a corridor in an area encompassing
    very critical and significant transportation infrastructure
    providing regional, national, and international access through the
    State of New Jersey, including Interstate Routes 95, 80, 287, and
    78, and United States Routes 1, 3, 9, 17, and 46, and portways and
    connecting infrastructure.
        ``(64) The corridor in an area of passage in the State of New
    Jersey serving significant interstate and regional traffic, located
    near the cities of Camden, New Jersey, and Philadelphia,
    Pennsylvania, and including Interstate Route 295, United States
    Route 42, United States Route 130, and Interstate Route 676.
        ``(65) The Interstate Route 95 Corridor beginning at the New
    York State line and continuing through Connecticut to the Rhode
    Island State line.
        ``(66) The Interstate Route 91 Corridor from New Haven,
    Connecticut, to the Massachusetts State line.
        ``(67) The Fairbanks-Yukon International Corridor consisting of
    the portion of the Alaska Highway from the international border
    with Canada to the Richardson Highway, and the Richardson Highway
    from its junction with the Alaska Highway to Fairbanks, Alaska.
        ``(68) The Washoe County corridor, along Interstate Route 580/
    United States Route 95/United States Route 95A, from Reno, Nevada,
    to Las Vegas, Nevada.
        ``(69) The Cross Valley Connector connecting Interstate Route 5
    and State Route 14, Santa Clarita Valley, California.
        ``(70) The Economic Lifeline corridor, along Interstate Route
    15 and Interstate Route 40, California, Arizona, and Nevada,
    including Interstate Route 215 South from near San Bernadino,
    California, to Riverside, California, and State Route 91 from
    Riverside, California, to the intersection with Interstate Route 15
    near Corona, California.
        ``(71) The High Desert Corridor/E-220 from Los Angeles,
    California, to Las Vegas, Nevada, via Palmdale and Victorville,
    California.
        ``(72) The North-South corridor, along Interstate Route 49
    North, from Kansas City, Missouri, to Shreveport, Louisiana.
        ``(73) The Louisiana Highway corridor, along Louisiana Highway
    1, from Grand Isle, Louisiana, to the intersection with United
    States Route 90.
        ``(74) The portion of United States Route 90 from Interstate
    Route 49 in Lafayette, Louisiana, to Interstate Route 10 in New
    Orleans, Louisiana.
        ``(75) The Louisiana 28 corridor from Fort Polk to Alexandria,
    Louisiana.
        ``(76) The portion of Interstate Route 75 from Toledo, Ohio, to
    Cincinnati, Ohio.
        ``(77) The portion of United States Route 24 from the Indiana/
    Ohio State line to Toledo, Ohio.
        ``(78) The portion of Interstate Route 71 from Cincinnati,
    Ohio, to Cleveland, Ohio.
        ``(79) Interstate Route 376 from the Pittsburgh Interchange (I/
    C No. 56) of the Pennsylvania Turnpike, westward on Interstate
    Route 279, United States Route 22, United States Route 30, and
    Pennsylvania Route 60, continuing past the Pittsburgh International
    Airport on Turnpike Route 60, to the Pennsylvania Turnpike
    (Interstate Route 76), Interchange 10, and continuing north on
    Pennsylvania Turnpike Route 60 and on United States Route 422 to
    Interstate Route 80.
        ``(80) The Intercounty Connector, a new east-west multimodal
    highway between Interstate Route 270 and Interstate Route 95/United
    States Route 1 in Montgomery and Prince George's Counties,
    Maryland.''; and
        (6) by aligning paragraph (45) with paragraph (46) (as added by
    paragraph (5)).
    (c) Interstate Routes.--Section 1105(e)(5) of the Intermodal
Surface Transporation Efficiency Act of 1991 is amended--
        (1) in subparagraph (A) by striking ``and subsection (c)(45)''
    and inserting ``subsection (c)(45), subsection (c)(54), and
    subsection (c)(57)'';
        (2) by redesignating subparagraphs (B) through (D) as
    subparagraphs (C) through (E); and
        (3) by inserting after subparagraph (A) the following:
            ``(B) Interstate route 376.--
                ``(i) Designation of interstate route 376.--

                    ``(I) In general.--The routes referred to in
                subsection (c)(79), except the portion of Pennsylvania
                Turnpike Route 60 and United States Route 422 between
                Pennsylvania Turnpike Interchange 10 and Interstate
                Route 80, shall be designated as Interstate Route 376.
                    ``(II) Signs.--The State of Pennsylvania shall have
                jurisdiction over the highways described in subclause
                (I) (except Pennsylvania Turnpike Route 60) and erect
                signs in accordance with Interstate signing criteria
                that identify the routes described in subclause (I) as
                Interstate Route 376.
                    ``(III) Assistance from secretary.--The Secretary
                shall assist the State of Pennsylvania in carrying out,
                not later than December 31, 2008, an activity under
                subclause (II) relating to Interstate Route 376 and in
                complying with sections 109 and 139 of title 23, United
                States Code.

                ``(ii) Other segments.--The segment of the route
            referred to in subsection (c)(79) located between the
            Pennsylvania Turnpike, Interchange 10, and Interstate Route
            80 may be signed as Interstate Route 376 under clause
            (i)(II) if that segment meets the criteria under sections
            109 and 139 of title 23, United States Code.''.
    (d) Authorization of Appropriations.--There are authorized to be
appropriated to carry out, in accordance with title 23, United States
Code, projects on corridors identified in section 1105(c) of the
Intermodal Surface Transportation Efficiency Act of 1991 (105 Stat.
2032) such sums as may be necessary.

SEC. 1305. TRUCK PARKING FACILITIES.

    (a) Establishment.--In cooperation with appropriate State,
regional, and local governments, the Secretary shall establish a pilot
program to address the shortage of long-term parking for commercial
motor vehicles on the National Highway System.
    (b) Allocation of Funds.--
        (1) In general.--The Secretary shall allocate funds made
    available to carry out this section among States, metropolitan
    planning organizations, and local governments.
        (2) Applications.--To be eligible for an allocation under this
    section, a State (as defined in section 101(a) of title 23, United
    States Code), metropolitan planning organization, or local
    government shall submit to the Secretary an application at such
    time and containing such information as the Secretary may require.
        (3) Eligible projects.--Funds allocated under this subsection
    shall be used by the recipient for projects described in an
    application approved by the Secretary. Such projects shall serve
    the National Highway System and may include the following:
            (A) Constructing safety rest areas (as defined in section
        120(c) of title 23, United States Code) that include parking
        for commercial motor vehicles.
            (B) Constructing commercial motor vehicle parking
        facilities adjacent to commercial truck stops and travel
        plazas.
            (C) Opening existing facilities to commercial motor vehicle
        parking, including inspection and weigh stations and park-and-
        ride facilities.
            (D) Promoting the availability of publicly or privately
        provided commercial motor vehicle parking on the National
        Highway System using intelligent transportation systems and
        other means.
            (E) Constructing turnouts along the National Highway System
        for commercial motor vehicles.
            (F) Making capital improvements to public commercial motor
        vehicle parking facilities currently closed on a seasonal basis
        to allow the facilities to remain open year-round.
            (G) Improving the geometric design of interchanges on the
        National Highway System to improve access to commercial motor
        vehicle parking facilities.
        (4) Priority.--In allocating funds made available to carry out
    this section, the Secretary shall give priority to applicants
    that--
            (A) demonstrate a severe shortage of commercial motor
        vehicle parking capacity in the corridor to be addressed;
            (B) have consulted with affected State and local
        governments, community groups, private providers of commercial
        motor vehicle parking, and motorist and trucking organizations;
        and
            (C) demonstrate that their proposed projects are likely to
        have positive effects on highway safety, traffic congestion, or
        air quality.
    (c) Report to Congress.--Not later than 3 years after the date of
enactment of this Act, the Secretary shall submit to Congress a report
on the results of the pilot program.
    (d) Funding.--
        (1) In general.--There is authorized to be appropriated from
    the Highway Trust Fund (other than the Mass Transit Account) to
    carry out this section $6,250,000 for each of fiscal years 2006
    through 2009.
        (2) Contract authority.--Funds authorized under this subsection
    shall be available for obligation in the same manner as if the
    funds were apportioned under chapter 1 of title 23, United States
    Code; except that such funds shall not be transferable and shall
    remain available until expended, and the Federal share of the cost
    of a project under this section shall be determined in accordance
    with sections 120(b) and 120(c) of such title.
    (e) Treatment of Projects.--Notwithstanding any other provision of
law, projects funded under this section shall be treated as projects on
a Federal-aid system under chapter 1 of title 23, United States Code.

SEC. 1306. FREIGHT INTERMODAL DISTRIBUTION PILOT GRANT PROGRAM.

    (a) In General.--The Secretary shall establish and implement a
freight intermodal distribution pilot grant program.
    (b) Purposes.--The purposes of the program established under
subsection (a) shall be for the Secretary to make grants to States--
        (1) to facilitate and support intermodal freight transportation
    initiatives at the State and local levels to relieve congestion and
    improve safety; and
        (2) to provide capital funding to address infrastructure and
    freight distribution needs at inland ports and intermodal freight
    facilities.
    (c) Eligible Projects.--Projects for which grants may be made under
this section shall help relieve congestion, improve transportation
safety, facilitate international trade, and encourage public-private
partnership and may include projects for the development and
construction of intermodal freight distribution and transfer facilities
at inland ports.
    (d) Selection Process.--
        (1) Applications.--A State (as defined in section 101(a) of
    title 23, United States Code) shall submit for approval by the
    Secretary an application for a grant under this section containing
    such information as the Secretary may require to receive such a
    grant.
        (2) Priority.--In selecting projects for grants, the Secretary
    shall give priority to projects that will--
            (A) reduce congestion into and out of international ports
        located in the United States;
            (B) demonstrate ways to increase the likelihood that
        freight container movements involve freight containers carrying
        goods; and
            (C) establish or expand intermodal facilities that
        encourage the development of inland freight distribution
        centers.
        (3) Designated projects.--Subject to the provisions of this
    section, the Secretary shall allocate for each of fiscal years 2005
    through 2009, from funds made available to carry out this section,
    20 percent of the following amounts for grants to carry out the
    following projects under this section:
            (A) Short-haul intermodal projects, Oregon, $5,000,000.
            (B) The Georgia Port Authority, $5,000,000.
            (C) The ports of Los Angeles and Long Beach, California,
        $5,000,000.
            (D) Fairbanks, Alaska, $5,000,000.
            (E) Charlotte Douglas International Airport Freight
        Intermodal Facility, North Carolina, $5,000,000.
            (F) South Piedmont Freight Intermodal Center, North
        Carolina, $5,000,000.
    (e) Use of Grant Funds.--Funds made available to a recipient of a
grant under this section shall be used by the recipient for the project
described in the application of the recipient approved by the
Secretary.
    (f) Report.--Not later than 3 years after the date of enactment of
this Act, the Secretary shall submit to Congress a report on the
results of the pilot program carried out under this section.
    (g) Funding.--
        (1) In general.--There is authorized to be appropriated from
    the Highway Trust Fund (other than the Mass Transit Account) to
    carry out this section $6,000,000 for each of fiscal years 2005
    through 2009.
        (2) Contract authority.--Funds authorized by this subsection
    shall be available for obligation in the same manner as if the
    funds were apportioned under chapter 1 of title 23, United States
    Code; except that such funds shall not be transferable and shall
    remain available until expended, and the Federal share of the cost
    of a project under this section shall be determined in accordance
    with section 120 of such title.
    (h) Treatment of Projects.--Notwithstanding any other provision of
law, projects for which grants are made under this section shall be
treated as projects on a Federal-aid system under chapter 1 of title
23, United States Code.

SEC. 1307. DEPLOYMENT OF MAGNETIC LEVITATION TRANSPORTATION PROJECTS.

    (a) Definitions.--In this section, the following definitions apply:
        (1) Eligible project costs.--The term ``eligible project
    costs''--
            (A) means the capital cost of the fixed guideway
        infrastructure of a MAGLEV project, including land, piers,
        guideways, propulsion equipment and other components attached
        to guideways, power distribution facilities (including
        substations), control and communications facilities, access
        roads, and storage, repair, and maintenance facilities, but not
        including costs incurred for a new station; and
            (B) includes the costs of preconstruction planning
        activities.
        (2) Full project costs.--The term ``full project costs'' means
    the total capital costs of a MAGLEV project, including eligible
    project costs and the costs of stations, vehicles, and equipment.
        (3) MAGLEV.--The term ``MAGLEV'' means transportation systems
    employing magnetic levitation that would be capable of safe use by
    the public at a speed in excess of 240 miles per hour.
        (4) State.--The term ``State'' has the meaning such term has
    under section 101(a) of title 23, United States Code.
    (b) In General.--
        (1) Assistance for eligible projects.--The Secretary shall make
    available financial assistance to pay the Federal share of full
    project costs of eligible projects authorized by this section.
        (2) Use of assistance.--Financial assistance provided under
    paragraph (1) shall be used only to pay eligible project costs of
    projects authorized by this section.
        (3) Applicability of other laws.--Financial assistance made
    available under this section, and projects assisted with such
    assistance, shall be subject to section 5333(a) of title 49, United
    States Code.
    (c) Project Eligibility.--To be eligible to receive financial
assistance under subsection (b), a project shall--
        (1) involve a segment or segments of a high-speed ground
    transportation corridor;
        (2) result in an operating transportation facility that
    provides a revenue producing service; and
        (3) be approved by the Secretary based on an application
    submitted to the Secretary by a State or authority designated by
    one or more States.
    (d) Allocation.--Of the amounts made available to carry out this
section for a fiscal year, the Secretary shall allocate 50 percent for
the MAGLEV project between Las Vegas and Primm, Nevada, and 50 percent
for a MAGLEV project located east of the Mississippi River.

SEC. 1308. DELTA REGION TRANSPORTATION DEVELOPMENT PROGRAM.

    (a) In General.--The Secretary shall carry out a program in the 8
States comprising the Delta Region (Alabama, Arkansas, Illinois,
Kentucky, Louisiana, Mississippi, Missouri, and Tennessee) to--
        (1) support and encourage multistate transportation planning
    and corridor development;
        (2) provide for transportation project development;
        (3) facilitate transportation decisionmaking; and
        (4) support transportation construction.
    (b) Eligible Recipients.--A State transportation department or
metropolitan planning organization in a Delta Region State may receive
and administer funds provided under the program.
    (c) Eligible Activities.--The Secretary shall make allocations
under the program for multistate highway planning, development, and
construction projects.
    (d) Other Provisions Regarding Eligibility.--All activities funded
under this program shall be consistent with the continuing,
cooperative, and comprehensive planning processes required by sections
134 and 135 of title 23, United States Code.
    (e) Selection Criteria.--The Secretary shall select projects to be
carried out under the program based on--
        (1) whether the project is located--
            (A) in an area under the authority of the Delta Regional
        Authority; and
            (B) on a Federal-aid highway;
        (2) endorsement of the project by the State department of
    transportation; and
        (3) evidence of the ability of the recipient of funds provided
    under the program to complete the project.
    (f) Program Priorities.--In administering the program, the
Secretary shall--
        (1) encourage State and local officials to work together to
    develop plans for multimodal and multijurisdictional transportation
    decisionmaking; and
        (2) give priority to projects that emphasize multimodal
    planning, including planning for operational improvements that--
            (A) increase the mobility of people and goods;
            (B) improve the safety of the transportation system with
        respect to catastrophic natural disasters or disasters caused
        by human activity; and
            (C) contribute to the economic vitality of the area in
        which the project is being carried out.
    (g) Federal Share.--Amounts provided by the Delta Regional
Authority to carry out a project under this subsection may be applied
to the non-Federal share of the project required by section 120 of
title 23, United States Code.
    (h) Funding.--
        (1) In general.--There is authorized to be appropriated from
    the Highway Trust Fund (other than the Mass Transit Account) to
    carry out this section $10,000,000 for each of fiscal years 2006
    through 2009.
        (2) Contract authority.--Funds made available to carry out this
    section shall be available for obligation in the same manner as if
    such funds were apportioned under chapter 1 of title 23, United
    States Code; except that such funds shall not be transferable and
    shall remain available until expended.

SEC. 1309. EXTENSION OF PUBLIC TRANSIT VEHICLE EXEMPTION FROM AXLE
              WEIGHT RESTRICTIONS.

    Section 1023(h)(1) of the Intermodal Surface Transportation
Efficiency Act of 1991 (23 U.S.C. 127 note; 106 Stat. 1552) is amended
by striking ``2005'' and inserting ``2009''.

SEC. 1310. INTERSTATE OASIS PROGRAM.

    (a) In General.--Not later than 180 days after the date of
enactment of this section, in consultation with the States and other
interested parties, the Secretary shall--
        (1) establish an interstate oasis program; and
        (2) after providing an opportunity for public comment, develop
    standards for designating, as an interstate oasis, a facility
    that--
            (A) offers--
                (i) products and services to the public;
                (ii) 24-hour access to restrooms; and
                (iii) parking for automobiles and heavy trucks; and
            (B) meets other standards established by the Secretary.
    (b) Standards for Designation.--The standards for designation under
subsection (a) shall include standards relating to--
        (1) the appearance of a facility; and
        (2) the proximity of the facility to the Dwight D. Eisenhower
    National System of Interstate and Defense Highways.
    (c) Eligibility for Designation.--If a State (as defined in section
101(a) of title 23, United States Code) elects to participate in the
interstate oasis program, any facility meeting the standards
established by the Secretary shall be eligible for designation under
this section.
    (d) Logo.--The Secretary shall design a logo to be displayed by a
facility designated under this section.

                       Subtitle D--Highway Safety

SEC. 1401. HIGHWAY SAFETY IMPROVEMENT PROGRAM.

    (a) Safety Improvement.--
        (1) In general.--Section 148 of title 23, United States Code,
    is amended to read as follows:

``Sec. 148. Highway safety improvement program

    ``(a) Definitions.--In this section, the following definitions
apply:
        ``(1) High risk rural road.--The term `high risk rural road'
    means any roadway functionally classified as a rural major or minor
    collector or a rural local road--
            ``(A) on which the accident rate for fatalities and
        incapacitating injuries exceeds the statewide average for those
        functional classes of roadway; or
            ``(B) that will likely have increases in traffic volume
        that are likely to create an accident rate for fatalities and
        incapacitating injuries that exceeds the statewide average for
        those functional classes of roadway.
        ``(2) Highway safety improvement program.--The term `highway
    safety improvement program' means the program carried out under
    this section.
        ``(3) Highway safety improvement project.--
            ``(A) In general.--The term `highway safety improvement
        project' means a project described in the State strategic
        highway safety plan that--
                ``(i) corrects or improves a hazardous road location or
            feature; or
                ``(ii) addresses a highway safety problem.
            ``(B) Inclusions.--The term `highway safety improvement
        project' includes a project for one or more of the following:
                ``(i) An intersection safety improvement.
                ``(ii) Pavement and shoulder widening (including
            addition of a passing lane to remedy an unsafe condition).
                ``(iii) Installation of rumble strips or another
            warning device, if the rumble strips or other warning
            devices do not adversely affect the safety or mobility of
            bicyclists, pedestrians, and the disabled.
                ``(iv) Installation of a skid-resistant surface at an
            intersection or other location with a high frequency of
            accidents.
                ``(v) An improvement for pedestrian or bicyclist safety
            or safety of the disabled.
                ``(vi) Construction of any project for the elimination
            of hazards at a railway-highway crossing that is eligible
            for funding under section 130, including the separation or
            protection of grades at railway-highway crossings.
                ``(vii) Construction of a railway-highway crossing
            safety feature, including installation of protective
            devices.
                ``(viii) The conduct of a model traffic enforcement
            activity at a railway-highway crossing.
                ``(ix) Construction of a traffic calming feature.
                ``(x) Elimination of a roadside obstacle.
                ``(xi) Improvement of highway signage and pavement
            markings.
                ``(xii) Installation of a priority control system for
            emergency vehicles at signalized intersections.
                ``(xiii) Installation of a traffic control or other
            warning device at a location with high accident potential.
                ``(xiv) Safety-conscious planning.
                ``(xv) Improvement in the collection and analysis of
            crash data.
                ``(xvi) Planning integrated interoperable emergency
            communications equipment, operational activities, or
            traffic enforcement activities (including police
            assistance) relating to workzone safety.
                ``(xvii) Installation of guardrails, barriers
            (including barriers between construction work zones and
            traffic lanes for the safety of motorists and workers), and
            crash attenuators.
                ``(xviii) The addition or retrofitting of structures or
            other measures to eliminate or reduce accidents involving
            vehicles and wildlife.
                ``(xix) Installation and maintenance of signs
            (including fluorescent, yellow-green signs) at pedestrian-
            bicycle crossings and in school zones.
                ``(xx) Construction and yellow-green signs at
            pedestrian-bicycle crossings and in school zones.
                ``(xxi) Construction and operational improvements on
            high risk rural roads.
        ``(4) Safety project under any other section.--
            ``(A) In general.--The term `safety project under any other
        section' means a project carried out for the purpose of safety
        under any other section of this title.
            ``(B) Inclusion.--The term `safety project under any other
        section' includes a project to promote the awareness of the
        public and educate the public concerning highway safety matters
        (including motorcyclist safety) and a project to enforce
        highway safety laws.
        ``(5) State highway safety improvement program.--The term
    `State highway safety improvement program' means projects or
    strategies included in the State strategic highway safety plan
    carried out as part of the State transportation improvement program
    under section 135(g).
        ``(6) State strategic highway safety plan.--The term `State
    strategic highway safety plan' means a plan developed by the State
    transportation department that--
            ``(A) is developed after consultation with--
                ``(i) a highway safety representative of the Governor
            of the State;
                ``(ii) regional transportation planning organizations
            and metropolitan planning organizations, if any;
                ``(iii) representatives of major modes of
            transportation;
                ``(iv) State and local traffic enforcement officials;
                ``(v) persons responsible for administering section 130
            at the State level;
                ``(vi) representatives conducting Operation Lifesaver;
                ``(vii) representatives conducting a motor carrier
            safety program under section 31102, 31106, or 31309 of
            title 49;
                ``(viii) motor vehicle administration agencies; and
                ``(ix) other major State and local safety stakeholders;
            ``(B) analyzes and makes effective use of State, regional,
        or local crash data;
            ``(C) addresses engineering, management, operation,
        education, enforcement, and emergency services elements
        (including integrated, interoperable emergency communications)
        of highway safety as key factors in evaluating highway
        projects;
            ``(D) considers safety needs of, and high-fatality segments
        of, public roads;
            ``(E) considers the results of State, regional, or local
        transportation and highway safety planning processes;
            ``(F) describes a program of projects or strategies to
        reduce or eliminate safety hazards;
            ``(G) is approved by the Governor of the State or a
        responsible State agency; and
            ``(H) is consistent with the requirements of section
        135(g).
    ``(b) Program.--
        ``(1) In general.--The Secretary shall carry out a highway
    safety improvement program.
        ``(2) Purpose.--The purpose of the highway safety improvement
    program shall be to achieve a significant reduction in traffic
    fatalities and serious injuries on public roads.
    ``(c) Eligibility.--
        ``(1) In general.--To obligate funds apportioned under section
    104(b)(5) to carry out this section, a State shall have in effect a
    State highway safety improvement program under which the State--
            ``(A) develops and implements a State strategic highway
        safety plan that identifies and analyzes highway safety
        problems and opportunities as provided in paragraph (2);
            ``(B) produces a program of projects or strategies to
        reduce identified safety problems;
            ``(C) evaluates the plan on a regular basis to ensure the
        accuracy of the data and priority of proposed improvements; and
            ``(D) submits to the Secretary an annual report that--
                ``(i) describes, in a clearly understandable fashion,
            not less than 5 percent of locations determined by the
            State, using criteria established in accordance with
            paragraph (2)(B)(ii), as exhibiting the most severe safety
            needs; and
                ``(ii) contains an assessment of--

                    ``(I) potential remedies to hazardous locations
                identified;
                    ``(II) estimated costs associated with those
                remedies; and
                    ``(III) impediments to implementation other than
                cost associated with those remedies.

        ``(2) Identification and analysis of highway safety problems
    and opportunities.--As part of the State strategic highway safety
    plan, a State shall--
            ``(A) have in place a crash data system with the ability to
        perform safety problem identification and countermeasure
        analysis;
            ``(B) based on the analysis required by subparagraph (A)--
                ``(i) identify hazardous locations, sections, and
            elements (including roadside obstacles, railway-highway
            crossing needs, and unmarked or poorly marked roads) that
            constitute a danger to motorists (including motorcyclists),
            bicyclists, pedestrians, and other highway users; and
                ``(ii) using such criteria as the State determines to
            be appropriate, establish the relative severity of those
            locations, in terms of accidents, injuries, deaths, traffic
            volume levels, and other relevant data;
            ``(C) adopt strategic and performance-based goals that--
                ``(i) address traffic safety, including behavioral and
            infrastructure problems and opportunities on all public
            roads;
                ``(ii) focus resources on areas of greatest need; and
                ``(iii) are coordinated with other State highway safety
            programs;
            ``(D) advance the capabilities of the State for traffic
        records data collection, analysis, and integration with other
        sources of safety data (such as road inventories) in a manner
        that--
                ``(i) complements the State highway safety program
            under chapter 4 and the commercial vehicle safety plan
            under section 31102 of title 49;
                ``(ii) includes all public roads;
                ``(iii) identifies hazardous locations, sections, and
            elements on public roads that constitute a danger to
            motorists (including motorcyclists), bicyclists,
            pedestrians, the disabled, and other highway users; and
                ``(iv) includes a means of identifying the relative
            severity of hazardous locations described in clause (iii)
            in terms of accidents, injuries, deaths, and traffic volume
            levels;
            ``(E)(i) determine priorities for the correction of
        hazardous road locations, sections, and elements (including
        railway-highway crossing improvements), as identified through
        crash data analysis;
            ``(ii) identify opportunities for preventing the
        development of such hazardous conditions; and
            ``(iii) establish and implement a schedule of highway
        safety improvement projects for hazard correction and hazard
        prevention; and
            ``(F)(i) establish an evaluation process to analyze and
        assess results achieved by highway safety improvement projects
        carried out in accordance with procedures and criteria
        established by this section; and
            ``(ii) use the information obtained under clause (i) in
        setting priorities for highway safety improvement projects.
    ``(d) Eligible Projects.--
        ``(1) In general.--A State may obligate funds apportioned to
    the State under section 104(b)(5) to carry out--
            ``(A) any highway safety improvement project on any public
        road or publicly owned bicycle or pedestrian pathway or trail;
        or
            ``(B) as provided in subsection (e), other safety projects.
        ``(2) Use of other funding for safety.--
            ``(A) Effect of section.--Nothing in this section prohibits
        the use of funds made available under other provisions of this
        title for highway safety improvement projects.
            ``(B) Use of other funds.--States are encouraged to address
        the full scope of their safety needs and opportunities by using
        funds made available under other provisions of this title
        (except a provision that specifically prohibits that use).
    ``(e) Flexible Funding for States With a Strategic Highway Safety
Plan.--
        ``(1) In general.--To further the implementation of a State
    strategic highway safety plan, a State may use up to 10 percent of
    the amount of funds apportioned to the State under section
    104(b)(5) for a fiscal year to carry out safety projects under any
    other section as provided in the State strategic highway safety
    plan if the State certifies that--
            ``(A) the State has met needs in the State relating to
        railway-highway crossings; and
            ``(B) the State has met the State's infrastructure safety
        needs relating to highway safety improvement projects.
        ``(2) Other transportation and highway safety plans.--Nothing
    in this subsection requires a State to revise any State process,
    plan, or program in effect on the date of enactment of this
    section.
    ``(f) High Risk Rural Roads.--
        ``(1) In general.--After making an apportionment under section
    104(b)(5) for a fiscal year beginning after September 30, 2005, the
    Secretary shall ensure, from amounts made available to carry out
    this section for such fiscal year, that a total of $90,000,000 of
    such apportionment is set aside by the States, proportionally
    according to the share of each State of the total amount so
    apportioned, for use only for construction and operational
    improvements on high risk rural roads.
        ``(2) Special rule.--A State may use funds apportioned to the
    State pursuant to this subsection for any project under this
    section if the State certifies to the Secretary that the State has
    met all of State needs for construction and operational
    improvements on high risk rural roads.
    ``(g) Reports.--
        ``(1) In general.--A State shall submit to the Secretary a
    report that--
            ``(A) describes progress being made to implement highway
        safety improvement projects under this section;
            ``(B) assesses the effectiveness of those improvements; and
            ``(C) describes the extent to which the improvements funded
        under this section contribute to the goals of--
                ``(i) reducing the number of fatalities on roadways;
                ``(ii) reducing the number of roadway-related injuries;
                ``(iii) reducing the occurrences of roadway-related
            crashes;
                ``(iv) mitigating the consequences of roadway-related
            crashes; and
                ``(v) reducing the occurrences of crashes at railway-
            highway crossings.
        ``(2) Contents; schedule.--The Secretary shall establish the
    content and schedule for a report under paragraph (1).
        ``(3) Transparency.--The Secretary shall make reports submitted
    under subsection (c)(1)(D) available to the public through--
            ``(A) the Web site of the Department; and
            ``(B) such other means as the Secretary determines to be
        appropriate.
        ``(4) Discovery and admission into evidence of certain reports,
    surveys, and information.--Notwithstanding any other provision of
    law, reports, surveys, schedules, lists, or data compiled or
    collected for any purpose directly relating to paragraph (1) or
    subsection (c)(1)(D), or published by the Secretary in accordance
    with paragraph (3), shall not be subject to discovery or admitted
    into evidence in a Federal or State court proceeding or considered
    for other purposes in any action for damages arising from any
    occurrence at a location identified or addressed in such reports,
    surveys, schedules, lists, or other data.
    ``(h) Federal Share of Highway Safety Improvement Projects.--Except
as provided in sections 120 and 130, the Federal share of the cost of a
highway safety improvement project carried out with funds apportioned
to a State under section 104(b)(5) shall be 90 percent.''.
        (2) Clerical amendment.--The analysis for chapter 1 of such
    title is amended by striking the item relating to section 148 and
    inserting the following:

``148. Highway safety improvement program.''.

        (3) Conforming amendments.--
            (A) Transfers of apportionments.--Section 104(g) of such
        title is amended in the first sentence by striking ``sections
        130, 144, and 152 of this title'' and inserting ``sections 130
        and 144''.
            (B) Uniform transferability.--Section 126(a) of such title
        is amended by inserting ``under'' after ``State's
        apportionment''.
            (C) Other sections.--Sections 154, 164, and 409 of such
        title are amended by striking ``152'' each place it appears and
        inserting ``148''.
    (b) Apportionment of Highway Safety Improvement Program Funds.--
Section 104(b) of such title (as amended by section 1103 of this Act)
is amended--
        (1) in the matter preceding paragraph (1), by inserting after
    ``Improvement program,'' the following: ``the highway safety
    improvement program,''; and
        (2) by adding at the end the following:
        ``(5) Highway safety improvement program.--
            ``(A) In general.--For the highway safety improvement
        program, in accordance with the following formula:
                ``(i) 33\1/3\ percent of the apportionments in the
            ratio that--

                    ``(I) the total lane miles of Federal-aid highways
                in each State; bears to
                    ``(II) the total lane miles of Federal-aid highways
                in all States.

                ``(ii) 33\1/3\ percent of the apportionments in the
            ratio that--

                    ``(I) the total vehicle miles traveled on lanes on
                Federal-aid highways in each State; bears to
                    ``(II) the total vehicle miles traveled on lanes on
                Federal-aid highways in all States.

                ``(iii) 33\1/3\ percent of the apportionments in the
            ratio that--

                    ``(I) the number of fatalities on the Federal-aid
                system in each State in the latest fiscal year for
                which data are available; bears to
                    ``(II) the number of fatalities on the Federal-aid
                system in all States in the latest fiscal year for
                which data are available.

            ``(B) Minimum apportionment.--Notwithstanding subparagraph
        (A), each State shall receive a minimum of one-half of 1
        percent of the funds apportioned under this paragraph.''.
    (d) Elimination of Hazards Relating to Railway-Highway Crossings.--
        (1) Funds for protective devices.--Section 130(e) of such title
    is amended--
            (A) by striking ``At'' and inserting the following:
        ``(1) In general.--Before making an apportionment under section
    104(b)(5) for a fiscal year, the Secretary shall set aside, from
    amounts made available to carry out the highway safety improvement
    program under section 148 for such fiscal year, at least
    $220,000,000 for the elimination of hazards and the installation of
    protective devices at railway-highway crossings. At''; and
            (B) by adding at the end the following:
        ``(2) Special rule.--If a State demonstrates to the
    satisfaction of the Secretary that the State has met all its needs
    for installation of protective devices at railway-highway
    crossings, the State may use funds made available by this section
    for other purposes under this subsection.''.
        (2) Apportionment.--Section 130(f) of such title is amended to
    read as follows:
    ``(f) Apportionment.--
        ``(1) Formula.--Fifty percent of the funds set aside to carry
    out this section pursuant to subsection (e)(1) shall be apportioned
    to the States in accordance with the formula set forth in section
    104(b)(3)(A), and 50 percent of such funds shall be apportioned to
    the States in the ratio that total public railway-highway crossings
    in each State bears to the total of such crossings in all States.
        ``(2) Minimum apportionment.--Notwithstanding paragraph (1),
    each State shall receive a minimum of one-half of 1 percent of the
    funds apportioned under paragraph (1).
        ``(3) Federal share.--The Federal share payable on account of
    any project financed with funds set aside to carry out this section
    shall be 90 percent of the cost thereof.''.
        (3) Biennial reports to congress.--Section 130(g) of such title
    is amended in the third sentence--
            (A) by inserting ``and the Committee on Commerce, Science,
        and Transportation,'' after ``Public Works''; and
            (B) by striking ``not later than April 1 of each year'' and
        inserting ``, not later than April 1, 2006, and every 2 years
        thereafter,''.
        (4) Expenditure of funds.--Section 130 of such title is amended
    by adding at the end the following:
    ``(k) Expenditure of Funds.--Not more than 2 percent of funds
apportioned to a State to carry out this section may be used by the
State for compilation and analysis of data in support of activities
carried out under subsection (g).''.
    (e) Transition.--
        (1) Implementation.--Except as provided in paragraph (2), the
    Secretary shall approve obligations of funds apportioned under
    section 104(b)(5) of title 23, United States Code (as added by
    subsection (b)), to carry out section 148 of that title, only if,
    not later than October 1 of the second fiscal year beginning after
    the date of enactment of this Act, a State has developed and
    implemented a State strategic highway safety plan as required
    pursuant to section 148(c) of that title.
        (2) Interim period.--
            (A) In general.--Before October 1 of the second fiscal year
        after the date of enactment of this Act and until the date on
        which a State develops and implements a State strategic highway
        safety plan, the Secretary shall apportion funds to a State for
        the highway safety improvement program and the State may
        obligate funds apportioned to the State for the highway safety
        improvement program under section 148 for projects that were
        eligible for funding under sections 130 and 152 of that title,
        as in effect on the day before the date of enactment of this
        Act.
            (B) No strategic highway safety plan.--If a State has not
        developed a strategic highway safety plan by October 1, 2007,
        the State shall receive for the highway safety improvement
        program for each subsequent fiscal year until the date of
        development of such plan an amount that equals the amount
        apportioned to the State for that program for fiscal year 2007.

SEC. 1402. WORKER INJURY PREVENTION AND FREE FLOW OF VEHICULAR TRAFFIC.

    Not later than 1 year after the date of enactment of this Act, the
Secretary shall issue regulations to decrease the likelihood of worker
injury and maintain the free flow of vehicular traffic by requiring
workers whose duties place them on or in close proximity to a Federal-
aid highway (as defined in section 101 of title 23, United States Code)
to wear high visibility garments. The regulations may also require such
other worker-safety measures for workers with those duties as the
Secretary determines to be appropriate.

SEC. 1403. TOLL FACILITIES WORKPLACE SAFETY STUDY.

    (a) In General.--The Secretary shall conduct a study on the safety
of highway toll collection facilities, including toll booths, to
determine the safety of the facilities for the toll collectors who work
in and around the facilities, including consideration of--
        (1) the effect of design or construction of the facilities on
    the likelihood of vehicle collisions with the facilities;
        (2) the safety of crosswalks used by toll collectors in transit
    to and from toll booths;
        (3) the extent of the enforcement of speed limits in the
    vicinity of the facilities;
        (4) the use of warning devices, such as vibration and rumble
    strips, to alert drivers approaching the facilities;
        (5) the use of cameras to record traffic violations in the
    vicinity of the facilities;
        (6) the use of traffic control arms in the vicinity of the
    facilities;
        (7) law enforcement practices and jurisdictional issues that
    affect safety in the vicinity of the facilities; and
        (8) the incidence of accidents and injuries in the vicinity of
    toll booths.
    (b) Data Collection.--As part of the study, the Secretary shall
collect data regarding the incidence of accidents and injuries in the
vicinity of highway toll collection facilities.
    (c) Report.--Not later than 1 year after the date of enactment of
this Act, the Secretary shall submit to the Committee on Transportation
and Infrastructure of the House of Representatives and the Committee on
Environment and Public Works of the Senate a report on the results of
the study, together with recommendations for improving toll facilities
workplace safety.
    (d) Funding.--
        (1) Authorization of appropriations.--There is authorized to be
    appropriated to carry out this section, out of the Highway Trust
    Fund (other than the Mass Transit Account), $500,000 for fiscal
    year 2006.
        (2) Contract authority.--Funds authorized to be appropriated by
    this section shall be available for obligation in the same manner
    and to the same extent as if the funds were apportioned under
    chapter 1 of title 23, United States Code, except that the Federal
    share of the cost of the project shall be 100 percent, and the
    funds shall remain available until expended and shall not be
    transferable.

SEC. 1404. SAFE ROUTES TO SCHOOL PROGRAM.

    (a) Establishment.--Subject to the requirements of this section,
the Secretary shall establish and carry out a safe routes to school
program for the benefit of children in primary and middle schools.
    (b) Purposes.--The purposes of the program shall be--
        (1) to enable and encourage children, including those with
    disabilities, to walk and bicycle to school;
        (2) to make bicycling and walking to school a safer and more
    appealing transportation alternative, thereby encouraging a healthy
    and active lifestyle from an early age; and
        (3) to facilitate the planning, development, and implementation
    of projects and activities that will improve safety and reduce
    traffic, fuel consumption, and air pollution in the vicinity of
    schools.
    (c) Apportionment of Funds.--
        (1) In general.--Subject to paragraphs (2), (3), and (4),
    amounts made available to carry out this section for a fiscal year
    shall be apportioned among the States in the ratio that--
            (A) the total student enrollment in primary and middle
        schools in each State; bears to
            (B) the total student enrollment in primary and middle
        schools in all States.
        (2) Minimum apportionment.--No State shall receive an
    apportionment under this section for a fiscal year of less than
    $1,000,000.
        (3) Set-aside for administrative expenses.--Before apportioning
    under this subsection amounts made available to carry out this
    section for a fiscal year, the Secretary shall set aside not more
    than $3,000,000 of such amounts for the administrative expenses of
    the Secretary in carrying out this subsection.
        (4) Determination of student enrollments.--Determinations under
    this subsection concerning student enrollments shall be made by the
    Secretary.
    (d) Administration of Amounts.--Amounts apportioned to a State
under this section shall be administered by the State's department of
transportation.
    (e) Eligible Recipients.--Amounts apportioned to a State under this
section shall be used by the State to provide financial assistance to
State, local, and regional agencies, including nonprofit organizations,
that demonstrate an ability to meet the requirements of this section.
    (f) Eligible Projects and Activities.--
        (1) Infrastructure-related projects.--
            (A) In general.--Amounts apportioned to a State under this
        section may be used for the planning, design, and construction
        of infrastructure-related projects that will substantially
        improve the ability of students to walk and bicycle to school,
        including sidewalk improvements, traffic calming and speed
        reduction improvements, pedestrian and bicycle crossing
        improvements, on-street bicycle facilities, off-street bicycle
        and pedestrian facilities, secure bicycle parking facilities,
        and traffic diversion improvements in the vicinity of schools.
            (B) Location of projects.--Infrastructure-related projects
        under subparagraph (A) may be carried out on any public road or
        any bicycle or pedestrian pathway or trail in the vicinity of
        schools.
        (2) Noninfrastructure-related activities.--
            (A) In general.--In addition to projects described in
        paragraph (1), amounts apportioned to a State under this
        section may be used for noninfrastructure-related activities to
        encourage walking and bicycling to school, including public
        awareness campaigns and outreach to press and community
        leaders, traffic education and enforcement in the vicinity of
        schools, student sessions on bicycle and pedestrian safety,
        health, and environment, and funding for training, volunteers,
        and managers of safe routes to school programs.
            (B) Allocation.--Not less than 10 percent and not more than
        30 percent of the amount apportioned to a State under this
        section for a fiscal year shall be used for noninfrastructure-
        related activities under this subparagraph.
        (3) Safe routes to school coordinator.--Each State receiving an
    apportionment under this section for a fiscal year shall use a
    sufficient amount of the apportionment to fund a full-time position
    of coordinator of the State's safe routes to school program.
    (g) Clearinghouse.--
        (1) In general.--The Secretary shall make grants to a national
    nonprofit organization engaged in promoting safe routes to schools
    to--
            (A) operate a national safe routes to school clearinghouse;
            (B) develop information and educational programs on safe
        routes to school; and
            (C) provide technical assistance and disseminate techniques
        and strategies used for successful safe routes to school
        programs.
        (2) Funding.--The Secretary shall carry out this subsection
    using amounts set aside for administrative expenses under
    subsection (c)(3).
    (h) Task Force.--
        (1) In general.--The Secretary shall establish a national safe
    routes to school task force composed of leaders in health,
    transportation, and education, including representatives of
    appropriate Federal agencies, to study and develop a strategy for
    advancing safe routes to school programs nationwide.
        (2) Report.--Not later than March 31, 2006, the Secretary shall
    submit to Congress a report containing the results of the study
    conducted, and a description of the strategy developed, under
    paragraph (1) and information regarding the use of funds for
    infrastructure-related and noninfrastructure-related activities
    under paragraphs (1) and (2) of subsection (f).
        (3) Funding.--The Secretary shall carry out this subsection
    using amounts set aside for administrative expenses under
    subsection (c)(3).
    (i) Applicability of Title 23.--Funds made available to carry out
this section shall be available for obligation in the same manner as if
such funds were apportioned under chapter 1 of title 23, United States
Code; except that such funds shall not be transferable and shall remain
available until expended, and the Federal share of the cost of a
project or activity under this section shall be 100 percent.
    (j) Treatment of Projects.--Notwithstanding any other provision of
law, projects assisted under this subsection shall be treated as
projects on a Federal-aid system under chapter 1 of title 23, United
States Code.
    (k) Definitions.--In this section, the following definitions apply:
        (1) In the vicinity of schools.--The term ``in the vicinity of
    schools'' means, with respect to a school, the area within
    bicycling and walking distance of the school (approximately 2
    miles).
        (2) Primary and middle schools.--The term ``primary and middle
    schools'' means schools providing education from kindergarten
    through eighth grade.

SEC. 1405. ROADWAY SAFETY IMPROVEMENTS FOR OLDER DRIVERS AND
              PEDESTRIANS.

    (a) In General.--The Secretary shall carry out a program to improve
traffic signs and pavement markings in all States (as such term is
defined in section 101 of title 23, United States Code) in a manner
consistent with the recommendations included in the publication of the
Federal Highway Administration entitled ``Guidelines and
Recommendations to Accommodate Older Drivers and Pedestrians (FHWA-RD-
01-103)'' and dated October 2001.
    (b) Federal Share.--The Federal share of the cost of a project
carried out under this section shall be determined in accordance with
section 120 of title 23, United States Code.
    (c) Authorization of Appropriations.--There is authorized to be
appropriated such sums as may be necessary to carry out this section
for each of fiscal years 2005 through 2009.

SEC. 1406. SAFETY INCENTIVE GRANTS FOR USE OF SEAT BELTS.

    Section 157(g)(1) of title 23, United States Code, is amended by
striking ``2004, and'' and all that follows through ``2005'' and
inserting ``2004, and $112,000,000 for fiscal year 2005''.

SEC. 1407. SAFETY INCENTIVES TO PREVENT OPERATION OF MOTOR VEHICLES BY
              INTOXICATED PERSONS.

    (a) Codification of Penalty.--Section 163 of title 23, United
States Code, is amended--
        (1) by redesignating subsection (e) as subsection (f); and
        (2) by inserting after subsection (d) the following:
    ``(e) Penalty.--
        ``(1) In general.--On October 1, 2003, and October 1 of each
    fiscal year thereafter, if a State has not enacted or is not
    enforcing a law described in subsection (a), the Secretary shall
    withhold from amounts apportioned to the State on that date under
    each of paragraphs (1), (3), and (4) of section 104(b) an amount
    equal to the amount specified in paragraph (2).
        ``(2) Amount to be withheld.--If a State is subject to a
    penalty under paragraph (1), the Secretary shall withhold for a
    fiscal year from the apportionments of the State described in
    paragraph (1) an amount equal to a percentage of the funds
    apportioned to the State under paragraphs (1), (3), and (4) of
    section 104(b) for fiscal year 2003. The percentage shall be as
    follows:
            ``(A) For fiscal year 2004, 2 percent.
            ``(B) For fiscal year 2005, 4 percent.
            ``(C) For fiscal year 2006, 6 percent.
            ``(D) For fiscal year 2007, and each fiscal year
        thereafter, 8 percent.
        ``(3) Failure to comply.--If, within 4 years from the date that
    an apportionment for a State is withheld in accordance with this
    subsection, the Secretary determines that the State has enacted and
    is enforcing a law described in subsection (a), the apportionment
    of the State shall be increased by an amount equal to the amount
    withheld. If, at the end of such 4-year period, any State has not
    enacted or is not enforcing a law described in subsection (a) any
    amounts so withheld from such State shall lapse.''.
    (b) Authorization of Appropriations.--Section 163(f)(1) of such
title (as redesignated by subsection (a)(1) of this section) is amended
by striking ``2004, and'' and inserting ``2004, and $110,000,000 for
fiscal year 2005''.
    (c) Repeal.--Section 351 of the Department of Transportation and
Related Agencies Appropriations Act, 2001 (23 U.S.C. 163 note; 114
Stat. 1356A-34) is repealed.

SEC. 1408. IMPROVEMENT OR REPLACEMENT OF HIGHWAY FEATURES ON NATIONAL
              HIGHWAY SYSTEM.

    (a) Update of Implementation Guidance.--The Secretary, in
cooperation with the American Association of State Highway and
Transportation Officials, shall update as appropriate the August 28,
1998, Federal Highway Administration Policy on Implementation of the
report of the Transportation Research Board of the National Research
Council entitled ``NCHRP Report 350-Recommended Procedures for the
Safety Performance Evaluation of Highway Features''.
    (b) Guidance.--The Secretary, in cooperation with the Association,
shall publish updated guidance regarding the conditions under which
States, when choosing to improve or replace highway features on the
National Highway System, should improve or replace such features with
highway features that have been tested, evaluated, and found to be
acceptable under the guidelines of the report referred to in subsection
(a).
    (c) Matters To Be Considered.--Guidance published in accordance
with subsection (a)--
        (1) shall address those highway features that are covered by
    the guidelines in the report referred to in subsection (b); and
        (2) shall consider types of highway features, cost-
    effectiveness, and practicality of replacement with highway
    features that have been found to be acceptable under the report
    guidelines to determine conditions when such features should be
    used.

SEC. 1409. WORK ZONE SAFETY GRANTS.

    (a) In General.--The Secretary shall establish and implement a work
zone safety grant program under which the Secretary may make grants to
nonprofit organizations and not-for-profit organizations to provide
training to prevent or reduce highway work zone injuries and
fatalities.
    (b) Eligible Activities.--Grants may be made under the program for
the following purposes:
        (1) Training for construction craft workers on the prevention
    of injuries and fatalities in highway and road construction.
        (2) Development of guidelines for the prevention of highway
    work zone injuries and fatalities.
        (3) Training for State and local government transportation
    agencies and other groups implementing guidelines for the
    prevention of highway work zone injuries and fatalities.
    (c) Funding.--
        (1) In general.--There is authorized to be appropriated from
    the Highway Trust Fund (other than the Mass Transit Account) to
    carry out this section $5,000,000 for each of fiscal years 2006
    through 2009.
        (2) Contract authority.--Funds authorized by this subsection
    shall be available for obligation in the same manner as if the
    funds were apportioned under chapter 1 of title 23, United States
    Code; except that such funds shall not be transferable.
    (d) Construction Work in Alaska.--Section 114 of title 23, United
States Code, is amended by adding at the end of the following:
    ``(c) Construction Work in Alaska.--
        ``(1) In general.--The Secretary shall ensure that a worker who
    is employed on a remote project for the construction of a highway
    or portion of a highway located on a Federal-aid system in the
    State of Alaska and who is not a domiciled resident of the locality
    shall receive meals and lodging.
        ``(2) Lodging.--The lodging under paragraph (1) shall be in
    accordance with section 1910.142 of title 29, Code of Federal
    Regulations (relating to temporary labor camp requirements).
        ``(3) Per diem.--
            ``(A) In general.--Contractors are encouraged to use
        commercial facilities and lodges on remote projects, however,
        when such facilities are not available, per diem in lieu of
        room and lodging may be paid on remote Federal highway projects
        at a basic rate of $75.00 per day or part of a day the worker
        is employed on the project. Where the contractor provides or
        furnishes room and lodging or pays a per diem, the cost of the
        amount shall not be considered a part of wages and shall be
        excluded from the calculation of wages.
            ``(B) Secretary of labor.--Such per diem rate shall be
        adopted by the Secretary of Labor for all applicable remote
        Federal highway projects in Alaska.
            ``(C) Exception.--Per diem shall not be allowed on any of
        the following remote projects for the construction of a highway
        or portion of a highway located on a Federal-aid system:
                ``(i) West of Livengood on the Elliot Highway.
                ``(ii) Mile 0 on the Dalton Highway to the North Slope
            of Alaska; north of Mile 20 on the Taylor Highway.
                ``(iii) East of Chicken on the Top of the World Highway
            and south of Tetlin Junction to the Alaska Canadian border.
        ``(4) Definitions.--In this subsection, the following
    definitions apply:
            ``(A) Remote.--The term `remote', as used with respect to a
        project, means that the project is 65 road miles or more from
        the international airport in Fairbanks, Anchorage, or Juneau,
        Alaska, as the case may be, or is inaccessible by road in a 2-
        wheel drive vehicle.
            ``(B) Resident.--The term `resident', as used with respect
        to a project, means a person living within 65 road miles of the
        midpoint of the project for at least 12 consecutive months
        prior to the award of the project.''.

SEC. 1410. NATIONAL WORK ZONE SAFETY INFORMATION CLEARINGHOUSE.

    (a) Grants.--The Secretary shall make grants for fiscal years 2006
through 2009 to a national nonprofit foundation for the operation of
the National Work Zone Safety Information Clearinghouse, authorized by
section 358(b)(2) of Public Law 104-59, created for the purpose of
assembling and disseminating, by electronic and other means,
information relating to improvement of roadway work zone safety.
    (b) Authorization of Appropriations.--There is authorized to be
appropriated out of the Highway Trust Fund (other than the Mass Transit
Account) to carry out this section $1,000,000 for each of fiscal years
2006 through 2009.
    (c) Contract Authority.--Funds authorized by this subsection shall
be available for obligation in the same manner as if the funds were
apportioned under chapter 1 of title 23, United States Code, except the
Federal share of the cost of activities carried out using such funds
shall be 100 percent, and such funds shall remain available until
expended and shall not be transferable.

SEC. 1411. ROADWAY SAFETY.

    (a) Road Safety.--
        (1) In general.--The Secretary shall enter into an agreement to
    assist in the activities of a national nonprofit organization that
    is dedicated solely to improving public road safety--
            (A) by improving the quality of data pertaining to public
        road hazards and design features that affect or increase the
        severity of motor vehicle crashes;
            (B) by developing and carrying out a public awareness
        campaign to educate State and local transportation officials,
        public safety officials, and motorists regarding the extent to
        which public road hazards and design features are a factor in
        motor vehicle crashes; and
            (C) by promoting public road safety research and technology
        transfer activities.
        (2) Funding.--There is authorized to be appropriated from the
    Highway Trust Fund (other than the Mass Transit Account) $500,000
    for each of fiscal years 2006 through 2009 to carry out this
    subsection.
        (3) Applicability of title 23.--Funds made available by this
    subsection shall be available for obligation in the same manner as
    if such funds were apportioned under chapter 1 of title 23, United
    States Code, except that the funds shall remain available until
    expended.
    (b) Bicycle and Pedestrian Safety Grants.--
        (1) In general.--The Secretary shall make grants to a national,
    not-for-profit organization engaged in promoting bicycle and
    pedestrian safety--
            (A) to operate a national bicycle and pedestrian
        clearinghouse;
            (B) to develop information and educational programs; and
            (C) to disseminate techniques and strategies for improving
        bicycle and pedestrian safety.
        (2) Funding.--There is authorized to be appropriated from the
    Highway Trust Fund (other than the Mass Transit Account) $300,000
    for fiscal year 2005 and $500,000 for each of fiscal years 2006
    through 2009 to carry out this subsection.
        (3) Applicability of title 23.--Funds made available by this
    subsection shall be available for obligation in the same manner as
    if such funds were apportioned under chapter 1 of title 23, United
    States Code, except that the funds shall remain available until
    expended.

SEC. 1412. IDLING REDUCTION FACILITIES IN INTERSTATE RIGHTS-OF-WAY.

    Section 111 of title 23, United States Code, is amended by adding
at the end the following:
    ``(d) Idling Reduction Facilities in Interstate Rights-of-Way.--
        ``(1) In general.--Notwithstanding subsection (a), a State
    may--
            ``(A) permit electrification or other idling reduction
        facilities and equipment, for use by motor vehicles used for
        commercial purposes, to be placed in rest and recreation areas,
        and in safety rest areas, constructed or located on rights-of-
        way of the Interstate System in the State, so long as those
        idling reduction measures do not reduce the existing number of
        designated truck parking spaces at any given rest or recreation
        area; and
            ``(B) charge a fee, or permit the charging of a fee, for
        the use of those parking spaces actively providing power to a
        truck to reduce idling.
        ``(2) Purpose.--The exclusive purpose of the facilities
    described in paragraph (1) (or similar technologies) shall be to
    enable operators of motor vehicles used for commercial purposes--
            ``(A) to reduce idling of a truck while parked in the rest
        or recreation area; and
            ``(B) to use installed or other equipment specifically
        designed to reduce idling of a truck, or provide alternative
        power for supporting driver comfort, while parked.''.

            Subtitle E--Construction and Contract Efficiency

SEC. 1501. PROGRAM EFFICIENCIES.

    (a) Advance Construction.--Section 115 of title 23, United States
Code, is amended--
        (1) by redesignating subsection (c) as subsection (d); and
        (2) by striking subsections (a) and (b) and inserting the
    following:
    ``(a) In General.--The Secretary may authorize a State to proceed
with a project authorized under this title--
        ``(1) without the use of Federal funds; and
        ``(2) in accordance with all procedures and requirements
    applicable to the project other than those procedures and
    requirements that limit the State to implementation of a project--
            ``(A) with the aid of Federal funds previously apportioned
        or allocated to the State; or
            ``(B) with obligation authority previously allocated to the
        State.
    ``(b) Obligation of Federal Share.--The Secretary, on the request
of a State and execution of a project agreement, may obligate all or a
portion of the Federal share of a project authorized to proceed under
this section from any category of funds for which the project is
eligible.''.
    (b) Obligation and Release of Funds.--Section 118(d) of such title
is amended to read as follows:
    ``(d) Obligation and Release of Funds.--
        ``(1) In general.--Funds apportioned or allocated to a State
    for a purpose for any fiscal year shall be considered to be
    obligated if a sum equal to the total of the funds apportioned or
    allocated to the State for that purpose for that fiscal year and
    previous fiscal years is obligated.
        ``(2) Released funds.--Any funds released by the final payment
    for a project, or by modifying the project agreement for a project,
    shall be--
            ``(A) credited to the same class of funds previously
        apportioned or allocated to the State for the project; and
            ``(B) immediately available for obligation.
        ``(3) Net obligations.--Notwithstanding any other provision of
    law (including a regulation), obligations recorded against funds
    made available under this subsection shall be recorded and reported
    as net obligations.''.

SEC. 1502. HIGHWAYS FOR LIFE PILOT PROGRAM.

    (a) Establishment.--
        (1) In general.--The Secretary shall establish and implement a
    pilot program to be known as the ``Highways for LIFE Pilot
    Program''.
        (2) Purpose.--The purpose of the pilot program shall be to
    advance longer-lasting highways using innovative technologies and
    practices to accomplish the fast construction of efficient and safe
    highways and bridges.
        (3) Objectives.--Under the pilot program, the Secretary shall
    provide leadership and incentives to demonstrate and promote state-
    of-the-art technologies, elevated performance standards, and new
    business practices in the highway construction process that result
    in improved safety, faster construction, reduced congestion from
    construction, and improved quality and user satisfaction.
    (b) Projects.--
        (1) Applications.--To be eligible to participate in the pilot
    program, a State shall submit to the Secretary an application that
    is in such form and contains such information as the Secretary
    requires. Each application shall contain a description of proposed
    projects to be carried by the State under the pilot program.
        (2) Eligibility.--A proposed project shall be eligible for
    assistance under the pilot program if the project--
            (A) constructs, reconstructs, or rehabilitates a route or
        connection on a Federal-aid highway eligible for assistance
        under chapter 1 of title 23, United States Code;
            (B) uses innovative technologies, manufacturing processes,
        financing, or contracting methods that improve safety, reduce
        congestion due to construction, and improve quality; and
            (C) meets additional criteria as determined by the
        Secretary.
        (3) Project proposal.--A project proposal submitted under
    paragraph (1) shall contain--
            (A) an identification and description of the projects to be
        delivered;
            (B) a description of how the projects will result in
        improved safety, faster construction, reduced congestion due to
        construction, user satisfaction, and improved quality;
            (C) a description of the innovative technologies,
        manufacturing processes, financing, and contracting methods
        that will be used for the proposed projects; and
            (D) such other information as the Secretary may require.
        (4) Selection criteria.--In selecting projects for approval
    under this section, the Secretary shall ensure that the projects
    provide an evaluation of a broad range of technologies in a wide
    variety of project types and shall give priority to the projects
    that--
            (A) address achieving the Highways for LIFE performance
        standards for quality, safety, and speed of construction;
            (B) deliver and deploy innovative technologies,
        manufacturing processes, financing, contracting practices, and
        performance measures that will demonstrate substantial
        improvements in safety, congestion, quality, and cost-
        effectiveness;
            (C) include innovation that will lead to change in the
        administration of the State's transportation program to more
        quickly construct long-lasting, high-quality, cost-effective
        projects that improve safety and reduce congestion;
            (D) are or will be ready for construction within 1 year of
        approval of the project proposal; and
            (E) meet such other criteria as the Secretary determines
        appropriate.
        (5) Financial assistance.--
            (A) Funds for highways for life projects.--Out of amounts
        made available to carry out this section for a fiscal year, the
        Secretary may allocate to a State up to 20 percent, but not
        more than $5,000,000, of the total cost of a project approved
        under this section. Notwithstanding any other provision of law,
        funds allocated to a State under this subparagraph may be
        applied to the non-Federal share of the cost of construction of
        a project under title 23, United States Code.
            (B) Use of apportioned funds.--A State may obligate not
        more than 10 percent of the amount apportioned to the State
        under one or more of paragraphs (1), (2), (3), and (4) of
        section 104(b) of title 23, United States Code, for a fiscal
        year for projects approved under this section.
            (C) Increased federal share.--Notwithstanding sections 120
        and 129 of title 23, United States Code, the Federal share
        payable on account of any project constructed with Federal
        funds allocated under this section, or apportioned under
        section 104(b) of such title, to a State under such title and
        approved under this section may amount to 100 percent of the
        cost of construction of such project.
            (D) Limitation on statutory construction.--Except as
        provided in subparagraph (C), nothing in this subsection shall
        be construed as altering or otherwise affecting the
        applicability of the requirements of chapter 1 of title 23,
        United States Code (including requirements relating to the
        eligibility of a project for assistance under the program and
        the location of the project), to amounts apportioned to a State
        for a program under section 104(b) that are obligated by the
        State for projects approved under this subsection.
        (6) Project selections.--In the period of fiscal years 2005
    through 2009, the Secretary, to the maximum extent possible, shall
    approve at least 1 project in each State for participation in the
    pilot program and for financial assistance under paragraph (5) if
    the State submits an application and the project meets the
    eligibility requirements and selection criteria under this
    subsection.
        (7) Maximum number of projects.--The maximum number of projects
    for which the Secretary may allocate funds under this subsection in
    a fiscal year is 15.
    (c) Technology Partnerships.--
        (1) In general.--The Secretary may make grants or enter into
    cooperative agreements or other transactions to foster the
    development, improvement, and creation of innovative technologies
    and facilities to improve safety, enhance the speed of highway
    construction, and improve the quality and durability of highways.
        (2) Federal share.--The Federal share of the cost of an
    activity carried out under this subsection shall not exceed 80
    percent.
    (d) Technology Transfer and Information Dissemination.--
        (1) In general.--The Secretary shall conduct a highways for
    life technology transfer program.
        (2) Availability of information.--The Secretary shall ensure
    that the information and technology used, developed, or deployed
    under this subsection is made available to the transportation
    community and the public.
    (e) Stakeholder Input and Involvement.--The Secretary shall
establish a process for stakeholder input and involvement in the
development, implementation, and evaluation of the Highways for LIFE
Pilot Program. The process may include participation by representatives
of State departments of transportation and other interested persons.
    (f) Project Monitoring and Evaluation.--The Secretary shall monitor
and evaluate the effectiveness of any activity carried out under this
section.
    (g) Contract Authority.--Except as otherwise provided in this
section, funds authorized to be appropriated to carry out this section
shall be available for obligation in the same manner as if the funds
were apportioned under chapter 1 of title 23, United States Code.
    (h) State Defined.--In this section, the term ``State'' has the
meaning such term has in section 101(a) of title 23, United States
Code.

SEC. 1503. DESIGN BUILD.

    Section 112(b)(3) of title 23, United States Code, is amended--
        (1) by redesignating subparagraph (D) as subparagraph (E); and
        (2) by striking subparagraph (C) and inserting the following:
            ``(C) Qualified projects.--A qualified project referred to
        in subparagraph (A) is a project under this chapter (including
        intermodal projects) for which the Secretary has approved the
        use of design-build contracting under criteria specified in
        regulations issued by the Secretary.
            ``(D) Regulatory process.--Not later than 90 days after the
        date of enactment of the SAFETEA-LU, the Secretary shall issue
        revised regulations under section 1307(c) of the Transportation
        Equity Act for 21st Century (23 U.S.C. 112 note; 112 Stat. 230)
        that--
                ``(i) do not preclude a State transportation department
            or local transportation agency, prior to compliance with
            section 102 of the National Environmental Policy Act of
            1969 (42 U.S.C. 4332), from--

                    ``(I) issuing requests for proposals;
                    ``(II) proceeding with awards of design-build
                contracts; or
                    ``(III) issuing notices to proceed with preliminary
                design work under design-build contracts;

                ``(ii) require that the State transportation department
            or local transportation agency receive concurrence from the
            Secretary before carrying out an activity under clause (i);
            and
                ``(iii) preclude the design-build contractor from
            proceeding with final design or construction of any
            permanent improvement prior to completion of the process
            under such section 102.''.

                          Subtitle F--Finance

SEC. 1601. TRANSPORTATION INFRASTRUCTURE FINANCE AND INNOVATION ACT
              AMENDMENTS.

    (a) Definitions.--Section 181 of title 23, United States Code, is
amended--
        (1) in paragraph (3) by striking ``category'' and ``offered
    into the capital markets'';
        (2) by striking paragraph (7) and redesignating paragraphs (8)
    through (15) as paragraphs (7) through (14), respectively;
        (3) in paragraph (8) (as redesignated by paragraph (2) of this
    subsection)--
            (A) in subparagraph (B) by striking the period at the end
        and inserting a semicolon; and
            (B) by striking subparagraph (D) and inserting the
        following:
            ``(D) a project that--
                ``(i) is a project--

                    ``(I) for a public freight rail facility or a
                private facility providing public benefit for highway
                users;
                    ``(II) for an intermodal freight transfer facility;
                    ``(III) for a means of access to a facility
                described in subclause (I) or (II);
                    ``(IV) for a service improvement for a facility
                described in subclause (I) or (II) (including a capital
                investment for an intelligent transportation system);
                or
                    ``(V) that comprises a series of projects described
                in subclauses (I) through (IV) with the common
                objective of improving the flow of goods;

                ``(ii) may involve the combining of private and public
            sector funds, including investment of public funds in
            private sector facility improvements; and
                ``(iii) if located within the boundaries of a port
            terminal, includes only such surface transportation
            infrastructure modifications as are necessary to facilitate
            direct intermodal interchange, transfer, and access into
            and out of the port.''; and
        (4) in paragraph (10) (as redesignated by paragraph (2) of this
    subsection) by striking ``bond'' and inserting ``credit''.
    (b) Determination of Eligibility.--Section 182(a) of such title is
amended--
        (1) by striking paragraphs (1) and (2) and inserting the
    following:
        ``(1) Inclusion in transportation plans and programs.--The
    project shall satisfy the applicable planning and programming
    requirements of sections 134 and 135 at such time as an agreement
    to make available a Federal credit instrument is entered into under
    this subchapter.
        ``(2) Application.--A State, local government, public
    authority, public-private partnership, or any other legal entity
    undertaking the project and authorized by the Secretary, shall
    submit a project application to the Secretary.'';
        (2) in paragraph (3)(A)(i) by striking ``$100,000,000'' and
    inserting ``$50,000,000'';
        (3) in paragraph (3)(A)(ii) by striking ``50'' and inserting
    ``33\1/3\'';
        (4) in paragraph (3)(B) by striking ``$30,000,000'' and
    inserting ``$15,000,000''; and
        (5) in paragraph (4)--
            (A) by striking ``Project financing'' and inserting ``The
        Federal credit instrument''; and
            (B) by inserting before the period at the end ``that also
        secure the project obligations''.
    (c) Project Selection.--Section 182(b) of such title is amended--
        (1) in paragraph (1) by striking ``criteria'' the second place
    it appears and inserting ``requirements''; and
        (2) in paragraph (2)(B) by inserting ``, which may be the
    Federal credit instrument,'' after ``obligations''.
    (d) Secured Loans.--
        (1) Agreements.--Section 183(a)(1) of such title is amended--
            (A) in subparagraph (A) by inserting ``of any project
        selected under section 602'' after ``costs'';
            (B) by striking the semicolon at the end of subparagraph
        (B) and all that follows through ``under section 182.'' and
        inserting ``of any project selected under section 602; or'';
        and
            (C) by adding at the end the following:
            ``(C) to refinance long-term project obligations or Federal
        credit instruments if such refinancing provides additional
        funding capacity for the completion, enhancement, or expansion
        of any project that--
                ``(i) is selected under section 602; or
                ``(ii) otherwise meets the requirements of section
            602.''.
        (2) Investment-grade rating requirement.--Section 183(a)(4) of
    such title is amended--
            (A) by striking ``The funding'' and inserting ``The
        execution''; and
            (B) by striking the first comma and all that follows
        through ``1 rating agency''.
        (3) Terms and limitations.--Section 183(b) of such title is
    amended--
            (A) in paragraph (2)--
                (i) by inserting ``the lesser of'' after ``exceed'';
            and
                (ii) by inserting ``or, if the secured loan does not
            receive an investment grade rating, the amount of the
            senior project obligations'' after ``costs'';
            (B) in paragraph (3)(A)(i) by inserting ``that also secure
        the senior project obligations'' after ``sources''; and
            (C) in paragraph (4) by striking ``marketable''.
        (4) Repayment.--Section 183(c) of such title is amended--
            (A) by striking paragraph (3);
            (B) by redesignating paragraphs (4) and (5) as paragraphs
        (3) and (4), respectively;
            (C) in paragraph (3)(A) (as redesignated by subparagraph
        (B) of this paragraph) by striking ``during the 10 years''; and
            (D) in subparagraph (3)(B)(ii) (as so redesignated) by
        striking ``loan'' and all that follows and inserting ``loan.''.
    (e) Lines of Credit.--
        (1) Terms and limitations.--Section 184(b) of such title is
    amended--
            (A) by striking paragraph (2) and inserting the following:
        ``(2) Maximum amounts.--The total amount of the line of credit
    shall not exceed 33 percent of the reasonably anticipated eligible
    project costs.'';
            (B) in paragraph (3) by striking ``, any debt service
        reserve fund, and any other available reserve'' and inserting
        ``but not including reasonably required financing reserves'';
            (C) in paragraph (4)--
                (i) by striking ``marketable'';
                (ii) by striking ``on which'' and inserting ``of
            execution of''; and
                (iii) by striking ``is obligated'' and inserting
            ``agreement'';
            (D) in paragraph (5)(A)(i) by inserting ``that also secure
        the senior project obligations'' after ``sources''; and
            (E) in paragraph (6) by striking ``line of credit'' and
        inserting ``full amount of the line of credit, to the extent
        not drawn upon,''.
        (2) Repayment.--Section 184(c) of such title is amended--
            (A) in paragraph (2)--
                (i) by striking ``scheduled'';
                (ii) by inserting ``be scheduled to'' after ``shall'';
            and
                (iii) by striking ``be fully repaid, with interest,''
            and inserting ``to conclude, with full repayment of
            principal and interest,''; and
            (B) by striking paragraph (3).
    (f) Program Administration.--Section 185 of such title is amended
to read as follows:

``Sec. 185. Program administration

    ``(a) Requirement.--The Secretary shall establish a uniform system
to service the Federal credit instruments made available under this
subchapter.
    ``(b) Fees.--
        ``(1) In general.--The Secretary may collect and spend fees,
    contingent upon authority being provided in appropriations Acts, at
    a level that is sufficient to cover--
            ``(A) the costs of services of expert firms retained
        pursuant to subsection (d); and
            ``(B) all or a portion of the costs to the Federal
        Government of servicing the Federal credit instruments.
    ``(c) Servicer.--
        ``(1) In general.--The Secretary may appoint a financial entity
    to assist the Secretary in servicing the Federal credit
    instruments.
        ``(2) Duties.--The servicer shall act as the agent for the
    Secretary.
        ``(3) Fee.--The servicer shall receive a servicing fee, subject
    to approval by the Secretary.
    ``(d) Assistance From Expert Firms.--The Secretary may retain the
services of expert firms, including counsel, in the field of municipal
and project finance to assist in the underwriting and servicing of
Federal credit instruments.''.
    (g) Funding.--Section 188 of such title is amended to read as
follows:

``Sec. 188. Funding

    ``(a) Funding.--
        ``(1) In general.--There is authorized to be appropriated from
    the Highway Trust Fund (other than the Mass Transit Account) to
    carry out this subchapter $122,000,000 for each of fiscal years
    2005 through 2009.
        ``(2) Availability.--Amounts made available to carry out this
    chapter shall remain available until expended.
        ``(3) Administrative costs.--From funds made available to carry
    out this chapter, the Secretary may use, for the administration of
    this subchapter, not more than $2,200,000 for each of fiscal years
    2005 through 2009.
    ``(b) Contract Authority.--
        ``(1) In general.--Notwithstanding any other provision of law,
    approval by the Secretary of a Federal credit instrument that uses
    funds made available under this subchapter shall impose upon the
    United States a contractual obligation to fund the Federal credit
    investment.
        ``(2) Availability.--Amounts authorized under this section for
    a fiscal year shall be available for obligation on October 1 of the
    fiscal year.''.
    (h) Dates for Submission of Reports.--Section 189 of such title is
amended--
        (1) by striking the section designation and heading and
    inserting the following:

``Sec. 189. Reports to Congress'';

        (2) by striking ``Not later than 4 years after the date of
    enactment of this subchapter,'' and inserting ``On June 1, 2006,
    and every 2 years thereafter,''; and
        (3) by striking ``subchapter'' each place it appears and
    inserting ``chapter (other than section 610)''.
    (i) Clerical Amendment.--The analysis for chapter 1 of such title
is amended by striking the item relating to section 185 and inserting
the following:

``185. Program administration.''.

SEC. 1602. STATE INFRASTRUCTURE BANKS.

    (a) In General.--Subchapter II of chapter 1 of title 23, United
States Code, is amended by adding at the end the following:

``Sec. 190. State infrastructure bank program

    ``(a) Definitions.--In this section, the following definitions
apply:
        ``(1) Capital project.--The term `capital project' has the
    meaning such term has under section 5302 of title 49.
        ``(2) Other forms of credit assistance.--The term `other forms
    of credit assistance' includes any use of funds in an
    infrastructure bank--
            ``(A) to provide credit enhancements;
            ``(B) to serve as a capital reserve for bond or debt
        instrument financing;
            ``(C) to subsidize interest rates;
            ``(D) to insure or guarantee letters of credit and credit
        instruments against credit risk of loss;
            ``(E) to finance purchase and lease agreements with respect
        to transit projects;
            ``(F) to provide bond or debt financing instrument
        security; and
            ``(G) to provide other forms of debt financing and methods
        of leveraging funds that are approved by the Secretary and that
        relate to the project with respect to which such assistance is
        being provided.
        ``(3) State.--The term `State' has the meaning such term has
    under section 401.
        ``(4) Capitalization.--The term `capitalization' means the
    process used for depositing funds as initial capital into a State
    infrastructure bank to establish the infrastructure bank.
        ``(5) Cooperative agreement.--The term `cooperative agreement'
    means written consent between a State and the Secretary which sets
    forth the manner in which the infrastructure bank established by
    the State in accordance with this section will be administered.
        ``(6) Loan.--The term `loan' means any form of direct financial
    assistance from a State infrastructure bank that is required to be
    repaid over a period of time and that is provided to a project
    sponsor for all or part of the costs of the project.
        ``(7) Guarantee.--The term `guarantee' means a contract entered
    into by a State infrastructure bank in which the bank agrees to
    take responsibility for all or a portion of a project sponsor's
    financial obligations for a project under specified conditions.
        ``(8) Initial assistance.--The term `initial assistance' means
    the first round of funds that are loaned or used for credit
    enhancement by a State infrastructure bank for projects eligible
    for assistance under this section.
        ``(9) Leverage.--The term `leverage' means a financial
    structure used to increase funds in a State infrastructure bank
    through the issuance of debt instruments.
        ``(10) Leveraged.--The term `leveraged', as used with respect
    to a State infrastructure bank, means that the bank has total
    potential liabilities that exceed the capital of the bank.
    ``(b) Cooperative Agreements.--Subject to the provisions of this
section, the Secretary may enter into cooperative agreements with
States for the establishment of State infrastructure banks for making
loans and providing other forms of credit assistance to public and
private entities carrying out or proposing to carry out projects
eligible for assistance under this section.
    ``(c) Interstate Compacts.--
        ``(1) In general.--Congress grants consent to two or more of
    the States, entering into a cooperative agreement under subsection
    (a) with the Secretary for the establishment by such States of a
    multistate infrastructure bank in accordance with this section, to
    enter into an interstate compact establishing such bank in
    accordance with this section.
        ``(2) Reservation of rights.--The right to alter, amend, or
    repeal interstate compacts entered into under this subsection is
    expressly reserved.
    ``(d) Funding.--
        ``(1) Highway account.--Subject to subsection (j), the
    Secretary may permit a State entering into a cooperative agreement
    under this section to establish a State infrastructure bank to
    deposit into the highway account of the bank not to exceed--
            ``(A) 10 percent of the funds apportioned to the State for
        each of fiscal years 2005 through 2009 under each of sections
        104(b)(1), 104(b)(3), 104(b)(4), and 144; and
            ``(B) 10 percent of the funds allocated to the State for
        each of such fiscal years under section 105.
        ``(2) Transit account.--Subject to subsection (j), the
    Secretary may permit a State entering into a cooperative agreement
    under this section to establish a State infrastructure bank, and
    any other recipient of Federal assistance under section 5307, 5309,
    or 5311 of title 49, to deposit into the transit account of the
    bank not to exceed 10 percent of the funds made available to the
    State or other recipient in each of fiscal years 2005 through 2009
    for capital projects under each of such sections.
        ``(3) Rail account.--Subject to subsection (j), the Secretary
    may permit a State entering into a cooperative agreement under this
    section to establish a State infrastructure bank, and any other
    recipient of Federal assistance under subtitle V of title 49, to
    deposit into the rail account of the bank funds made available to
    the State or other recipient in each of fiscal years 2005 through
    2009 for capital projects under such subtitle.
        ``(4) Capital grants.--
            ``(A) Highway account.--Federal funds deposited into a
        highway account of a State infrastructure bank under paragraph
        (1) shall constitute for purposes of this section a
        capitalization grant for the highway account of the bank.
            ``(B) Transit account.--Federal funds deposited into a
        transit account of a State infrastructure bank under paragraph
        (2) shall constitute for purposes of this section a
        capitalization grant for the transit account of the bank.
            ``(C) Rail account.--Federal funds deposited into a rail
        account of a State infrastructure bank under paragraph 3 shall
        constitute for purposes of this section a capitalization grant
        for the rail account of the bank.
        ``(5) Special rule for urbanized areas of over 200,000.--Funds
    in a State infrastructure bank that are attributed to urbanized
    areas of a State with urbanized populations of over 200,000 under
    section 133(d)(3) may be used to provide assistance with respect to
    a project only if the metropolitan planning organization designated
    for such area concurs, in writing, with the provision of such
    assistance.
        ``(6) Discontinuance of funding.--If the Secretary determines
    that a State is not implementing the State's infrastructure bank in
    accordance with a cooperative agreement entered into under
    subsection (b), the Secretary may prohibit the State from
    contributing additional Federal funds to the bank.
    ``(e) Forms of Assistance From Infrastructure Banks.--An
infrastructure bank established under this section may make loans or
provide other forms of credit assistance to a public or private entity
in an amount equal to all or a part of the cost of carrying out a
project eligible for assistance under this section. The amount of any
loan or other form of credit assistance provided for the project may be
subordinated to any other debt financing for the project. Initial
assistance provided with respect to a project from Federal funds
deposited into an infrastructure bank under this section may not be
made in the form of a grant.
    ``(f) Eligible Projects.--Subject to subsection (e), funds in an
infrastructure bank established under this section may be used only to
provide assistance for projects eligible for assistance under this
title and capital projects defined in section 5302 of title 49, and any
other projects relating to surface transportation that the Secretary
determines to be appropriate.
    ``(g) Infrastructure Bank Requirements.--In order to establish an
infrastructure bank under this section, the State establishing the bank
shall--
        ``(1) deposit in cash, at a minimum, into each account of the
    bank from non-Federal sources an amount equal to 25 percent of the
    amount of each capitalization grant made to the State and deposited
    into such account; except that, if the deposit is into the highway
    account of the bank and the State has a non-Federal share under
    section 120(b) that is less than 25 percent, the percentage to be
    deposited from non-Federal sources shall be the lower percentage of
    such grant;
        ``(2) ensure that the bank maintains on a continuing basis an
    investment grade rating on its debt, or has a sufficient level of
    bond or debt financing instrument insurance, to maintain the
    viability of the bank;
        ``(3) ensure that investment income derived from funds
    deposited to an account of the bank are--
            ``(A) credited to the account;
            ``(B) available for use in providing loans and other forms
        of credit assistance to projects eligible for assistance from
        the account; and
            ``(C) invested in United States Treasury securities, bank
        deposits, or such other financing instruments as the Secretary
        may approve to earn interest to enhance the leveraging of
        projects assisted by the bank;
        ``(4) ensure that any loan from the bank will bear interest at
    or below market interest rates, as determined by the State, to make
    the project that is the subject of the loan feasible;
        ``(5) ensure that repayment of any loan from the bank will
    commence not later than 5 years after the project has been
    completed or, in the case of a highway project, the facility has
    opened to traffic, whichever is later;
        ``(6) ensure that the term for repaying any loan will not
    exceed 30 years after the date of the first payment on the loan;
    and
        ``(7) require the bank to make an annual report to the
    Secretary on its status no later than September 30 of each year and
    such other reports as the Secretary may require under guidelines
    issued to carry out this section.
    ``(h) Applicability of Federal Law.--
        ``(1) In general.--The requirements of this title and title 49
    that would otherwise apply to funds made available under this title
    or such title and projects assisted with those funds shall apply
    to--
            ``(A) funds made available under this title or such title
        and contributed to an infrastructure bank established under
        this section, including the non-Federal contribution required
        under subsection (g); and
            ``(B) projects assisted by the bank through the use of the
        funds,
    except to the extent that the Secretary determines that any
    requirement of such title (other than sections 113 and 114 of this
    title and section 5333 of title 49) is not consistent with the
    objectives of this section.
        ``(2) Repayments.--The requirements of this title and title 49
    shall apply to repayments from non-Federal sources to an
    infrastructure bank from projects assisted by the bank. Such a
    repayment shall be considered to be Federal funds.
    ``(i) United States not Obligated.--The deposit of Federal funds
into an infrastructure bank established under this section shall not be
construed as a commitment, guarantee, or obligation on the part of the
United States to any third party, nor shall any third party have any
right against the United States for payment solely by virtue of the
contribution. Any security or debt-financing instrument issued by the
infrastructure bank shall expressly state that the security or
instrument does not constitute a commitment, guarantee, or obligation
of the United States.
    ``(j) Management of Federal Funds.--Sections 3335 and 6503 of title
31 shall not apply to funds deposited into an infrastructure bank under
this section.
    ``(k) Program Administration.--For each of fiscal years 2005
through 2009, a State may expend not to exceed 2 percent of the Federal
funds contributed to an infrastructure bank established by the State
under this section to pay the reasonable costs of administering the
bank.''.
    (b) Preparatory Amendments.--
        (1) Section 181.--Section 181 of such title is amended--
            (A) by striking the section designator and heading and
        inserting the following:

``Sec. 181. Generally applicable provisions'';

            (B) by striking ``In this subchapter'' and inserting the
        following:
    ``(a) Definitions.--In this chapter'';
            (C) in paragraph (5) by striking ``184'' and inserting
        ``604'';
            (D) in paragraph (11) (as redesignated by section 1601(a)
        of this Act) by striking ``183'' and inserting ``603''; and
            (E) by adding at the end the following:
    ``(b) Treatment of Chapter.--For purposes of this title, this
chapter shall be treated as being part of chapter 1.''.
        (2) Section 182.--Section 182(b)(2)(A)(viii) of such title is
    amended by inserting ``and chapter 1'' after ``this chapter''.
        (3) Section 183.--Section 183(a)(3) of such title is amended by
    striking ``182(b)(2)(B)'' and inserting ``602(b)(2)(B)''.
        (4) Section 184.--Section 184 of such title is amended--
            (A) in subsection (a)(1) by striking ``182'' and inserting
        ``602'';
            (B) in subsection (a)(3) by striking ``182(b)(2)(B)'' and
        inserting ``602(b)(2)(B)''; and
            (C) in subsection (b)(10) by striking ``183'' and inserting
        ``603''.
        (5) References in subchapter.--Subchapter II of chapter 1 of
    such title is amended by striking ``this subchapter'' each place it
    appears and inserting ``this chapter''.
        (6) Subchapter headings.--Chapter 1 of such title is further
    amended--
            (A) by striking ``SUBCHAPTER I--GENERAL PROVISIONS''
        preceding section 101; and
            (B) by striking ``SUBCHAPTER II--INFRASTRUCTURE FINANCE''
        preceding section 181.
    (c) Chapter 6.--Such title is further amended by adding at the end
the following:

                  ``CHAPTER 6--INFRASTRUCTURE FINANCE

``Sec.
``601. Generally applicable provisions.
``602. Determination of eligibility and project selection.
``603. Secured loans.
``604. Lines of credit.
``605. Program administration.
``606. State and local permits.
``607. Regulations.
``608. Funding.
``609. Reports to Congress.
``610. State infrastructure bank program.''.

    (d) Moving and Redesignating.--Such title is further amended--
        (1) by redesignating sections 181 through 189 as sections 601
    through 609, respectively;
        (2) by moving such sections from chapter 1 to chapter 6 (as
    added by subsection (c)); and
        (3) by inserting such sections after the analysis for chapter
    6.
    (e) Analysis for Chapter 1 and Table of Chapters.--
        (1) Analysis for chapter 1.--The analysis for chapter 1 of such
    title is amended--
            (A) by striking the headings for subchapters I and II; and
            (B) by striking the items relating to sections 181 through
        189.
        (2) Table of chapters.--The table of chapters for such title is
    amended by inserting after the item relating to chapter 5 the
    following:

``6. Infrastructure Finance......................................601.''.

SEC. 1603. USE OF EXCESS FUNDS AND FUNDS FOR INACTIVE PROJECTS.

    (a) Definitions.--In this section, the following definitions apply:
        (1) Eligible funds.--
            (A) In general.--The term ``eligible funds'' means excess
        funds or inactive funds for a specific transportation project
        or activity that were--
                (i) allocated before fiscal year 1991; and
                (ii) designated in a public law, or a report
            accompanying a public law, for allocation for the specific
            surface transportation project or activity.
            (B) Inclusion.--The term ``eligible funds'' includes funds
        described in subparagraph (A) that were allocated and
        designated for a demonstration project.
        (2) Excess funds.--The term ``excess funds'' means--
            (A) funds obligated for a specific transportation project
        or activity that remain available for the project or activity
        after the project or activity has been completed or canceled;
        or
            (B) an unobligated balance of funds allocated for a
        transportation project or activity that the State in which the
        project or activity was to be carried out certifies are no
        longer needed for the project or activity.
        (3) Inactive funds.--The term ``inactive funds'' means--
            (A) an obligated balance of Federal funds for an eligible
        transportation project or activity against which no
        expenditures have been charged during any 1-year period
        beginning after the date of obligation of the funds; and
            (B) funds that are available to carry out a transportation
        project or activity in a State, but, as certified by the State,
        are unlikely to be advanced for the project or activity during
        the 1-year period beginning on the date of certification.
    (b) Availability for STP Purposes.--Eligible funds shall be--
        (1) made available in accordance with this section to the State
    that originally received the funds; and
        (2) available for obligation for any eligible purpose under
    section 133 of title 23, United States Code.
    (c) Retention for Original Purpose.--
        (1) In general.--The Secretary may determine that eligible
    funds identified as inactive funds shall remain available for the
    purpose for which the funds were initially made available if the
    applicable State certifies that the funds are necessary for that
    initial purpose.
        (2) Report.--A certification provided by a State under
    paragraph (1) shall include a report on the status of, and an
    estimated completion date for, the project that is the subject of
    the certification.
    (d) Authority to Obligate.--Notwithstanding the original source or
period of availability of eligible funds, the Secretary may, on the
request by a State--
        (1) obligate the funds for any eligible purpose under section
    133 of title 23, United States Code; or
        (2)(A) deobligate the funds; and
        (B) reobligate the funds for any eligible purpose under that
    section.
    (e) Applicability.--
        (1) In general.--Subject to paragraph (2), this section applies
    only to eligible funds.
        (2) Discretionary allocations; section 125 projects.--This
    section does not apply to funds that are--
            (A) allocated at the discretion of the Secretary and for
        which the Secretary has the authority to withdraw the
        allocation for use on other projects; or
            (B) made available to carry out projects under section 125
        of title 23, United States Code.
    (f) Period of Availability; Title 23 Requirements.--
        (1) In general.--Notwithstanding the original source or period
    of availability of eligible funds obligated, or deobligated and
    reobligated, under subsection (d), the eligible funds--
            (A) shall remain available for obligation for a period of 3
        fiscal years after the fiscal year in which this Act is
        enacted; and
            (B) except as provided in paragraph (2), shall be subject
        to the requirements of title 23, United States Code, that apply
        to section 133 of that title, including provisions relating to
        Federal share.
        (2) Exception.--With respect to eligible funds described in
    paragraph (1)--
            (A) section 133(d) of title 23, United States Code, shall
        not apply; and
            (B) the period of availability of the eligible funds shall
        be determined in accordance with this section.
    (g) Report.--Not later than 1 year after the date of enactment of
this Act, and annually thereafter, the Secretary shall submit to the
Committee on Environment and Public Works of the Senate and the
Committee on Transportation and Infrastructure of the House of
Representatives a report describing any action taken by the Secretary
under this section.
    (h) Sense of Congress Regarding Use of Eligible Funds.--It is the
sense of Congress that eligible funds made available under this Act or
title 23, United States Code, should be available for obligation for
transportation projects and activities in the same geographic region
for which the eligible funds were initially made available.

SEC. 1604. TOLLING.

    (a) Value Pricing Pilot Program.--Section 1012(b)(8) of the
Intermodal Surface Transportation Efficiency Act of 1991 (23 U.S.C. 149
note; 105 Stat. 1938) is amended--
        (1) by redesignating subparagraphs (A) and (B) as subparagraphs
    (C) and (D), respectively; and
        (2) by inserting before subparagraph (C) (as redesignated by
    paragraph (1)) the following:
            ``(A) In general.--There are authorized to be appropriated
        to the Secretary from the Highway Trust Fund (other than the
        Mass Transit Account) to carry out this subsection--
                ``(i) for fiscal year 2005, $11,000,000; and
                ``(ii) for each of fiscal years 2006 through 2009,
            $12,000,000.
            ``(B) Set-aside for projects not involving highway tolls.--
        Of the amounts made available to carry out this subsection,
        $3,000,000 for each of fiscal years 2006 through 2009 shall be
        available only for congestion pricing pilot projects that do
        not involve highway tolls.''.
    (b) Express Lanes Demonstration Program.--
        (1) Definitions.--In this subsection, the following definitions
    apply:
            (A) Eligible toll facility.--The term ``eligible toll
        facility'' includes--
                (i) a facility in existence on the date of enactment of
            this Act that collects tolls;
                (ii) a facility in existence on the date of enactment
            of this Act that serves high occupancy vehicles;
                (iii) a facility modified or constructed after the date
            of enactment of this Act to create additional tolled lane
            capacity (including a facility constructed by a private
            entity or using private funds); and
                (iv) in the case of a new lane added to a previously
            non-tolled facility, only the new lane.
            (B) Nonattainment area.--The term ``nonattainment area''
        has the meaning given that term in section 171 of the Clean Air
        Act (42 U.S.C. 7501).
        (2) Demonstration program.--Notwithstanding sections 129 and
    301 of title 23, United States Code, the Secretary shall carry out
    15 demonstration projects during the period of fiscal years 2005
    through 2009 to permit States, public authorities, or a public or
    private entities designated by States, to collect a toll from motor
    vehicles at an eligible toll facility for any highway, bridge, or
    tunnel, including facilities on the Interstate System--
            (A) to manage high levels of congestion;
            (B) to reduce emissions in a nonattainment area or
        maintenance area; or
            (C) to finance the expansion of a highway, for the purpose
        of reducing traffic congestion, by constructing one or more
        additional lanes (including bridge, tunnel, support, and other
        structures necessary for that construction) on the Interstate
        System.
        (3) Limitation on use of revenues.--
            (A) Use.--
                (i) In general.--Toll revenues received under paragraph
            (2) shall be used by a State, public authority, or private
            entity designated by a State, for--

                    (I) debt service;
                    (II) a reasonable return on investment of any
                private financing;
                    (III) the costs necessary for proper operation and
                maintenance of any facilities under paragraph (2)
                (including reconstruction, resurfacing, restoration,
                and rehabilitation); or
                    (IV) if the State, public authority, or private
                entity annually certifies that the tolled facility is
                being adequately operated and maintained, any other
                purpose relating to a highway or transit project
                carried out under title 23 or 49, United States Code.

            (B) Requirements.--
                (i) Variable price requirement.--A facility that
            charges tolls under this subsection may establish a toll
            that varies in price according to time of day or level of
            traffic, as appropriate to manage congestion or improve air
            quality.
                (ii) HOV variable pricing requirement.--The Secretary
            shall require, for each high occupancy vehicle facility
            that charges tolls under this subsection, that the tolls
            vary in price according to time of day or level of traffic,
            as appropriate to manage congestion or improve air quality.
                (iii) HOV passenger requirements.--Pursuant to section
            166 of title 23, United States Code, a State may permit
            motor vehicles with fewer than two occupants to operate in
            high occupancy vehicle lanes as part of a variable toll
            pricing program established under this subsection.
            (C) Agreement.--
                (i) In general.--Before the Secretary may permit a
            facility to charge tolls under this subsection, the
            Secretary and the applicable State, public authority, or
            private entity designated by a State shall enter into an
            agreement for each facility incorporating the conditions
            described in subparagraphs (A) and (B).
                (ii) Termination.--An agreement under clause (i) shall
            terminate with respect to a facility upon the decision of
            the State, public authority, or private entity designated
            by a State to discontinue the variable tolling program
            under this subsection for the facility.
                (iii) Debt.--If there is any debt outstanding on a
            facility at the time at which the decision is made to
            discontinue the program under this subsection with respect
            to the facility, the facility may continue to charge tolls
            in accordance with the terms of the agreement until such
            time as the debt is retired.
            (D) Limitation on federal share.--The Federal share of the
        cost of a project on a facility tolled under this subsection,
        including a project to install the toll collection facility
        shall be a percentage, not to exceed 80 percent, determined by
        the applicable State.
        (4) Eligibility.--To be eligible to participate in the program
    under this subsection, a State, public authority, or private entity
    designated by a State shall provide to the Secretary--
            (A) a description of the congestion or air quality problems
        sought to be addressed under the program;
            (B) a description of--
                (i) the goals sought to be achieved under the program;
            and
                (ii) the performance measures that would be used to
            gauge the success made toward reaching those goals; and
            (C) such other information as the Secretary may require.
        (5) Automation.--Fees collected from motorists using an express
    lane shall be collected only through the use of noncash electronic
    technology that optimizes the free flow of traffic on the tolled
    facility.
        (6) Interoperability.--
            (A) In general.--Not later than 180 days after the date of
        enactment of this Act, the Secretary shall promulgate a final
        rule specifying requirements, standards, or performance
        specifications for automated toll collection systems
        implemented under this section.
            (B) Development.--In developing that rule, which shall be
        designed to maximize the interoperability of electronic
        collection systems, the Secretary shall, to the maximum extent
        practicable--
                (i) seek to accelerate progress toward the national
            goal of achieving a nationwide interoperable electronic
            toll collection system;
                (ii) take into account the use of noncash electronic
            technology currently deployed within an appropriate
            geographical area of travel and the noncash electronic
            technology likely to be in use within the next 5 years; and
                (iii) seek to minimize additional costs and maximize
            convenience to users of toll facility and to the toll
            facility owner or operator.
        (7) Reporting.--
            (A) In general.--The Secretary, in cooperation with State
        and local agencies and other program participants and with
        opportunity for public comment, shall--
                (i) develop and publish performance goals for each
            express lane project;
                (ii) establish a program for regular monitoring and
            reporting on the achievement of performance goals,
            including--

                    (I) effects on travel, traffic, and air quality;
                    (II) distribution of benefits and burdens;
                    (III) use of alternative transportation modes; and
                    (IV) use of revenues to meet transportation or
                impact mitigation needs.

            (B) Reports to congress.--The Secretary shall submit to the
        Committee on Environment and Public Works of the Senate and the
        Committee on Transportation and Infrastructure of the House of
        Representatives--
                (i) not later than 1 year after the date of enactment
            of this Act, and annually thereafter, a report that
            describes in detail the uses of funds under this subsection
            in accordance with paragraph (8)(D); and
                (ii) not later than 3 years after the date of enactment
            of this Act, and every 3 years thereafter, a report that
            describes any success of the program under this subsection
            in meeting congestion reduction and other performance goals
            established for express lane programs.
    (c) Interstate System Construction Toll Pilot Program.--
        (1) Establishment.--The Secretary shall establish and implement
    an Interstate System construction toll pilot program under which
    the Secretary, notwithstanding sections 129 and 301 of title 23,
    United States Code, may permit a State or an interstate compact of
    States to collect tolls on a highway, bridge, or tunnel on the
    Interstate System for the purpose of constructing Interstate
    highways.
        (2) Limitation on number of facilities.--The Secretary may
    permit the collection of tolls under this section on three
    facilities on the Interstate System.
        (3) Eligibility.--To be eligible to participate in the pilot
    program, a State shall submit to the Secretary an application that
    contains, at a minimum, the following:
            (A) An identification of the facility on the Interstate
        System proposed to be a toll facility.
            (B) In the case of a facility that affects a metropolitan
        area, an assurance that the metropolitan planning organization
        designated under section 134 or 135 for the area has been
        consulted concerning the placement and amount of tolls on the
        facility.
            (C) An analysis demonstrating that financing the
        construction of the facility with the collection of tolls under
        the pilot program is the most efficient and economical way to
        advance the project.
            (D) A facility management plan that includes--
                (i) a plan for implementing the imposition of tolls on
            the facility;
                (ii) a schedule and finance plan for the construction
            of the facility using toll revenues;
                (iii) a description of the public transportation agency
            that will be responsible for implementation and
            administration of the pilot program;
                (iv) a description of whether consideration will be
            given to privatizing the maintenance and operational
            aspects of the facility, while retaining legal and
            administrative control of the portion of the Interstate
            route; and
                (v) such other information as the Secretary may
            require.
        (4) Selection criteria.--The Secretary may approve the
    application of a State under paragraph (3) only if the Secretary
    determines that--
            (A) the State's analysis under paragraph (3)(C) is
        reasonable;
            (B) the State plan for implementing tolls on the facility
        takes into account the interests of local, regional, and
        interstate travelers;
            (C) the State plan for construction of the facility using
        toll revenues is reasonable;
            (D) the State will develop, manage, and maintain a system
        that will automatically collect the tolls; and
            (E) the State has given preference to the use of a public
        toll agency with demonstrated capability to build, operate, and
        maintain a toll expressway system meeting criteria for the
        Interstate System.
        (5) Prohibition on noncompete agreements.--Before the Secretary
    may permit a State to participate in the pilot program, the State
    must enter into an agreement with the Secretary that provides that
    the State will not enter into an agreement with a private person
    under which the State is prevented from improving or expanding the
    capacity of public roads adjacent to the toll facility to address
    conditions resulting from traffic diverted to such roads from the
    toll facility, including--
            (A) excessive congestion;
            (B) pavement wear; and
            (C) an increased incidence of traffic accidents, injuries,
        or fatalities.
        (6) Limitations on use of revenues; audits.--Before the
    Secretary may permit a State to participate in the pilot program,
    the State must enter into an agreement with the Secretary that
    provides that--
            (A) all toll revenues received from operation of the toll
        facility will be used only for--
                (i) debt service;
                (ii) reasonable return on investment of any private
            person financing the project; and
                (iii) any costs necessary for the improvement of and
            the proper operation and maintenance of the toll facility,
            including reconstruction, resurfacing, restoration, and
            rehabilitation of the toll facility; and
            (B) regular audits will be conducted to ensure compliance
        with subparagraph (A) and the results of such audits will be
        transmitted to the Secretary.
        (7) Limitation on use of interstate maintenance funds.--During
    the term of the pilot program, funds apportioned for Interstate
    maintenance under section 104(b)(4) of title 23, United States
    Code, may not be used on a facility for which tolls are being
    collected under the program.
        (8) Program term.--The Secretary may approve an application of
    a State for permission to collect a toll under this section only if
    the application is received by the Secretary before the last day of
    the 10-year period beginning on the date of enactment of this Act.
        (9) Interstate system defined.--In this section, the term
    ``Interstate System'' has the meaning such term has under section
    101 of title 23, United States Code.

                   Subtitle G--High Priority Projects

SEC. 1701. HIGH PRIORITY PROJECTS PROGRAM.

    (a) Authorization of High Priority Projects.--Section 117(a) of
title 23, United States Code, is amended to read as follows:
    ``(a) Authorization of High Priority Projects.--
        ``(1) In general.--The Secretary is authorized to carry out
    high priority projects with funds made available to carry out the
    high priority projects program under this section.
        ``(2) Availability of funds.--
            ``(A) For tea-21.--Of amounts made available to carry out
        this section for fiscal years 1998 through 2003, the Secretary,
        subject to subsection (b), shall make available to carry out
        each project described in section 1602 of the Transportation
        Equity Act for the 21st Century the amount listed for such
        project in such section.
            ``(B) For safetea-lu.--Of amounts made available to carry
        out this section for fiscal years 2005 through 2009, the
        Secretary, subject to subsection (b), shall make available to
        carry out each project described in section 1702 of the
        SAFETEA-LU the amount listed for such project in such section.
        ``(3) Availability of unallocated funds.--Any amounts made
    available to carry out such program that are not allocated for
    projects described in such section shall be available to the
    Secretary, subject to subsection (b), to carry out such other high
    priority projects as the Secretary determines appropriate.''.
    (b) Allocation Percentages.--Section 117(b) of such title is
amended to read as follows:
    ``(b) For TEA-21.--For each project to be carried out with funds
made available to carry out the high priority projects program under
this section for fiscal years 1998 through 2003--
        ``(1) 11 percent of such amount shall be available for
    obligation beginning in fiscal year 1998;
        ``(2) 15 percent of such amount shall be available for
    obligation beginning in fiscal year 1999;
        ``(3) 18 percent of such amount shall be available for
    obligation beginning in fiscal year 2000;
        ``(4) 18 percent of such amount shall be available for
    obligation beginning in fiscal year 2001;
        ``(5) 19 percent of such amount shall be available for
    obligation beginning in fiscal year 2002; and
        ``(6) 19 percent of such amount shall be available for
    obligation beginning in fiscal year 2003.
    ``(c) For SAFETEA-LU.--For each project to be carried out with
funds made available to carry out the high priority projects program
under this section for fiscal years 2005 through 2009--
        ``(1) 20 percent of such amount shall be available for
    obligation beginning in fiscal year 2005;
        ``(2) 20 percent of such amount shall be available for
    obligation beginning in fiscal year 2006;
        ``(3) 20 percent of such amount shall be available for
    obligation beginning in fiscal year 2007;
        ``(4) 20 percent of such amount shall be available for
    obligation beginning in fiscal year 2008; and
        ``(5) 20 percent of such amount shall be available for
    obligation beginning in fiscal year 2009.''.
    (c) Advance Construction.--Section 117(e) of such title is
amended--
        (1) in paragraph (1) by inserting after ``21st Century'' the
    following: ``or section 1701 of the SAFETEA-LU, as the case may
    be,''; and
        (2) by striking ``section 1602 of the Transportation Equity Act
    for the 21st Century.'' and inserting ``such section 1602 or 1702,
    as the case may be.''
    (d) Availability of Obligation Limitation.--Section 117(g) of such
title is amended by inserting after ``21st Century'' the following:
``or section 1102(g) of the SAFETEA-LU, as the case may be''.
    (e) Federal-State Relationship.--Section 145(b) of such title is
amended--
        (1) by inserting after ``described in'' the following:
    ``section 1702 of the SAFETEA-LU,'';
        (2) by inserting after ``for such projects by'' the following:
    ``section 1101(a)(16) of the SAFETEA-LU,''; and
        (3) by striking ``117 of title 23, United States Code,'' and
    inserting ``section 117 of this title,''.

SEC. 1702. PROJECT AUTHORIZATIONS.

    Subject to section 117 of title 23, United States Code, the amount
listed for each high priority project in the following table shall be
available (from amounts made available by section 1101(a)(16) of this
Act) for fiscal years 2005 through 2009 to carry out each such project:

                Highway Projects  High Priority Projects
------------------------------------------------------------------------
     No.           State         Project Description          Amount
------------------------------------------------------------------------
1              CA            Construct safe access to           $400,000
                              streets for bicyclists and
                              pedestrians including
                              crosswalks, sidewalks and
                              traffic calming measures,
                              Covina....................
2              CA            Develop and implement ITS          $800,000
                              master plan in Anaheim....
3              TN            Improve circuitry on                $47,200
                              vehicle protection device
                              installed at highway/RR
                              crossing in Athens, TN....
4              CA            Builds a pedestrian bridge       $1,960,000
                              from Hiller Street to the
                              Bay Trail, Belmont........
5              OH            Renovate and expand              $2,750,000
                              National Packard Museum
                              and adjacent historic
                              Packard facilities........
6              IL            Land acquisition for the         $4,000,000
                              widening of Rt. 47 in
                              Yorkville, IL.............
7              NE            Interstate 80 Interchange        $1,600,000
                              at Pflug Road, Sarpy
                              County, Nebraska..........
8              TX            Construction of Segment #1       $1,600,000
                              of Morrison Road for the
                              City of Brownsville.......
9              MI            I-96 at Latson Road              $4,800,000
                              Interchange improvements..
10             IL            Preconstruction and                $800,000
                              Construction of IL 83 at
                              IL 132....................
11             TN            Add third lane on U.S. 27        $4,800,000
                              (State Route 29) for truck-
                              climbing lane and
                              realignment of roadway at
                              Wolf Creek Road to Old
                              U.S. 27 north of Robbins..
12             MI            Reconfiguration of U.S. 31         $600,000
                              from the Manistee Bascule
                              Bridge to Lincoln Street
                              in the City of Manistee...
13             AR            Bentonville, Arkansas--          $1,420,000
                              Widen and improve I-540
                              and SH 102 Interchange....
14             WA            Interstate 5 and 41st            $3,180,000
                              Street/Broadway
                              Interchange and Arterial
                              Improvement Project,
                              Everett...................
15             CA            Reconstruct and deep-lift        $4,000,000
                              asphalt on various roads
                              throughout the district in
                              Santa Barbara County......
16             OK            Improving the I-35               $1,600,000
                              Interchange at Milepost 1
                              Near Thackerville.........
17             NJ            Laurel Avenue Bridge               $800,000
                              replacement in Holmdel
                              Township..................
18             OH            Construct overpass over CSX        $448,000
                              Railroad on Columbia Road
                              (State Route 252), Olmsted
                              Falls.....................
19             TN            Reconstruct and widen U.S.         $800,000
                              72 from south of State
                              Route 175 to State Route
                              57, Shelby County.........
20             NY            Construct roundabout at            $380,000
                              Oregon Road--Westbrook
                              Drive--Red Mill Road in
                              Town of Cortlandt.........
21             IL            Construct Bike, Pedestrian         $320,000
                              Paths, Orland Hills.......
22             PA            Construct I-79/Rte 3025            $920,000
                              missing ramps at Jackson
                              Township, PA..............
23             NY            John Street Extension-           $2,000,000
                              Lehigh Station Road to
                              Bailey Road in the Town of
                              Henrietta.................
24             TX            Extension of SH 349 to U.S.      $2,000,000
                              87 Relief Route in Dawson
                              County....................
25             IL            Parking facility in Peoria,        $800,000
                              IL........................
26             IL            Construct Interchange on        $17,500,000
                              Interstate 255/Davis Ferry
                              Road, Dupo................
27             MN            Construction and right-of-       $3,200,000
                              way acquisition for
                              interchange at TH 65 and
                              TH 242 in Blaine, MN......
28             CA            Huntington Beach, Remove           $400,000
                              off-ramp on I-405 at Beach
                              Blvd. Construct fourth
                              lane on I-405 North, at
                              the Beach Blvd.
                              interchange...............
29             TN            Addition of an interchange       $2,400,000
                              on I-40 in Roane County at
                              Buttermilk Road and I-40..
30             NY            Purchase Three Ferries and      $15,000,000
                              Establish System for Ferry
                              Service from Rockaway
                              Peninsula to Manhattan....
31             IL            Reconstruction of                $1,600,000
                              Mockingbird Lane and
                              Stratford St, Granite City
32             FL            Construction a new multi-          $400,000
                              lane tunnel below the
                              channel to link the Port
                              of Miami on Dodge Island
                              with I-395 on Watson
                              Island and I-95 in
                              Downtown Miami............
33             MD            Rehabilitation of West             $720,000
                              Baltimore Trail and
                              Implementation of
                              Pedestrian Improvements
                              Along Associated Roadways.
34             TN            Removal and Reconfiguration      $2,400,000
                              of Interstate Ramps/I-40..
35             CA            Replace structurally unsafe      $1,600,000
                              Winters Bridge for
                              vehicles, bicycles and
                              pedestrians between Yolo
                              and Solano Counties.......
36             IL            City of Havana, Illinois           $762,058
                              Upgrades to Broadway
                              Street....................
37             MN            Construction of Gitchi-Gami        $900,000
                              State Trail from Cascade
                              River to Grand Marais.....
38             LA            Develop master                     $400,000
                              transportation plan for
                              the New Orleans Regional
                              Medical Center............
39             VA            Final Design and                   $800,000
                              Construction for
                              improvements at I-64 and
                              City Line Road, Virginia
                              Beach and Chesapeake......
40             MA            Replacement of Cross Street        $800,000
                              Bridge spanning flood
                              prone Aberjona River,
                              Winchester................
41             NC            Construction of and              $8,800,000
                              improvement to I-73, I-74,
                              and U.S. 220 in Montgomery
                              and Randolph Counties, NC.
42             IA            Access and transportation        $1,600,000
                              enhancements to access
                              Lake Belva Deer, Sigourney
43             CA            Roadway surface                    $640,000
                              improvements, street
                              lighting, and storm drain
                              improvements to South
                              Center Street from
                              Baughman Road to State
                              Route 78/86, Westmorland..
44             TX            Construct two connectors         $1,800,000
                              between SH 288 and Beltway
                              8.........................
45             NY            Implement Central NY             $1,600,000
                              highway grade crossing and
                              grade separation project..
46             CA            Douglas St. Improvements,        $3,200,000
                              El Segundo................
47             MA            Reconstruction of                $1,600,000
                              Massachusetts Avenue
                              including safety
                              improvements and related
                              pedestrian, bike way in
                              Arlington.................
48             NY            Reconstruction of Rt. 5, 8,        $800,000
                              12 (North South Arterial)
                              Burrstone Rd. to Oriskany
                              Circle, City of Utica.....
49             OK            Construction of Norman           $1,600,000
                              highway-rail Grade
                              Separation................
50             PA            Construction of the Montour      $1,600,000
                              Trail, Great Allegheny
                              Passage...................
51             CA            Route 1 San Pedro Creek          $2,500,000
                              Bridge replacement in
                              Pacifica..................
52             MI            South Lyon, 2nd St. between        $100,000
                              Warren and Haggadorn......
53             PA            Street improvements,             $1,600,000
                              Abington Township.........
54             IA            Study of a direct link to I-       $400,000
                              80, Pella.................
55             TN            Knoxville, TN Cessna Rd.            $76,800
                              Improving At-Grade highway-
                              railroad Crossings........
56             OR            Construct bike/pedestrian          $440,000
                              path, Powers..............
57             IL            IL 29 from IL 6 to I-180--       $1,600,000
                              Phase 2 study and land
                              acquisition...............
58             FL            Construct a new bridge at          $800,000
                              Indian Street, Martin
                              County....................
59             GA            Improve sidewalks, upgrade         $400,000
                              lighting, and add
                              landscaping in downtown
                              Glennville................
60             LA            Continue planning and            $1,520,000
                              construction of the New
                              Orleans Regional Planning
                              Commission Mississippi
                              River trail in St. John,
                              Plaquemines St. Bernard
                              and St. Charles parishes..
61             MO            Road widening and curb and       $2,400,000
                              gutter improvements on Hwy
                              33 in Kearney.............
62             TX            The SH 146, Port Rd. direct     $10,560,000
                              connectors allows traffic
                              bypass several rail lines
                              and traffic signals at,
                              near intersection of SH
                              146 and Port Rd...........
63             UT            Reconstruct South Moore Cut-     $7,500,000
                              off Road in Emery County..
64             PA            Improvements to exits along      $6,560,000
                              Interstate 81 in Franklin
                              County, PA--Antrim Road...
65             OH            Plan and construct the           $4,480,000
                              Southeast Arterial
                              Connector highway at
                              Delaware, Ohio............
66             TN            To construct transportation      $6,400,000
                              enhancements on a multi-
                              faceted greenway in
                              downtown Columbia on the
                              Duck River................
67             RI            New Interchange constructed      $4,640,000
                              from I-195 to Taunton and
                              Warren Avenue in East
                              Providence................
68             NY            Town of Chester                     $64,000
                              reconstruction of Walton
                              Lake Estates subdivision
                              and related roads.........
69             NC            Extend M.L. King, Jr.,           $1,600,000
                              Boulevard in Monroe.......
70             NY            Town of Fishkill Old               $260,400
                              Glenham Road (aka
                              Washington Ave.)
                              reconstruction............
71             PA            U.S. Route 13 Corridor           $4,000,000
                              Reconstruction,
                              Redevelopment and
                              Beautification, Bucks
                              County....................
72             NY            Rochester and Southern           $1,464,000
                              Highway-Rail Grade
                              Crossing Bypass, Silver
                              Springs, New York.........
73             IL            Upgrade streets in the City        $800,000
                              of Rushville, IL..........
74             MO            Construct 2 lanes on             $1,600,000
                              Chouteau Trafficway from
                              MO 210 to I-35............
75             AZ            U.S. 60 to Gonzalez Pass...      $3,040,000
76             LA            Interstate lighting system         $240,000
                              (I-10 and LA 93)..........
77             ............  ...........................              $0
78             WA            SR 704 Cross-Base Highway,       $1,200,000
                              Spanaway Loop Road to SR 7
79             NY            Village of Brewster Main           $780,000
                              Street and Route 6 related
                              construction and
                              improvements..............
80             PA            Design and construct             $4,544,000
                              relocation of U.S. 11
                              between Ridge Hill and
                              Hempt Roads...............
81             VA            Improve Route 42 (Main             $400,000
                              Street) in Bridgewater,
                              Virginia..................
82             NY            Construction of Route 59         $1,000,000
                              Palisades Interstate
                              Parkway to Route 303......
83             IL            Improve University Drive,          $400,000
                              Macomb....................
84             CA            Adams Street Rehabilitation        $310,400
                              Project, Glendale.........
85             NY            Construct grade separation-      $1,160,000
                              interchange between
                              Taconic Parkway and
                              Pudding Street............
86             IA            Construction of 100th St.          $800,000
                              interchange on I-35/I-80,
                              Urbandale.................
87             MO            Lewis and Clark Expressway.      $1,600,000
88             PA            Mercer County, PA I-79 and       $2,400,000
                              PA 208 Interchange
                              Improvement Project.......
89             WA            Plan to relieve traffic            $440,000
                              until North-South freeway
                              Hwy 2.....................
90             CA            San Diego River Multiuse           $400,000
                              Bicycle and Pedestrian
                              Path......................
91             PA            Construction of the              $9,120,000
                              Lafayette Street extension
                              project in Montgomery
                              County, PA................
92             NJ            Construct new ramps between      $4,000,000
                              I-295 and Route 42........
93             PA            Construct SR 29 Wal-mart to      $1,360,000
                              River Betterment, Eaton
                              Tunkhannock, Wyoming
                              County....................
94             WV            Construct Shawnee Parkway..        $880,000
95             FL            Improve pedestrian and             $480,000
                              bicycle sidewalks,
                              lighting, and ADA ramps--
                              Main Street, Canal Street,
                              Miramar...................
96             MN            Reconstruct CSAH 19 from           $160,000
                              CSAH 36 to CSAH 2,
                              Morrison County...........
97             TN            Develop trails, bike paths         $200,000
                              and recreational
                              facilities on Bird
                              Mountain, Morgan County
                              for Cumberland Trail State
                              Park......................
98             MN            Lyndale Avenue Bridge,          $13,000,000
                              Richfield.................
99             MI            Provide a bypass around the         $80,000
                              Village of Almont during M-
                              53 reconstruction which is
                              contiguous with Macomb
                              County....................
100            NY            Town of Wallkill new               $800,000
                              construction road-tunnel
                              under Rt. 17..............
101            NY            Village of Cold Spring Main        $656,000
                              Street and ancillary road
                              and sidewalk improvements.
102            IL            West Ridge Nature Preserve,      $2,800,000
                              Chicago...................
103            TN            Widen Campbell Station Road      $1,440,000
                              in Knoxville, TN..........
104            AL            Widen Hwy 84 to 4 lanes          $4,800,000
                              west of I-65 from
                              Evergreen to Monroeville
                              and beyond to the State of
                              AL line...................
105            MS            Widen State Highway 57 from      $4,800,000
                              I-10 through Vancleave....
106            WA            Widening SR 527 from 2           $1,200,000
                              lanes to 5 from Bothell to
                              Mill Creek................
107            TX            Paving of County Roads 3230      $1,000,000
                              and 3240 connecting FM
                              1158 to FM 1159 Northeast
                              of Clarksville, TX........
108            MI            Construct improvements to        $3,520,000
                              Finkbeiner Road from
                              Patterson Road to
                              Whitneyville Road in Barry
                              County, and new bridge
                              over Thornapple River.....
109            PA            York Road improvements from      $1,000,000
                              Horsham Road to Summit
                              Avenue, Borough of Hatboro
110            OH            Construct Highland Road            $489,600
                              pedestrian path and
                              intersection improvements
                              at Highland and Bishop
                              Roads in the City of
                              Highland Heights, OH......
111            WI            Reconstruct Wisconsin State      $2,400,000
                              Highway 21 at I-94
                              interchange...............
112            MN            Safety improvements and          $1,440,000
                              intersection enhancements
                              of TH 95 and TH 169,
                              Princeton.................
113            NY            Wading River Bicycle and           $960,000
                              Pedestrian Project in
                              Riverhead.................
114            FL            Widen County Line Road (CR       $4,800,000
                              578) from Suncoast Parkway
                              to U.S. 41 to four lanes..
115            IL            Improve Great River Road,          $600,000
                              Warsaw....................
116            WA            SR 518 3rd lane                  $1,600,000
                              construction, King County.
117            FL            Construct East Central             $800,000
                              Regional Rail Trail in
                              Volusia County, Florida...
118            MO            Y Highway U.S. 71 to MO 58,      $1,600,000
                              Cass County...............
119            WY            WYO 59 Reconstruction......      $1,600,000
120            LA            Plan and construct bike/         $3,200,000
                              pedestrian crossings of
                              Washington-Palmetto Canal
                              in the vicinity of Xavier
                              University, New Orleans...
121            NC            Winston-Salem Northern           $4,000,000
                              Beltway, Eastern Section
                              and Extension, NC.........
122            CA            Willow and Herndon Traffic         $240,000
                              Flow Improvements, City of
                              Clovis, California........
123            MO            U.S. 71 at Y Highway North       $1,600,000
                              and Southbound Ramps......
124            CA            Will add landscaping             $2,320,000
                              enhancements along the
                              Ronald Reagan Freeway
                              Route 118 for aesthetic
                              purposes..................
125            NC            Widens U.S. 29 Business          $8,000,000
                              Freeway Drive from South
                              Scales St. to NC 14 in
                              Rockingham County.........
126            PA            Widening, rechannelization,        $640,000
                              signalization to 2nd Ave.
                              and Bates street, replace
                              Elisa Furnace bridge over
                              Bates Street..............
127            KS            Resurfacing, grading,              $627,200
                              replacing guardrails and
                              adding shoulders to Old
                              Highway 77 in Geary
                              County, to accommodate
                              expected traffic increase.
128            MO            Widening, curb and gutter        $2,400,000
                              improvements on Hwy 92 as
                              part of Hwy 33
                              redevelopment project in
                              Kearney...................
129            IL            Construct streetscape along      $1,600,000
                              Morse avenue from Clark
                              street to Sheridan road,
                              Chicago...................
130            SC            Build extension of North         $5,600,000
                              Rhett Boulevard from
                              Liberty Hall Road to U.S.
                              176 in SC.................
131            NH            Construct and upgrade              $800,000
                              intersection of Route 3
                              and Franklin Industrial
                              Drive in Franklin.........
132            GA            Construct Waycross East          $2,560,000
                              Bypass from U.S. 84 in
                              Pierce County, Georgia to
                              U.S. 1 in Ware County,
                              Georgia...................
133            NY            Design and Construction of       $1,200,000
                              a transportation
                              enhancement project at the
                              Erie Canal Aqueduct in
                              downtown Rochester........
134            CA            Improvement of intersection        $400,000
                              at Balboa Blvd. and San
                              Fernando Rd...............
135            TN            Impove Vehicle Efficiencies         $79,200
                              at highway At-Grade
                              Railroad Crossing in
                              Athens, TN................
136            WI            Develop pedestrian and bike      $1,680,000
                              connections that link to
                              Hank Aaron State Trail in
                              Milwaukee.................
137            AK            Keystone Drive Road              $1,000,000
                              Improvements..............
138            GA            Pedestrian and streetscape         $250,000
                              improvements, Ellaville...
139            NY            Construct and improve            $1,600,000
                              pedestrian access on Main
                              Street in Hempstead.......
140            IL            Preconstruction activities       $1,600,000
                              IL 336 from Macomb to
                              Peoria....................
141            OH            Purchase of right-of-ways          $400,000
                              for construction of
                              pedestrian and bicycle
                              improvements in the City
                              of Aurora, OH.............
142            IL            Replacement of bridge on           $800,000
                              Harlem Avenue, The Village
                              of River Forest...........
143            CA            State Route 86S and Ave. 66      $3,600,000
                              highway safety grade
                              separation................
144            IL            Construct Bissel Street            $800,000
                              Roadway Connector, Tri-
                              City Regional Port
                              District..................
145            CT            Improve Route 1 between          $1,600,000
                              East Avenue and Belden
                              Avenue, Norwalk, CT.......
146            IA            Central IA Trail Loop,             $800,000
                              bicycle and pedestrian,
                              Ankeny to Woodward section
147            MI            Chippewa County, Upgrade           $800,000
                              Tilson Road between M-28
                              South to intersection of M-
                              48 at Rudyard.............
148            WA            Coal Creek Parkway Bridge          $800,000
                              Replacement, Newcastle WA.
149            PA            Complete gaps in the               $600,000
                              Pittsburgh Riverfront
                              Trail Network including
                              the Hot Metal Bridge......
150            TX            Construct passing lanes on         $797,000
                              Texas State Highway 16 in
                              Atascosa County...........
151            TX            Construct street and               $250,000
                              drainage improvements to
                              road system in Encinal....
152            MN            Environmental assessment         $1,600,000
                              and right of-way-
                              acquisition at U.S. 52 and
                              CSAH 24 Interchange,
                              Cannon Falls, Goodhue
                              Cnty, MN..................
153            NY            Planning and design,             $8,000,000
                              construction, and related
                              relocations for approaches
                              to Peace Bridge
                              Development Project,
                              Buffalo...................
154            MN            Construct recreational           $1,300,000
                              visitor center on the
                              Mesabi Trail, City of
                              Virginia..................
155            NE            Engineering, right-of-way          $400,000
                              and construction of the
                              23rd Street Viaduct in
                              Fremont, Nebraska.........
156            MN            Phase III of Devil Track         $1,200,000
                              Road Project, Cook County.
157            ME            Relocation of southbound on-     $1,500,000
                              ramp to I-95 at Exit 184,
                              Bangor....................
158            MA            Construct access roads to        $1,600,000
                              Hospital Hill project in
                              Northampton, MA...........
159            IN            Construct interchange for        $2,400,000
                              146th St. and I-69,
                              Hamilton County, Indiana..
160            NY            Design and construct a             $950,000
                              bicycle and pedestrian
                              walkway along the
                              decommissioned Putnam Rail
                              Line......................
161            AK            False Pass Road                  $3,000,000
                              construction from small
                              boat harbor dock to
                              airport and town..........
162            IL            Improve North Illinois St.       $5,000,000
                              and related roads,
                              Belleville................
163            AR            Construction of I-49,           $17,000,000
                              Highway 71: Arkansas
                              portion of Bella Vista
                              Bypass....................
164            NM            Coors--I-40 Interchange         $15,600,000
                              Reconstruction,
                              Albuquerque...............
165            GA            Extend the south Toccoa          $2,320,000
                              Bypass east of Toccoa to
                              CR 311, four lanes for
                              approximately 5.7 miles on
                              new location..............
166            TX            Construct SH 183 from SH         $1,600,000
                              360 to Belt Line Road in
                              Irving, Texas.............
167            CA            Construct pedestrian,              $240,000
                              bicycle and ADA accessible
                              boardwalks at the Pismo
                              Beach Promenade in San
                              Luis Obispo County........
168            TX            SH 44 E of Alice near SH         $1,600,000
                              359 to U.S. 281, Jim Wells
                              County....................
169            AR            Conway Western Loop--For           $400,000
                              engineering, rights-of-
                              way, relocations, and
                              continued planning and
                              design....................
170            PA            For design, land and ROW           $800,000
                              acquisition, and
                              construction of a parking
                              facility and associated
                              activities in the City of
                              Wilkes-Barre..............
171            TN            Hawkins County, Tennessee          $800,000
                              SR 31 reconstruction......
172            WI            Reconstruct U.S. Highway         $1,000,000
                              41--STH 67 interchange
                              (Dodge County, Wisconsin).
173            MA            Reconstruct Route 24/Route      $13,000,000
                              140 Interchange, replace
                              bridge and ramps, widen
                              and extend acceleration
                              and deceleration lanes....
174            OR            Study landslides on U.S.         $1,000,000
                              Highway 20 between
                              Cascadia and Santiam Pass
                              to develop long-term
                              repair strategy...........
175            MS            Upgrade Alex Gates Road and      $1,400,000
                              Walnut Road in Quitman
                              County, and roads in
                              Falcon, Sledge and Lambert
176            IL            Upgrades for Muller Road in        $224,000
                              the City of Washington, IL
177            AL            Construction of Valleydale       $4,720,000
                              Road Flyover and widening
                              and improvements from U.S.
                              31 to I-65 (Shelby County
                              Rd. 17)...................
178            MS            Upgrade roads in Beauregard        $800,000
                              (U. S. Hwy 51), Dentville-
                              Jack Rd. near Crystal
                              Springs, and Hazelhurst
                              (U.S. Highway 51 and I-
                              55), Copiah County........
179            NY            Westchester County, NY             $520,000
                              Rehabilitation of June
                              Road Town of North Salem..
180            CA            Implement streetscape              $960,000
                              improvements on segments
                              of Laurel Canyon Blvd. and
                              Victory Blvd. in North
                              Hollywood.................
181            OH            Construct loop road along        $6,960,000
                              U.S. 23 in City of
                              Fostoria, Seneca County...
182            PA            Design, engineering, ROW         $1,600,000
                              acquisition, and
                              construction of street
                              improvements, parking,
                              safety enhancements, and
                              roadway redesign in
                              Nanticoke.................
183            LA            Improve Ralph Darden               $280,000
                              Memorial Parkway Between
                              LA 182 and Martin Luther
                              King, Jr., Road, St. Mary
                              Parish....................
184            CA            Reconstruct segments of          $2,000,000
                              Hollister Avenue between
                              San Antonio Road and State
                              Route 154 in Santa Barbara
                              County....................
185            NY            Reconstruction of Schenck        $4,000,000
                              Avenue from Jamaica Avenue
                              to Flatlands Avenue,
                              Brooklyn..................
186            CO            Construct Wadsworth              $1,600,000
                              Interchange over U.S. 36
                              in Broomfield.............
187            NY            Enhance Battery Park             $1,600,000
                              Bikeway Perimeter, New
                              York City.................
188            FL            I-95 Interchange in the         $11,400,000
                              City of Boca Raton........
189            NJ            Construct Long Valley              $800,000
                              Bypass....................
190            MI            Alpena County, Resurface           $512,000
                              3.51 miles of Hamilton and
                              Wessel Roads..............
191            CA            Construct a 2.8 mile             $2,000,000
                              bikeway along Lambert Road
                              from Mills Ave., to Valley
                              Home Ave., in the City of
                              Whittier, CA..............
192            TX            Hidalgo County Loop........        $800,000
193            ME            Improvements to Route 108        $1,500,000
                              to enhance access to
                              business park, Rumford....
194            NY            Installation of new turning        $340,000
                              lane from Mohansic Ave.
                              onto eastbound Route 202
                              and addition of new
                              striped crosswalk.........
195            NY            Rockland County Hudson           $1,600,000
                              River Greenway Trail
                              Project construction......
196            TX            Construct a segment of FM        $1,000,000
                              110 in San Marcos.........
197            TX            Big Spring, TX Construction      $7,320,000
                              of the Big Spring Reliever
                              Route.....................
198            NY            Improvements to Intermodal       $2,240,000
                              Transportation Facility
                              and Construction of
                              Waterfront Esplanade at
                              Fort Totten...............
199            PA            Reconstruction and repair          $240,000
                              of Haverford Ave. Between
                              68th St. and Lansdowne Ave
200            ND            Bismarck/Mandan Liberty         $24,000,000
                              Memorial Bridge over the
                              Missouri River............
201            WI            City of Glendale, WI.            $2,400,000
                              Develop and rehabilitate
                              exit ramps on I-43, and
                              improvements at West
                              Silver Spring Drive and
                              North Port Washington Rd..
202            TX            Construction of Lake Ridge       $2,800,000
                              and U.S. 67 Project, Cedar
                              Hill, TX..................
203            NY            Install Improvements for           $250,000
                              Pedestrian Safety
                              including in the vicinity
                              of PS K277................
204            WI            Resurface U.S. 8 between           $880,000
                              CTH C and Monico..........
205            PA            South Phila. Access Rd.          $2,400,000
                              Design and construction of
                              port access road from
                              South Phila Port and
                              intermodal facilities,
                              Philadelphia..............
206            NY            Implement ITS system and           $100,000
                              apparatus to enhance
                              citywide truck route
                              system on Broadway to
                              Irwin Ave. between 232 to
                              231 in the neighborhood of
                              Kingsbridge, NY...........
207            PA            SR 219 Purchase of right-of-    $13,600,000
                              way and completion of four
                              lane extension from the
                              Town of Somerset to the
                              Maryland border...........
208            WI            Expand U.S. 41 between           $1,600,000
                              Oconto and Peshtigo,
                              Wisconsin (Oconto and
                              Marinette Counties,
                              Wisconsin)................
209            IA            Study for NE Beltway, Polk         $400,000
                              Co........................
210            NY            This project involves a          $1,920,000
                              full reconstruction of all
                              the streets in Long Island
                              City surrounding 11th
                              Street....................
211            AZ            Upgrade and Widen SR 85 to       $1,200,000
                              I-10 (Mileposts 120-141)..
212            MS            Upgrade Dog Pen Road,              $840,000
                              Galilee Road, and Holmes
                              County Bridge in Holmes
                              County, and roads in
                              Cruger, Pickens, and
                              Goodman...................
213            GA            U.S. 19/SR 92 median work        $1,200,000
                              from Ellis Rd. to West
                              Taylor ST, Griffin........
214            MS            Upgrade roads at Coahoma         $1,200,000
                              Community College, and
                              roads in Coahoma and
                              Jonestown, Coahoma County.
215            IN            Construction of Dixon Road         $400,000
                              from Markland Avenue to
                              Judson Road in Kokomo,
                              Indiana...................
216            CA            Construction of Cross            $4,000,000
                              Valley Connector between I-
                              5 and SR 14...............
217            MA            State Street Corridor            $4,800,000
                              Redevelopment Project
                              includes street
                              resurfacing, pedestrian
                              walkway improvements and
                              ornate lighting from Main
                              Street to St. Michael's
                              Cemetery, Springfield.....
218            MI            Resurfacing of Stephenson          $280,000
                              Highway in Madison Heights
219            CA            Soundwall construction on        $1,440,000
                              the 210 Freeway, Pasadena.
220            GA            Streetscape-Ashburn........        $200,000
221            NY            Improve traffic flow on            $500,000
                              Rockaway Point Boulevard
                              in the Breezy Point
                              neighborhood of Queens
                              County, including work to
                              install a traffic signal
                              at the intersection of
                              Rockaway Point Boulevard
                              and Reid Avenue...........
222            WI            Improve Superior Avenue:         $1,000,000
                              Interstate 43 to State
                              Highway 32, Sheboygan
                              County, Wisconsin.........
223            TX            Design, construction, and          $800,000
                              streetscape improvements
                              to enhance pedestrian
                              access, pedestrian access
                              to bus services and
                              facilities................
224            IL            Upgrade roads, The Village         $800,000
                              of Berkeley...............
225            GA            Upgrade sidewalks and              $320,000
                              lighting, Wrightsville....
226            PA            Upgrades to Bedford Route        $1,680,000
                              220 at the entrance of the
                              Bedford Business Park to
                              Beldon Ridge intersection.
227            MI            Widen Baldwin Road from          $3,200,000
                              Morgan to Waldon in Orion
                              Township..................
228            FL            Construct Saxon Boulevard        $1,680,000
                              Extension, Volusia County,
                              Florida...................
229            NY            Construction and                   $816,000
                              rehabilitation of East and
                              West Gates Avenues in the
                              Village of Lindenhurst, NY
230            TN            Widen Interstate 240 from          $800,000
                              Interstate 55 to
                              Interstate 40 West of
                              Memphis, Shelby County....
231            NJ            Rahway River Corridor            $1,200,000
                              Greenway Bicycle and
                              Pedestrian Path, South
                              Orange....................
232            CT            Reconstruct Pearl Harbor         $1,600,000
                              Memorial Bridge, New Haven
233            PA            Development of Northwest           $200,000
                              Lancaster County River
                              Trail.....................
234            CA            Widen SR 89 at existing          $2,827,744
                              mousehole two lane RR
                              underpass.................
235            LA            Construct Mississippi River        $400,000
                              Trail and Bikepath, New
                              Orleans...................
236            NY            Utica Marsh-Reestablish          $2,120,000
                              Water Street..............
237            AR            Widen to 5 lanes,                $3,200,000
                              improvement, and other
                              development to U.S.
                              Highway 79B/University
                              Ave. in Pine Bluff........
238            WA            SR 9 and 20th St. SE               $250,000
                              Intersection
                              Reconstruction in
                              Snohomish County..........
239            OH            Streetscape and related            $280,000
                              safety improvements to
                              U.S. 20 in Painesville
                              Township, OH..............
240            PA            Design, construct                  $800,000
                              intersection and other
                              upgrades on PA 24 and 124
                              in York County, PA........
241            WA            Issaquah Historical                $200,000
                              Society, Issaquah Valley
                              Trolley Project...........
242            IL            Construct new bridge on            $240,000
                              Illinois Prairie Path over
                              East Branch River in
                              Milton Township, IL.......
243            TN            Plan and construct                  $40,000
                              improvements, Livingston
                              public square.............
244            GA            Construction on U.S. 82            $800,000
                              from Dawson to Alabama
                              Line......................
245            IA            Construct I-74 Bridge in         $1,200,000
                              Bettendorf, IA............
246            CA            Operations and management          $800,000
                              improvements, including
                              ITS technologies, on U.S.
                              Highway 101 in Santa
                              Barbara County............
247            OH            Plan and construct new           $4,160,000
                              interchange on Interstate
                              71 at Big Walnut Road in
                              Delaware County, Ohio.....
248            PA            Design and construct access      $1,600,000
                              to intermodal facility in
                              York County...............
249            WA            Complete preliminary             $1,500,000
                              engineering and
                              environmental analysis for
                              SR 14 through Camas and
                              Washougal.................
250            UT            Construct Bingham Junction       $5,400,000
                              Boulevard in Midvale City.
251            MD            Construct Centreville, MD          $305,600
                              spur of Queen Annes County
                              Cross Island Trail,
                              Centreville to U.S. Route
                              301.......................
252            MN            Polk, Pennington, Marshall       $4,480,000
                              County 10-Ton Corridor in
                              Northwestern Minnesota....
253            CA            Quincy-Oroville Highway            $800,000
                              Rehabilitation in Plumas
                              County....................
254            CA            Construct Coyote Creek           $2,000,000
                              Trail Project from Story
                              Road to Montague
                              Expressway in San Jose....
255            TX            Construct Depression of          $5,600,000
                              Belt Line Road at I-35 E
                              Intermodal Transportation
                              Project in Carrollton, TX.
256            AL            Construct Anniston Eastern      $21,600,000
                              Bypass from Golden Springs
                              Road to U.S. Highway 431..
257            NY            Construct greenway along         $1,000,000
                              East River waterfront
                              between East River Park
                              (ERP) and Brooklyn Bridge,
                              and reconstruct South
                              entrance to ERP, in
                              Manhattan.................
258            NE            Construction of I-80/Cherry      $6,400,000
                              Avenue Interchange and
                              East Bypass, Kearney,
                              Nebraska..................
259            MN            Corridor study, EIS, and           $800,000
                              ROW acquisition for a
                              future highway and bridge
                              over the Mississippi
                              River, City of Brainerd...
260            CA            Escondido, CA Construction       $1,600,000
                              of Bear Valley Parkway,
                              East Valley Parkway.......
261            AR            Junction Bridge--                $1,280,000
                              Rehabilitation and
                              conversion from rail to
                              pedestrian use............
262            WA            Port of Tacoma Rd.--               $400,000
                              Construct a second left
                              turn lane for traffic from
                              westbound Pac. Hwy E. to
                              Port of Tacoma Rd. and I-5
263            NY            Realign Union Valley Road          $264,000
                              in Town of Carmel.........
264            MO            Roadway improvements to          $3,200,000
                              U.S. 67 in St. Francois
                              County....................
265            FL            Homestead, FL Widening of        $5,600,000
                              SW 328 from SW 137 Ave. to
                              152 Ave...................
266            CA            Reconstruct I-710 southern       $2,400,000
                              terminus off ramps, Long
                              Beach.....................
267            GA            SR 4 widen from                  $4,000,000
                              Milledgeville Road to
                              Government Street,
                              Richmond County...........
268            TN            Develop trails, bike paths         $200,000
                              and recreational
                              facilities on Western
                              Slope of Black Mountain,
                              Cumberland County for
                              Cumberland Trail State
                              Park......................
269            NJ            Routes 1 and 9 Secaucus            $800,000
                              Road to Broad Avenue in
                              Hudson and Bergen Counties
270            MA            Massachusetts Avenue             $3,850,000
                              Reconstruction, Boston....
271            NY            Improve Ashburton Ave. from      $1,200,000
                              the Saw Mill River Parkway
                              to the waterfront, Yonkers
272            MN            Trail extensions to Mesabi         $235,796
                              Trail, City of Aurora.....
273            LA            I-10 Ryan Street exit ramp       $4,000,000
                              to include relocation and
                              realignment of Lakeshore
                              Drive to include portions
                              of Front Street and or Ann
                              Street, and to include
                              expansion of Contraband
                              Bayou Bridge..............
274            MI            Van Buren, Belleville Road         $880,000
                              widen to 5 lanes between
                              Tyler and Ecorse..........
275            IA            Widening University Blvd.,         $800,000
                              Clive.....................
276            HI            Construct Waimea Bypass....        $800,000
277            IL            Widening two blocks of             $384,000
                              Poplar St. from Park Ave.
                              to 13th Street, Williamson
                              County....................
278            CA            Widening the highway and         $5,600,000
                              reconstructing off ramps
                              on Hwy 101 between Steele
                              Lane and Windsor, CA to
                              reduce traffic and promote
                              carpools..................
279            WA            Granite Falls Alternate          $2,834,000
                              Freight Route in Granite
                              Falls.....................
280            NY            Construction and                   $616,000
                              rehabilitation of North
                              Queens Avenue and Grand
                              Avenue in the Village of
                              Lindenhurst, NY...........
281            SC            Extension and expansion of         $560,000
                              Lower Richland Roads Phase
                              I.........................
282            OR            Kuebler Boulevard                $1,200,000
                              improvements, Salem.......
283            NC            Upgrade U.S. 1 in                $8,000,000
                              Rockingham................
284            CA            Implement Southwest San          $1,840,000
                              Fernando Valley Road and
                              Safety Improvements.......
285            VA            Upgrade DOT crossing               $161,440
                              #467662S to constant
                              warning time devices......
286            TX            Construct new location          $12,800,000
                              highway and interchanges
                              on Inner Loop, from Global
                              Reach to Loop 375
                              including the Global Reach
                              ext., El Paso.............
287            CA            Rehabilitation, repair, and/     $2,800,000
                              or reconstruction of
                              deficient 2-lane roads
                              that connect to Interstate
                              5, SR 180, SR 41 and SR 99
                              countywide, Fresno County.
288            OH            Relocate SR 149 from 26th          $520,000
                              Street to Trough Run in
                              Bellaire..................
289            WA            Auburn, Washington--M              $400,000
                              Street SE rehabilitation
                              between 29th Street SE and
                              37th Street SE............
290            KY            Replace Bridge over Stoner         $800,000
                              Creek, 2 Miles East of
                              U.S. 27 Junction, Bourbon
                              County....................
291            NM            Development of Paseo del         $1,600,000
                              Volcan corridor located in
                              Sandoval County from Iris
                              Road to U.S. Highway 550..
292            OH            Stan Hywet Hall and Gardens        $144,000
                              to restore, expand,
                              construct, and improve
                              pedestrian paths and bike
                              trail system..............
293            MS            Construct bicycle path,            $160,000
                              Petal.....................
294            NJ            Construction of Route 206        $1,600,000
                              Chester Township, NJ......
295            IL            For IDOT to conduct Phase          $800,000
                              II engineering for
                              reconstruction of 159th
                              St./US 6/IL 7 in Will and
                              Cook Counties.............
296            IL            For Will County to begin         $1,600,000
                              Phase II engineering and
                              preconstruction activities
                              for a high level bridge
                              linking Caton Farm Road
                              with Bruce Road...........
297            CA            Study of Thomas Bridge to        $1,600,000
                              meet future cargo and
                              passenger traffic needs of
                              the ports of Long Beach
                              and Los Angeles...........
298            MD            Construct new Greenbelt          $1,000,000
                              Metro Station Access
                              Interchange at I-95/I-495.
299            IL            Construct Citywide bicycle         $200,000
                              path network, City of
                              Evanston..................
300            CA            Mount Vernon Avenue grade        $1,600,000
                              separation and bridge
                              expansion in Colton.......
301            NJ            Improvements for St.               $400,000
                              Georges Avenue from Wood
                              Avenue to Chestnut Street
                              including the Linden and
                              Roselle sides of the
                              street....................
302            PA            Design, construct and            $3,200,000
                              upgrade interchange of
                              U.S. 15 and U.S. 30 in
                              Adams County..............
303            OH            State Route 8 Improvements       $3,000,000
                              in Northern Summit County.
304            CO            U.S. 50 East, State Line to      $6,000,000
                              Pueblo....................
305            IN            Widening road (along Gordon     $11,520,000
                              Road, Sixth Street, and
                              West Shafer Drive) to 3-
                              lane street, with sidewalk
                              and improvements to
                              existing bridge White
                              County/Monticello, Indiana
306            OH            Widening Pleasant Valley         $1,200,000
                              Bagley Road (Rte 27),
                              Parma and Middleburg
                              Heights...................
307            MA            Rehabilitation of I-95           $1,600,000
                              Whittier Bridge--Amesbury
                              and Newburyport...........
308            CA            Streetscape improvements at        $600,000
                              East 14th St-Mission Blvd.
                              in Alameda County.........
309            NY            Construct W. 79th St.            $1,600,000
                              Rotunda, New York City....
310            TX            Acquire Kelly Parkway              $400,000
                              Corridor Right-of-way
                              through San Antonio.......
311            NC            Construct new route from           $800,000
                              U.S. 17 to U.S. 421 in
                              Brunswick and New Hanover
                              Counties..................
312            PA            Construct safety and               $200,000
                              capacity improvements to
                              Route 309 and Old
                              Packhouse Road............
313            OR            Delta Ponds Bike/Pedestrian      $2,880,000
                              Path......................
314            FL            Hollywood U.S. Route 1           $1,840,000
                              Young Circle Safety
                              Improvement...............
315            MI            Houghton County, Gravel and        $344,000
                              paving of remaining 3.2
                              miles in 5.5 mile stretch
                              of Jacobsville Rd.........
316            PA            Improve access to Airport          $800,000
                              Connector from PA 283 to
                              the terminus of the
                              Airport Connector at State
                              Route 230 and adjacent
                              access roads..............
317            CA            Construct one additional         $2,568,000
                              all purpose lane in each
                              direction on I-405 and
                              provide additional capital
                              improvements from SR 73
                              through the LA County line
318            IL            Improve Roads and Bridges,       $3,200,000
                              Cook County...............
319            CA            Improve traffic safety,          $1,120,000
                              including streetlights,
                              from Queen to Barclay to
                              Los Angeles River to
                              Riverside in Elysian
                              Valley, Los Angeles.......
320            MI            Construction and                 $2,320,000
                              improvements to Western
                              Avenue and associated
                              streets between Third
                              Street and Terrace Street
                              in Muskegon...............
321            IL            Construct Reed Station           $1,655,004
                              Parkway Extension to IL
                              Rt. 3, Carbondale.........
322            AL            Construction of Patton           $8,000,000
                              Island Bridge Corridor....
323            MI            Highland, Clyde Road from          $100,000
                              Hickory Ridge to
                              Strathcona................
324            MI            Alger County, Repaving a         $1,280,720
                              portion of H-58 from Buck
                              Hill towards Little Beaver
                              Road......................
325            TX            Improvements to U.S. 183 in        $400,000
                              Gonzales County...........
326            CA            Construct a raised                 $320,000
                              landscaped median on
                              Alondra Blvd. between
                              Clark Ave. and Woodruff
                              Ave. in Bellflower........
327            MN            Right-of-way acquisition         $2,000,000
                              for TH 23 Paynesville
                              Bypass....................
328            FL            Construct interchange              $400,000
                              improvements at I-75 and
                              University Parkway........
329            CO            For construction and             $4,000,000
                              architectural improvements
                              of Wadsworth Bypass (SH
                              121) Burlington Northern
                              Railroad and Grandview
                              Grade Separation..........
330            KS            Construction of 4-lane           $2,000,000
                              improvement on K-18 in
                              Riley County, Kansas......
331            NJ            Replace Rockaway Road              $800,000
                              Bridge, Randolph Township,
                              New Jersey................
332            FL            Construction of paved road       $2,400,000
                              over existing unpaved
                              roadway on SE 144th Ave.
                              from SR 100 to U.S. 301,
                              distance of 1.2 miles.....
333            FL            Construct I-4 Frontage Rd.,      $1,600,000
                              Volusia County, Florida...
334            MD            Construction of Fringe and       $3,200,000
                              Corridor Parking Facility
                              at intersection of Clinton
                              Street and Keith Avenue in
                              Baltimore.................
335            OH            Purchase of right-of-way         $1,152,000
                              for transportation
                              enhancement activities in
                              Bainbridge Township, OH...
336            NJ            Rowan Boulevard Parking            $800,445
                              adjacent to Highway 322
                              Corridor in Glassboro
                              Township..................
337            CA            Construct interchange on         $1,440,000
                              U.S. 50 at Empire Ranch
                              Road in Folsom............
338            FL            Bicycle and Pedestrian             $240,000
                              Improvements in the Town
                              of Windermere, Florida....
339            TN            Plan and construct a             $2,400,000
                              bicycle and pedestrian
                              trail, Smyrna.............
340            CA            Santa Anita Avenue Corridor      $2,400,000
                              Improvement project,
                              Arcadia, California.......
341            AL            Phoenix City on/off ramps          $257,200
                              for U.S. Highway 80.......
342            PA            Design, engineering, ROW           $480,000
                              acquisition, and
                              construction of a
                              connector road between
                              Pennsylvania Rt. 93 and
                              Pennsylvania Rt. 309 in
                              Hazle Township............
343            GA            South Tifton Bypass from           $400,000
                              U.S. 82/SR 520 west to
                              U.S. 319/SR 35 east, Tift
                              County....................
344            NJ            Streetscape and Traffic            $800,000
                              Improvement Project to
                              Downtown West Orange......
345            NJ            Bergen County, NJ On Route       $4,400,000
                              17, address congestion,
                              safety, drainage,
                              maintenance, signing,
                              access, pedestrian
                              circulation and transit
                              access....................
346            CA            Road widening, construct         $5,200,000
                              bike path, lighting, and
                              safety improvements on
                              road leading to Hansen Dam
                              Recreation Area, Los
                              Angeles...................
347            OH            Highway grade crossing              $54,400
                              improvement on Summit Road
                              at Pataskala, Ohio........
348            NY            Reconstruct a historic             $464,000
                              bridge crossing Maxwell
                              Creek in the Town of
                              Sodus, NY.................
349            NJ            Safety and operation               $960,000
                              improvements on Route 73
                              in Berlin, Voorhees and
                              Evesham...................
350            NJ            Study and preliminary              $800,000
                              engineering designs for a
                              boulevard on State Route
                              440 and U.S. Highway
                              Routes 1 and 9, Jersey
                              City......................
351            VA            Construction of Route 17         $6,400,000
                              Dominion Boulevard,
                              Chesapeake, VA............
352            LA            Installation of proper             $160,000
                              lighting standards to
                              illuminate inbound and
                              outbound ramps of I-10 and
                              portions of Hwy 95........
353            IN            Cyntheanne Rd. Interchange         $800,000
                              and Corridor Improvements,
                              Town of Fishers, Indiana..
354            ME            Plan and construct North-        $3,000,000
                              South Aroostook highways,
                              to improve access to St.
                              John Valley, including
                              Presque Isle Bypass and
                              other improvements........
355            TN            Plan and construct a             $1,200,000
                              bicycle and pedestrian
                              trail, LaVergne...........
356            TX            Build Arkansas Street Grade      $1,000,000
                              Separation in Laredo......
357            CA            Construct new left turn            $560,000
                              lane at State Route 19 and
                              Telstar in El Monte.......
358            NY            Meadow Drive Extension--         $1,600,000
                              North Tonawanda, New York.
359            CA            Reconstruct I-880 and            $8,000,000
                              Coleman Avenue Interchange
                              and implement other I-880
                              Corridor operational
                              improvements in Santa
                              Clara County..............
360            OR            Improve Millican, West           $1,600,000
                              Butte Road which connects
                              U.S. Highway 20 with U.S.
                              Highway 126...............
361            VA            Metropolitan Washington,         $1,600,000
                              D.C. Regional
                              Transportation
                              Coordination Program......
362            NY            Brooks Landing                     $400,000
                              Transportation
                              Improvements and
                              Enhancement project,
                              Rochester.................
363            NJ            Construct CR 538 Coles Mill        $400,000
                              Road Bridge over Scotland
                              Run, Gloucester County....
364            TX            Convert discontinuous 2-way      $4,000,000
                              frontage roads to
                              continuous one-way
                              frontage roads on IH 30 in
                              Texarkana, TX.............
365            TX            Regional bicycle routes on         $800,000
                              existing highways in
                              Austin, TX................
366            IN            Construct Interchange at I-      $5,963,375
                              65 and 109th Avenue, Crown
                              Point.....................
367            GA            Intersection improvement at        $480,000
                              Harris Drive at SR 42.....
368            IL            Engineering and                     $80,000
                              construction of the East
                              Branch DuPage River
                              Greenway Trail in central
                              DuPage County, IL.........
369            NY            Rehabilitate a historic            $480,000
                              transportation-related
                              warehouse on the Erie
                              Canal in the Town of
                              Lyons, NY.................
370            NY            Relocating Miller Highway W      $2,000,000
                              59th-72 St. Manhattan
                              under future expansion of
                              Riverside Park............
371            MI            Allen Road under the CN          $3,560,000
                              Railroad Grade Separation,
                              Woodhaven.................
372            PA            Design, engineering, ROW           $160,000
                              acquisition, and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking, and
                              roadway redesign in
                              Larksville Borough,
                              Luzerne County............
373            AR            Northeast Arkansas               $2,400,000
                              Connector (relocation of
                              Highway 226)..............
374            NJ            Reconstruct Route 168 from         $526,400
                              Route 41 to 6th Avenue in
                              Runnemede.................
375            NY            Renovation of Metropolitan       $1,700,000
                              Avenue and Unionport Road
                              center islands............
376            PA            Rt. 60 Millennium Park             $640,000
                              Interchange, construct new
                              interchange on Rt. 60 to
                              provide access to new
                              Lawrence County Industrial
                              Park......................
377            AR            Bentonville, Arkansas--          $1,500,000
                              Widen Arkansas Highway 102
                              between U.S. 71B and the
                              west city limits..........
378            PA            Purchase of right-of-way,        $2,400,000
                              utilities and construction
                              for Northern Access to
                              Altoona from Interstate
                              99, Blair County, PA......
379            CA            Construct Class I bike and         $320,000
                              pedestrian path from San
                              Luis Obispo to Avila Beach
380            MN            Reconstruct CSAH 61 from           $252,800
                              south county line to TH
                              73, Moose Lake............
381            AZ            Improving Lone Pine Dam          $2,000,000
                              Road in Navajo County.....
382            MI            Construct Road Improvements      $2,160,000
                              to North Henry St. from
                              Vermont Ave. to Wilder Rd.
                              Bay City..................
383            TX            Reconstruct I-35E Trinity       $12,000,000
                              River Bridge, Dallas......
384            NY            Town of Greenville                 $100,000
                              rehabilitation of
                              Grahamtown Rd. and Burnt
                              Corners Rd................
385            NJ            Completion of Hudson River         $800,000
                              Waterfront Walkway through
                              Stevens Institute of
                              Technology in Hoboken.....
386            NC            Construct U.S. 74 Bypass,        $2,400,000
                              Shelby, NC................
387            WA            Tukwila Urban Access               $800,000
                              Improvement Project--
                              Address necessary
                              improvements to
                              Southcenter Parkway in
                              Tukwila to relieve
                              congestion................
388            CA            Construction of a traffic          $100,000
                              signal at the intersection
                              of Independence Avenue and
                              Sherman Way...............
389            NH            Design and construction of         $800,000
                              intersection of Rte 101A
                              and Rte 13 in Milford.....
390            NJ            Construct Rte 30--Pomona         $4,000,000
                              Road Intersection
                              Improvements, Atlantic
                              County....................
391            CA            I-10 and Indian Ave.             $2,200,000
                              Interchange, Palm Springs,
                              CA........................
392            CA            Complete the Bay Trail             $800,000
                              along the western edge of
                              the American Canyon
                              Wetlands Edge Bay Trail...
393            KY            Right-of-way for and             $2,560,000
                              construction of Pennyrile
                              Parkway Extension from 41A
                              S. to I-24................
394            TN            Sevier County, Tennessee SR      $1,400,000
                              66 widening...............
395            TN            Plan and construct                 $320,000
                              interchange improvements,
                              I-65 at Highland Road.....
396            IA            Reconstruction of NW Madrid        $800,000
                              Drive, Polk Co............
397            NH            Relocation and                   $1,040,000
                              Reconstruction of
                              intersection at Route 103
                              and North Street in
                              Claremont.................
398            IL            To construct a new 2-lane          $400,000
                              road extending 1650 feet
                              north from intersection
                              with University Park
                              Drive, Edwardsville.......
399            NY            Town of Highlands                  $180,000
                              reconstruction of bridge
                              on School Street..........
400            AK            Unalaska, AK Construction        $7,500,000
                              of AMHW ferry terminal
                              including approach,
                              staging, and upland
                              improvements..............
401            PA            Design and construct             $2,800,000
                              interchange and related
                              improvements to I-83 Exit
                              4.........................
402            MD            Great Allegheny Passage,         $1,600,000
                              Allegany County, MD.
                              Construction of 5 miles of
                              trail from Cumberland to
                              Wharf Branch..............
403            MI            Northwestern Highway             $7,280,000
                              Extension projects in
                              Oakland County............
404            PA            PA Route 61 safety               $2,400,000
                              improvements, Leesport
                              Borough and Ontelaunee and
                              Muhlenburg Townships......
405            OH            Improve Rt. 62 (Main and         $5,200,000
                              Town Streets) Bridges over
                              Scioto River, Columbus....
406            AK            Planning, design, and          $100,000,000
                              construction of a bridge
                              joining the Island of
                              Gravina to the Community
                              of Ketchikan..............
407            MN            U.S. Trunk Highway 14 from       $3,315,200
                              Waseca to Owatonna,
                              Minnesota.................
408            TX            Construct Mission Trails         $3,820,000
                              Project Packages 4 and 5
                              in San Antonio............
409            MS            Upgrade Roads in Carthage,         $160,000
                              Leake County..............
410            MI            Construct access road at            $20,800
                              intersection of Doerr Road
                              and Schell Street to
                              Develop 65-Acre of
                              Municipal Tract of
                              Industrial Land. Village
                              of Cass City, Tuscola
                              County....................
411            MS            Upgrade roads in Humphreys         $680,000
                              County Districts 1 and 5
                              and Isola.................
412            IN            126th Street Project, Town       $1,000,000
                              of Fishers, Indiana.......
413            HI            Construct Puanaiko Street..        $800,000
414            AZ            Burro Creek section between        $800,000
                              Wikieup and the Santa
                              Maria River...............
415            PA            Conduct Environmental              $800,000
                              Impact Statement study for
                              Parkway West corridor.....
416            SC            Build Railroad Avenue            $1,600,000
                              Extension in Berkeley
                              County, SC--SCDOT.........
417            MD            Construct a visitors center      $3,760,000
                              and related roads serving
                              Fort McHenry..............
418            OH            Construction of Gracemont        $2,400,000
                              Street Exchange Interstate
                              77--Bethlehem Township and
                              Pike Township, Ohio.......
419            MI            Design, Right-of-Way and        $15,480,000
                              Construction of the I-196
                              Chicago Drive (Baldwin
                              Street) Interchange
                              Modification, Michigan....
420            CA            Folsom Blvd. Transportation      $5,600,000
                              Enhancements, City of
                              Rancho Cordova............
421            TN            improve streetscape and            $240,000
                              pavement repair, Monroe
                              County, TN................
422            TX            IH37 frontage roads in           $1,600,000
                              Mathis....................
423            WV            Construct New River Parkway      $3,600,000
424            NY            Construct sidewalk and             $264,000
                              improvements on Broadway
                              in the Town of Cortlandt..
425            PA            Erie, PA Powell Avenue           $3,200,000
                              Bridge Replacement, Asbury
                              Road Improvement Project..
426            VA            Liberty Street Construction        $236,800
                              in Martinsville, Virginia.
427            CA            Implement streetscape            $3,200,000
                              project on Central Avenue
                              from 103rd Street to Watts/
                              103rd Street Station,
                              Watts.....................
428            MA            Realignments and                 $2,560,000
                              reconstruction of a
                              section of Route 32 in
                              Palmer to the Ware town
                              line......................
429            CA            Seismic retrofit of the          $8,800,000
                              Golden Gate Bridge........
430            CA            Upgrade and extend Commerce      $1,600,000
                              Avenue, City of Concord...
431            MA            Somerville Roadway               $2,300,000
                              Improvements..............
432            LA            Replace Almonaster Bridge,         $400,000
                              New Orleans...............
433            IN            Upgrade Traffic Signals            $512,000
                              Phase III in the City of
                              Muncie, Indiana...........
434            FL            Sharpes Ferry Bridge             $2,240,000
                              replacement in Marion
                              County....................
435            IA            U.S. 34 Missouri River           $2,000,000
                              bridge relocation and
                              replacement...............
436            NY            Village of Highland Falls          $120,000
                              repaving and sidewalk
                              construction of Oak Avenue
437            MN            Interchange Reconstruction         $800,000
                              at CSAH 4 and U.S. 169....
438            IL            Development and                  $4,800,000
                              construction of an
                              interchange at Brisbin Rd.
                              and Interstate 80.........
439            NE            Design, right-of-way and        $12,000,000
                              construction of rail-grade
                              separations throughout
                              Nebraska as identified by
                              Nebraska Dept. of Roads...
440            MO            Redesign and Reconstruction      $1,600,000
                              of the I-270 Dorsett Road
                              Interchange Complex in the
                              City of Maryland Heights..
441            SC            Build Berlin Myers               $6,400,000
                              Extension in Summerville,
                              SC........................
442            IN            Improve 100 South, Porter          $800,000
                              County....................
443            NY            Improve safety measures at       $1,280,000
                              the railroad grade
                              crossings on the West
                              Short River Line, Rockland
                              County....................
444            NJ            Street Improvements and            $640,000
                              Traffic Signal Replacement
                              in Union City Central
                              Business District.........
445            GA            Streetscape project to             $300,000
                              replace sidewalks in
                              downtown Forsyth..........
446            AK            Westside development             $5,000,000
                              Williamsport-Pile Bay Road
447            NV            Construct Interstate 15-Las     $10,000,000
                              Vegas Beltway Interchange.
448            NY            Palisades Trailway Phase 2-        $150,000
                              Rockland County, New York.
449            PA            Replace a Highway Rail             $400,000
                              Grade crossing in
                              Jeanette, PA at Wegleys
                              Road......................
450            CA            Conduct project design and       $2,800,000
                              environmental analysis of
                              Heritage Bridge on
                              Heritage Road linking
                              Chula Vista to Otay Mesa..
451            MA            Assabet River National             $420,000
                              Wildlife Refuge, MA,
                              Design and Construction of
                              parking areas.............
452            NY            Reconstruct Main Street in          $72,000
                              the Town of Lewisboro.....
453            MA            Study and analysis of              $500,000
                              Lowell Westford St.-Wood
                              St. Rourke Bridge
                              Corridor, Lowell..........
454            OR            Highway 20, Lincoln County.      $5,600,000
455            MN            Construction of 8th Street       $1,600,000
                              North: Stearns C.R. 120 to
                              TH 15 in St. Cloud, MN....
456            IL            Construction of a                  $180,000
                              pedestrian sidewalk along
                              S. Chicago Street in
                              Geneseo, IL...............
457            OH            Construct Bike and Walking         $280,000
                              Path from West 210 St. to
                              Metroparks Fairview Park..
458            PA            Great Allegheny Passage,           $800,000
                              Somerset County, PA.
                              Garrett Crossing Bridge,
                              realign trail and
                              construct a new bridge to
                              eliminate a dangerous
                              crossing of a State
                              highway...................
459            MN            City of East Grand Forks           $960,000
                              Construct 13th St. SE
                              Extension.................
460            NY            Improvements to Clark Pl.          $296,000
                              and Cherry Ln.--Rt. 6 and
                              6 N in Putnam County......
461            NJ            Construct Garden State          $32,000,000
                              Parkway Grade Separation,
                              Cape May County...........
462            VA            High Knob Horse Trails--           $600,000
                              Construction of horse
                              riding trails and
                              associated facilities in
                              High Knob area of
                              Jefferson National Forest.
463            TN            Plan and construct a             $2,000,000
                              bicycle and pedestrian
                              trail, Cookeville.........
464            UT            Provo, Utah Westside               $800,000
                              Connector from I-15 to
                              Provo Municipal Airport...
465            CA            I-5 Santa Clarita-Los            $1,600,000
                              Angeles Gateway
                              Improvement Project.......
466            NY            Project will revitalize            $800,000
                              staircases used as streets
                              due to steep grade of
                              terrain in areas in which
                              they are located, the
                              Bronx.....................
467            TX            Construct and rehabilitate         $800,000
                              pedestrian walkways along
                              the Main Street Corridor
                              to improve transit-related
                              accessibility.............
468            MD            Reconstruct East North           $4,000,000
                              Avenue (US Route 1) in
                              Baltimore.................
469            CT            Reconstructoin of Lakeville        $716,000
                              Center to improve
                              pedestrian and vehicle
                              safety at the intersection
                              of Routes 41 and 44.......
470            TX            City of Robstown Trade           $5,000,000
                              Processing and Inland
                              Center....................
471            CA            San Gabriel Blvd.                  $240,000
                              Rehabilitation Project--
                              Mission Rd. to Broadway,
                              San Gabriel...............
472            NC            To plan, design, and             $2,131,200
                              construct the 10th Street
                              Connector Project in
                              Greenville, NC............
473            OH            To widen Western Reserve         $2,000,000
                              Road from SR 7 to
                              Hitchcock Road, Mahoning
                              Co........................
474            NY            Binghamton, Improve Front        $4,000,000
                              Street....................
475            FL            U.S. Highway 19 Bayside          $1,600,000
                              Segment...................
476            MI            Arenac County, Upgrade           $1,316,800
                              Maple Ridge Road from
                              Briggs Road east to M-65..
477            NY            Village of Highland Falls          $180,000
                              repaving and sidewalk
                              construction of Mearns Ave
478            NY            Village of Nelsonville             $200,000
                              improvements, paving and
                              sidewalk installation to
                              North Pearl St., Crown
                              St., Pine St., and Wood
                              Ave.......................
479            CA            Widen Firestone Blvd.            $1,600,000
                              between Ryerson Blvd. and
                              Stewart and Gray Road in
                              Downey....................
480            CA            Construct Air Cargo Access         $720,000
                              Road to Oakland
                              International Airport.....
481            MD            Peer review study of                $80,000
                              conflicts between road
                              system and light rail
                              operations in Linthicum,
                              MD........................
482            GA            Resurface and widen Jac-Art        $200,000
                              Road as part of the
                              Bleckley County
                              Development Authority
                              project...................
483            VA            Construction of Virginia           $240,000
                              Blue Ridge Trail in
                              Amherst County, VA........
484            FL            Implement NE 6th Street/           $800,000
                              Sistrunk Boulevard
                              Streetscape and
                              Enhancement Project, City
                              of Fort Lauderdale........
485            CA            Widen Lakewood Blvd.             $1,600,000
                              between Telegraph Rd. and
                              Fifth St. in Downey.......
486            TX            Widen Motor Street               $4,400,000
                              thoroughfare in Dallas to
                              improve accessibility to
                              Southwestern Medical
                              District..................
487            MN            Construction of Gitchi-Gami        $500,000
                              State Trail, Lutsen Phase,
                              CR 34 to Lockport store...
488            PA            Widen of SR 309 through the      $2,400,000
                              Borough of Coopersburg to
                              create left-turn lanes and
                              complete the Rt. 309
                              Corridor Improvement
                              Project...................
489            CA            Pasadena Ave/Monterey Rd.          $240,000
                              Partial Grade Separation--
                              Preliminary Engineering--
                              Feasibility, South
                              Pasadena..................
490            OH            Intermodal Bikeway,              $2,000,000
                              Independence..............
491            MO            Widen shoulder and               $2,400,000
                              resurface U.S. 136 and
                              replace 2 deficient
                              bridges between Rock Port
                              and Bethany, Missouri.....
492            FL            SR 43 (U.S.301) Improvement      $3,200,000
                              Project--Ellentown to
                              Parrish, Florida..........
493            GA            Bike and pedestrian paths          $640,000
                              and other transportation
                              enhancements at Georgia
                              Veterans Memorial Park....
494            AK            Citywide pavement                $1,000,000
                              rehabilitation in City of
                              North Pole................
495            GA            Replace and upgrade                 $50,000
                              sidewalks, Glenwood.......
496            MI            Reconstruction of Leeman         $1,200,000
                              Road from County Road 581
                              west 7 miles to Lerza
                              Road, Dickinson County....
497            GA            Widen SR 133 from Spence           $800,000
                              Field to SR 35 in Colquitt
                              County, Georgia...........
498            CA            Mariposa County, CA Improve      $2,800,000
                              16 roads, bridge and one
                              bike path.................
499            LA            Upgrade highway-rail               $160,000
                              crossings at Madison
                              Street, City of Gretna....
500            PA            Two-lane Extension of            $1,600,000
                              Bristol Road, Bucks County
501            TN            Widen SR 30 From Athens to       $4,606,400
                              Etowah, Tennessee.........
502            MI            Iosco County, Reconstruct          $258,000
                              Bissonette Road from
                              Lorenz Road to Chambers
                              Road......................
503            TX            Development of one-story         $1,200,000
                              300-vehicle parking
                              facility..................
504            WA            Design and construct             $1,600,000
                              improved I-182 interchange
                              ramps at Broadmoor Blvd.
                              in Pasco, WA..............
505            NY            Erie Canalway National           $2,600,000
                              Heritage Corridor in
                              Lockport, NY--
                              Transportation
                              Enhancements..............
506            MI            M-6 Paul Henry Freeway           $2,224,000
                              trail design and
                              construction..............
507            CT            Reconstruction and               $1,364,000
                              conversion of Union
                              Station in North Canaan to
                              establish a transportation
                              museum....................
508            OR            Construct passing lanes on       $1,827,000
                              U.S. 199, Josephine County
509            CA            Scenic preservation and run-     $1,200,000
                              off mitigation in the
                              Santa Monica Mountains
                              National Recreation Area
                              near PCH and U.S. 101.....
510            IL            South Shore Drive and 67th       $1,040,000
                              Underpass.................
511            CA            Mission Boulevard/State          $3,360,000
                              Route 71 Interchange--
                              Corridor Improvements.....
512            OR            For purchase of right-of-        $8,545,600
                              way, planning, design, and
                              construction of a highway,
                              Newberg...................
513            VA            Smith River Trail--                $400,000
                              Construction of trail
                              along Smith River in Henry
                              County....................
514            IL            Resurface Clifton Park Ave.        $320,000
                              and S. Louis Ave., Village
                              of Evergreen..............
515            NJ            University Heights                 $509,600
                              Connector for improvements
                              to First Street in Newark
                              from Sussex Street to West
                              Market Street.............
516            GA            Broad Avenue Bridge: Albany        $400,000
517            CA            Carlsbad, CA Construction        $1,600,000
                              of Poinsettia Lane........
518            CA            Construct pedestrian             $2,000,000
                              enhancements on Broadway
                              in Los Angeles............
519            NJ            Construct Rt. 56 Maurice         $1,600,000
                              River Bridge Replacement,
                              Salem and Cumberland
                              Counties..................
520            WA            Conduct route analysis for          $50,000
                              community pathway through
                              Chehalis..................
521            WA            Construct a multi-               $1,600,000
                              jurisdictional non-
                              motorized transportation
                              project parallel to SR 99
                              called the Interurban
                              Trail.....................
522            FL            Construct Downtown Bypass          $400,000
                              Roadway Connector, Lake
                              Mary, Florida.............
523            NY            To study, design, and            $6,600,000
                              construct the Brooklyn
                              Waterfront Greenway in Red
                              Hook, Greenpoint, and the
                              Navy Yard in Brooklyn.....
524            NY            Update all county and town         $220,000
                              traffic signage in Wayne
                              County, NY................
525            CA            Construct Route 101              $3,000,000
                              Auxiliary Lanes 3rd Ave.
                              in the City of San Mateo
                              to Millbrae Ave. in
                              Millbrae..................
526            CA            Undertake Cordelia Hill Sky      $2,400,000
                              Valley transportation
                              enhancement project,
                              including upgrade of
                              pedestrian and bicycle
                              corridors, Solano County..
527            MS            Construct I-20 Interchange       $2,000,000
                              at Hawkins Crossing,
                              Lauderdale County.........
528            TN            Sevier, Jefferson, Cocke         $1,400,000
                              Counties, Tennessee SR 35
                              and U.S. 411 widening.....
529            GA            Upgrade Safety of Bicycle        $2,400,000
                              and Pedestrian Access to
                              Public Schools, Dekalb
                              County....................
530            OH            Construction of Safety and          $96,000
                              related improvements on
                              Rutlege Transfer Road in
                              Vernon Township, OH.......
531            WI            Reconstruct U.S. 45 in           $1,616,000
                              Antigo....................
532            WA            SR 2/Main Street/Old Owen          $384,000
                              Road Intersection in
                              Monroe....................
533            GA            Install landscaping and            $350,000
                              upgrade lighting on Fall
                              Line Freeway, Reynolds....
534            WA            Congestion relief on I-405         $800,000
                              with added lanes from SR
                              520-SR 522 including 2
                              lanes each way from NE
                              85th-NE 124th.............
535            NY            Conduct NYS 5 construction          $64,000
                              study.....................
536            PA            Widen lanes, add left turn       $1,200,000
                              lanes and update and
                              install traffic signals at
                              SR 309, SR 4010
                              interchange in North
                              Whitehall Township........
537            KY            Reconstruct I-64-KY 180          $1,600,000
                              Interchange, Boyd County,
                              Kentucky..................
538            TX            Widen U.S. 271 from a 2-         $1,600,000
                              lane facility to a 4 lane
                              divided facility from
                              Paris, TX to Pattonville,
                              TX........................
539            TN            Carter County, Tennessee SR        $400,000
                              362 reconstruction........
540            OH            Construct Ohio River Trail,        $220,000
                              Anderson Township.........
541            MI            Delta County, CR 515 from          $256,000
                              U.S. 2 and U.S. 41 in
                              Rapid River to County Road
                              446 at Days River Road-
                              Bituminous overlay and
                              joint repair..............
542            FL            Fund design phase for              $800,000
                              widening U.S. 41 north of
                              Dunnellon to four lanes...
543            TN            Construction of                    $800,000
                              Elizabethton Connector in
                              Carter County, Tennessee..
544            NJ            Newark Waterfront                $1,200,000
                              Pedestrian and Bicycle
                              Access project............
545            ME            Plan and construct Lewiston/     $4,360,000
                              Auburn Downtown Connector.
546            OH            Conduct Miami St. along SR         $800,000
                              Route 53 safety
                              enhancement project to
                              improve access to railroad
                              crossing..................
547            AK            Planning, design, and           $15,000,000
                              construction of Juneau
                              access roads in Juneau,
                              Alaska....................
548            TN            Construction of an               $1,920,000
                              intersection/interchange
                              in the City of Cleveland
                              along I-75................
549            FL            Construct Flagler Avenue           $808,000
                              Improvements, City of Key
                              West, Florida.............
550            CA            Rehabilitate street surface         $34,400
                              of Cedros Avenue between
                              Burbank Blvd. and Magnolia
                              Blvd......................
551            VA            Engineering and Right-of-        $1,000,000
                              way to widen Route 221 in
                              Forest, Virginia..........
552            NY            Install Improvements for           $250,000
                              Pedestrian Safety
                              including in the vicinity
                              of PS Q200................
553            TX            SH 146 grade separation         $13,600,000
                              over Red Bluff Rd.........
554            TN            Construction of park access        $240,000
                              road and adjacent trails
                              at the Athens Regional
                              Park in Athens, TN........
555            IL            State Street Road                $3,080,000
                              Improvements from 43rd
                              Street to IL Rt. 157, East
                              St. Louis.................
556            GA            Streetscape-Dawson.........        $160,000
557            SC            Build Carolina Bays Parkway      $2,400,000
                              Segment from SC 544 to
                              U.S. 17 in Myrtle Beach,
                              SC........................
558            GA            U.S. 341 U.S. 41 SR 7 from       $3,200,000
                              Barnesville to SR 3,
                              Georgia...................
559            OH            Reconstruct and widen State        $800,000
                              Route 82 in North Royalton
560            FL            Acquisition, engineering,          $800,000
                              and construction of West
                              Avenue Connector Bridge,
                              City of Miami Beach, FL...
561            ME            Safety Enhancements on             $400,000
                              Routes 11, 6, and 16 for
                              Piscataquis County
                              Industrial Development....
562            IL            Study, design, and                 $905,600
                              construction of a
                              designated truck route
                              through the City of
                              Monticello................
563            CA            Improvement of intersection      $2,000,000
                              at Aviation Blvd. and
                              Rosecrans Ave. to reduce
                              congestion, City of
                              Hawthorne.................
564            WI            Preliminary engineering for      $7,200,000
                              upgrading I-94 between
                              Illinois State Line and
                              Mitchell Interchange in SE
                              Wisconsin.................
565            MI            Cogshall Road Crossing             $960,000
                              Improvement and Life
                              Safety Access Project in
                              Holly, MI.................
566            MI            Ontonagon County, Improve          $400,000
                              Fed. Forest Hwy 16 from M-
                              38 to Houghton County Line
567            UT            Forest Street Improvements,      $2,000,000
                              Brigham City, UT..........
568            NC            I-40 Union Cross Road              $800,000
                              Interchange in Forsyth
                              County, NC................
569            NJ            Construct Sea Isle               $1,600,000
                              Boulevard Reconstruction
                              from Garden State Parkway
                              to Ludlams Thoroughfare,
                              Cape May County...........
570            CA            I-5 HOV Improvements from          $400,000
                              Route 134 to Route 170....
571            NY            Reconfiguration of                 $400,000
                              intersection and redesign
                              of traffic signal timing
                              at Mohegan Ave. and
                              Lakeland St...............
572            CA            Shoal Creek Pedestrian           $1,200,000
                              Bridge (San Diego)........
573            GA            Streetscape-Cordele........        $200,000
574            CA            Construct I-605 Interchange      $1,600,000
                              Capacity Improvements in
                              Irwindale.................
575            SC            Construction of interchange      $1,760,000
                              at I-385 and SC 14, Exit
                              19, in Laurens County,
                              South Carolina............
576            NE            Design, right-of-way and         $7,600,000
                              construction of Nebraska
                              Highway 35 between Norfolk
                              and South Sioux City......
577            MO            Complete impact study for          $400,000
                              North Oak Highway corridor
                              redevelopment.............
578            MA            Design and construct the         $1,200,000
                              1.5 mile East Long-meadow
                              Redstone rail Trail bike
                              path......................
579            NY            Improve bicycle and                $100,000
                              pedestrian safety on Main
                              Street, Holbrook..........
580            CA            Tuolumne, Stanislaus and         $2,000,000
                              Merced Counties Upgrade
                              existing county highway,
                              J59.......................
581            FL            U.S. 19 Continuous right         $5,760,000
                              turn lanes in Pasco County
582            NJ            Union Boulevard                    $400,000
                              Revitalization and
                              Streetscape Enhancements,
                              Totowa....................
583            IL            Improve roads, The Village         $800,000
                              of Westchester............
584            IN            Reconstruct 45th Avenue          $2,160,000
                              from Colfax Street to
                              Grant Street, Lake County.
585            IN            Construct Grade Separation       $1,600,000
                              Underpass on Main Street
                              in Mishawaka, Indiana.....
586            UT            Construct 2-lane divided         $4,000,000
                              highway from the
                              Atkinville Interchange to
                              the new replacement
                              airport access road in St.
                              George....................
587            CA            Diamond Bar On-Off Ramp at       $9,600,000
                              Lemon Ave. on SR 60.......
588            NY            Transportation parking           $8,000,000
                              facility serving the
                              Harlem Hospital Complex...
589            MA            Downtown revitalization for      $1,520,000
                              Pleasant Street, Malden...
590            NY            Install Improvements for           $250,000
                              Pedestrian Safety in the
                              vicinity of Prospect Park
                              Yeshiva...................
591            NY            Emergency vehicle                  $500,000
                              preemption system at
                              traffic signals, Smithtown
592            CA            Reconstruct interchange for      $3,120,000
                              south-bound traffic
                              entering I-80 from Central
                              Avenue, City of Richmond..
593            KY            Reconstruct KY 393, Oldham       $1,600,000
                              County, Kentucky..........
594            CA            Reduce Orange County               $200,000
                              Congestion Program........
595            CA            Street Closure at Chevy            $640,000
                              Chase Drive, Glendale.....
596            PA            Allegheny County Urban             $800,000
                              Runoff Mitigation-
                              eliminate urban highway
                              runoff and the discharge
                              of culverted streams into
                              municipal combined sewers.
597            SC            Construct Briggs-Pearson-       $16,080,000
                              DeLaine Connector.........
598            NM            Construct an interchange on      $5,600,000
                              I-25 to provide access to
                              Mesa del Sol in
                              Albuquerque...............
599            MI            Reconstruction of 30th             $270,080
                              Avenue from 13th Street to
                              22nd Street, Menominee....
600            VA            Rivermont Ave. (Lynchburg)       $1,760,000
                              Bridge improvements.......
601            MA            Construct new interchange          $500,000
                              on I-95 between existing
                              Route 1A ramp to the north
                              and Route 123 ramp to the
                              south, Attleboro..........
602            OH            Construct Waverly, Ohio          $2,560,000
                              South Connector from U.S.
                              23 to SR 104 to SR 220....
603            VA            Craig County Trail--               $120,000
                              Improvements to trail in
                              Craig County..............
604            CO            U.S. 160, State Highway 3        $4,800,000
                              to East of the Florida
                              River.....................
605            TX            Bridge Access Road for FM        $5,000,000
                              493 from U.S. 281 to U.S.
                              83........................
606            AZ            Pinal Avenue/Main Street           $800,000
                              right-of-way acquisition--
                              Pinal County, Casa Grande,
                              AZ--To reconstruct Main
                              St. to include a bypass
                              for commercial traffic....
607            PA            Design, engineering, ROW           $160,000
                              acquisition, and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking,
                              garage, and roadway
                              redesign in Duryea
                              Borough, Luzerne County...
608            OK            SH-33, Widen SH 33 from the      $6,400,000
                              Cimarron River East to
                              U.S. 177 Payne County, OK.
609            TX            Washington Boulevard             $2,080,000
                              Improvements in Beaumont,
                              Texas.....................
610            FL            Widen Midway Road from           $1,600,000
                              South 25th Street to U.S.
                              1 in St. Lucie County.....
611            NY            Enhance road and                 $4,000,000
                              transportation facilities
                              in the vicinity of W. 65th
                              St. and Broadway, New York
                              City......................
612            LA            Construct Kansas-Garrett         $4,000,000
                              Connector and I-20
                              Interchange Improvements..
613            PA            Construct the SR 1058            $1,280,000
                              Connector between PA 309
                              and the Pennsylvania
                              Turnpike Northeast
                              Extension in Montgomery
                              County....................
614            OK            Reconstruct the Interstate       $2,400,000
                              44 193rd street
                              interchange...............
615            NY            Roadway improvements to          $1,600,000
                              Woodbury Rd. at
                              intersection with Syosset-
                              Woodbury Rd...............
616            RI            Construct a handicapped            $160,000
                              accessible trail and
                              platform at Kettle Pond
                              Visitor Center
                              Administrative Facility...
617            NJ            Construct Great Swamp              $200,000
                              National Wildlife Refuge
                              Road......................
618            CA            Grade Separation at 32nd           $800,000
                              Street between I-15 and
                              Harbor Drive, San Diego...
619            IN            Widen Old Meridian Street          $900,000
                              from 2 to 4 lanes, City of
                              Carmel, Indiana...........
620            WI            Construct a bicycle/             $1,760,000
                              pedestrian path, City of
                              Portage...................
621            VA            Widen Route 17 in Stafford.      $4,000,000
622            VA            Widen Route 820 in Bergton,      $1,240,000
                              Virginia..................
623            IL            Construction of 2 North/         $8,320,000
                              South Blvds. and 2 East/
                              West Blvds. in the
                              vicinity of Northern
                              Illinois University.......
624            CA            Begin construction of road         $800,000
                              from U.S. 395 west towards
                              SR 14.....................
625            PA            Design, engineering, ROW           $160,000
                              acquisition, and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking, and
                              roadway redesign in Old
                              Forge Borough, Lackawanna
                              County....................
626            PA            Improvements to Amtrak             $400,000
                              Keystone Corridor grade
                              crossings at Irishtown
                              Rd., New Comer Rd., and a
                              new bridge at Ebychiques
                              Rd........................
627            TN            Acquire and construct trail      $1,280,000
                              and bikeway along S.
                              Chickamauga Creek in
                              Chattanooga, TN...........
628            TX            Interchange improvements IH-     $1,600,000
                              30 Arlington at FM 157
                              (Collins Street) and
                              Center Street.............
629            MO            Highway 350 Access                 $800,000
                              Management Study from I-
                              435 to I-470..............
630            TX            Reconstruct Mile 6 W from          $800,000
                              US83 to SH 107, Hidalgo
                              County....................
631            NJ            Pedestrian facilities and          $346,400
                              street lighting on Haddon
                              Avenue from Albertson
                              Avenue to Glenwood Avenue,
                              Haddon Township...........
632            NY            Rehabilitate highway             $2,000,000
                              bridges--Ithaca secondary
                              line......................
633            WA            Buckley, WA; New Road            $1,600,000
                              alignments on 112th Street
                              Corridor..................
634            ID            Construct Washington Street      $4,400,000
                              North from the end of
                              Project # (STP 7072(102))
                              to the beginning of
                              Project # (DHP-NH-F-
                              2390(104))................
635            SC            Construction of the U.S. 15/     $3,600,000
                              SC-341 connector parallel
                              to I-20, Lee County.......
636            PA            Construct Recreational           $1,200,000
                              Trail from Oil City to
                              Rynd Farm (Venango County)
637            TX            FM 1637 from FM 3051 to FM       $1,600,000
                              185, Waco.................
638            VA            Green Cove Station--                $80,000
                              Improvements to existing
                              Forest Service facility
                              located at trailhead of
                              Virginia Creeper Trail....
639            NJ            South Essex Street Bridge          $462,400
                              Pedestrian Access
                              Improvements, Orange......
640            TX            FM 3391 (East Renfro St.)        $2,200,000
                              from I-35W to CR 602,
                              Burleson..................
641            WI            Replace Wisconsin Street        $10,000,000
                              Bridge (STH 44) in
                              Oshkosh, Wisconsin........
642            CT            Construct Route 11              $14,400,000
                              Extension and bicycle and
                              pedestrian path from Salem
                              to Waterford..............
643            TX            Drainage Study and                 $800,000
                              Engineering for U.S. 83 in
                              Starr County..............
644            TN            Widen SR 62 in Knox County,      $6,500,000
                              TN........................
645            GA            Widen U.S. 17 SR 25 from         $1,600,000
                              Yacht Drive to Harry
                              Driggers Boulevard, Glynn
                              County, Georgia...........
646            KY            Widen U.S. 25 from U.S. 421        $800,000
                              North to KY 876, Madison
                              County....................
647            GA            Widen U.S. 280/SR 30 from          $800,000
                              east of Flint River to SR
                              300 Connector west of
                              Cordele...................
648            MS            Upgrade roads in Gunnison,       $1,600,000
                              Mound Bayou, Beulah,
                              Benoit, Pace and Shaw,
                              Bolivar County............
649            NY            Construct and enhance            $1,200,000
                              Fillmore Avenue and
                              traffic down-grade and
                              infrastructure
                              improvements to Humboldt
                              Parkway, Buffalo..........
650            NJ            Construct Route 46 and Main      $1,600,000
                              Street intersection in
                              Lodi......................
651            MN            Phase III construction of        $4,000,000
                              Trunk Highway 61010
                              Minnesota.................
652            NM            NM 128 JCT NM 31 East to         $3,200,000
                              Texas State Line..........
653            NJ            Replacement of Prospect            $320,000
                              Avenue Culvert, City of
                              Summit, County of Union...
654            FL            U.S. 441 Traffic                   $720,000
                              Improvements--Road
                              surface, road access,
                              curb, gutter, and right-of-
                              way, Miami Gardens........
655            MN            Environmental studies and        $4,000,000
                              right-of-way acquisition
                              for Trunk Highway 55
                              Corridor Protection
                              Project...................
656            NY            Roadway improvements on            $640,000
                              Woodbine Avenue between
                              5th Avenue and Beach
                              Avenue....................
657            NY            Saugerties, Improve                $960,000
                              downtown streets..........
658            IN            Widen U.S. 31 Hamilton             $800,000
                              County, Indiana...........
659            GA            Build a bridge across Big        $1,000,000
                              Indian Creek, Perry.......
660            MI            Carpenter Road                   $1,600,000
                              Reconstruction--700 feet
                              South of Textile Road to I-
                              94, Washtenaw County......
661            IN            Resurface and widen Shelby         $800,000
                              County Indiana 400 North
                              Phases IV and V...........
662            SC            Widen West Georgia Road          $1,600,000
                              from Neely Ferry Road to
                              Fork Shoals Road..........
663            TX            Construct Phase II of City       $4,800,000
                              of Killeen SH 201.........
664            MN            Interchange improvements at        $800,000
                              I-94 and CSAH 19 and at
                              CSAH 37 in the City of
                              Albertville, MN...........
665            KY            Construction of bypass           $1,200,000
                              between KY 55 and U.S. 68
                              at Lebanon in Marion
                              County....................
666            NY            Peruville Road/Creating          $1,600,000
                              overpass to address
                              intersection safety issue.
667            OR            Add a southbound lane to         $4,000,000
                              section of I-5 through
                              Portland, OR between Delta
                              Park and Lombard..........
668            MN            10th Street Bridge                 $800,000
                              Expansion in St. Cloud, MN
669            NJ            Intermodal Access                $1,600,000
                              Improvements to the
                              Peninsula at Bayonne
                              Harbor....................
670            TX            Nolana Loop from FM 1426 to      $1,600,000
                              FM 88, Hidalgo County.....
671            OH            Perry Park Road                     $53,600
                              Improvements and
                              Pedestrian Trail Expansion
                              at Call Road in the
                              Village of Perry, OH......
672            NV            Implement Regional               $5,000,000
                              Transportation of Southern
                              Nevada FAST system........
673            NY            Bronx River Greenway 233rd         $750,000
                              Street Connection.........
674            ............  ...........................              $0
675            FL            Planning and design for            $400,000
                              development of future
                              highway connections to the
                              Florida International
                              Airport, Hardee County....
676            WI            Reconstruct and rebuild St.      $5,600,000
                              Croix River Crossing,
                              connecting Wisconsin State
                              Highway 64 in Houlton,
                              Wisconsin to Minnesota
                              State Highway 36 in
                              Stillwater, Minnesota.....
677            TN            Conduct study for SR 45 to         $400,000
                              SR 386 Connector..........
678            IN            Reconstruct and widen              $800,000
                              Shelby County Indiana 500
                              East from 1200 N to U.S.
                              52........................
679            MO            Removal and Replacement of       $2,800,000
                              the Grand Avenue Bridge in
                              the City of St. Louis.....
680            TX            Conduct reconstruction and       $4,000,000
                              managed lanes project on
                              Airport Freeway (SH 183-SH
                              121) from IH 820 to the
                              Dallas County Line........
681            FL            Reconstruction of Hanford        $2,200,000
                              Boulevard, North Miami
                              Beach.....................
682            MA            Commonwealth Ave/Kenmore         $4,000,000
                              Sq. roadway and pedestrian
                              improvements..............
683            NY            Pedestrian walkway and           $2,560,000
                              bikeway improvements along
                              the NYC Greenway System in
                              Coney Island..............
684            PA            Restore Route 222 in             $2,000,000
                              Maxatawny and Richmond
                              Townships, Berks County,
                              PA........................
685            OH            Study and design of              $2,400,000
                              modifications to I-75
                              interchanges at M.L. King,
                              Jr.,/Hopple, I-74, and
                              Mitchell in Cincinnati....
686            VA            Widen Route 10 to six lanes        $800,000
                              from Route 1 to
                              Meadowville Road,
                              Chesterfield..............
687            GA            Rebuild sidewalks, install         $250,000
                              sidewalks, and add speed
                              monitoring system, Alamo..
688            CA            Widen Wilmington Ave. from       $4,000,000
                              223rd street including
                              ramp modifications, Carson
689            WI            Construct SH 32 (Claude            $400,000
                              Allouez) bridge in DePere,
                              Wisconsin (Brown County,
                              Wisconsin)................
690            NY            Construction of drainage           $408,000
                              improvements and aesthetic
                              enhancements to Oak Beach
                              Road in the Town of
                              Babylon, NY...............
691            WI            Construct an alternative         $3,200,000
                              connection to divert local
                              traffic from I-90, a major
                              highway, and allow
                              movement through the
                              Gateway commercial
                              development project.......
692            WA            East Marine View Drive           $3,500,000
                              Widening in Everett.......
693            OH            Construction of safety             $240,000
                              improvements at
                              intersection of U.S. 422
                              and SR 700 in Geauga
                              County, OH................
694            WV            Upgrade Route 10, Logan Co.      $4,000,000
695            TX            Conduct Preliminary              $3,200,000
                              Engineering for Funnel
                              Project on SH 114 from BS
                              114L to Dallas County Line
                              and on SH 121 from SH 360
                              to Dallas Co Line.........
696            NC            Install ITS on U.S. 70             $800,000
                              Clayton Bypass............
697            PA            Brighton Road Extension-Add        $800,000
                              new street to N Shore
                              roadway network to
                              facilitate access to
                              amphitheater..............
698            NJ            Broad Street Streetscape           $560,000
                              Project in Elizabeth to
                              provide physical
                              improvements and to
                              enhance transportation
                              flow and efficiency.......
699            FL            Construction of 4 lane           $2,400,000
                              highway around
                              Jacksonville connecting
                              U.S. 1 to Route 9A........
700            WA            510-507 Loop--Conduct            $2,000,000
                              engineering, design, and
                              ROW acquisition for
                              alternative route to two
                              existing highways that
                              bisect Yelm, WA...........
701            CA            Develop and implement            $1,600,000
                              traffic calming measures
                              for traffic exiting the I-
                              710 into Long Beach.......
702            CA            San Diego, CA Construction       $6,400,000
                              of the I-5 and SR 56
                              Connectors................
703            IL            Upgrade Ridge Avenue,            $2,400,000
                              Evanston..................
704            SC            Widening and improvements        $1,600,000
                              of SC Highway 5 Bypass in
                              York County...............
705            IA            Widening and                     $8,720,000
                              Reconstruction, I-235, Des
                              Moines....................
706            CA            Bay Road improvements            $4,800,000
                              between University Avenue
                              to Fordham, and from
                              Clarke Avenue to Cooley
                              Landing. Northern access
                              improvements between
                              University and Illinois
                              Avenues, East Palo Alto...
707            NC            Project to widen U.S. 501        $3,200,000
                              from NC 49 in Roxboro to
                              the VA State line with
                              part on new location......
708            NY            Congestion reduction,              $640,000
                              traffic flow improvement
                              and intermodal transfer
                              study at Roosevelt Avenue/
                              74th Street in Queens.....
709            CA            Construct bicycle and              $600,000
                              pedestrian bridge between
                              Oyster Bay Regional Park
                              in San Leandro and
                              Metropolitan Golf Course
                              in Oakland................
710            TX            For right-of-way                 $4,800,000
                              acquisition and
                              construction of Seg 5 and
                              6 of SH 130 from 183 to
                              Seguin, TX................
711            NJ            Construct the Airport              $800,000
                              Circle Elimination at
                              Tilton and Delilah Roads,
                              Atlantic County...........
712            CA            The Alameda Corridor SR 47       $8,000,000
                              Port Access Expressway
                              design funding............
713            NV            Construct U.S. Highway 95--     $10,000,000
                              Las Vegas Beltway
                              Interchange...............
714            NY            Repair and repave the north        $120,000
                              side of the Mineola train
                              station...................
715            IL            Repair of CH 29 and                $800,000
                              reconstruction of CH 8 at
                              interchanges with
                              Interstate 55 at Towanda
                              and Lexington, Illinois...
716            CA            Conduct a Project Study            $400,000
                              Report for new Highway 99
                              interchange between SR 165
                              and Bradbury Road, serving
                              Turlock/Hilmar region.....
717            PA            Construction of U.S. 22 to       $1,200,000
                              I-79 Section of Southern
                              Beltway, Pittsburgh,
                              Pennsylvania..............
718            MN            Construction of new highway      $2,400,000
                              between the bridge over
                              Partridge River on CR 565
                              in Hoyt Lakes to the
                              intersection of CSAH 21
                              and 70, Babbitt...........
719            CA            State Route 1 improvements       $2,936,000
                              between Soquel and
                              Morrissey Blvd. including
                              merge lanes and the La
                              Fonda overpass, Santa Cruz
720            WA            The West Corridor Coalition        $250,000
                              in Washington State.......
721            WA            North Sound Connecting             $960,000
                              Communities Transportation
                              Project Planning..........
722            FL            West Relief Bridge               $1,200,000
                              Rehabilitation, Bay Harbor
                              Islands...................
723            NE            Western Douglas County           $5,600,000
                              Trails Project, Nebraska..
724            TN            Bristol, Tennessee highway--        $80,000
                              RR grade Crossing
                              improvement--Hazelwood
                              Street....................
725            GA            Extend East Greene Street,         $400,000
                              install street lights,
                              utilities, and
                              landscaping, Milledgeville
726            CA            Grade Separation at Vanowen        $800,000
                              and Cliveborne, Burbank...
727            MA            Improve traffic signal           $1,200,000
                              operations, pavement
                              markings and regulatory
                              signage, Milton-Boston
                              City Line.................
728            NY            Port Jervis, NY downtown           $560,000
                              pedestrian mall and
                              promenade.................
729            MN            Construct Soo Line Trail           $396,000
                              from north of Bowlus to
                              the east side of
                              Mississippi River.........
730            WI            Construct traffic                  $320,000
                              mitigation signals, signs,
                              and other upgrades for
                              Howard Ave, St. Francis...
731            NH            Reconstruction of NH 11 and        $560,000
                              NH 28 Intersection in
                              Alton.....................
732            CA            Riverside Drive                    $320,000
                              Improvements, Los Angeles.
733            CA            Upgrade CA SR 4 East from       $16,000,000
                              the vicinity of Loveridge
                              Road to G Street, Contra
                              Costa County..............
734            TX            Widen SH 24 from a 2-lane        $1,600,000
                              facility to 4-lane divided
                              facility from SH 19 to
                              Cooper, TX................
735            PA            Rail crossing signalization        $260,320
                              upgrade, Willow Street,
                              Fleetwood, Berks..........
736            AZ            Navajo Route 20/Navajo             $800,000
                              Nation, Coconino County,
                              AZ/To Conduct a 2-lane
                              road design for 28 miles
                              of dirt road between the
                              communities of Le Chee,
                              Coppermine, and Gap.......
737            SC            Construct Hub City                 $800,000
                              Connector Passage (12.5
                              miles of bicycle-
                              pedestrian improvements,
                              176-SC 56), part of state-
                              wide Palmetto Trail
                              Project...................
738            FL            Construct U.S. 1/SR 100          $2,000,000
                              Connector, Bunnell,
                              Florida...................
739            ............  ...........................              $0
740            CA            Design and environmental           $800,000
                              analysis for State Route
                              11 connecting State Route
                              905 to the new East Otay
                              Mesa Port of Entry, San
                              Diego.....................
741            NY            Improve North Fork Trail,          $200,000
                              Southold..................
742            HI            Interstate Route H1 Deck         $3,816,000
                              Repair, Airport Viaduct...
743            OH            Replace Grade Separation at        $600,000
                              Eastland and Sheldon Road,
                              Berea.....................
744            WA            Widen I-5 through Lewis          $3,750,000
                              County....................
745            SC            Engineering, design, and         $8,000,000
                              construction of I-73 from
                              the North Carolina State
                              Line to I-95..............
746            OH            Planning and construction        $2,000,000
                              of a bicycle trail
                              adjacent to the I-90 and
                              SR 615 Interchange in Lake
                              County, OH................
747            SC            Widening of Boiling Springs      $4,800,000
                              9 from Rainbow Lake Rd. to
                              SC 292....................
748            IL            Construct Streetscape              $320,000
                              Project, Orland Hills.....
749            ............  ...........................              $0
750            OR            Widening of Oregon Hwy 217       $7,745,600
                              between Tualatin Valley
                              Hwy and the U.S. 26
                              interchange, Beaverton....
751            PA            SR 10 widening, New Morgan       $1,600,000
                              Borough and Caernarvon
                              Township, PA..............
752            MI            Widen M-72 from U.S. 31          $2,000,000
                              easterly 7.2 miles to Old
                              M-72......................
753            PA            Widening of Rt. 22 and SR        $2,700,000
                              26 in Huntingdon. Upgrades
                              to the interchange at U.S.
                              Rt. 22 and SR 26..........
754            MN            Widening of U.S. Highway 61        $640,000
                              at Frontenac Station, MN..
755            KS            Construction and                 $3,200,000
                              reconstruction of four
                              interchanges on I-435, I-
                              35 and U.S. 69 in Johnson
                              Co........................
756            MA            Melnea Cass Blvd.                $2,160,000
                              Reconstruction............
757            NH            Improve Meredith Village           $800,000
                              Traffic Rotary............
758            FL            Implement Blue Heron             $2,000,000
                              Boulevard Streetscape
                              Improvements, City of
                              Riviera Beach.............
759            NY            Install Improvements for           $250,000
                              Pedestrian Safety
                              including in the vicinity
                              of PS Q114................
760            WI            Reconstruct SH 181 between       $3,600,000
                              Florist Ave. and North
                              Milwaukee County Line.....
761            LA            Replace the Prospect Street      $2,400,000
                              Bridge (LA 3087), Houma...
762            GA            Streetscape improvements           $160,000
                              along LaVista Road in the
                              Northlake business
                              district of DeKalb County,
                              Georgia...................
763            MD            Study Greater Towson Area          $160,000
                              traffic flow and future
                              needs.....................
764            FL            Construct U.S. 1                   $320,000
                              Improvements, Cities of
                              Holly Hill and Ormond
                              Beach, Florida............
765            OH            Transportation Enhancements        $560,000
                              to the downtown area of
                              the Village of Chagrin
                              Falls, OH.................
766            MA            Pedestrian Walkway for the         $780,000
                              Town of Norwood...........
767            NJ            Restoration of Route 35 in       $1,600,000
                              Ocean County, New Jersey..
768            PA            Extension of Third Street        $4,320,000
                              from Interstate 83 to
                              Chestnut Street,
                              Harrisburg................
769            TX            Carlton road grade               $4,000,000
                              separation, Laredo, TX....
770            OH            Construct connector roadway      $1,000,000
                              between SR 13 and Horns
                              Hill Road in north Newark.
771            TN            Construct new lighting on          $200,000
                              Veterans Memorial Bridge,
                              Loudon County, Tennessee..
772            NY            Roadway improvements on CR       $1,776,000
                              3 between Ruland Rd. and I-
                              495.......................
773            TN            Construct State Route 385        $2,520,000
                              (North and East) around
                              the City of Memphis.......
774            NY            Waterloo, NY by-pass             $5,600,000
                              project...................
775            IN            Extend Everbrook Drive from        $512,000
                              SR 332 to Bethel Avenue in
                              the City of Muncie,
                              Indiana...................
776            TN            Construct Proposed SR 397        $1,780,000
                              extension from SR 96 West
                              to U.S. 431 North to
                              Franklin Williamson County
777            AK            Construct linking road from      $1,500,000
                              airport to port in Akutan.
778            PA            Uniontown to Brownsville         $4,000,000
                              section of Pennsylvania
                              Mon/Fayette Expressway....
779            NY            Ashburton Avenue                 $1,000,000
                              Reconstruction, Yonkers,
                              New York..................
780            OR            Highway 22, Polk County....        $800,000
781            FL            I-75 Widening and               $36,000,000
                              Improvements in Collier
                              and Lee County, Florida...
782            WI            Pioneer Road Rail Grade          $5,000,000
                              Separation (Fond du Lac,
                              Wisconsin)................
783            FL            Design and construction of       $3,200,000
                              double-deck roadway system
                              exiting FLL airport
                              connecting Y.S. 1 and I-
                              595.......................
784            MI            Wayne, Reconstruct one             $100,000
                              quarter of a mile stretch
                              of Laurenwood.............
785            GA            Construct the West               $2,320,000
                              Cleveland Bypass from U.S.
                              129 SR 11 near Hope Road
                              extending west of
                              Cleveland, on new and
                              existing locations to SR
                              75........................
786            IL            Reconstruct Highway-Railway      $1,600,000
                              crossing over U.S. 14 and
                              realignment of U.S. 14,
                              Des Plaines...............
787            OR            Highway 22-Cascade Highway         $400,000
                              interchange improvements,
                              Marion County.............
788            VA            Widen Route 29 between           $2,400,000
                              Eaton Place and Route 123
                              in Fairfax City, VA.......
789            WI            Reroute State Hwy 11 near        $3,200,000
                              Burlington, WI (Walworth
                              and Racine Counties, WI)..
790            IL            East Peoria, Illinois              $800,000
                              Technology Blvd. upgrades.
791            DC            Metro Branch Trail               $1,600,000
                              Construction..............
792            MA            Study and design I-93/             $400,000
                              Mystic Ave. Interchange at
                              Assembly Sq...............
793            NM            Widening of U.S. 491 from        $1,600,000
                              Navajo 9 to Colorado State
                              border....................
794            FL            Construct access road to         $4,000,000
                              link Jacksonville
                              International Airport to I-
                              95........................
795            FL            Widening of SR 60 from 66th        $800,000
                              Avenue to I-95 in Indian
                              River County, FL..........
796            GA            Widening of SR 133:                $800,000
                              Colquitt Co./Daughtery Co.
797            IL            Upgrade streets, Stickney        $2,206,400
                              Township..................
798            PA            Widening of SR 1001 Section        $800,000
                              601 in Clinton County.....
799            PA            Widening of Route 40 in          $1,600,000
                              Wharton Township, Fayette
                              County, Pa................
800            NJ            Widening of Route 1 and            $800,000
                              intersection improvements
                              in South Brunswick........
801            PA            Construct PA 706 Wyalusing         $800,000
                              Bypass Bradford County,
                              Pennsylvania..............
802            IL            Construct four lane                $480,000
                              extension of IL RT29 from
                              Rochester to Taylorville..
803            IL            Widening of Old Madison          $1,600,000
                              Road, St. Clair County....
804            NY            Construction of Bicycle            $400,000
                              Path and Pedestrian Trail
                              in City of Dunkirk........
805            PA            Design, engineering, ROW           $160,000
                              acquisition, and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking, and
                              roadway redesign in Plains
                              Township, Luzerne County..
806            CA            Replace I-880 overpass at          $600,000
                              Davis St. in San Leandro..
807            PA            DuBois-Jefferson County          $1,200,000
                              Airport Access Road
                              Construction..............
808            GA            Streetscape project to             $400,000
                              improve accessibility and
                              safety for pedestrians,
                              Mount Vernon..............
809            IL            Replacement of Fullerton         $3,840,000
                              Avenue Bridge and
                              Pedestrian Walkway........
810            NH            Construct intersection at          $560,000
                              U.S. 3 and Pembroke Hill
                              Road in Pembroke..........
811            FL            A new interchange with the      $10,400,000
                              Pineda Causeway Extension
                              and I-95..................
812            CT            Make Improvements to Groton        $160,000
                              Bicycle and Pedestrian
                              Trails and Facilities.....
813            MN            TH 36--Stillwater Bridge;          $400,000
                              cut-and-cover approach to
                              river crossing............
814            NM            U.S. 54 Reconstruction,          $2,400,000
                              Tularosa to Santa Rosa....
815            VA            Daniel Boone Wilderness          $2,560,000
                              Trail Corridor--Acquire
                              site; design and
                              construction of
                              interpretative center,
                              enhancement of trail
                              corridor..................
816            MI            Widening of M-24 from two          $800,000
                              lanes to four lanes with a
                              boulevard from I-69 to the
                              county line...............
817            IN            Construct U.S. 231 in            $4,800,000
                              Spencer and Dubois
                              Counties in Indiana.......
818            TN            Construct overpass at            $5,200,000
                              Highway 321 and Highway 11
                              Loudon County, Tennessee..
819            SD            Improve the SD Advanced            $800,000
                              Traveler Information
                              System....................
820            GA            Streetscape, lighting, and         $500,000
                              traffic enhancements from
                              Lancaster to Church Street
                              on Bellevue, Dublin.......
821            NY            Implement ITS system and           $100,000
                              apparatus to enhance
                              citywide truck route
                              system on Avenue P between
                              Coney Island Avenue and
                              Ocean Avenue in the 9th
                              District of New York......
822            GA            Install sidewalks, trails,       $1,000,000
                              lighting, and amenities in
                              Balls Ferry Park,
                              Wilkinson County..........
823            CA            Construct Inland Empire          $1,200,000
                              Transportation Management
                              Center in Fontana to
                              better regulate traffic
                              and dispatch personnel to
                              incidents.................
824            IL            Reconstruct Milwaukee           $13,600,000
                              Avenue, including Six
                              Corners...................
825            TX            Implementation and              $22,796,800
                              quantification of benefits
                              of large-scale landscaping
                              along freeways and
                              interchanges in the
                              Houston region............
826            PA            Design, engineering, ROW           $200,000
                              acquisition, and
                              construction of a
                              connector road between PA
                              115 and Interstate 81 in
                              Luzerne County............
827            AL            Pedestrian Improvements for        $320,000
                              Homewood, AL..............
828            TN            Plan and construct a               $532,000
                              bicycle and pedestrian
                              trail, Gallatin...........
829            MA            Conduct design, feasibility      $1,400,000
                              and environmental impact
                              studies of proposal to
                              relocate New Bedford/
                              Fairhaven bridge..........
830            IA            Iowa City, IA Construction       $2,000,000
                              of arterial extension
                              project connecting
                              Coralville to west and
                              south Iowa City...........
831            NJ            Rehabilitate Route 139 in        $1,600,000
                              Jersey City--Portway......
832            NJ            Route 605 extension to U.S.        $800,000
                              206.......................
833            OH            Widen SR 170 Calcutta......      $2,000,000
834            IA            Widening of Hwy 44, Grimes.        $800,000
835            VA            Widening of Highway 15 in        $1,349,760
                              Farmville, Virginia.......
836            MA            Design and construct               $800,000
                              intersection improvements
                              at Memorial Park II on
                              Roosevelt Ave. from Bay
                              St. to Page Boulevard,
                              Springfield...............
837            SC            Widening of Frontage Road        $2,240,000
                              from U.S. 72 to U.S. 56,
                              Laurens, SC...............
838            NY            Mill Road: NY Rte 261 to           $400,000
                              North Avenue in the Town
                              of Greece.................
839            NC            Widening of Beckford Drive,        $768,000
                              City of Henderson.........
840            NY            Realignment of Clove Road          $960,000
                              and Rt. 208, access
                              management improvements in
                              Orange County.............
841            NY            City of Peeskill, NY Street         $41,600
                              Resurfacing Program, Brown
                              Street....................
842            FL            Fund advanced Right-of-Way       $2,960,000
                              Acquisition along SR 52 in
                              Pasco County, Florida.....
843            MA            Design, engineer, permit,          $800,000
                              and construct ``Border to
                              Boston Bikeway'' rails-
                              trails project, from
                              Salisbury to Danvers......
844            FL            Soutel Drive Road                $1,200,000
                              Enhancements, Jacksonville
845            NJ            Bicycle facilities in West          $92,000
                              Deptford Township.........
846            PA            Create a direct connection       $2,400,000
                              between State Road 29 and
                              State Route 113...........
847            MA            Design and construction of       $1,200,000
                              the north and southbound
                              ramps on Interstate 91 at
                              Exit 19...................
848            IA            NW 70th Ave.                     $4,000,000
                              reconstruction, Johnston..
849            NY            Town of Minisink South             $220,000
                              Plank Road................
850            VA            Town of St. Paul--                 $120,000
                              Restoration of historic
                              Hillman House to serve as
                              trail system information
                              center and construction of
                              stations on trails........
851            PA            Conduct environmental            $3,360,000
                              review and acquire right-
                              of-way for preferred
                              alternative to improve PA
                              41........................
852            FL            Acquire Right-of-Way for           $400,000
                              Ludlam Trail, Miami,
                              Florida...................
853            NY            Construct Safe Routes to         $2,800,000
                              Schools projects in New
                              York City.................
854            CO            Construction of U.S. 24--        $4,800,000
                              Tennessee Pass, Colorado..
855            CA            Implement Riverside Avenue         $400,000
                              Railroad Bridge
                              improvements, south of
                              Interstate 10 in Rialto...
856            MA            Longwood Ave/Urban Ring            $450,000
                              Tunnel Study..............
857            MN            Ely Area Joint Public Works      $1,500,000
                              Complex...................
858            IA            U.S. 63 improvement near         $6,960,000
                              New Hampton, Iowa.........
859            NY            Village of Unionville               $64,000
                              reconstruction of Main
                              Street....................
860            TX            Widening from two lanes to       $7,200,000
                              four of SH 36 from
                              Bellville, TX to Sealy, TX
861            KY            Comprehensive Traffic Study        $480,000
                              for intersection of Main
                              Street and Berea College
                              Campus, Berea.............
862            TN            Improve State Route 62 in        $3,600,000
                              Morgan County near U.S. 27
                              in Wartburg to Petit Lane
                              from existing two lane
                              highway to four lanes.....
863            IL            Construct West Corbin            $4,000,000
                              Overpass over Illinois
                              255, Bethalto.............
864            OR            I-5/99W connector..........        $248,000
865            FL            Improvements to I-75 in the      $6,000,000
                              City of Pembroke Pines,
                              Florida...................
866            CA            Planning, design,                $4,000,000
                              engineering, and
                              construction of Naval Air
                              Station, North Island
                              access tunnel on SR 75-282
                              corridor, San Diego.......
867            CA            Construct road from Mace           $800,000
                              Blvd. in Yolo County to
                              federally supported
                              Pacific Flyway wildlife
                              area......................
868            PA            Construction of ramps on I-      $2,400,000
                              95 and U.S. 322, widening
                              of streets and
                              intersections.............
869            NY            Construct and restore              $800,000
                              pedestrian and residential
                              roadways in downtown
                              business district in
                              Rockville Centre..........
870            LA            Plan, design, and construct      $2,400,000
                              Pointe Clair Expressway in
                              Iberville Parish..........
871            MA            Construction of East Milton      $1,000,000
                              Parking Deck over
                              Interstate/Rt. 93.........
872            PA            Reconstruction of I-176 in       $2,400,000
                              Cumru and Robeson
                              Townships, Berks County...
873            MI            Resurfacing of Masonic             $928,000
                              Boulevard in Fraser.......
874            OH            Construct Ohio River Trail       $1,600,000
                              from Downtown Cincinnati,
                              Ohio to Salem Road........
875            PA            Realignment and                  $1,600,000
                              reconstruction of SR 60
                              interchange with U.S. 22-
                              30 and reconstruct
                              adjacent Tonidale-Bayer
                              intersection..............
876            NY            Construction and                   $836,000
                              rehabilitation of East and
                              West John Streets in the
                              Village of Lindenhurst, NY
877            NY            Construct Northern State         $4,800,000
                              Parkway and Long Island
                              Expressway access at
                              Marcus Avenue and
                              Lakeville Road and
                              associated Park and Ride..
878            PA            Deployment of an                 $3,200,000
                              Intelligent Transportation
                              System along I-476 PA
                              Turnpike NE Ext/PA 309 and
                              I-76 Schuylkill Exprway in
                              Montgomery County.........
879            NY            Install Improvements for           $250,000
                              Pedestrian Safety
                              including in the vicinity
                              of PS Q153................
880            TX            Build 36th Street Extension      $1,680,000
                              in San Antonio............
881            CA            North Atlantic Pedestrian          $480,000
                              Bridge, Monterey Park.....
882            CA            Reconstruct Eastern Ave.           $800,000
                              from Muller St. to Watcher
                              St. in Bell Gardens.......
883            PA            Design, engineering, ROW           $160,000
                              acquisition, and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking, and
                              roadway redesign in West
                              Pittston, Luzerne County..
884            CA            Design Traffic Flow              $1,000,000
                              Improvements Azusa and
                              Amar, City of West Covina.
885            MI            Reconstruction of Nine Mile        $896,000
                              Road in Eastpointe........
886            WA            Redmond, WA City-wide ITS..        $800,000
887            IL            Reconstruction and               $1,664,000
                              realignment of Baseline
                              Rd., Montgomery, IL.......
888            NY            Transportation Enhancements        $240,000
                              to support development of
                              Erie Canal in Orleans
                              County, NY................
889            CO            U.S. 160, East of Wolf          $12,000,000
                              Creek Pass................
890            MA            Design, engineering, and         $2,200,000
                              construction at I-93 The
                              Junction Interchange,
                              Andover, Tewksbury and
                              Wilmington................
891            CA            Rosemead Boulevard/Highway          $80,000
                              19 Renovation Project,
                              Pico Rivera...............
892            PA            Intersection improvements          $600,000
                              at PA Route 209 and Water
                              Company Road, construction
                              of a bridge and access
                              enhancements to Nature and
                              Arts Center, Upper Paxton
                              Township..................
893            TX            Improvements to FM 1979 in         $240,000
                              Caldwell County...........
894            HI            Interstate Route H 1 guard       $3,040,000
                              rail and shoulder
                              improvements, Waikele
                              Bridge to Airport
                              Interchange, Honolulu.....
895            MI            M-168 Reconstruction in the      $1,760,000
                              village of Elberta........
896            CA            Colima Road at Fullerton           $800,000
                              Road Intersection
                              Improvements..............
897            OH            Design and construct             $2,100,000
                              Youngstown State
                              University Roadway and
                              Pedestrian Safety
                              Improvements, Youngstown..
898            MO            Reconstruct Interstate 44        $4,000,000
                              and Highway 39 Interchange
899            WA            Complete final Columbia            $640,000
                              River crossing
                              Environmental Impact
                              Statement for SR 35 in
                              Klickitat County..........
900            KY            Reconstruct U.S. 127 at            $480,000
                              Bellows Road, Mercer
                              County....................
901            NY            Roadway and Pedestrian           $3,200,000
                              Improvements for Times and
                              Duffy Squares in New York
                              City......................
902            FL            Six lane expansion of State      $3,200,000
                              Road 200 (A1A) from
                              Interstate 95 east to
                              Amelia Island.............
903            MI            Widen and reconstruct           $10,800,000
                              Tienken Road in Rochester
                              Hills from Livernois to
                              Sheldon...................
904            NV            Design and Construct I-580       $1,600,000
                              Meadowood Complex
                              Improvements, Washoe
                              County....................
905            NY            Town of Chester                    $160,000
                              reconstruction of 13
                              independent town roads....
906            NY            Implement ITS system and           $100,000
                              apparatus to enhance
                              citywide truck route
                              system at 9th Street and
                              3rd Avenue intersection in
                              Kings County..............
907            TX            Construction of highway            $800,000
                              infrastructure to provide
                              flood protection for
                              Nueces County.............
908            FL            Widen State Road 80, Hendry      $2,800,000
                              County....................
909            NE            Construction of the              $3,600,000
                              Columbus, Nebraska North
                              Arterial Road.............
910            KY            Extension of Newtown Pike       $16,000,000
                              from West Main Street to
                              South Limestone Street,
                              Lexington.................
911            OH            Road construction and              $400,000
                              related improvements in
                              the Village of Gates
                              Mills, OH.................
912            IL            Widening and Reconstruction      $1,200,000
                              of 55th Street from Holmes
                              Avenue to Williams Street
                              in Westmont and Clarendon
                              Hills.....................
913            IL            Road upgrades for the              $707,200
                              Village of Oreana, IL.....
914            ID            Widen Amity Road from            $1,600,000
                              Chestnut Street to
                              Robinson Road in Nampa,
                              Idaho.....................
915            TX            Widening FM 60 (University       $2,400,000
                              Drive) from SH 6 to FM
                              158, College Station......
916            GA            Widening Cedarcrest Road         $2,520,000
                              from Paulding County line
                              to Governors Towne........
917            CA            Widening Avenue 416 in           $1,200,000
                              Dinuba California.........
918            MA            Infrastructure Improvements        $600,000
                              in the Gardner-Kilby-
                              Hammond Area, Worcester...
919            TX            Extend Munn Street from            $800,000
                              Demaree Ln. to Gellhorn
                              Drive.....................
920            MN            City of Moorhead SE Main         $2,400,000
                              GSI, 34th St. and I-94
                              Interchange and Moorhead
                              Comprehensive Rail Safety
                              Program...................
921            AL            Widening and safety              $1,813,333
                              improvements to SR 216
                              between SR 215 and I-59, I-
                              20........................
922            GA            The Carrollton Greenbelt           $280,000
                              Project, City of
                              Carrollton, Georgia.......
923            IL            Improve safety of culvert          $256,000
                              replacement on 250th Rd.
                              between 460th St. and
                              County Hwy 20 in Grandview
                              Township, Edgar County, IL
924            NY            Kingston, Improve uptown         $1,040,000
                              streets...................
925            PA            Replace Blair Creek Bridge       $1,280,000
                              over the Little Lehigh
                              Creek, just west of the
                              Maple Grove Bridge, in
                              Longswamp Township, Berks
                              County....................
926            CA            Construct highway                $7,600,000
                              connecting State Route 78/
                              86 and State Route 111,
                              Brawley...................
927            GA            Widening and improvements          $800,000
                              on Colerain Road in St.
                              Marys, Georgia............
928            MD            Implement Pedestrian and         $1,600,000
                              Roadway Improvements
                              Contained in the Druid
                              Hill Park Neighborhood
                              Access Program in
                              Baltimore.................
929            AZ            Kabba Wash project between       $1,600,000
                              I-40 and Wikieup..........
930            ME            Route 2 Improvements from        $1,000,000
                              Bethel to Gilead..........
931            FL            Widening and Improvements       $21,600,000
                              for I-75 in Collier and
                              Lee County................
932            TX            Widening 349 Dawson and          $1,600,000
                              Martin County.............
933            WI            Widen Wisconsin State            $3,200,000
                              Highway 64 between Houlton
                              and New Richmond..........
934            IN            Widen Wheeling Avenue from         $768,000
                              Centennial to McGalliard
                              Road in the City of
                              Muncie, Indiana...........
935            MN            Construct a bike trail             $540,000
                              along the north side of TH
                              11 to the Voyageurs
                              National Park Visitor
                              Center on Black Bay of
                              Rainy Lake................
936            FL            Construct pedestrian             $1,280,000
                              underpass and safety
                              improvements at SR A1A and
                              Castillo Drive, City of
                              St. Augustine.............
937            CA            Rehabilitate street                 $99,200
                              surfaces in Sherman Oaks..
938            CA            Repair and realignment of          $240,000
                              Brahma Drive and Winnetka
                              Ave.......................
939            NJ            Riverwalk in Millburn along        $600,000
                              the West Branch of the
                              Rahway River..............
940            AL            I-20 widening and safety         $4,000,000
                              improvements in St. Clair
                              County....................
941            TN            Plan and construct                 $400,000
                              Rutherford County
                              visitor's center/
                              Transportation information
                              hub.......................
942            UT            Streetscape a 2-lane road        $1,050,000
                              and add turning lanes at
                              key intersections on Santa
                              Clara Drive in Santa Clara
943            CA            U.S. 101 Operational             $4,000,000
                              Improvements, San Jose....
944            IL            Upgrade traffic signal             $400,000
                              system on 87th Street,
                              Chicago...................
945            LA            Water Well Road Gateway          $4,520,000
                              Corridor (LA 478)--Design,
                              right-of-way, and
                              Construction of 3.6 miles
                              from I-49 to LA 1.........
946            CO            East 104th and U.S. 85             $664,000
                              Intersection: Study,
                              design, and construction
                              of needed improvements to
                              intersection..............
947            FL            Widen West Virginia Drive        $2,400,000
                              from Floresta Drive to
                              U.S. 1 in St. Lucie.......
948            ID            Widen U.S. 95 in Idaho from      $2,400,000
                              Jct. SH 1 to Canadian
                              Border....................
949            IL            Engineering of the Willow          $160,000
                              Creek Trail Extension from
                              Rock Cut State Park to the
                              Long Prairie Trail........
950            CA            Widen Interstate 8 overpass      $1,698,000
                              at Dogwood Road, Imperial
                              County....................
951            CA            Improve bridge 58-7 on SR          $800,000
                              115 that crosses the Alamo
                              River in Holtville and
                              also project design and
                              environmental analysis of
                              a new bridge over the same
                              river.....................
952            ID            Widen U.S. 95 from Worley        $2,400,000
                              to Mica Creek, Idaho......
953            MI            Complete the 2 segments of       $4,000,000
                              U.S. 127 from Ithaca to
                              St. Johns to a limited
                              access freeway............
954            CA            Construct a new interchange      $8,000,000
                              where I-15 meets Cajalco
                              Road in Corona, CA........
955            OH            Construct interchange at CR      $5,000,000
                              80 on IR 77 near Dover....
956            TX            Colonial Drive Project,          $1,200,000
                              Cleburne..................
957            NC            Widen and improve I-85           $6,400,000
                              through Cabarrus County
                              from U.S. 29/49 to 29/601.
958            NC            U.S. 401 from Raleigh to         $3,200,000
                              Fayetteville..............
959            GA            Construct and Improve            $3,200,000
                              Westside Parkway, Northern
                              Section, in Fulton County.
960            NY            City of Peeskill, NY Street        $104,000
                              Resurfacing Program,
                              Hudson Avenue.............
961            CA            Construction of CA 101           $1,800,000
                              Auxiliary Lanes, Marsh Rd.
                              to Santa Clara County Line
962            NY            For the acquisition of           $1,200,000
                              ferry boats and ferry
                              terminal facilities and
                              operation of ferry service
                              from Rockland County-
                              Yonkers-Manhattan.........
963            IL            For engineering, right-of-       $1,700,000
                              way acquisition and
                              reconstruction of two
                              existing lanes on Arsenal
                              Road from Baseline Rd. to
                              Rt. 53....................
964            PA            For the Scranton City            $2,000,000
                              Redevelopment Authority to
                              design, engineer, acquire
                              ROW and construct
                              streetscaping
                              enhancements, paving,
                              lighting and safety
                              improvements, parking, and
                              roadway redesign..........
965            FL            Construct landscaped             $1,228,833
                              sidewalks, bus lanes,
                              pedestrian/bicycle paths,
                              vehicular lanes, City of
                              Plantation................
966            NY            Improve Route 17--Access         $2,000,000
                              Control, Elmira to Chemung
967            PA            Design, engineering, ROW           $160,000
                              acquisition, and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking, and
                              roadway redesign in
                              Plymouth Borough, Luzerne
                              County....................
968            ID            Improve SH 75 from               $4,800,000
                              Timmerman to Ketchum......
969            OR            Improve U.S. 97 from Modoc       $1,600,000
                              Point to Algoma...........
970            SD            Construct an interchange on      $5,600,000
                              I-90 at Marion Road west
                              of Sioux Falls............
971            CA            Realign First St. between        $1,000,000
                              Mission Rd. and Clarence
                              St. in Los Angeles........
972            MO            Relocation of Route 13           $4,160,000
                              Branson West Bypass.......
973            IL            Resurfacing Congress               $400,000
                              Parkway The Illinois
                              Department of
                              Transportation............
974            RI            Establish interchange            $4,800,000
                              between Route 4 and
                              Interstate 95.............
975            TX            Improvements to FM 676 in          $400,000
                              Alton.....................
976            MA            Reconstruction of Goddard          $900,000
                              Memorial Drive from State
                              Route 9 to Airport Drive,
                              Worcester.................
977            FL            Homestead, FL Widening of        $2,000,000
                              SW 320 Street (Mowry
                              Drive) from Flagler Avenue
                              to SW 187 Avenue..........
978            CT            Broad Street Reconstruction      $2,000,000
                              Project in New Britain....
979            PA            Construct Johnsonburg            $3,520,000
                              Bypass....................
980            CT            Construct Valley Service         $1,600,000
                              Road Extension, North
                              Haven.....................
981            VA            Construction of                    $800,000
                              transportation related
                              enhancements and
                              infrastructure of the VMFA
                              project...................
982            MI            Reconstruct and Widen I-94      $12,800,000
                              in Kalamazoo, MI..........
983            MD            Land Acquisition for            $15,600,000
                              Highway Mitigation in
                              Cecil and Worcester
                              Counties, MD..............
984            CA            Construct overpass on              $600,000
                              Central Ave. at the
                              railroad crossing in
                              Newark....................
985            IL            City of Bartonville, Street        $762,058
                              widening and improvements
                              and sidewalk improvements.
986            OH            Construct Williamsburg,            $240,000
                              Ohio to Batavia, Ohio
                              Hike, and Bike Trail......
987            IL            The continuation of U.S.         $2,400,000
                              Route 12 from the
                              Wisconsin State line to
                              the intersection of Tryon
                              Grove Road, Route 12 and
                              Illinois State Route 31...
988            FL            U.S. 17-92 and French Ave.         $400,000
                              Roundabout, Sanford.......
989            PA            Design, engineering, ROW           $160,000
                              acquisition, and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking, and
                              roadway redesign in
                              Hanover Township, Luzerne
                              County....................
990            MI            Reduction from 3.5 miles of      $2,400,000
                              travel to 1.0 mile of
                              travel crossing over the
                              Tittabawassee River on
                              Meridian Road.............
991            ID            Widen U.S. 95 from Top of        $1,600,000
                              Lewiston Hill to Moscow,
                              Idaho.....................
992            TX            Construct a pedestrian/            $750,000
                              bicycle trail in the
                              Sunnyside area of Houston.
993            TX            Construct remaining 800-           $928,000
                              foot 4-lane divided
                              thoroughfare for Preston
                              Rd. segment between
                              Beltway 8 and Genoa Red
                              Bluff Rd..................
994            ............  ...........................              $0
995            SC            Medical University of South      $3,200,000
                              Carolina Roadway
                              Enhancement...............
996            PA            Acquisition of adjacent          $2,000,000
                              property to planned Park-n-
                              Ride at Kressler and
                              Hamilton Boulevards in
                              Wescosville, PA...........
997            MI            Livonia, reconstruct Stark         $800,000
                              Rd. between Plymouth Rd.
                              and I-96..................
998            PA            PA Route 309 roadway             $1,600,000
                              construction and
                              signalization improvements
                              in Tamaqua Borough........
999            MA            Union Square Roadway and           $400,000
                              Streetscape Improvements..
1000           TX            Improvements to South            $1,920,000
                              McColl Road in Hidalgo
                              County....................
1001           MS            Widen U.S. Highway 61 and        $3,040,000
                              improve major
                              intersections, Natchez....
1002           TX            Widen U.S. 82 from 2-lane        $3,600,000
                              facility to 4-lane
                              facility from FM 1417 in
                              Sherman, TX to U.S. 69 in
                              Bells, TX.................
1003           TX            Widen U.S. 79, from FM 1512      $1,600,000
                              near Jewett to IH-45 to a
                              4-lane divided highway....
1004           TN            Construct shoulder and turn      $1,200,000
                              lane on SR 35 in Seymour,
                              Tennessee.................
1005           NE            Construction of Heartland        $6,000,000
                              Expressway between
                              Alliance and Minatare, NE.
1006           WA            Pedestrian Sidewalk                $140,000
                              Construction in Snohomish.
1007           TN            North Second Street              $1,600,000
                              Corridor Upgrade, Memphis.
1008           OH            Purchase High Speed Ferries        $600,000
                              for Black River Excursion
                              Boat Service, Lorain......
1009           MD            MD4 at Suitland Parkway....      $3,200,000
1010           OK            Widen U.S. 60 from               $1,600,000
                              approximately 2 miles east
                              of the U.S. 60/US 75
                              interchange east
                              approximately 5.5 miles...
1011           NC            Widen U.S. 401 from Wake         $2,400,000
                              County to Louisburg.......
1012           PA            CUPSS, Pennsylvania, Urban       $4,000,000
                              Maglev Demonstration Test
                              Project...................
1013           TX            Widen U.S. 287 Bypass at         $6,400,000
                              Ennis from two to four
                              lanes.....................
1014           KY            Widen U.S. 27 from KY 34 to      $1,600,000
                              U.S. 150 Bypass, Garrard
                              County and Lincoln County.
1015           MN            Right-of-way acquisition           $800,000
                              for Mississippi River
                              Bridge connecting I-94 and
                              U.S. 10 between U.S. 169
                              and TH 101................
1016           WI            Rehabilitate Highway 53          $3,200,000
                              between Chippewa Falls and
                              New Auburn................
1017           IL            Widen U.S. Route 67 from         $1,600,000
                              Macomb to Illinois 101....
1018           IL            Widen U.S. Route 51 from         $2,400,000
                              Pana to Vandalia..........
1019           IL            Widen U.S. Route 34 from         $3,200,000
                              U.S. 67 to Carmen Road....
1020           WA            Alaskan Way Viaduct and         $11,200,000
                              Seawall...................
1021           NJ            East Coast Greenway bicycle        $800,000
                              and pedestrian path from
                              New Brunswick to Hudson
                              River.....................
1022           FL            Construct bicycle and            $1,200,000
                              pedestrian underpass and
                              park under I-95, Miami....
1023           CA            Implement Van Nuys Road and        $400,000
                              Safety Improvements.......
1024           FL            New systems interchange          $6,400,000
                              ramps at SR 417 and Boggy
                              Creek Road in Orange
                              County, FL................
1025           NY            Reconstruction of Tappan           $800,000
                              Street Bridge in Town of
                              Newark Valley.............
1026           IL            Widen Rakow Road from            $5,720,000
                              Ackman Road to IL Rt. 31
                              in McHenry County,
                              Illinois..................
1027           IL            Widen U.S. Route 30 from           $400,000
                              Rock Falls to Round Grove,
                              Whiteside County..........
1028           TN            Bristol, Tennessee highway-         $40,000
                              RR grade crossing
                              improvement--Cedar Street.
1029           IL            Perform Broadway and             $1,200,000
                              Sheridan Road signal
                              interconnect project,
                              Chicago...................
1030           IL            Widen U.S. Highway 30 in           $800,000
                              Whiteside County, Illinois
1031           WI            Rehabilitate existing            $5,600,000
                              bridge and construct new
                              bridge on Michigan Street
                              in Sturgeon Bay, Wisconsin
1032           ME            Replacement of the Route         $3,000,000
                              201-A ``covered'' bridge,
                              Norridgewock..............
1033           AR            Widen to four lanes,             $5,000,000
                              improvement, and other
                              development to U.S.
                              Highway 167 from LA State
                              line north to I-530.......
1034           PA            Widen the Route 412              $8,000,000
                              corridor from I-78 into
                              the City of Bethlehem.....
1035           HI            Construct access road for          $800,000
                              Kahului Airport...........
1036           IL            Improve Highway-Railroad           $600,000
                              Crossings, Galesburg......
1037           MN            Sauk Rapids Bridge and           $4,800,000
                              Roadway Replacement in
                              Sauk Rapids, MN...........
1038           TN            Construct Transportation           $800,000
                              and Heritage Museum in
                              Townsend, Tennessee.......
1039           CA            Widen State Route 98,            $2,400,000
                              including storm drain
                              developments, from Kloke
                              Road to State Route 111,
                              Calexico..................
1040           CA            Widen State Route 98 from        $4,000,000
                              Route 111 to State Route
                              7, Calexico...............
1041           GA            Construction of bypass           $1,600,000
                              around town of Hiram, from
                              SR 92 to U.S. 278,
                              Paulding County, Georgia..
1042           TX            Construction of the              $2,000,000
                              interchanges at BI20 and
                              IH20 for JBS Parkway......
1043           CA            Widen State Route 46            $33,461,000
                              between Airport Road and
                              the Shandon Rest Stop in
                              San Luis Obispo County....
1044           TN            Widen State Route 4 (U.S.          $800,000
                              78) from Mississippi State
                              Line to Getwell Road (SR
                              176) in Memphis, Shelby
                              County....................
1045           MI            Baraga County,                     $600,000
                              Reconstruction of county
                              primary road on Bayshore
                              Drive from Haanpaa Road
                              northerly 1.7 miles to
                              Whirligig Road............
1046           NY            Town of Warwick, NY walking        $400,000
                              and biking trail..........
1047           AK            Bridge over Fish Creek in        $1,000,000
                              Matanuska-Susitna Borough.
1048           GA            GA 400 and McGinnis Ferry        $2,400,000
                              Road Interchange, Forsyth
                              County, GA................
1049           NY            Implement Improvements for         $600,000
                              Pedestrian Safety in Kings
                              County....................
1050           NY            Reconfigure road through           $316,000
                              FDR VA Hospital to provide
                              access to Battery Place in
                              Town of Cortlandt.........
1051           CA            Widen State Route 262,           $3,200,000
                              replace two railroad
                              overpass structures, and
                              rebuild on and off ramps
                              between SR 262 and Kato
                              Rd. in Fremont............
1052           TN            Widen State Route 101 in         $6,400,000
                              Cumberland County from two
                              lane highway to five lanes
                              between State Routes 282
                              (Dunbar Road) and 392 in
                              Crossville................
1053           FL            Widen State Road 50 in Lake      $5,600,000
                              County, Florida...........
1054           AZ            Construct a passing lane         $1,600,000
                              between the north end of
                              Lake Havasu City to I-40..
1055           GA            Widen SR 85 from SR 74 to        $2,400,000
                              County Route 126 Bernhard
                              Road, Fayette County,
                              Georgia...................
1056           CT            Construct New arterial           $8,000,000
                              roadway from Barnum Avenue
                              north to proposed Lake
                              Success Business Park in
                              Bridgeport, CT............
1057           MI            M-13 Washington Avenue           $1,200,000
                              Streetscape Project. Phase
                              II of High Priority
                              Project 192 in Public Law
                              105-550, City of Saginaw..
1058           TX            Improvements to FM 716 in          $800,000
                              Duval County..............
1059           NY            Town of Chester Surrey             $240,000
                              Meadow subdivision road
                              improvements..............
1060           PA            Cresheim Valley Drive              $880,000
                              Revitalization project
                              involving scenic
                              enhancements and
                              pedestrian safety
                              improvements from Lincoln
                              Drive to Navajo Street....
1061           NC            Transportation Improvements      $2,400,000
                              at Piedmont Triad Research
                              Park, Winston-Salem, NC...
1062           MO            Upgrade and partially            $2,880,000
                              relocate MO Rt. 141 from I-
                              64 to Rt. 340.............
1063           NY            Construct Millennium             $8,400,000
                              Parkway in the Towns of
                              Dunkirk and Sheridan......
1064           AZ            Construct the Rio Salado         $6,400,000
                              Parkway to connect I-10
                              and Loop 202 freeways to
                              7th Street in downtown
                              Phoenix...................
1065           TN            Improving Vehicle                   $83,200
                              Efficiencies at At-Grade
                              highway-Railroad Crossing
                              in Lenoir City, TN........
1066           NJ            Replacement of Monmouth          $2,400,000
                              County bridges W-7, W-8,
                              and W-9...................
1067           OK            U.S. 54, Widen U.S. 54 from        $800,000
                              North of Optima Northeast
                              to Kansas State Line,
                              Texas County, OK..........
1068           FL            Widen Palm Coast Parkway         $2,320,000
                              and I-95 interchange and
                              overpass, Flagler County,
                              Florida...................
1069           FL            Delray Beach Federal             $1,600,000
                              Highway pedestrian
                              improvements SE 4th Street
                              to NE 4th Street..........
1070           WI            Expand Highway 10 between       $16,000,000
                              Marshfield and Stevens
                              Point.....................
1071           NY            Install Improvements for           $250,000
                              Pedestrian Safety
                              including in the vicinity
                              of IS R72/PS R69..........
1072           TN            Upgrade roads for Slack          $1,500,000
                              Water Port facility and
                              industrial park Lake
                              County....................
1073           AK            Emergency evacuation road        $3,000,000
                              at Point Hope in North
                              Slope Borough.............
1074           MI            Construct railroad grade         $1,600,000
                              separation on M-85 (Fort
                              Street) North of Van Horn
                              Road, Trenton.............
1075           IL            Land acquisition,                $4,000,000
                              engineering, and
                              construction for the
                              initial 2-lane segments of
                              the Corridor between IL 31
                              to IL 25 and other
                              segments of the Corridor
                              as appropriate............
1076           PA            Modernize traffic signals,         $384,000
                              complete minor roadway
                              realignment, and improve
                              channelization at U.S. 322
                              and PA 10 intersection....
1077           KS            Construction of a 4-lane         $8,548,800
                              access controlled
                              improvement for 4 miles on
                              US 54/400 in Pratt County.
1078           IN            Upgrade rail crossing at           $160,000
                              93rd Avenue, St. John.....
1079           FL            Widen SR 710 by 2 lanes          $2,400,000
                              from Congress Avenue to
                              U.S. 1....................
1080           GA            Widen SR 234/Gillionville          $800,000
                              Road from Eight Mile Road
                              to Lockett Station,
                              Dougherty County..........
1081           CA            Widen SR 12 to four lanes        $6,400,000
                              through Jamieson Canyon
                              (between I-80 and SR 29)
                              for safety concerns and
                              economic growth...........
1082           GA            Widen SR 104 from SR 383/        $3,200,000
                              Belaire Road to CR 515/
                              Cumberland Drive
                              (including bridges) in
                              Columbia County...........
1083           IN            Study Traffic on Muncie By-         $96,000
                              Pass from Centennial
                              Avenue to McGalliard Road
                              in the City of Muncie and
                              Delaware County, Indiana..
1084           FL            Construct U.S. 17-92             $1,200,000
                              improvements, Maitland,
                              Florida...................
1085           CA            Widen South Main St.-Soda        $3,200,000
                              Bay Rd. between CR 400A
                              (mile marker 0.0-mile
                              marker 0.7) and CR 502
                              (mile marker 0.0 and 0.9).
1086           VA            Replacement of the 635             $400,000
                              Bridge in Orange County,
                              VA........................
1087           TX            Construct Loop 20 in Laredo      $1,600,000
1088           IA            Construct SE Connector/          $7,200,000
                              Martin Luther King, Jr.,
                              Pkwy, Des Moines..........
1089           FL            Construction and Design of       $1,600,000
                              Miami River Greenway Road
                              Improvements and 5th
                              Street Improvements.......
1090           TX            Widen SH 317 from two lanes      $1,600,000
                              to four lane divided
                              facility..................
1091           TX            Widen SH 205 from two lanes        $800,000
                              to a six lane urban
                              divided highway from North
                              of SH 66 to proposed SH
                              276.......................
1092           CA            Widen Santa Maria River          $2,720,000
                              Bridge on U.S. Highway 101
                              between Santa Barbara
                              County and San Luis Obispo
                              County....................
1093           CA            Widen San Fernando Road            $848,000
                              North, including
                              streetscape projects,
                              Sylmar....................
1094           PA            Central Susquehanna Valley       $4,880,000
                              Transportation Project
                              U.S. 15: $5 million for
                              the final design..........
1095           NJ            Construct Rt. 49 Cohansey        $2,400,000
                              River Bridge Replacement,
                              Cumberland County.........
1096           ME            Construction and snowmobile      $4,000,000
                              safety accommodations for
                              Route 116 Bridge, Medway..
1097           MI            Construct pedestrian trail          $80,000
                              and bridge in Kearsley
                              Park in Flint.............
1098           IA            Coralville, IA                   $1,600,000
                              Implementation of final
                              phase of Safety
                              Improvements Project from
                              12th Ave. to 22nd Ave.....
1099           IL            Expand and improve Illinois      $5,720,000
                              Route 47 Roadway from Reed
                              Road to Kreutzer Road in
                              Huntley, Illinois.........
1100           NY            Build Route 15,                 $20,000,000
                              Pennsylvania to Presho....
1101           GA            I-285 Riverside interchange      $1,600,000
                              reconstruction, Fulton
                              County, Georgia...........
1102           MN            Construct 3 segments of          $1,200,000
                              Cuyuna Lakes Trails, Crow
                              Wing County...............
1103           WA            Improve I-5 interchange at      $10,772,000
                              134th Street in Clark
                              County....................
1104           GA            Construct Pedestrian Safety      $2,400,000
                              Improvements on Buford Hwy
                              (SR 13), Dekalb County....
1105           DC            11th St. Bridges,               $17,600,000
                              Rehabilitation of
                              structures as well as new
                              ramps to provide for
                              traffic at Navy Yard,
                              Southeast Federal Ctr.,
                              and Gateway Government Ctr
1106           MO            Improve U.S. 36 to divided       $8,000,000
                              four lane expressway from
                              Macon to Route 24.........
1107           VA            Mill Road Slip Ramp........        $400,000
1108           NY            Construct sidewalks and            $300,000
                              curbing on Tate Avenue in
                              Village of Buchanan.......
1109           MI            Delta County, Widen,               $589,920
                              pulverize, improve
                              drainage at County Rd. 497
                              from U.S. 2 at Nahma
                              Junction southerly 4.75
                              miles to the village of
                              Nahma.....................
1110           UT            Construction of 200 North        $3,200,000
                              Street highway-rail graded
                              crossing separation,
                              Kaysville, Utah...........
1111           FL            Kennedy Blvd.                    $1,600,000
                              Reconstruction, Eatonville
1112           VA            Improvements to public           $2,400,000
                              roadways within the campus
                              boundaries of the Virginia
                              Biotechnology Park,
                              Richmond, VA..............
1113           VA            Install Transpiration               $94,720
                              Critical Incident Mobile
                              Data Collection Device in
                              Charlottesville...........
1114           NY            Ithaca, Design and                 $435,200
                              construct pedestrian and
                              bicycle path..............
1115           AZ            Navajo Mountain Road on the      $1,000,000
                              Navajo Nation.............
1116           PA            Expansion of existing PA         $3,280,000
                              Turnpike ITS System.......
1117           TX            Construction of ferryboat          $320,000
                              for City of Port Aransas..
1118           NY            Project will rehabilitate        $4,000,000
                              and reopen historic High
                              Bridge, which crosses the
                              Harlem River between
                              Manhattan and the Bronx...
1119           NJ            Route 17 Congestion              $9,600,000
                              Improvements and Widening,
                              from Williams Avenue to
                              the Garden State Parkway
                              and Route 4 in Bergen
                              County....................
1120           IN            Design and construct Tanner        $992,000
                              Creek Bridge on U.S. 50,
                              Dearborn County Indiana...
1121           NC            Environmental studies and        $4,800,000
                              construction of U.S. 74
                              Monroe Bypass Extension...
1122           OH            Construct Pedestrian Bridge      $1,712,000
                              from east of Dock 32 to
                              Voinovich Park southwest
                              corner, Cleveland.........
1123           GA            Extension of Sugarloaf           $2,400,000
                              Parkway, Gwinnett County..
1124           ME            Construct bicycle and            $1,000,000
                              pedestrian bridge over
                              Stillwater River, Orono...
1125           IL            For widening from two to           $800,000
                              four lanes, the Brookmont
                              Boulevard Viaduct in
                              Kankakee, IL and adjusting
                              approach grades...........
1126           GA            I-285 SR 400 interchange           $800,000
                              reconstruction and HOV
                              interchange, Fulton
                              County, Georgia...........
1127           MN            Construct a road between           $240,000
                              Highway 332 and TH 11
                              including a signalized
                              rail road crossing,
                              Koochiching County........
1128           MO            Hanley Road from I-64 to         $8,000,000
                              south of State Route 100,
                              St. Louis County..........
1129           AL            Expand SR 167 from Troy, AL      $2,400,000
                              to Enterprise, AL.........
1130           MN            Construction of primary and      $3,400,000
                              secondary access roadways
                              to the Duluth Air National
                              Guard Base, City of Duluth
1131           CT            Construct high-speed rail        $3,440,000
                              crossing to bike and
                              pedestrian trails-Enfield,
                              CT........................
1132           TX            Expansion of Port Rd. at         $9,552,000
                              Northbound Frontage Rd. of
                              SH 146 east to
                              intersection with Cruise
                              Terminal Rd. to 6-lane
                              section with raised median
1133           TN            Constuct Western Bypass          $2,720,000
                              from Zinc Plant Road to
                              Dotsonville Road,
                              Montgomery County.........
1134           CA            Improvements to State Route      $4,000,000
                              67/State Route 52
                              interchange...............
1135           TN            Plan and construct a               $200,000
                              bicycle and pedestrian
                              trail, Springfield........
1136           TX            Expansion of Daniel McCall       $2,200,000
                              Dr., Lufkin, TX...........
1137           NY            Rehabilitate the Pines           $2,212,000
                              Bridge Road and Lake
                              Avenue and Ryder Road, in
                              Ossining, York-town, and
                              New Castle................
1138           CA            Construct Valley Boulevard         $600,000
                              Drainage Improvements, El
                              Monte.....................
1139           NJ            Route 82 Union County              $800,000
                              Streetscape and
                              Intersection Improvements.
1140           NY            Short Clove Road Rail              $800,000
                              Overpass, Haverstraw......
1141           FL            Construct Atlantic                 $800,000
                              Boulevard Improvements,
                              Key West, Florida.........
1142           CA            Implement intelligent            $2,400,000
                              management and logistics
                              measures to improve
                              freight movement, Gateway
                              Cities....................
1143           WI            Expand U.S. 45 between CTH       $4,000,000
                              G and Winchester,
                              Winnebago County, WI......
1144           NY            Implement ITS system and           $100,000
                              apparatus to enhance
                              citywide truck route
                              system on LIE Eastbound
                              Service Road at 74th
                              Street to Caldwell Ave,
                              Grand Ave. from 69th
                              Street to Flushing Ave,
                              and Eliot Ave. from 69th
                              Street to Woodhaven Blvd..
1145           IA            Construct IA-32 Arterial        $15,200,000
                              from U.S. 20 in Dubuque
                              Co, IA to U.S. 61 and U.S.
                              151.......................
1146           HI            Kapolei Transportation             $800,000
                              Improvements, Island of
                              Oahu......................
1147           NY            125th Street Corridor           $11,200,000
                              Improvements from Old
                              Broadway to Marginal
                              Street/Waterfront, New
                              York City.................
1148           CA            Los Angeles Regional Diesel        $400,000
                              Emissions Reduction
                              Program For Engine
                              Retrofit, Gateway Cities..
1149           IL            Reconstruct intersection of     $11,440,000
                              Wood Dale and Irving Park
                              roads in DuPage County, IL
1150           GA            Social Circle bypass             $2,400,000
                              completion, from Stanford
                              Road to SR 11, Social
                              Circle....................
1151           GA            Streetscape Project to             $500,000
                              install sidewalks and
                              bicycle trails, Gray......
1152           MO            Reconstruction of the            $5,600,000
                              Tucker Street Bridge in
                              the City of St. Louis.....
1153           PA            Bethlehem Pike improvements        $800,000
                              from Valley Green Road to
                              South of Gordon Lane,
                              Springfield Township......
1154           GA            Construct I-75 I-575 HOV           $480,000
                              interchange, Cobb County,
                              Georgia...................
1155           IL            Construct multi-use                $200,000
                              pedestrian path between
                              Oakton St. and Dempster
                              St., Skokie...............
1156           AZ            Construct link from Twin         $4,800,000
                              Peaks Road to I-10 and
                              Linda Vista Blvd.
                              including bridge over
                              Santa Cruz River and
                              overpass of Union Pacific
                              Rail Road.................
1157           PA            Design, engineering, ROW           $160,000
                              acquisition and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in
                              Newport Township, Luzerne
                              County....................
1158           VA            Fries Train Station and            $800,000
                              Trail--Restoration of
                              former train station for
                              use as visitors center and
                              construction of trail
                              along New River...........
1159           PA            Construction SR 3024,              $560,000
                              Middle Creek Bridge II,
                              South Canaan, Wayne County
1160           WI            Expand U.S. 141 between SH       $1,600,000
                              22 and SH 64 (Oconto and
                              Marinette Counties,
                              Wisconsin)................
1161           IL            Development of a                 $2,560,000
                              coordinated trail system,
                              parking and trial systems
                              in Dixon, IL..............
1162           PA            Installation of                    $720,000
                              comprehensive signage
                              system across 1700 acres
                              of urban parks in
                              Pittsburgh................
1163           GA            Interstate 75/Windy Hill         $1,600,000
                              Road Interchange..........
1164           NJ            Bridge replacement and SR          $800,000
                              31 widening over the
                              Raritan Valley Line in
                              Glen Gardner, Hampton,
                              Hunterdon County..........
1165           VA            Bristol Train Station--            $400,000
                              Historic preservation and
                              rehabilitation of former
                              Bristol, VA train station.
1166           CO            I-25 Improvements--Douglas--     $4,800,000
                              Arapahoe County Line to El
                              Paso County Line..........
1167           TN            Reconstruct connection with        $400,000
                              Hermitage Avenue to
                              Cumberland River Bluff in
                              Nashville.................
1168           IL            For Village of Lemont to            $80,000
                              construct a bridge over
                              Chicago Ship and Sanitary
                              Canal linking Centennial
                              Trail to I&M Canal Trail..
1169           OH            Construct roadway                  $100,000
                              improvement along State
                              Route 62 in Berlin........
1170           NY            Reconstruction and               $1,600,000
                              improvements of University
                              Avenue and the extension
                              of the ARTWalk project,
                              Rochester.................
1171           NH            Reconstruction and               $1,600,000
                              Improvements to NH Route
                              110 in Berlin.............
1172           PA            Route 6 Resurfacing from         $1,200,000
                              Mansfield Borough in
                              Richmond Township to the
                              Village of Mainesburg in
                              Sullivan Township.........
1173           WA            SR 167--Right-of-way             $2,000,000
                              acquisition for a new
                              freeway connecting SR 509
                              to SR 161.................
1174           MD            I-70: Frederick............      $1,600,000
1175           NY            Planning, Design, ROW and        $5,200,000
                              Construction of Fort Drum
                              Connector Road............
1176           CA            Study and construct highway      $3,200,000
                              alternatives between
                              Orange and Riverside
                              Counties, directed by the
                              Riverside Orange Corridor
                              Authority working with
                              local government agencies,
                              local transp. authorities,
                              and guided by the current
                              MIS.......................
1177           CA            Fresno County, CA Widen          $1,200,000
                              Friant Road to four lanes
                              with class II bicycle
                              lanes.....................
1178           MO            Study for Highway 160 and        $1,600,000
                              Kansas Expressway Corridor
1179           FL            Construct Route 9B from          $4,000,000
                              U.S. 1 to Route 9A (I-295)
                              to the Duval County line..
1180           PA            Design, const. widening of       $2,400,000
                              PA 94 from York-Adams
                              County line to Elm Street
                              in Hanover, PA............
1181           CA            Improvement of intersection        $128,000
                              at Burbank Blvd. and
                              Woodley Ave...............
1182           TX            Port of Beaumont Southside       $5,190,400
                              Intermodal Project........
1183           WA            Perform final interchange          $840,000
                              design and property
                              acquisition at Fleshman
                              Way where it crosses SR
                              129, that enhances safety
                              and passenger and freight
                              mobility and reduces
                              congestion................
1184           WA            Roosevelt Extension at           $3,200,000
                              Urban Avenue to Cameron
                              Way in Mount Vernon.......
1185           NJ            Hazel Street                     $3,200,000
                              reconstruction, Passaic
                              County....................
1186           FL            Improvements to Eller Drive        $800,000
                              including right-of-way
                              acquisition and
                              construction of return
                              loop connector............
1187           MO            Study Highway 37-60 Entire       $2,000,000
                              Corridor..................
1188           TX            The District-Tyler Outer         $5,184,000
                              Loop 49 Construction......
1189           PA            Tidal Schuylkill Riverfront      $1,344,000
                              project consists of an
                              eight mile bike and
                              pedestrian recreation
                              trail from Locust Street
                              to Historic Bar-tram's
                              Gardens...................
1190           NY            Town of Fishkill                    $19,600
                              reconstruct Maple Ave.....
1191           IL            For IDOT to expedite pre-        $2,800,000
                              construction and
                              construction to widen I-55
                              from Naperville Road south
                              to I-80...................
1192           UT            200 East Minor Arterial,           $720,000
                              Logan City, Utah..........
1193           NJ            Construct I-287, I-80,             $800,000
                              Route 202 Interchange.....
1194           NY            Design and construction of       $4,480,000
                              Fulton Street from Clinton
                              Avenue to Bedford Avenue
                              in Brooklyn, New York.....
1195           TX            Port of Corpus Christi Joe         $400,000
                              Fulton International Trade
                              Corridor for congestion
                              and safety enhancements...
1196           MO            Renovations and                    $640,000
                              Enhancements on the
                              Bicycle Pedestrian
                              Facility on the Old Chain
                              of Rocks Bridge spanning
                              the Mississippi River.....
1197           CT            Construct Shoreline              $1,600,000
                              Greenway Trail, Guilford,
                              Branford, East Haven......
1198           NJ            Transportation Improvements      $4,000,000
                              in Liberty Corridor.......
1199           OH            Construct SR 104 into a 4        $6,000,000
                              lane facility with a
                              turning lane in Ross
                              County....................
1200           MO            Construct 2 lanes on Hwy 45      $2,400,000
                              from Hwy 9 to Graden Road
                              in Platte County..........
1201           MS            Plan and Construct Highway       $2,400,000
                              45 Bypass in Columbus.....
1202           PA            Reconstruct Hwy and replace      $1,200,000
                              of bridge on U.S. 422
                              between the Berks County
                              Line and the Schuylkill
                              River in Montgomery and
                              Chester Counties..........
1203           FL            Construct SR 20 connection       $3,440,000
                              to SR 100 via CR 309-C,
                              Putnam County, Florida....
1204           OH            Road and related pedestrian         $80,000
                              improvements at SR 283 in
                              the Village of Grand
                              River, OH.................
1205           NY            Road infrastructure              $6,520,000
                              projects to improve
                              commercial access in the
                              Towns of Malta and
                              Stillwater and the Village
                              of Round Lake, Saratoga
                              County, New York..........
1206           NY            Replace structurally               $800,000
                              deficient bridge over the
                              Pocantico River, the
                              Village of Pleasantville..
1207           IL            Complete Heavy Truck Loop          $500,000
                              for DuQuoin Industrial
                              Park......................
1208           MD            Construction and                $12,000,000
                              dualization of U.S. 113...
1209           GA            Streetscape-Quitman........        $160,000
1210           NY            Town of New Windsor Toleman        $592,000
                              and Station Roads
                              Reconstruction and area
                              Improvements..............
1211           ............  ...........................              $0
1212           WA            Design and construct             $2,000,000
                              pedestrian land bridge
                              spanning SR 14............
1213           MI            Construction of Greenways          $239,200
                              in Pittsfield Charter
                              Township--2.5 miles to
                              existing Ann Arbor
                              Greenways, Pittsfield
                              Charter Township..........
1214           CA            Golden Gate National Parks       $5,000,000
                              Conservancy--Plan and
                              Implement Trails and
                              Bikeways Plan for the
                              Golden Gate National
                              Recreation Area and
                              Presidio..................
1215           NY            State of NY Village of             $600,000
                              Kiryas Joel sidewalk
                              project...................
1216           ............  ...........................              $0
1217           IL            Transportation Enhancement         $762,058
                              and road improvements
                              necessary for Downtown
                              Plaza improvements in
                              Jacksonville, IL..........
1218           CA            Upgrade and reconstruct I-       $2,000,000
                              580/Vasco Road
                              Interchange, City of
                              Livermore.................
1219           TX            Build Bike Trail at Chacon       $3,300,000
                              Creek in Laredo...........
1220           UT            3200 South Project, Nibley,        $800,000
                              Utah......................
1221           NJ            Expand Route 440--State          $4,000,000
                              Street Interchange in
                              Perth Amboy...............
1222           GA            Improvement and                    $800,000
                              construction of SR 40 from
                              east of St. Marys cutoff
                              at mile post 5.0, Charlton
                              County to County Route 61,
                              Camden County, Georgia....
1223           PA            Erie, PA Regional upgrades       $1,280,000
                              to urban-rural corridors..
1224           GA            Georgia Construct Three          $1,600,000
                              Greenway Trail Project,
                              Dekalb County.............
1225           FL            Cross Creek Boulevard            $1,440,000
                              Widening..................
1226           MD            Implement Intelligent            $1,120,000
                              Transportation System in
                              Baltimore.................
1227           OH            Construct an access road           $800,000
                              into the industrial park
                              near SR 209 and CR 345 in
                              Guernsey County...........
1228           CA            Improve the Rosecrans Ave.          $40,000
                              and Alondra Blvd. bridges
                              over the San Gabriel River
                              in Bellflower.............
1229           PA            Independence National            $3,600,000
                              Historic Park scenic
                              enhancement and pedestrian
                              walkways improvement
                              project in conjunction
                              with the park's Executive
                              Mansion Exhibit...........
1230           CA            Modesto, Riverbank and           $1,600,000
                              Oakdale, CA Improve SR 219
                              to 4-lanes................
1231           ME            Modifications to Exit 7/I-         $180,000
                              295 and to Franklin
                              Arterial, Portland........
1232           KY            Replace Bridge and                 $700,000
                              Approaches on Searcy
                              School Road over Beaver
                              Creek, Anderson County....
1233           NJ            Route 22 Sustainable             $2,400,000
                              Corridor Plan.............
1234           NY            Conduct studies, if              $4,000,000
                              necessary, and construct
                              the High Line Trail
                              Project, New York City....
1235           WA            Install dual left turn           $1,750,000
                              lanes and intersection
                              signal modifications at SR
                              432 and Columbia Blvd.....
1236           OK            Transportaion enhancements       $2,400,000
                              for Highway 19 from Ada to
                              Stratford.................
1237           CA            I-15/Base Line Road              $4,000,000
                              Interchange Project,
                              Rancho Cucamonga,
                              California................
1238           SC            Build Interchange at U.S.        $4,800,000
                              17 and Bowman Road in
                              Mount Pleasant, SC........
1239           CA            Complete Monterey Bay            $5,800,000
                              Sanctuary Scenic Trail
                              between Monterey and Santa
                              Cruz counties.............
1240           NY            Improve Hospital Road            $4,800,000
                              Bridge between CR 99 and
                              CR 101, Patchogue.........
1241           NV            Construct Martin Luther          $8,000,000
                              King, Jr., Blvd.--
                              Industrial Rd. Connector..
1242           MI            I-96 Beck, Wixom Road            $2,400,000
                              Interchange, design, ROW,
                              and construction..........
1243           IA            Muscatine, IA Construction         $400,000
                              of 4.2 mile multipurpose
                              trail from Musser Park to
                              Weggens Road..............
1244           GA            Historic preservation of a         $160,000
                              city bus station in
                              downtown Eastman..........
1245           TX            Construction of internal         $2,000,000
                              roads at Port of
                              Brownsville to make roads
                              safer with less wear and
                              tear......................
1246           NY            NYSDOT Route 55 turning            $400,000
                              lane at Gardner Hollow
                              Road......................
1247           TN            Plan and construct a                $80,000
                              bicycle and pedestrian
                              trail, Lewisburg..........
1248           TX            Reconstruct Danieldale Rd.       $1,600,000
                              from I-35E to Houston
                              School Rd. in Lancaster...
1249           CT            Relocation of Edmond Road        $1,600,000
                              in Newtown and
                              construction of additional
                              turning lanes at Rte 6 and
                              Commerce and Edmond Rds...
1250           OH            Construction of Interchange      $1,200,000
                              at State Route 8 and
                              Seasons Road, Stow, OH....
1251           NJ            North Avenue-Route 1                $60,000
                              Elizabeth Pedestrian and
                              Bicycle Project...........
1252           AL            Pedestrian Improvements for        $106,666
                              Morris, AL................
1253           NY            Preliminary design and           $7,360,000
                              environmental impact study
                              for a collector-
                              distributor road along I-
                              95 from Westchester Ave.
                              to Bartow Ave.............
1254           NJ            Replacement of Signals at          $392,000
                              the Intersections of
                              Centennial Ave. at Lincoln
                              Ave. and Walnut Ave. at
                              Lincoln Ave., Cranford, NJ
1255           KS            Replacement or                   $2,000,000
                              rehabilitation of the
                              Amelia Earhart U.S. 59
                              Bridge in Atchison County,
                              Kansas....................
1256           ............  ...........................              $0
1257           CA            Central Galt and State           $2,400,000
                              Route 99 Interchange and
                              Access Improvements.......
1258           OH            Construction of Roadways         $3,560,000
                              and transportation
                              improvements for downtown
                              Springfield, Ohio.........
1259           KY            Reconstruct KY 89 from             $600,000
                              Irvine Bypass to 2000 Feet
                              North of Estill County
                              High School, Estill County
1260           NY            Town of East Fishkill new          $640,000
                              construction Bypass road..
1261           CA            Establish new grade              $1,600,000
                              separation at Sunset Ave.
                              in Banning................
1262           CT            Construct and Widen                $800,000
                              Stamford Rail Underpass
                              and Road Realignment
                              Project...................
1263           TN            Hamblen County, Tennessee          $800,000
                              U.S. 11E (SR 34)
                              interchange improvements..
1264           IL            Implement ITS and                $3,200,000
                              congestion Mitigation
                              Project on I-294 and I-90.
1265           AZ            Design and construction of       $1,600,000
                              roadway improvements on
                              U.S. 60 from 67th Avenue
                              to McDowell...............
1266           TX            Hike and bike trail will           $800,000
                              tie into the Gellhorn
                              Drive project providing an
                              improved multimodal
                              transportation facility...
1267           OH            Jackson Township, Ohio--         $1,600,000
                              Hill and Dales Road
                              widening..................
1268           SC            Build 701 Connector              $4,000,000
                              (Southern Conway Bypass)
                              in SC.....................
1269           MN            Reconstruct I-694 White            $400,000
                              Bear Avenue (CSAH 65)
                              Interchange in White Bear
                              Lake......................
1270           WI            Replace 17th Street Lift         $6,000,000
                              Bridge, Two Rivers,
                              Wisconsin.................
1271           MA            Route 116 and Bay Road           $3,200,000
                              Intersection Improvements-
                              Amherst...................
1272           IL            Streetscape improvements on        $800,000
                              Blue Island from 19th-21st
                              St, Chicago...............
1273           TN            Construct and improve               $80,000
                              intersections in Niota,
                              Tennessee.................
1274           CA            Upgrade Bellflower                 $280,000
                              intersections at Alondra
                              Blvd. and at Rosecrans
                              Ave. in Bellflower........
1275           NJ            Construct Riverbank Park         $2,000,000
                              Bike Trail, Kearny........
1276           NC            Install ITS on U.S. 52 in          $320,000
                              Forsyth County............
1277           MD            Construction and                 $5,600,000
                              dualization of MD 404 in
                              Queen Anne, Talbot and
                              Caroline Counties.........
1278           NY            Land acquisition and               $740,000
                              improvements on Louisa
                              Street, Peekskill, NY.....
1279           IL            Upgrade connector road from      $1,920,000
                              IL Rt. I-255 to IL Rt. 3,
                              Sauget....................
1280           NJ            Reconstruction of Route 46/      $9,600,000
                              Route 3/Valley Rd/ Notch
                              Rd. Interchange...........
1281           MS            Upgrade roads in Attala            $800,000
                              County District 4 (Roads
                              4211 and 4204), Kosciusko,
                              Ward 3 (U.S. Highway 16),
                              and Ethel (U.S. Highway
                              12), Attala County........
1282           TX            Construction of streets in       $9,250,000
                              the White Heather area of
                              Houston...................
1283           MS            Upgrade roads in Canton            $320,000
                              (U.S. Highway 51, 22, 16,
                              and I-55), Madison County.
1284           IA            Reconstruction of the Neal       $2,880,000
                              Smith Trail, bicycle and
                              pedestrian, Polk Co.......
1285           CA            Rehabilitate pavement on           $400,000
                              Azusa Avenue and San
                              Gabriel Avenue in Azusa...
1286           CA            South Bay Cities COG             $1,600,000
                              Coastal Corridor
                              Transportation Initiative,
                              Phase 3, El Segundo.......
1287           MS            Upgrade roads in Terry,          $1,000,000
                              Edwards, Utica and Bolton,
                              Hinds County..............
1288           FL            U.S. 1 six laning from St.         $800,000
                              Lucie County line to south
                              of 4th St. in Indian River
                              County, FL................
1289           MD            Expand Route 29 in Howard        $5,440,000
                              County....................
1290           WA            Issaquah SE Bypass.........      $4,000,000
1291           ............  ...........................              $0
1292           MD            U.S. 220 MD 53 North South         $800,000
                              Corridor..................
1293           NJ            Improvements to Clove Road       $2,800,000
                              and Long Hill Road in
                              Little Falls and Upper
                              Mountain Ave. in Montclair
1294           HI            Study of East Hawaii               $160,000
                              Alternative Road, Island
                              of Hawaii.................
1295           FL            Town of Southwest Ranches        $1,600,000
                              Urban Interchange.........
1296           CA            Long Beach Intelligent           $2,400,000
                              Transportation System:
                              Integrate functioning
                              traffic management center
                              that includes the port,
                              transit, airport as well
                              as the city's police and
                              fire departments, Long
                              Beach.....................
1297           CA            Almaden Expressway               $2,800,000
                              Improvements between
                              Branham Lane and Blossom
                              Road, San Jose............
1298           AR            Construct and rehabilitate       $1,200,000
                              University of Arkansas
                              Technology Corridor
                              Enhancement Project.......
1299           CO            U.S. 550, New Mexico State       $4,800,000
                              Line to Durango...........
1300           TX            Construct bicycle and              $600,000
                              pedestrian trails in
                              Houston's historic Third
                              Ward......................
1301           NY            Village of Cold Spring Main        $200,000
                              St. sidewalk and lighting
                              improvements..............
1302           NY            Village of Goshen Hatfield         $200,000
                              Lane reconstruction.......
1303           SC            Plan and build Interstate        $8,000,000
                              73 from NC line to Myrtle
                              Beach, SC.................
1304           ............  ...........................              $0
1305           FL            Construct College Road             $400,000
                              Improvements, Key West,
                              Florida...................
1306           NY            West Harlem Waterfront-         $11,200,000
                              ferry, intermodal and
                              street improvements.......
1307           CA            Construct sound barriers at        $680,000
                              the I-805/SR 54
                              Interchange, National City
1308           NY            Road projects that develop       $1,000,000
                              Access to Port Byron and
                              Erie Canal................
1309           FL            West Palm Beach, Florida,          $800,000
                              Flagler Drive Re-
                              configuration.............
1310           AL            Construct extension of I-        $4,000,000
                              565 westward from existing
                              interchange to existing
                              Tennessee River bridges at
                              Decatur, AL...............
1311           CT            Construct Farmington Canal       $2,000,000
                              Greenway, City of New
                              Haven and Hamden..........
1312           GA            Replace sidewalks, upgrade         $320,000
                              lighting, and install
                              landscaping, Helena.......
1313           IA            Upgrade U.S. 30 Liberty          $7,600,000
                              Square in City of Clinton,
                              Iowa......................
1314           HI            Study of Waianae Coast             $400,000
                              Emergency Access Road.....
1315           NY            Westchester County, NY             $400,000
                              Rehabilitation of
                              Lexington Ave, Mount Kisco
1316           CA            Widen and Improve County         $1,600,000
                              Line Road in Calimesa.....
1317           OH            Construct turn lane,               $600,000
                              install traffic light, and
                              reorient traffic on SR 146
                              near Bussemer Lane in
                              Muskingum County..........
1318           RI            Restore and Expand Maritime        $800,000
                              Heritage site in Bristol..
1319           OH            City of Green, Ohio. Lauby       $1,200,000
                              Road exit improvements....
1320           NY            Construct Bicycle Path in          $520,000
                              Town of Bedford...........
1321           CA            Compton Arterial                 $3,200,000
                              Reconstruction and
                              Improvement Program,
                              Compton...................
1322           MT            Construction of S. 323 from      $9,600,000
                              Alzada to Ekalaka in
                              Carter County.............
1323           IL            Improve Great River Road,          $400,000
                              Mercer County.............
1324           FL            Normandy Blvd. and Cassat          $400,000
                              Ave. Transportation
                              Enhancements, Jacksonville
1325           OH            North Canton, OH Applegrove      $2,400,000
                              St. road widening.........
1326           MA            Design and Build Cape Cod        $3,200,000
                              Bike Trail, with Shining
                              Sea Bikeway, to link core
                              with outer Cape
                              communities and heavily
                              visited national sites....
1327           TN            Plan and construct N.              $400,000
                              Tennessee Boulevard
                              enhancements..............
1328           NJ            Quinn Road realignment,          $2,400,000
                              Clifton...................
1329           MO            Reconstruct Interstate 44       $13,040,000
                              and Highway 65 Interchange
1330           MN            Reconstruct TH 61 from           $9,664,000
                              Split Rock River to Silver
                              Bay including construction
                              of the Gitchi Gami Spur
                              Trail between the main
                              trail and Silver Bay
                              Marina along the TH 61
                              roadway segment...........
1331           KY            Reconstruction of KY 259 in      $1,200,000
                              Edmonson County from Green
                              River Bridge at
                              Brownsville to Kyrock
                              Elementary School.........
1332           LA            Construction of a turn lane        $400,000
                              expansion along with
                              signalization at the north
                              bound off ramp on I-49, at
                              the intersection of U.S.
                              190.......................
1333           AL            Expand SR 210 (Ross Clark        $3,200,000
                              Circle) from U.S. 231
                              North to U.S. 231 South in
                              Dothan, AL................
1334           MD            Construct interchange at MD      $1,600,000
                              Route 355 at Montrose and
                              Randolph Roads in
                              Montgomery County.........
1335           CA            Construct new interchange        $1,936,000
                              and related road
                              improvements on U.S. 101
                              near Airport Blvd.,
                              Salinas...................
1336           PA            Construct the French Creek       $4,000,000
                              Parkway in Phoenixville,
                              PA........................
1337           MN            Capacity and safety              $5,760,000
                              improvements to TH 8, west
                              of 306th St. to eastern
                              city limits, Lindstrom....
1338           VA            Eastern Seaboard Intermodal      $1,200,000
                              Transportation
                              Applications Center
                              (ESITAC) in Hampton Roads.
1339           IL            Construct underpass at           $4,400,000
                              intersection of Damen/
                              Fullerton/Elston Avenues,
                              Chicago...................
1340           AR            Highway 165: Railroad            $1,600,000
                              Overpass..................
1341           FL            Implement Snake Road (BIA          $800,000
                              Route 1281) Widening and
                              Improvements..............
1342           CA            Construction of new freeway      $4,000,000
                              between I-15 and U.S. 395,
                              including new interchange
                              at I-15...................
1343           OH            Lake Township, Ohio. Market      $1,760,000
                              Avenue-Lake Center
                              intersections improvement.
1344           CT            Construct Quinnipiac Linear        $800,000
                              Trail, Wallingford........
1345           MI            Construction of a hike and         $400,000
                              bike path from Riverbends
                              Park, 22 Mile Road, to
                              Stony Creek Park, 25 Mile
                              Road in Shelby Township...
1346           IN            Reconstruct Boston Street,         $600,000
                              from State Road 2 to Bach
                              St., Larson-Whirlpool St.
                              in LaPorte, Indiana.......
1347           OR            Improvements to Bandon-          $4,200,000
                              Charleston State Scenic
                              Tour on Randolph Road and
                              North Bank Lane...........
1348           VA            Conduct study of Route 460       $4,000,000
                              Corridor, Virginia........
1349           NJ            Construct Sparta Stanhope          $800,000
                              Road Bridge (AKA Bridge K-
                              07).......................
1350           KY            Reconstruct Turkeyfoot           $2,400,000
                              Road, Kenton County,
                              Kentucky..................
1351           OH            Construct additional lane          $800,000
                              to alleviate traffic
                              congestion on U.S. 40 in
                              and adjacent to St.
                              Clairsville...............
1352           CO            CO 56th Avenue and Quebec        $5,200,000
                              Street Improvements Phase
                              I, Denver.................
1353           OH            Construct Truck Bypass-          $4,803,520
                              Orville, Ohio.............
1354           PA            Conversion of Penn and Park         $40,000
                              Bridges located over
                              Spring Run in Altoona, PA
                              into pedestrian bridges...
1355           CA            Coyote Creek Trail Project--     $2,000,000
                              Story Road to Montague
                              Expressway................
1356           PA            Construct Cameron Street           $800,000
                              Bridge Northumberland
                              County, Pennsylvania......
1357           ............  ...........................              $0
1358           OH            Medina, Ohio. Guilford             $480,000
                              Avenue urban road
                              collector pavement
                              reconstruction............
1359           TN            Improvements to I-40             $2,400,000
                              interchange at I-240 East
                              of Memphis (Phase II).....
1360           WY            Casper Bypass: Reconstruct       $4,000,000
                              Old Yellowstone Hwy and
                              2nd St....................
1361           NY            Construct sidewalks and            $480,000
                              roadway improvements on
                              Oscawana Lake Road in the
                              Town of Putnam Valley.....
1362           LA            Engineering and right-of-        $8,000,000
                              way acquisition for I-49
                              Corridor through
                              Lafayette, LA.............
1363           PA            Design, engineering, ROW           $160,000
                              acquisition and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in
                              Edwardsville Borough,
                              Luzerne County............
1364           IL            Foster Avenue at Kedzie          $1,600,000
                              Avenue Streetscape........
1365           WV            Construct I-73/74 High           $8,960,000
                              Priority Corridor, Mercer
                              Co........................
1366           NY            Improve Long and Short           $2,100,000
                              Beach Road, Southampton...
1367           CA            Modify I-880 and Stevens         $9,600,000
                              Creek Boulevard
                              Interchange to ease
                              traffic congestion in San
                              Jose......................
1368           NY            Improve road and                   $800,000
                              streetscape along Prospect
                              Avenue in North Hempstead.
1369           CA            Palm Drive and Interstate        $2,200,000
                              10 interchange project....
1370           MN            Reconstruct TH 36 from           $4,800,000
                              expressway to freeway in
                              North St. Paul............
1371           CA            Construct I-580 Interchange        $960,000
                              Improvements in Castro
                              Valley....................
1372           AL            Expand U.S. 331 from             $2,400,000
                              Luverne, AL to Montgomery,
                              AL........................
1373           TX            Construction of highway            $400,000
                              medians, pedestrian
                              walkways for City of South
                              Padre Island..............
1374           NY            Construct Rt. 12                 $1,920,000
                              intersection between
                              Pamela Drive-River Road-
                              Located in the Town of
                              Chenango..................
1375           IL            Construct Streetscape              $640,000
                              Project, Village of
                              Robbins...................
1376           GA            Effingham Parkway to             $3,200,000
                              Connect SR 119 to SR 30...
1377           MD            Construct Phase 2 of the         $3,200,000
                              Jones Falls Trail from
                              Baltimore Penn Station to
                              the Maryland Science
                              Center on the Inner Harbor
1378           IL            For Will County for                $400,000
                              engineering and right-of-
                              way acquisition to extend
                              95th Street from
                              Plainfield-Naperville Road
                              east to Boughton Road.....
1379           PA            Construct Valley Business        $2,160,000
                              Park Access Road C,
                              Bradford County...........
1380           LA            Improve by widening,             $2,400,000
                              realigning, and
                              resurfacing 3.2 miles of
                              LA Hwy 820 btwn LA Hwy 145
                              and LA Hwy 821............
1381           IN            45th Street Improvements,          $400,000
                              Munster...................
1382           NY            Install Improvements for           $250,000
                              Pedestrian Safety
                              including in the vicinity
                              of PS K124................
1383           VT            Construction and                   $868,411
                              engineering for the
                              Vermont Smugglers Notch
                              Scenic Highway Corridor
                              Southern Gateway and Notch
                              Proper Facilities.........
1384           OH            Planning and construction          $760,000
                              of a network of
                              recreational trails in
                              Perry Township............
1385           GA            Construction of the Truman       $1,008,000
                              Linear Park Trail-Phase II
1386           NJ            Pedestrian and bicycle             $600,000
                              facilities, and street
                              lighting in Haddon Heights/
                              Barrington................
1387           CA            Reconstruct interchange at       $1,600,000
                              I-10 and Riverside Avenue
                              to improve traffic in
                              Rialto....................
1388           CA            Reconstruct Bloomfield Ave.        $320,000
                              with medians from Carson
                              St. to north city limits
                              in Hawaiian Gardens.......
1389           SC            Extension of Wells Highway,      $1,600,000
                              Oconee County, South
                              Carolina..................
1390           CA            Reconstruct Paramount Blvd.        $480,000
                              with medians and improve
                              drainage from Artesia
                              Blvd. to Candlewood St. in
                              Long Beach................
1391           IL            Reconstruction of 5th              $762,056
                              Street Road (FAS 569) in
                              Logan County, IL..........
1392           WA            Reconstruction of SR 99          $1,600,000
                              (Aurora Ave. N) between N
                              145th St. and N 205th St..
1393           NY            Page Green--Phase III--          $2,880,000
                              Reconstruction of 2.6
                              miles. Town of Virgil,
                              Cortland County...........
1394           MI            Gogebic County, Reconstruct        $644,000
                              Lake Road in Ironwood from
                              Margaret Street to Airport
                              Road......................
1395           ............  ...........................              $0
1396           IN            Redevelop and Complete the       $2,400,000
                              Cardinal Green-way and
                              Starr-Gennett Area in the
                              City of Richmond, Indiana.
1397           NY            Rehabilitate and redesign          $400,000
                              Erie Canal Museum in
                              Syracuse, NY through the
                              Erie Canalway National
                              Heritage Corridor
                              Commission................
1398           OH            Construction of 6.25 mile          $400,000
                              bicycle project in
                              Mahoning County...........
1399           NM            I-40/Munoz Reconstruction        $1,200,000
                              in the City of Gallup.....
1400           TX            Rehabilitate Yale Street           $800,000
                              between IH 10 to IH 610...
1401           CA            Reconstruct Long Beach           $2,400,000
                              Blvd. with medians and
                              improve drainage from Palm
                              Ave. to Tweedy Blvd. in
                              Lynwood...................
1402           CA            Expand carsharing pilot          $1,600,000
                              program to serve low-and
                              moderate-income
                              neighborhoods in the City
                              and County of San
                              Francisco.................
1403           FL            Implement Kennedy Boulevard      $2,000,000
                              corridor improvements to
                              improve safety in Tampa...
1404           MD            Construct Broadneck              $1,200,000
                              Peninsula Trail, Anne
                              Arundel County, Maryland..
1405           MO            Relocation and                  $13,744,000
                              reconstruction of Rt. MM
                              from Rt. 21 to Rt. 30.....
1406           MN            Replace three at-grade             $473,600
                              highway-railroad crossings
                              with grade-separated
                              crossings adjacent to
                              Winona State University...
1407           CA            Construct Traffic flow             $600,000
                              improvements Vincent and
                              Lakes Drive, West Covina..
1408           CA            Construction of a Lincoln        $2,400,000
                              Bypass on SR 65 in Placer
                              County, CA................
1409           KS            Construct highway-rail          $11,200,000
                              grade separation from
                              Douglas Avenue to 17th
                              Street North in Wichita,
                              KS........................
1410           OH            Conduct Phase II of U.S.         $1,840,000
                              Route 68 bypass project in
                              Urbana....................
1411           GA            Construct sidewalks and            $500,000
                              install landscaping,
                              Vienna....................
1412           TX            Extension of FM 1427 in            $560,000
                              Penitas...................
1413           MD            MD 124, Woodfield Road,          $1,600,000
                              from Midcounty Highway to
                              Warfield Road.............
1414           CA            Rio Vista Bridge                   $560,000
                              Realignment Study and
                              Street Sign Safety Program
1415           CO            SH 121/Bowles Ave.               $1,600,000
                              Intersection and Roadway
                              Improvements, Jefferson
                              County Colorado...........
1416           NY            Implement Improvements for         $600,000
                              Pedestrian Safety in
                              Queens County.............
1417           NY            Repair and improve Jericho       $1,600,000
                              Turnpike (NYS Hwy 25) and
                              construct streetscapes
                              along the Turnpike in New
                              Hyde Park.................
1418           GA            SR 316/SR 20 interchange           $400,000
                              construction Gwinnett
                              County....................
1419           IL            Construct pedestrian             $3,553,600
                              walkways and streetscaping
                              projects in the Village of
                              Western Springs...........
1420           WA            SR 518 corridor--                  $800,000
                              Improvements to SR 518-509
                              interchange and addition
                              of eastbound travel lane
                              on a portion of the
                              corridor..................
1421           CA            Development and                  $2,400,000
                              construction of
                              improvements to State
                              Route 79 in the San
                              Jacinto Valley............
1422           MN            Construct roadway                $5,568,000
                              improvements on the Great
                              River Road on CSAH 10 and
                              CSAH 21, Aitkin County....
1423           WA            Conduct preliminary              $7,000,000
                              engineering and EIS for
                              Columbia River Crossing in
                              WA and OR.................
1424           NC            Greensboro Signal System        $10,000,000
                              Replacement ITS
                              Enhancement Project.......
1425           MN            Reconstruction of 1 mile of        $400,000
                              CR 107 from CSAH 2 to
                              Highway 11 and 71,
                              Koochiching County........
1426           OH            Plain Township, Ohio.            $4,000,000
                              Market Avenue widening....
1427           LA            Construct right-of-way           $2,400,000
                              improvements from Third
                              St. at James St. to LA.
                              Hwy. One at Broadway St.
                              Acquire property at Third
                              St. and Winn St...........
1428           PA            State Street Bridge              $1,200,000
                              Rehabilitation, Hamburg...
1429           OH            Construct Flats East             $3,720,000
                              Bulkhead and Riverwalk:
                              construct bulkhead and
                              riverwalk connecting Front
                              and Maine Ave.............
1430           NY            Construct/reconstruct              $720,000
                              Lincoln Road: Commercial
                              Street to Route 31F in the
                              Town-Village of East
                              Rochester.................
1431           OH            Acquire land and construct         $800,000
                              Portage Bike and Hike
                              Trail, Portage Co.........
1432           NC            Continued development of         $1,200,000
                              Cary, NC pedestrian bike
                              paths.....................
1433           TX            Cottonflat Road overpass at      $1,200,000
                              Interstate 20.............
1434           NY            Improve Rt. 17M access,            $600,000
                              safety and traffic
                              management................
1435           OH            Safety improvements to           $1,200,000
                              Paris Avenue intersections
                              and Meese Rd. and Easton
                              St.-Nimishillen Township,
                              Ohio......................
1436           CA            Alameda Corridor-East              $240,000
                              Construction Authority,
                              San Gabriel Valley........
1437           WA            Construct a tunnel as part      $16,800,000
                              of the Bremerton
                              Pedestrian-Bremerton
                              Transportation Center
                              Access Improvement project
1438           NC            Eliminate highway-railway          $800,000
                              crossings in the City of
                              Fayetteville, NC..........
1439           NJ            Hoboken Observer Highway         $2,000,000
                              Operational and Safety
                              Improvements..............
1440           CA            Reconfigure San Fernando         $5,160,000
                              Road from Fletcher Drive
                              to I-5 Fwy, Los Angeles...
1441           NY            Construction of an access        $2,156,000
                              road, drainage
                              improvements, and
                              aesthetic enhancements
                              adjacent to Ocean Parkway
                              in the Town of Babylon, NY
1442           TX            Construct highway                $2,000,000
                              improvements on E.
                              Tidwell, Ley Rd., and E.
                              Little York Rd............
1443           AZ            Construct pedestrian and         $2,400,000
                              bicycle overpass at
                              McDowell Road and 35th
                              Avenue in Phoenix.........
1444           TX            Reconstruct I-30 Trinity        $20,000,000
                              River Bridge, Dallas......
1445           PA            Armstrong and Indiana            $1,600,000
                              County, Pennsylvania, U.S.
                              422 Improvements..........
1446           TX            Bicycle and Pedestrian           $7,680,000
                              Trail Network in East
                              Austin....................
1447           NV            Construct I-15 Cactus            $8,000,000
                              Avenue....................
1448           AL            I-65 Widening from U.S. 31       $6,400,000
                              in Alabaster (Exit 238) to
                              AL 25 in Calera (Exit 228)
1449           NY            Improve Route 4 Streetscape      $3,480,000
                              and replace waterlines,
                              Town and Village of Fort
                              Edward, Washington County.
1450           OH            Planning and construction          $800,000
                              on bike paths and trails
                              as part of Phases III-VI
                              in Ashtabula Metroparks
                              Western Reserve Greenway..
1451           CO            Construction of Powers           $8,000,000
                              Boulevard and Woodman Road
                              interchange, Colorado
                              Springs...................
1452           MN            Environmental review for TH        $480,000
                              8 upgrade, Forest Lake to
                              Chisago City..............
1453           MD            Construct Pedestrian Bridge      $2,640,000
                              and Garage at Coppin State
                              University in Baltimore...
1454           MD            Historic Preservation and        $1,520,000
                              Traffic Improvements along
                              Liberty Heights Ave. and
                              in Druid Hill Park in
                              Baltimore.................
1455           NC            I-85 in Vance County.......        $800,000
1456           PA            Design and construct             $4,800,000
                              interchange and related
                              improvements at I-83 Exit
                              19........................
1457           IL            Preconstruction and              $1,936,000
                              Construction at IL 31 from
                              Bull Valley Road to IL 176
1458           MS            Replace Popps Ferry Road         $4,000,000
                              Bridge, Biloxi............
1459           IL            Reconstruct Lakeshore Drive      $1,200,000
                              Overpass over Wilson
                              Avenue, Chicago...........
1460           AL            Pedestrian Improvements for        $106,666
                              Moody, AL.................
1461           MA            Design and construct Canal         $800,000
                              and Union Street Corridor
                              improvements, Lawrence....
1462           OH            Construct new two lane road      $1,000,000
                              to Sycamore Street in
                              Gallia County.............
1463           AL            Construct interchange on           $400,000
                              Interstate 85 at Beehive
                              Road in Auburn, AL........
1464           ME            Improvements to the                $500,000
                              Interconnecting Trail
                              System for bike/pedestrian
                              trails near Baxter State
                              Park......................
1465           TX            ROW acquisition for 87           $1,200,000
                              Relief Route..............
1466           WA            Restore and construct              $400,000
                              historic Naches Depot and
                              Trail project.............
1467           GA            SR 20 widening from I-575          $800,000
                              to SR 369, Cherokee County
1468           IL            Road Construction and            $1,840,000
                              reconstruction in the
                              Village of Hampshire:
                              Keyes Ave., Industrial
                              Drive Overlay, and Mill
                              Avenue....................
1469           IL            Conduct study and design of        $800,000
                              Chicago North lakefront
                              path expansion project....
1470           MS            I-59 interchange at U.S. 84      $4,000,000
                              and SR 15, Laurel.........
1471           TX            Improvements to IH-35E from      $3,200,000
                              U.S. 77 North of
                              Waxahachie to U.S. 77
                              South of Waxahachie.......
1472           MO            Scudder Road and I-170           $1,600,000
                              Interchange Improvements,
                              St. Louis County..........
1473           GA            Construct and improve Cobb         $900,000
                              County Trails.............
1474           MS            Extend SR 590 from U.S. 11       $3,200,000
                              to SR 29 near Ellisville..
1475           IN            Improve Intersection at            $448,000
                              Jackson Street and
                              Morrison Road in the City
                              of Muncie, Delaware
                              County, Indiana...........
1476           CO            Construction of McCaslin           $800,000
                              Boulevard U.S. 36
                              Interchange in Superior...
1477           MA            Route 128 Improvements--         $1,600,000
                              Route 114 in Peabody to
                              Route 62 in Danvers.......
1478           TX            Lubbock, Texas Construction     $12,440,000
                              for Marsha Sharp Freeway
                              main lanes between Chicago
                              and Salem Avenues.........
1479           NH            South Road Mitigation in         $1,200,000
                              Londonderry...............
1480           NY            Paul Road--Fisher Road           $4,000,000
                              Improvements, Town of
                              Chili, Monroe County......
1481           CA            Construct truck lane on          $2,000,000
                              Keystone Road from State
                              Route 111 to Austin Road,
                              Imperial County...........
1482           MS            Construct East Metropolitan      $4,960,000
                              Corridor linking I-20 at
                              Brandon to Hwy 25 at
                              Flowood...................
1483           LA            Leeville Bridge, Port            $4,000,000
                              Fourchon to Golden Meadow.
1484           GA            National Infantry Museum         $2,400,000
                              Transportation Network....
1485           AL            Interchange at I-65 and            $800,000
                              Limestone County Road 24
                              Constuction...............
1486           PA            Project to realign               $1,319,200
                              intersection of King of
                              Prussia Road and Upper
                              Gulph Road to provide
                              turning lanes and
                              signalization.............
1487           FL            Widen State Road 80, Hendry        $800,000
                              County....................
1488           SD            Construction of 4-lane           $6,400,000
                              highway on U.S. 79 between
                              Maverick Junction, and the
                              Nebraska border...........
1489           IL            130th and Torrance Avenue        $7,200,000
                              Intersection Improvement,
                              Chicago...................
1490           OK            Improvements to Hereford           $800,000
                              Lane and US69 Interchange,
                              McAlester.................
1491           GA            Athens-Clarke County Bike        $1,120,000
                              Trail Project.............
1492           CT            Construct UCONN Storrs           $1,600,000
                              Campus-Hillside Road......
1493           NM            I-25, Tramway North to           $2,800,000
                              Bernalillo, Reconstruction
1494           NJ            Planning for Liberty               $400,000
                              Corridor..................
1495           OR            Sellwood Bridge Replacement-     $2,000,000
                              Multnomah County..........
1496           ............  ...........................              $0
1497           FL            Englewood Interstate             $2,400,000
                              Connector in Sarasota
                              County, Florida...........
1498           NY            Elevate and construct            $2,400,000
                              drainage improvements to
                              Beach Road, Canal Road,
                              and Sea Breeze Road in
                              Massapequa, New York......
1499           TX            Design and construction            $800,000
                              streetscape improvements
                              in Midtown, enhance
                              pedestrian access.........
1500           NY            Replace sidewalk along             $264,000
                              Route 9A in Hamlet of
                              Montrose, Town of
                              Cortlandt.................
1501           MN            Construction and widening        $1,600,000
                              of TH 241 in the City of
                              St. Michael, MN...........
1502           GA            I-75 lanes from Aviation         $1,200,000
                              Boulevard to SR 54,
                              Clayton County............
1503           VT            Construction and                 $1,108,800
                              rehabilitation of the
                              Cross Vermont Trail for
                              the Cross Vermont Trail
                              Association...............
1504           NY            Construction of a new ramp       $1,420,000
                              from 9A Southbound to
                              Taconic State Parkway
                              Southbound, Westchester
                              County....................
1505           NY            Restore vehicular traffic        $4,000,000
                              to Main Street in Downtown
                              Buffalo...................
1506           MI            Construction of 5 lane           $8,000,000
                              concrete pavement with
                              curb, gutter and sewer on
                              Romeo Plank Road from M-59
                              to 23 Mile Road in Macomb
                              Township..................
1507           NY            Enhance road and                   $550,000
                              transportation facilities
                              in the vicinity of the
                              Brooklyn Children's Museum
1508           IL            Construct and expand             $3,200,000
                              Northwest Illinois U.S.
                              Rte 20 from Freeport to
                              Galena, IL................
1509           CA            Construction of new roadway        $800,000
                              lighting on major
                              transportation corridors
                              in the Southwest San
                              Fernando Valley...........
1510           MO            Construct Interstate            $15,200,000
                              flyover at Hughes Road and
                              Liberty Drive to 76th
                              Street. Part of Liberty
                              Parkway Project...........
1511           CA            Freeway 180 Improvements         $7,600,000
                              Fresno....................
1512           NY            Construct sidewalks and            $360,000
                              curbs on Valley Road in
                              Town of Bedford...........
1513           OK            Construction of rail             $1,600,000
                              crossing in Claremore at
                              Blue Star Drive and SH 66.
1514           IL            Improve U.S. Route 34 from         $400,000
                              Kewanee to Kentville Road.
1515           IL            For Naperville Township to         $160,000
                              fund improvements to North
                              Aurora Road...............
1516           WA            Kent--Construct a single           $800,000
                              point urban interchange
                              (SPUI) under I-5 at South
                              272nd St..................
1517           TN            Construct Interpretive             $800,000
                              Visitor Center for the
                              Cherokee Removal Memorial
                              Park Trail of Tears site
                              in Meigs County, TN.......
1518           GA            Create a greenway trail          $2,000,000
                              along the Oconee River
                              connecting parks,
                              preserving historic sites,
                              and promoting economic
                              development...............
1519           PA            Design, engineering, ROW           $320,000
                              acquisition, and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in
                              Dunmore Borough,
                              Lackawanna County.........
1520           PA            Add turn lane, modify            $1,944,000
                              signals and install
                              pavement markings at
                              intersection of PA 422 and
                              PA 662 in Amity Township..
1521           WI            Construct bicycle/               $2,800,000
                              pedestrian path and
                              facilities in the Central
                              park area of Madison......
1522           VA            Expand Route 15 29 in            $1,600,000
                              Culpeper, Virginia........
1523           WV            Fairmont Gateway Connector      $17,600,000
                              System to provide an
                              improved highway link
                              between downtown Fairmont
                              and I-79 in the vicinity
                              of Fairmont...............
1524           OR            Construct Barber Street          $2,400,000
                              extension, Wilsonville....
1525           FL            Four-laning SR 281 (Avalon      $11,600,000
                              Boulevard) in Santa Rosa
                              County from Interstate 10
                              to north of CSX RR Bridge.
1526           OR            Interstate 5 Interchange at      $8,000,000
                              City of Coburg............
1527           IL            Construction of a bridge at     $70,400,000
                              Stearns Road in Kane
                              County, Illinois..........
1528           TX            East 7th Street                    $420,000
                              Improvements in Austin....
1529           GA            Rebuild SR 10 Memorial           $1,600,000
                              Drive for bicycle and
                              pedestrian safety, from
                              Mountain Drive to
                              Goldsmith Road, Dekalb
                              County....................
1530           NJ            Provide an alternative           $2,000,000
                              route for traffic passing
                              though congested SR 31
                              corridor in Flemington, NJ
1531           CA            Construction of a smart             $40,000
                              crosswalk system at the
                              intersection of Arminta
                              St. and Mason Ave.........
1532           WI            Reconstruct U.S. Highway 41     $13,000,000
                              north of Lake Butte des
                              Morts Bridge, Wisconsin...
1533           PA            Improvements to 8th and 9th        $392,000
                              Street bridges between
                              Pleasant Valley Blvd. and
                              Valley View Blvd.,
                              Altoona, PA...............
1534           LA            Construction of a direct        $10,400,000
                              intermodal truck access
                              road from Interstate 210
                              to the City Docks of the
                              Port of Lake Charles......
1535           TX            Construct Links Hike and           $400,000
                              Bike Trail Project. 2.2
                              mile trail project
                              connecting Gaylord Texan
                              to Grapevine Mills Mall.
                              Grapvine, TX..............
1536           GA            Construct sidewalks between        $300,000
                              Marion Middle School, City
                              Park, and Community
                              Center, Buena Vista.......
1537           IL            Construct a four lane            $1,600,000
                              connection between Rt. 13
                              and Rt. 45 and upgrades to
                              Netty Green Road in Saline
                              Co., Illinois.............
1538           MI            Plymouth, Haggerty Road            $400,000
                              from Plymouth Rd. to
                              Schoolcraft Rd............
1539           TN            Provide streetscape                $200,000
                              improvements and pavement
                              repair, Greenback,
                              Tennessee.................
1540           IA            Reconstruction of NE 56th          $800,000
                              St, eastern Polk Co.......
1541           IL            Relocate Pocket Road/              $900,000
                              Lakewood Place for Access
                              to the Racehorse Business
                              Park, Alorton.............
1542           CT            Construct roadway on East          $400,000
                              Commerce Drive, Oxford, CT
1543           TN            Niota, TN Improve vehicle           $45,600
                              efficiencies at highway At-
                              Grade Railroad Crossing...
1544           FL            Plan and Construct 17th          $1,600,000
                              Street connector in the
                              City of Sarasota, FL......
1545           VT            Reconstruction and widening      $1,200,000
                              of U.S. Route 5 for the
                              Town of Hartford..........
1546           MO            Relocate the entrance to           $400,000
                              the Shaw Nature Reserve
                              that is being altered due
                              to a redesign of the Gray
                              Summit I-44 interchange
                              project...................
1547           DC            Replace and reconstruct         $48,000,000
                              South Capitol Street/
                              Frederick Douglass
                              Memorial Bridge...........
1548           MI            Complete 13.8 miles of           $2,160,000
                              nonmotorized pedestrian
                              Fred Meijer Heartland
                              Trail of 30.1 miles.......
1549           MO            Roadway improvements on          $8,000,000
                              U.S. 60 from Willow
                              Springs to the Van Buren
                              Area......................
1550           UT            Construct Parley's Creek         $5,000,000
                              Trail.....................
1551           ME            Construction of Calais/St.       $7,000,000
                              Stephen Border Crossing
                              Project...................
1552           FL            Alleviate congestion at          $2,000,000
                              Atlantic Corridor Green-
                              way Network, City of Miami
                              Beach, FL.................
1553           MD            Construction of MD 331           $3,454,400
                              Dover Bridge..............
1554           NY            Improve Traffic Flow on          $1,000,000
                              Noel Road between Church
                              and Crossbay Boulevard
                              including work necessary
                              to demolish and
                              reconstruct the firehouse
                              facility..................
1555           PA            Construct 9th and 10th           $6,400,000
                              Street bridges over
                              Norfolk Southern Tracks,
                              Lebanon...................
1556           ............  ...........................              $0
1557           CA            Improve I-8 off ramp at            $800,000
                              Ocotillo to the Imperial
                              Valley College Desert
                              Museum/Regional Traveler
                              Visitor Center, Imperial
                              County....................
1558           CA            Install new grade                $4,000,000
                              separation at Ranchero
                              Road in Hesperia..........
1559           NY            Bartow Ave. Ramp and             $1,600,000
                              Reconstruction at the
                              Hutchinson Parkway........
1560           FL            Airport Access Rd.,              $1,600,000
                              Gainesville...............
1561           WA            Intersection project at          $2,400,000
                              South Access/522 beginning
                              and ending at the UWB-CCC
                              campus to improve access
                              and alleviate congestion..
1562           NJ            Reconstruction of CR 530         $8,000,000
                              from Rt. 206 to CR 644.
                              Construct shoulders,
                              travel lanes, center turn
                              lane, drainage
                              improvements and traffic
                              signal....................
1563           NY            Improve SCCC roads,              $1,100,000
                              Fallsburg.................
1564           CA            Add turn lane and adaptive       $1,280,000
                              traffic control system at
                              intersection of San Tomas
                              Expressway and Hamilton
                              Avenue in Campbell........
1565           CA            Interchange improvements at      $2,640,000
                              Rice Avenue and U.S.
                              Highway 101 in the City of
                              Oxnard....................
1566           GA            Northside Drive Multimodal       $1,600,000
                              Corridor..................
1567           GA            Replace sidewalks, meet ADA        $400,000
                              guidelines, and install a
                              crosswalk, McRae..........
1568           TX            Ritchie Road from FM 1695        $2,400,000
                              to U.S. 84, Waco..........
1569           AR            Maumelle Interchange--Third        $800,000
                              entrance into Maumelle....
1570           CT            Construct Housatonic               $800,000
                              Riverwalk, Shelton........
1571           MD            Rehabilitate Roadways            $6,800,000
                              Around East Baltimore Life
                              Science Park in Baltimore.
1572           AL            City of Vestavia Hills             $560,000
                              Pedestrian Walkway to
                              Cross U.S. 31.............
1573           IN            Replace Samuelson Road           $2,530,312
                              Underpass, Portage........
1574           IL            Construct Commuter Parking       $3,232,000
                              Structure in the Central
                              Business District in the
                              vicinity of La Grange Road
1575           PA            Design and construct inner         $400,000
                              loop roadway around
                              Shippensburg Boro.........
1576           WV            Construct I-73/74 High           $9,600,000
                              Priority Corridor, Mingo
                              Co........................
1577           NY            Roadway improvements to          $1,800,000
                              Jackson Avenue between
                              Jericho Turnpike and
                              Teibrook Avenue...........
1578           OR            Rogue River Bikeway/               $600,000
                              Pedestrian Path, Curry
                              County....................
1579           CA            San Gabriel Blvd.                  $160,000
                              Intersection Improvements
                              at Broadway and at Las
                              Tunas, San Gabriel........
1580           NY            Improvements to Erie             $1,000,000
                              Station Road, Town of
                              Henrietta, Monroe County..
1581           IA            Sioux City, Iowa Hoeven          $1,600,000
                              Corridor--Outer Drive
                              Project...................
1582           KY            Study and rehabilitate the       $1,600,000
                              I-471 corridor, Campbell
                              County, Kentucky..........
1583           SC            SCSU Transportation Center,      $5,200,000
                              Orangeburg................
1584           NY            Construction and                   $696,000
                              rehabilitation of North
                              and South Delaware Avenues
                              in the Village of
                              Lindenhurst, NY...........
1585           NY            Study on extending Rt. 5 to        $120,000
                              Auburn....................
1586           AL            Expand U.S. 84 from              $2,400,000
                              Andalusia, AL to
                              Enterprise, AL............
1587           NJ            Susse County, NJ, Safety         $3,440,000
                              and Operational
                              Improvements on Route 23
                              in Hardyston Township and
                              Franklin Borough..........
1588           PA            State Street and Mulberry        $4,000,000
                              Street Bridge Lighting
                              project, Harrisburg.......
1589           ............  ...........................              $0
1590           CA            Interstate 15 and State          $1,600,000
                              Route 79 South Freeway
                              Interchange and Ramp
                              Improvement Project.......
1591           OH            Road Improvements,                 $800,000
                              streetscapes, and
                              pedestrian safety
                              additions in Ashtabula
                              Harbor....................
1592           NY            Town of East Fishkill              $400,000
                              improvements to Robinson
                              Lane and Lake Walton Road
                              at NYS Route 376..........
1593           WI            Construct a bicycle/             $1,600,000
                              pedestrian path, Wisconsin
                              Dells.....................
1594           NY            Construct improvements in          $160,000
                              Sight Distance at Road
                              Grade and Trail Crossings
                              in Oneida and Herkimer
                              Counties..................
1595           NY            Repair Silver Mine Bridge          $120,000
                              in the Town of Lewisboro..
1596           IL            River walk Reconstruction,         $480,000
                              City of Chicago...........
1597           AR            Rogers, Arkansas--Construct      $5,000,000
                              new interchange on I-540
                              near the existing Perry
                              Road overpass.............
1598           IN            Design and construct            $16,000,000
                              Indiana Ohio River Bridges
                              Project on I-65 and 265...
1599           RI            Transportation Enhancements        $400,000
                              at Blackstone Valley
                              Heritage Corridor.........
1600           TX            Reconstruction of U.S. 79        $1,600,000
                              from FM 1460 to Williamson
                              County Road195............
1601           CA            Transportation enhancements        $960,000
                              to Children's Museum of
                              Los Angeles...............
1602           IN            Construct Shelby County            $400,000
                              Indiana Shelbyville
                              Parkway...................
1603           NY            Reconstruct the Niagara            $320,000
                              Street culvert/bridge
                              which crosses over Two
                              Mile Creek, City of
                              Tonawanda.................
1604           MA            Reconstruction of Main             $560,000
                              Street and Lebanon Street
                              in Melrose................
1605           OH            Construct the existing IR        $9,700,000
                              70 interchange at U.S. 40,
                              SR 331 west of St.
                              Clairsville...............
1606           GA            Install traffic lights and         $500,000
                              pedestrian walkways on
                              Highway 441 at Martin
                              Luther King, Jr.,
                              Boulevard, Dublin.........
1607           OH            Pike County, OH Fog Road           $960,000
                              Upgrade...................
1608           CA            Project design,                    $400,000
                              environmental assessment,
                              and roadway construction
                              of Lonestar Road from Alta
                              Road to Enrico Fermi Drive
                              San Diego County..........
1609           CA            Project Study Reports for I-       $320,000
                              105 and I-405 Interchanges
                              at Los Angeles
                              International Airport.....
1610           CA            Reconstruct Whittier Blvd.       $1,360,000
                              and improve parkway
                              drainage from Philadelphia
                              Ave. to Five Points in
                              Whittier..................
1611           NY            Rockland County Railroad         $1,000,000
                              Grade Crossings Safety
                              Study.....................
1612           TX            San Angelo Ports-to-Plains       $1,200,000
                              Route Loop 306 at F.M. 388
1613           MN            City of Hutchinson School          $800,000
                              Road Underpass of TH 7 and
                              TH 22 improvements........
1614           TN            construct and widen SR 33        $5,000,000
                              in Monroe County, TN......
1615           PA            Construct the realignment          $800,000
                              of Cool Creek Road in York
                              County, PA................
1616           NJ            Construct Waterfront             $1,600,000
                              Walkway from North Sinatra
                              Drive and 12th St. south
                              to Sinatra Drive in
                              Hoboken...................
1617           TX            Add shoulders to FM 156          $1,600,000
                              from Ponder, Texas to
                              Krum, Texas...............
1618           NJ            Bridge replacement on            $1,600,000
                              Section 6V of Route 1 from
                              Ryders Lane to Milltown
                              Road, North Brunswick.....
1619           MN            Construct Two Harbors High         $891,600
                              School Trail connecting
                              Two Harbors High School to
                              Two Harbors City..........
1620           SC            Construct I-85 Brockman-           $800,000
                              McClimon Interchange
                              between Greenville
                              Spartanburg Airport and SC
                              Highway 101 interchanges..
1621           IA            Fort Madison, IA                 $2,720,000
                              Construction of U.S. 61
                              bypass around Fort Madison
                              to create a safer and
                              faster route..............
1622           PA            Germantown Avenue                $1,856,000
                              Revitalization with Mount
                              Airy USA for landscaping,
                              scenic enhancements and
                              pedestrian safety
                              improvements along the
                              heavily traveled
                              thoroughfare..............
1623           NM            I-10 Reconstruction, Las         $2,400,000
                              Cruces to Texas State Line
1624           TX            IH 820 Widening Project....      $1,600,000
1625           IL            For Naperville Township to         $640,000
                              fund improvements to Diehl
                              Road between Eola Road and
                              Route 59..................
1626           KS            Remove and Replace Topeka        $5,600,000
                              Blvd. Bridge over the
                              Kansas River..............
1627           VA            Clifton, VA Main Street            $200,000
                              parking and sidewalk
                              improvements..............
1628           SC            Replace Milford Road               $400,000
                              Bridge, Anderson, SC......
1629           LA            Improvements to Essen Lane      $24,000,000
                              at I-12; and to Perkins
                              Rd.; and to Central
                              Thruway; and to O'Neal
                              Lane; and to Burbank Dr.;
                              and to Essen Park
                              Extension; and for LA 408
                              study.....................
1630           GA            Streetscape project for            $240,000
                              lighting and landscaping
                              on Main Street along
                              Georgia Highway 231,
                              Davisboro.................
1631           IA            City of Council Bluffs and       $1,200,000
                              Pottawattamie county East
                              Beltway Roadway and
                              Connectors Project........
1632           OR            U.S. 199/Laurel Road             $2,880,000
                              Intersection..............
1633           CA            Conduct project report             $400,000
                              study on Old River School
                              Rd--Firestone Blvd.
                              intersection re-
                              configuration.............
1634           FL            Conduct study for Port of        $1,600,000
                              Miami Tunnel, Miami, FL...
1635           NY            Ithaca, Design and                 $960,000
                              construct pedestrian and
                              bicycle path (Cayuga
                              Waterfront Trail).........
1636           NC            Greenway Trails Project,           $512,000
                              Elizabeth City............
1637           IL            Reconstruct Lakeshore Drive      $1,200,000
                              overpass over Lawrence
                              Avenue....................
1638           SC            Replace Murphy Road West           $188,000
                              Bridge, Anderson, SC......
1639           CA            Resurface and construct          $2,400,000
                              truck lane at CA Hwy 94
                              and I-8 interchange,
                              Boulevard.................
1640           CT            Undertake road improvements      $1,600,000
                              associated with Coltsville
                              Area Redevelopment,
                              Hartford..................
1641           AZ            Upgrade and Re-opening of          $960,000
                              Main Street in Yuma.......
1642           NJ            Pedestrian facilities,             $477,059
                              street lighting and
                              streetscaping improvements
                              in downtown Laurel Springs
1643           MS            Upgrade Blue Cane Road in          $600,000
                              Tallahatchie County, and
                              roads in Webb and Tutwiler
1644           OH            Upgrade circuitry on               $112,000
                              vehicle protection device
                              at Sheldon Road rail
                              crossing in Berea.........
1645           NY            Design and construct Upper         $600,000
                              Delaware Scenic Byway
                              Visitor Center, Cochecton.
1646           NY            Construct sidewalks and            $220,000
                              curbing on Westchester
                              Avenue in Village of
                              Buchanan..................
1647           NC            Downtown Redevelopment           $5,068,800
                              Project, City of Rocky
                              Mount.....................
1648           TX            Construction of divided            $800,000
                              four lane concrete
                              arterial with drainage
                              improvements--Sandy Lake
                              Road: Denton Tap Rd. to
                              North Coppell Road........
1649           IL            Preconstruction and              $1,092,000
                              Construction at IL 120 at
                              Bacon Road and Cedar Lake
                              Road......................
1650           GA            Revitalization project will        $400,000
                              extend and resurface the
                              Roberta Walking Trail,
                              Roberta...................
1651           KY            Construct Westbound Access       $2,320,000
                              to Mountain Parkway from
                              Exit 18 (KY 1057), Powell
                              County....................
1652           NC            Development of 2 miles of        $1,200,000
                              road parallel to I-95
                              located approximately
                              between the I-95/NC 125
                              interchange and I-95/U.S.
                              158 interchange...........
1653           CA            Engineering, right-of-way        $9,600,000
                              and construction of HOV
                              lanes on I-580 in the
                              Livermore Valley,
                              California................
1654           IL            Construct Streetscape              $400,000
                              Project, City of Markham..
1655           CA            Landscape south side of the        $200,000
                              91 Fwy at Bellflower Blvd.
                              in Bellflower.............
1656           MA            Southwick and Westfield          $4,000,000
                              Rail Trail, Design and
                              Construction..............
1657           VA            Upgrade DOT crossing               $155,680
                              #467665M to constant
                              warning time devices......
1658           TX            Reconstruct and add two          $5,600,000
                              lanes to U.S. 287 from the
                              Oklahoma State line to
                              U.S. 54 in Stratford......
1659           WY            Casper West Belt Loop......      $1,600,000
1660           MN            Munger Trail extension,          $2,500,000
                              City of Duluth............
1661           AK            Bogard/Sheldon Extension in      $4,000,000
                              Matanuska-Susitna Borough.
1662           CA            City of Redondo Beach              $800,000
                              Esplanade Improvement
                              Project...................
1663           MN            Kandiyohi and Meeker             $1,600,000
                              Counties Hwy 7 between TH
                              71 and TH 22..............
1664           NJ            Construction of Rowan              $480,000
                              Boulevard from U.S. Route
                              322 to Main Street,
                              Glassboro.................
1665           CA            Conduct Study of SR 130          $1,600,000
                              Realignment Project, San
                              Joaquin County and Santa
                              Clara County, CA..........
1666           CA            Passons Grade Separation in      $2,960,000
                              the City of Pico Rivera...
1667           MD            Construct South Shore              $800,000
                              Trail, Anne Arundel
                              County, MD................
1668           NJ            Realignment of the Routes        $1,600,000
                              35/36 intersection in
                              Eatontown.................
1669           IN            Construct Hoosier Heartland      $2,400,000
                              Highway in Cass and
                              Carroll County, Indiana...
1670           MI            Oscoda County,                     $768,000
                              Reconstruction and
                              surfacing of Valley Road
                              from M-33 west to Mapes
                              Road......................
1671           TX            Reconstruct Precinct Line          $800,000
                              Road 2-lane bridge as 4-
                              lane bridge and widen
                              Precinct Line Road to 4-
                              lane roadway from SH 10 to
                              Trammel Davis Rd..........
1672           CT            Reconstruct Waterfront           $1,200,000
                              Street Corridor, City of
                              New Haven.................
1673           TN            Improving Vehicle                   $79,200
                              Efficiencies at At-Grade
                              highway-Railroad Crossing
                              in Philadelphia, TN.......
1674           TX            Reconstruct Mile 2 W from          $800,000
                              Mile 12 N to U.S. 83,
                              Hidalgo County............
1675           NY            Reconstruction of West Neck      $2,400,000
                              Road from Huntington-Lloyd
                              Harbor boundary to the end
                              of the Village-maintained
                              road......................
1676           GA            Rehabilitate sidewalks and         $400,000
                              replace street lights,
                              Swainsboro................
1677           SC            Replace Murphy Road East           $212,000
                              Bridge, Anderson, SC......
1678           MO            Access improvements and          $4,000,000
                              safety and mobility
                              upgrades along U.S. 7 as
                              part of the Highway 7
                              Corridor Development Plan
                              in Blue Springs...........
1679           OH            Construct Stearns Road           $3,600,000
                              Grade Separation, Olmsted
                              Township..................
1680           CA            Implement Grove Avenue           $2,400,000
                              Corridor I-10 interchange
                              improvements in Ontario...
1681           MA            Construct and Replace West         $800,000
                              Corner Bridge and Culvert,
                              Rt. 228, spanning Weir
                              River Estuary and Straits
                              Pond Inlet................
1682           OK            Complete Reconstruction of       $3,200,000
                              the I-35/SH 9 West
                              Interchange...............
1683           NJ            Construct Rte 50 Tuckahoe        $3,200,000
                              River Bridge Replacement,
                              Cape May and Atlantic
                              Counties..................
1684           NY            Rt. 12 reconstruction-Town       $3,288,000
                              and Village of Greene.....
1685           MN            Becker County CR 143 and CR        $768,000
                              124 Improvements..........
1686           NY            Construct and extend             $1,080,000
                              existing pedestrian
                              streetscape areas in
                              Valley Stream.............
1687           MI            Construct Interchange at I-      $2,000,000
                              675 and M-13 (Washington
                              Avenue). Northbound Exit.
                              Phase I of Construction.
                              City of Saginaw...........
1688           OH            Construct Cleveland Towpath      $4,640,000
                              Trail, 6-mile extension
                              towards downtown,
                              Cleveland.................
1689           FL            Construct widening of U.S.      $16,300,000
                              17 to 4 lanes from San
                              Mateo to Volusia County
                              line, Putnam County,
                              Florida...................
1690           MD            Construct Phase 1 of the           $800,000
                              South Shore Trail in Anne
                              Arundel County from
                              Maryland Route 3 at
                              Millersville Road to I-97
                              at Waterbury Road.........
1691           MI            Construction of 5 lane           $1,663,600
                              concrete pavement with
                              curb, gutter and storm
                              sewer on Van Dyke Ave.
                              from 23 Mile Road to 26
                              Mile Road, Macomb Co......
1692           FL            Design and construct             $8,000,000
                              replacement for A. Max
                              Brewer Bridge, Titusville.
1693           NY            Implement ITS system and           $100,000
                              apparatus to enhance
                              citywide truck route
                              system on Victory Blvd.
                              Between Travis Ave. and
                              West Shore Expressway
                              Travis Section of SI......
1694           MI            Purchase and implementation      $9,944,000
                              of various Intelligent
                              Transportation System
                              technologies in the Grand
                              Rapids metro region.......
1695           WI            Recondition U.S. 45 between      $1,600,000
                              New London and
                              Clintonville, Wisconsin
                              (Waupaca County,
                              Wisconsin)................
1696           CA            Reconstruction of The            $1,600,000
                              Strand in the City of
                              Manhattan Beach to improve
                              beach access and
                              accommodate increased
                              pedestrian traffic........
1697           CA            Construction of new roadway        $400,000
                              lighting on major
                              transportation corridors
                              in the Northeast San
                              Fernando Valley...........
1698           MD            Rehabilitate Hanover Street      $1,200,000
                              Bridge in Baltimore.......
1699           NY            Rehabilitation of Hornbeck         $340,800
                              Road in the Town of
                              Poughkeepsie..............
1700           CA            Rehabilitation of Tulare         $3,200,000
                              County Farm to Market road
                              system....................
1701           GA            Riverside Drive Streetscape        $400,000
                              Project, Macon............
1702           GA            South Lumpkin Road Trail-          $400,000
                              Columbus..................
1703           CA            Implement Northeast San            $160,000
                              Fernando Valley Road and
                              Safety Improvements.......
1704           NY            Big Ridge Road: Spencerport      $1,000,000
                              Village Line to Gillet
                              Road in the Town of Ogden.
1705           TX            Build south bound ramp from      $4,400,000
                              east bound I-20 to Clark
                              Road at the southern
                              terminus of Spur 408.
                              Duncanville, TX...........
1706           ............  ...........................              $0
1707           TN            Reconstruct U.S. 64 from         $4,180,000
                              west of Bolivar to the
                              Lawrence County Line in
                              Hardemant, McNairy,
                              Hardin, Wayne Counties....
1708           PA            Improve safety of Route 145      $1,780,000
                              in Whitehall Township.....
1709           GA            Construct Stone Mountain-          $800,000
                              Lithonia Road Bike Lane
                              and Sidewalks, Dekalb
                              County....................
1710           OK            Texanna Road improvements          $800,000
                              around Lake Eufaula.......
1711           OH            North Huntington Street          $1,088,000
                              Improvements, Medina, OH..
1712           IL            To construct a new                 $440,000
                              intersection of a public
                              road and U.S. Route 50 and
                              a new street..............
1713           NC            To plan, design, and               $473,600
                              construct the Northwest
                              Corridor-Western Blvd.
                              Project in Jacksonville,
                              NC........................
1714           CT            Upgrade Mark Twain Drive,        $1,600,000
                              Hartford..................
1715           CO            CO I-70 East Multimodal          $2,000,000
                              Corridor (Highway
                              Expansion), Denver........
1716           MS            Upgrade roads in Indianola,      $1,600,000
                              Ruleville, Moorehead,
                              Doddsville, Sunflower and
                              Drew, Sunflower County....
1717           MS            Upgrade Marshall Road in           $320,000
                              North Carrollton (U.S.
                              Highway 35 and 82) McCain
                              Street, South Street, Love
                              Street, and Colver Street,
                              Carroll County............
1718           NJ            Passaic-Bergen intermodal       $12,000,000
                              transportation deployment
                              initiative................
1719           IL            Upgrade roads, The Village         $800,000
                              of Maywood................
1720           PA            Upgrade Route 30 Corridor          $800,000
                              and Airport Access........
1721           GA            Upgrade sidewalks and              $400,000
                              lighting, Lyons...........
1722           CA            State Route 88--Pine Grove         $400,000
                              Corridor Improvement
                              Project...................
1723           WA            Tacoma--Lincoln Avenue             $800,000
                              Grade Separation..........
1724           NY            Improve NY 112 from Old          $8,000,000
                              Town Road to NY 347.......
1725           NJ            Construct I-195 Noise            $2,000,000
                              Barrier, Hamilton
                              Township, Mercer County...
1726           AR            Highway 77 Rail Grade              $800,000
                              Separation................
1727           WA            Kent, WA Willis Street BNSF        $400,000
                              Railroad Grade Separation
                              Project...................
1728           MI            Menominee, Ogden Street            $160,000
                              Bridge rehabilitation
                              project-replacement of
                              deck, expansion joints,
                              sidewalks, railing and all
                              other joints..............
1729           VA            Pochantas Trail--                  $400,000
                              Development and
                              construction of trail from
                              Bluestone Junction to
                              Pochantas adjacent to
                              abandoned rail line.......
1730           NY            Suffolk County ITS arterial        $500,000
                              monitoring and performance
                              measures..................
1731           LA            Conduct study for Highway          $400,000
                              25 in Washington Parish...
1732           IL            Construction of the 43rd           $480,000
                              Street Bicycle Pedestrian
                              Bridge over Lake Shore
                              Drive, City of Chicago....
1733           NY            To design and reconstruct        $1,920,000
                              Nassau Avenue, improve
                              sidewalks and include
                              pedestrian amenities in
                              Greenpoint, Brooklyn......
1734           OH            Upgrade the I-480 and            $1,600,000
                              Tiedman Road interchange,
                              Brooklyn..................
1735           NJ            Interchange improvements         $4,000,000
                              and bridge replacement,
                              Route 46, Passaic County..
1736           ............  ...........................              $0
1737           IA            Construction of a Four Lane      $8,000,000
                              U.S. Highway 20 between
                              Moville in Woodbury
                              County, through Ida County
                              and Sac County to U.S. 71
                              at Early, IA..............
1738           AZ            Paving of Navajo Route 9010-     $3,440,000
                              off of I-40 at Houck, AZ
                              (Exit 348) to Pine Springs
                              Day School................
1739           OH            Red Bank Road Improvements       $3,120,000
                              from I-71 to Fair Lane in
                              Eastern Hamilton County,
                              Ohio......................
1740           CA            Construct earthen berm           $1,600,000
                              along Esperanza Road from
                              Yorba Linda Blvd. to the
                              west city limits to
                              mitigate noise............
1741           TX            U.S. 90--Construct 6             $1,600,000
                              mainlines from east of
                              Mercury to east of
                              Wallisville...............
1742           NY            Town of Chester Trout Brook         $56,000
                              road improvements and
                              reconstruction............
1743           OR            Upgrade the I-5 Fern Valley      $2,400,000
                              Interchange (Exit 24).....
1744           CA            Construct I-80 Gilman            $1,200,000
                              Street interchange
                              improvements in Berkeley..
1745           NJ            Construct Vineland               $1,400,000
                              Boulevard and Sherman
                              Avenue Intersection
                              Improvements, Vineland,
                              Cumberland County.........
1746           WA            Terry's Corner Park and          $1,120,000
                              Ride on Camano Island.....
1747           OR            Upgrade U.S. 101 and               $200,000
                              Utility Relocation, Gold
                              Beach.....................
1748           WI            Upgrade U.S. 41 from DePere      $2,000,000
                              to Suamico, Wisconsin
                              (Brown County, Wisconsin).
1749           IL            Upgrade Veterans Drive in          $800,000
                              Pekin, Illinois...........
1750           NY            Saugerties, Improve Tissle         $500,000
                              Road-Old Kings Highway
                              intersection..............
1751           TX            Design and Construct the           $800,000
                              Cottonwood Trail
                              pedestrian-bicycle
                              connection................
1752           NY            Rehabilitation of the            $2,080,000
                              Ashford Ave. bridge over I-
                              87 in the Villages of
                              Dobbs Ferry and Ardsley...
1753           OH            Streetscape completion              $80,000
                              along U.S. 40 in
                              Bridgeport................
1754           SD            Design and construct new         $7,108,844
                              Meridian Bridge across the
                              Missouri River at Yankton.
1755           MD            Upgrade MD 210 from MD 228       $3,000,000
                              to I-495..................
1756           IL            For DuPage County to                $80,000
                              construct certain segments
                              of Southern DuPage County
                              Regional Trail............
1757           IA            U.S. 20 relocated, Webster,      $2,400,000
                              Sac and Calhoun Counties,
                              Iowa......................
1758           NJ            Construction of new access         $800,000
                              roads along Route 42/
                              Blackhorse Pike in
                              Washington Township.......
1759           CA            Highways 152-156                   $800,000
                              Intersection improvements,
                              CA........................
1760           AK            Coffman Cove IFA ferry           $3,200,000
                              terminal or IFA vessel
                              debt repayment for MV
                              Prince of Wales Ferry.....
1761           MA            Acquisition, engineering,        $1,500,000
                              design, and construction
                              of the Assabet River Rail
                              Trail, Acton, Hudson,
                              Maynard, and Stow.........
1762           MI            Conduct Feasibility Study          $480,000
                              to Extend I-475 to U.S. 23
                              in Genesee County.........
1763           TX            Construct a reliever route       $2,400,000
                              on U.S. 287 South of Dumas
                              to U.S. 287 North of Dumas
1764           TN            construct new exit on I-75       $3,600,000
                              and connect U.S. 11, U.S.
                              411, and SR 30............
1765           PA            Design, engineering, ROW         $1,400,000
                              acquisition and
                              construction of street
                              improvements, parking,
                              safety enhancements and
                              roadway redesign in
                              Pittston..................
1766           TX            Dowlen Road Improvements         $2,764,800
                              for Beaumont, Texas.......
1767           CA            Construct Hwy 101 bicycle-         $400,000
                              pedestrian project in
                              Marin and Sonoma Counties
                              from north of Atherton
                              Ave. to south of Petaluma
                              River bridge..............
1768           TX            Construct raised median          $2,680,000
                              from Loop 224 to Sradley
                              St. in Nacogdoches, TX....
1769           OH            Construction of bicycle            $400,000
                              trail extension in Geauga
                              Park District in Chardon,
                              OH........................
1770           CA            Extension of a regional            $320,000
                              Class I bikeway from the
                              West City limits to the
                              East City limits along
                              leased railroad right-of-
                              way.......................
1771           AR            For rail grade separations       $8,000,000
                              identified by the MPO for
                              the Little Rock/North
                              Little Rock metropolitan
                              area, (which may include:
                              Edison Ave.; Springer
                              Blvd.; Hwy 89 Extension;
                              McCain/Fairfax; Salem
                              Road; J.P. Wright Loop;
                              South Loop; Geyer Springs
                              Rd).......................
1772           NY            Court Street and Smith             $640,000
                              Street Shopping District
                              Enhancements..............
1773           MA            Hampshire County Bike            $4,400,000
                              Paths, Design and
                              Construction..............
1774           NV            Construct I-15 Starr             $8,000,000
                              Interchange...............
1775           CA            Construct full-access            $3,200,000
                              interchange at SR 120--
                              McKinley Avenue, with the
                              necessary SR 120 auxiliary
                              lanes, Manteca, CA........
1776           CA            Install emergency vehicle          $400,000
                              preemption equipment along
                              major arterials in the I-
                              880 corridor, Alameda
                              County....................
1777           OH            Construct a proposed             $4,800,000
                              relocation of U.S. 22 and
                              SR 93 from the current IR
                              70, U.S. 40 west of
                              Zanesville................
1778           CA            Conduct Study and Construct        $800,000
                              I-205 Chrisman Road
                              Interchange Project,
                              Tracy, CA.................
1779           IL            Construction of part of a        $1,360,000
                              230 mile corridor U.S. 67
                              near Jerseyville and
                              Carrolton, Illinois.......
1780           CA            Construction of Campus             $400,000
                              Parkway from State Route
                              99 to Yosemite Ave.,
                              Merced County.............
1781           MI            Construction of Superior           $600,000
                              Road Roundabout, Superior
                              Township..................
1782           OR            Construction and                   $198,400
                              preliminary engineering of
                              a railroad crossing at the
                              intersection of Havlik
                              Road and Hwy 30, Scappoose
1783           FL            Clark Road Clover Leaf at I-     $4,400,000
                              95, Jacksonville..........
1784           PA            Construct and widen PA 94        $1,200,000
                              from the Adams and York
                              County line north to
                              Appler Road...............
1785           IL            For the reconstruction and       $1,600,000
                              realignment of 2 miles of
                              Evergreen Ave. located
                              west of the City of
                              Effingham.................
1786           IN            Improve State Road 332 and       $2,400,000
                              Nebo Road Intersection in
                              Delaware County, Indiana..
1787           AL            Birmingham Northern              $8,000,000
                              Beltline..................
1788           WI            Construct Lake Butte des        $28,000,000
                              Morts Bridge, U.S. Highway
                              41, Winnebago County,
                              Wisconsin.................
1789           MA            North Worcester County Bike      $4,000,000
                              Paths, Design and
                              Construction..............
1790           TX            Old Reliance Road Overpass       $2,000,000
                              at SH 6 (Earl Rudder
                              Freeway)--Widening project
                              in Brazos Co..............
1791           IA            Phase III of Main St.              $800,000
                              project, Amana............
1792           MN            Realign Vadnais Boulevard          $800,000
                              at interchange of I-694/
                              Highway 49, Ramsey County.
1793           CA            Reconfigure intersection at     $11,120,000
                              Highways 152 and 156 in
                              Santa Clara County........
1794           KY            Construct Georgetown             $2,400,000
                              Northwest Bypass from U.S.
                              460 West to I-75 North,
                              Scott County..............
1795           AZ            Grand Canyon Greenway            $2,560,000
                              Trails....................
1796           NY            Remediate road runoff in         $1,000,000
                              vicinity of Peconic
                              Estuary watershed.........
1797           ............  ...........................              $0
1798           OH            Construction of road               $120,000
                              improvements from Richmond
                              Road to new Cuyahoga
                              Community College in
                              Warrensville Heights, OH..
1799           MI            Construction of the I-696        $1,600,000
                              and Northwestern Highway
                              Interchange Freeway Ramps
                              at Franklin Road in
                              Southfield................
1800           OH            Construct access                 $1,600,000
                              improvements to I-680 and
                              internal roadways for
                              Corridor of Opportunity,
                              Mahoning Co...............
1801           NY            Mount Vernon Railroad Cut..      $2,000,000
1802           TX            Reconstruct and add two          $4,800,000
                              lanes to IH 27 from
                              Western Street in Amarillo
                              to Loop 335...............
1803           CO            SH 83-SH 88 Interchange          $3,200,000
                              Reconstruction--Arapahoe
                              County, CO................
1804           NY            Town of Pawling Old Rt. 55.        $400,000
1805           IL            Upgrade Curtis Road in           $5,600,000
                              conjunction with State
                              plan for I-57 interchange;
                              from Duncan Rd. to 1st
                              Street in Champaign.......
1806           MO            Upgrade Rt. 249 [Range           $8,000,000
                              Line] from Rt. 171 to I-44
1807           VA            Bland County Trails and            $800,000
                              Visitor Center--
                              Establishment of multi-use
                              trail network, associated
                              facilities and begin work
                              on visitors center........
1808           NH            Upgrade Sewalls Falls Road         $800,000
                              bridge over Merrimack
                              River in Concord..........
1809           IL            Perform Old Orchard Road           $800,000
                              Expansion and improvement
                              project between Harms Road
                              and U.S. 41, Cook County..
1810           MN            Design, engineering, and         $7,120,745
                              ROW acquisition to
                              reconstruct TH 95 bridge,
                              North Branch..............
1811           NY            Tappan Zee Bridge to I287        $1,000,000
                              Transportation Corridor...
1812           CA            Upgrade and reconstruct the     $17,480,000
                              I-80/I-680/SR 12
                              Interchange, Solano County
1813           MD            U.S. 219 Oakland Bypass....        $800,000
1814           NC            U.S. 221 widening from U.S.      $1,600,000
                              421 to Jefferson, NC......
1815           IL            Complete 80,000 lb truck         $2,400,000
                              route between CH 2 (Burma
                              Rd) and IL Rt. 130 in
                              Cumberland County.........
1816           CA            Improvement of intersection        $320,000
                              at Burbank Blvd. and
                              Hayvenhurst Ave...........
1817           OH            Construct pedestrian bridge      $2,000,000
                              over I-77; tunnel
                              underneath railroad;
                              bridge over Tuscarawas
                              River along OH and Erie
                              Canal in Tuscarawas County
1818           MN            Lake Street Access to I-         $1,600,000
                              35W, Minneapolis..........
1819           WI            Upgrade U.S. 2 in Ashland        $3,200,000
                              County....................
1820           OR            Construct an urban arterial      $4,200,000
                              street between NE Weidler
                              and NE Washington on NE
                              102nd, Portland...........
1821           CA            Construct an Interchange on      $2,028,000
                              Highway 70 at Georgia
                              Pacific Road in Oroville..
1822           AZ            Construct or Modify             $10,640,000
                              Railroad Grade Separations
                              on 6th St. and 22nd St.
                              and Reconstruct Speedway
                              Blvd. Underpass in Tucson.
1823           FL            Construct North Ormond             $880,000
                              Beach Business Park
                              Interchange at I-95
                              between U.S. 1 and SR 40,
                              Volusia County............
1824           MN            Environmental review for         $1,040,000
                              improvement along the
                              entire U.S. 10 corridor...
1825           NY            Construct visitor center,          $400,000
                              access road, and parking
                              at Sam's Point Preserve,
                              Ellenville................
1826           OH            Installation of road                $80,000
                              improvements on Old State
                              Road-SR 608 in
                              Middlefield, OH...........
1827           WA            To replace BNSF trestle,         $1,600,000
                              Sammamish River bridge and
                              reconstruct SR 202/127th
                              Pl. NE and SR 202/180th
                              Ave. NE intersections.....
1828           PA            Completion of beltway              $800,000
                              interchanges along
                              Business Route 60 in Moon
                              Township, Allegheny County
1829           TX            U.S. 290 Improvements in         $2,400,000
                              Austin, TX................
1830           CA            City of Madera, CA Improve       $2,400,000
                              SR 99--SR 145 Interchange.
1831           AL            Construct a new interchange        $800,000
                              on I-65 at Cullman, AL
                              County Road 222...........
1832           VA            National Park Service            $3,400,000
                              transportation
                              improvements to Historic
                              Jamestowne, Virginia......
1833           MI            Design and construction of       $2,400,000
                              West Michigan Regional
                              Trail Network connector to
                              link two trail systems
                              together and to Grand
                              Rapids....................
1834           TN            Plan and construct a             $7,200,000
                              bicycle and pedestrian
                              trail including
                              enhancements, Murfreesboro
1835           AZ            Replacement of Safford           $3,520,000
                              Bridge which crosses the
                              Gila River directly north
                              of Safford, AZ on North
                              8th Avenue................
1836           TX            Design and construct               $800,000
                              streetscape improvements
                              to Old Spanish Trail--SH
                              288 to Griggs, Griggs to
                              Mykawa....................
1837           TN            For each rail-highway               $45,600
                              crossing: Improve
                              circuitry on vehicle
                              protection device
                              installed at crossing in
                              Knoxville, TN.............
1838           OH            Reconstruct Broadway Ave.          $600,000
                              in Lorain.................
1839           OH            Road Widening and related        $2,728,000
                              improvements to SR 82 in
                              Macedonia, OH.............
1840           MN            Reconstruct CSAH 4 and CSAH      $1,392,000
                              5 (Forest Highway 11)
                              between CSAH 15 and TH 61,
                              Silver Bay................
1841           CA            Ramona Avenue Grade              $1,600,000
                              Separation, Montclair,
                              California................
1842           MN            Roadway improvements, City         $800,000
                              of Federal Dam............
1843           VA            Rocky Knob Heritage Center--     $1,200,000
                              Planning, design, site
                              acquisition, and
                              construction for trail
                              system and visitors center
                              on Blue Ridge Parkway.....
1844           FL            Design and construct             $1,600,000
                              capacity and safety
                              improvements for State
                              Road 426-County Road 419
                              in Oviedo from Pine St. to
                              west of Lockwood Blvd.....
1845           FL            Coordinated Regional             $1,200,000
                              Transportation Study of
                              U.S. 98 from Pensacola Bay
                              Bridge, Escambia County to
                              Hathaway Bridge, Bay
                              County, Florida...........
1846           PA            Paving and reconstruction        $1,600,000
                              in the townships: North
                              and South Eldorado, North
                              Altoona, Fairview,
                              Juniata, East End,
                              Pleasant Valley, South
                              Tracks, Lyswen-Altoona, PA
1847           AK            Ferry infrastructure at          $3,000,000
                              Seward Marine Center......
1848           AZ            Realign Davis Road from          $2,640,000
                              State Route 80 to State
                              Route 191.................
1849           PA            Reesdale Street roadway            $800,000
                              reconfiguration to allow
                              HOV access to new parking
                              facility..................
1850           WA            SR 538 (College Way) and           $140,000
                              North 26th St. Signal in
                              Mount Vernon..............
1851           TX            Acquisition of right-of-way     $11,200,000
                              and environmental
                              preservation from I-45 to
                              U.S. 59 for Grand Parkway.
1852           ID            Reconstruct Grangemont Road      $1,600,000
                              (Idaho Forest Highway 67)
                              from Orofino to Milepost
                              9.3.......................
1853           VA            Expansion of South Airport       $6,240,000
                              Connector Road (Clarkson
                              Road to Charles City).....
1854           NY            Design and Construction of         $384,000
                              bicycle and pedestrian
                              facilities in the area of
                              the Roosevelt Avenue
                              Bridge....................
1855           NC            Construct Endor Iron               $800,000
                              Furnace Greenway
                              enhancements from Deep
                              River to Sanford..........
1856           CO            Improve and widen State          $3,200,000
                              Highway 44 from Colorado
                              Boulevard to State Highway
                              2.........................
1857           FL            Fund improvement of U.S.         $1,600,000
                              301 corridor in Sumter and
                              Marion Counties...........
1858           TN            Complete construction and           $80,000
                              landscaping of visitor
                              center on Cherohala Skyway
                              in Monroe County, TN......
1859           OR            Construction of the East         $5,200,000
                              Burnside Street
                              improvements, Portland....
1860           AL            Expand to 4 lanes U.S.             $800,000
                              Highway 278 from Sulligent
                              to Guin...................
1861           IL            Francis Cabrini/W. Green           $480,000
                              Homes CHA Street
                              Construction, City of
                              Chicago...................
1862           NY            Plan and construct               $8,000,000
                              greenway, bicycle path,
                              esplanades and ferry
                              landing along New York Bay
                              in Sunset Park, Brooklyn..
1863           PA            Construct Dubois Regional          $480,000
                              Medical Center Access Road
1864           NY            To design and construct          $1,680,000
                              safe route to school
                              projects in Brooklyn,
                              Queens and Manhattan, NY..
1865           PA            U.S. 30 corridor                 $2,600,000
                              improvements from PA 896
                              to PA 897. Connects PA 41.
1866           MD            U.S. 40 Alternate,               $4,000,000
                              Middletown Bypass.........
1867           CA            Construction of a smart             $40,000
                              crosswalk system at the
                              intersection of Topanga
                              Canyon Blvd. and Gault St.
1868           WI            Expand U.S. 51 and SH 29 in      $6,400,000
                              Marathon County...........
1869           PA            Construct 2 flyover ramps        $5,600,000
                              and S Linden St. ext for
                              access to industrial sites
                              in the cities of
                              McKeesport and Duquesne...
1870           NY            Improvements and upgrades          $160,000
                              on Main Street, Beekman,
                              NY........................
1871           NY            Construct pedestrian             $5,600,000
                              walkway along Route 9A in
                              Hudson River Park, New
                              York City.................
1872           IN            Design engineering, right-       $1,600,000
                              of-way acquisition, and
                              construction for the Grant
                              County Economic Corridor..
1873           MN            City of Marshall TH 23 4-        $2,630,400
                              Lane Extension............
1874           IL            Henry Horner Homes CHA             $800,000
                              Street Construction, City
                              of Chicago................
1875           TN            Improve circuitry on               $126,400
                              vehicle protection device
                              installed at highway-RR
                              crossing in Knoxville, TN.
1876           NJ            Construct Intersection at        $1,200,000
                              Route 46 and Little Ferry
                              Circle in Little Ferry....
1877           AR            Improve State Highway 88         $3,560,000
                              (Higdon Ferry Road) in Hot
                              Springs...................
1878           MD            Improve U.S. 1, Washington         $800,000
                              Boulevard Corridor in
                              Howard County.............
1879           NY            Downtown Flushing Traffic          $800,000
                              and Pedestrian
                              Improvements..............
1880           FL            Arlington Expressway Access      $1,200,000
                              Rd., Jacksonville.........
1881           CO            Construct arterial on W          $6,000,000
                              side of Montrose to ease
                              traffic congestion on SH
                              550 between Grand Avenue,
                              N/S of city...............
1882           CO            North I-25: Denver to Fort       $7,733,333
                              Collins, Colorado.........
1883           CA            Planning for Orange Line           $280,000
                              Mag Lev from downtown Los
                              Angeles to central Orange
                              County....................
1884           NJ            Rahway Streetscape                 $400,000
                              Replacement Project.......
1885           CT            Reconstruct I-95/I-91            $1,600,000
                              interchange and construct
                              pedestrian walkway, New
                              Haven.....................
1886           VA            Blue Ridge Music Center--        $1,200,000
                              Install lighting/ steps,
                              upgrade existing trail
                              system and equip
                              interpretative center with
                              visitor information.......
1887           VA            Ceres Recreation Trail and         $120,000
                              Center--Design and
                              construct pedestrian/
                              bicycle trail in community
                              of Ceres and establish
                              trail center..............
1888           ME            Construction of trails           $1,000,000
                              within the Eastern Trail
                              Management District.......
1889           GA            I-75 interchanges from             $800,000
                              north of Tifton to Turner
                              County line...............
1890           GA            City of Savannah, Construct        $160,000
                              bike and pedestrian paths
                              along Heritage Rail.......
1891           FL            Implementation of the            $1,600,000
                              Advanced Traffic
                              Management System, Boca
                              Raton, FL.................
1892           NY            Lyell Avenue: NY Rt. 259         $1,280,000
                              (Union Street) to Village
                              Line, Village of
                              Spenscerport, Town of
                              Ogden.....................
1893           WI            Construct U.S. 151 between       $3,000,000
                              CTH D and SH 175, Fond du
                              Lac County, WI............
1894           OH            Construct transportation         $8,400,000
                              enhancement projects,
                              Toledo....................
1895           TX            Contruct grade separation        $4,000,000
                              at U.S. 59 and SH 99.
                              Replace the proposed
                              interim cloverleaf ramps
                              at the intersection.......
1896           MS            Gateways Transportation            $200,000
                              Enhancement Project,
                              Hancock County............
1897           NY            Install Improvements for           $250,000
                              Pedestrian Safety
                              including in the vicinity
                              of IS X194................
1898           OK            Improvements to SH 412P at       $3,600,000
                              412 Interchange...........
1899           FL            Acquire right-of-way and         $4,000,000
                              construct East-West
                              Connector from SR 37 to SR
                              563 in Lakeland, FL.......
1900           WA            Design Valley Mall Blvd.         $5,120,000
                              for Main St. to I-82 and
                              two I-82 interchanges at
                              Mileposts 36 and 38 in
                              Union Gap, WA.............
1901           WA            Extension of Waaga Way west        $400,000
                              to Old Frontier Rd........
1902           ME            Plan and construct highway       $1,000,000
                              access between U.S. Route
                              161 and U.S. Route 1 in
                              Madawaska.................
1903           CA            Randolph St. improvements          $960,000
                              between Wilmington Ave.
                              and Fishburn Ave. in
                              Huntington Park...........
1904           CA            Reconstruct Azusa Ave. and       $2,000,000
                              San Gabriel Ave. for 2-way
                              traffic in Azusa..........
1905           KS            Construction of a 1.5 mile         $400,000
                              alternate truck route in
                              Downs, Kansas.............
1906           AL            Pedestrian Improvements for        $106,667
                              Columbiana, AL............
1907           MN            Reconstruct CSAH 91 from         $4,000,000
                              the D.M. and I.R. Railroad
                              crossing at 8th Street in
                              Duluth to CSAH 56, St.
                              Louis County..............
1908           NY            Construct Wayne County, NY         $276,000
                              rails to trails initiative
1909           MA            Design and construct signal        $600,000
                              crossing and other safety
                              improvements to Emerald
                              Necklace Greenway Bicycle
                              Trail, Town of Brookline..
1910           MI            Construction of                    $240,000
                              Nonmotorized Pathway, City
                              of Rockwood...............
1911           WA            Purchase of scenic easement        $480,000
                              or site at I-90 and
                              Highway 18................
1912           PA            Reconstruct the SR 33, 512       $2,000,000
                              interchange in the Borough
                              of Wind Gap...............
1913           NY            Access improvements for          $3,200,000
                              terminal located on 12th
                              Ave. between W. 44th and
                              W. 54th St. in Manhattan..
1914           IL            Completion of the Grand          $1,034,000
                              Illinois Trail, Cook
                              County....................
1915           CA            Construct and improve            $1,360,000
                              medians and drainage on
                              Imperial Highway from west
                              border to east border of
                              city in La Mirada.........
1916           CT            Construct Pomfret                   $80,000
                              Pedestrian Bridge.........
1917           NV            Construct Laughlin Bullhead      $1,600,000
                              City Bridge...............
1918           PA            Design, engineering, ROW           $800,000
                              acquisition, and
                              construction of the
                              widening of Pennsylvania
                              Rt. 443 Corridor in Carbon
                              County....................
1919           NY            Palisades Interstate               $600,000
                              Parkway Mitigation
                              Measures for New Square...
1920           CA            Reconstruct and widen Del        $2,400,000
                              Amo Blvd. to four lanes
                              between Normandie Ave. and
                              New Hampshire Ave., Los
                              Angeles County............
1921           MN            Reconstruct Unorganized            $820,000
                              Township Road 488 from
                              CSAH 138, Koochiching
                              County....................
1922           NY            Reconstruction of Empire         $5,120,000
                              Boulevard.................
1923           PA            Reconstruction of PA 309         $2,000,000
                              from Greenwood Avenue to
                              Welsh Road................
1924           TN            Construction of I-69 in         $11,300,000
                              Obion, Dyer, Lauderdale
                              and Tipton Counties.......
1925           IL            Design, land acquisition,        $1,600,000
                              and construction of South
                              Main St. (IL 2) Corridor
                              from Beltline Rd. to Cedar
                              Street in Rockford, IL....
1926           OH            Grading, paving, roads for      $12,000,000
                              the transfer of rail to
                              truck for the intermodal
                              facility at Rickenbacker
                              Airport...................
1927           MA            Reconstruction of Pleasant       $1,600,000
                              Street, Watertown.........
1928           MN            Lake Wobegon Trail corridor        $281,600
                              from Sauk Centre to the
                              Stearns County line.......
1929           RI            Replace Sakonnet Bridge....      $1,600,000
1930           CA            Conduct study and construct      $4,000,000
                              CA State Route 239 from
                              State Route 4 in Brentwood
                              area to I-205 in Tracy
                              area......................
1931           MA            Geometric improvements,          $1,200,000
                              safety enhancements and
                              signal upgrades at Rt. 28
                              and Rt. 106, intersection
                              West Bridgewater..........
1932           WA            Fife--Widen 70th Ave. East         $800,000
                              and Valley Ave. East......
1933           CA            Construct two right hand           $400,000
                              turn for Byzantine Latino
                              Quarter transit plazas at
                              Normandie and Pico, and
                              Hoover and Pico, Los
                              Angeles...................
1934           WA            I-90 Two-Way Transit-HOV         $3,200,000
                              Project...................
1935           AL            Construct Talladega                $800,000
                              Mountains Natural Resource
                              Center--An educational
                              center and hub for hikers,
                              bicyclists, and
                              automobiles...............
1936           MD            Gaithersburg, MD Extension       $1,120,000
                              of Teachers Way-Olde Towne
                              Gaithersburg
                              Revitalization............
1937           IL            Millburn By-Pass (US Route       $2,080,000
                              45 at Gross Lake Road/
                              Millburn Road), Lake
                              County....................
1938           AK            Planning, design, and EIS        $2,000,000
                              of Bradfield Canal Road...
1939           TX            Reconstruct Clinton Drive       $11,200,000
                              from Federal Rd. to N.
                              Wayside Drive.............
1940           GA            Pave portions of CR 345, CR        $400,000
                              44, and CR 45, Hancock
                              County....................
1941           NY            Deer Avoidance System, to          $200,000
                              deter deer from milepost
                              marker 494.5, Ripley, PA,
                              to 304.2., Weedsport, NY
                              along I-90................
1942           CA            El Camino Real Grand Blvd.       $3,000,000
                              Initiative in San Mateo
                              County....................
1943           CA            Construct Guadalupe River        $6,400,000
                              Trail from I-880 to
                              Highway 237 in Santa Clara
                              County....................
1944           TN            Cocke County, Tennessee SR         $800,000
                              32 reconstruction.........
1945           IL            Construct I-80, Ridgeland          $800,000
                              Ave. Improvements, Tinley
                              Park......................
1946           KY            Construct Pedestrian Mall        $3,124,000
                              and Streetscape
                              Improvements on Lexington,
                              College, Walnut and
                              Gilespie Sts, Wilmore.....
1947           PA            PA 23 corridor improvements      $2,400,000
                              from U.S. 30 to U.S. 322..
1948           NJ            Replacement and realignment        $844,000
                              of Amwell Road Bridge over
                              Neshanic River............
1949           FL            City of Wilton Manors              $300,000
                              Powerline Road Streetscape
                              Enhancement Project.......
1950           TX            Construct SH 199 (Henderson      $6,400,000
                              St.) through the Trinity
                              Uptown Project between the
                              West Fork and Clear Fork
                              of the Trinity River in
                              Fort Worth................
1951           IN            Construction of multi-use          $200,000
                              paths, Town of Fishers,
                              Indiana...................
1952           OH            Construct White Pond Drive         $800,000
                              project in Akron..........
1953           MN            Design and right-of-way            $800,000
                              acquisition for I-35 E
                              CSAH 14 Main Street
                              Interchange, City of Lino
                              Lakes, Minnesota..........
1954           OR            Expand storage facilities        $2,500,000
                              in Eugene to support
                              transportation enhancement
                              activities throughout the
                              State.....................
1955           CA            Improvements to U.S. 101           $320,000
                              ramps between Winnetka
                              Ave. and Van Nuys Blvd....
1956           IN            Acquire right-of-way for         $2,400,000
                              and construct University
                              Parkway from Upper Mount
                              Vernon Road to SR 66......
1957           CA            Pine Avenue extension from       $6,800,000
                              Route 71 to Euclid Avenue
                              in the City of Chino,
                              California................
1958           MO            Confluence Greenway Land           $560,000
                              Acquisition for Riverfront
                              Trail development in St.
                              Louis.....................
1959           TN            Retrofit noise abatement         $2,000,000
                              walls in Davidson County..
1960           MA            Streestcape and pedestrian       $3,200,000
                              access improvements
                              between Museum Road and
                              Forsyth Way...............
1961           MI            Commerce, Haggerty Road          $1,200,000
                              from 14 Mile to Richardson
1962           WI            Expand SH 23, County            $24,000,000
                              Highway OJ to U.S. Highway
                              41, WI....................
1963           FL            Construct interchange at I-        $800,000
                              95 and Matanzas Woods
                              Parkway, Flagler County...
1964           IL            Miller Road Widening and         $6,364,000
                              Improvement, McHenry......
1965           NC            Construct Neuse River Trail      $1,600,000
                              in Johnston County........
1966           TX            Construct landscaping and        $1,600,000
                              other pedestrian amenities
                              in segments of the Old
                              Spanish Trail and Griggs
                              Road rights-of-way........
1967           NY            Construction of and                $800,000
                              improvements to Union Road
                              and Walden Avenue in
                              Cheektowaga...............
1968           LA            Construction of West             $3,200,000
                              Covington Bypass-LA 21
                              Widening..................
1969           MS            Construct Byrd Parkway           $1,200,000
                              Extension, Petal..........
1970           NY            Intermodal transportation        $3,200,000
                              improvements in Coney
                              Island....................
1971           MN            Construct one mile of new        $2,624,000
                              roadway and a bridge
                              crossing the DM&IR
                              railroad tracks, and
                              construct connector
                              between CSAH 14 and CSAH
                              284, Proctor..............
1972           NH            Construct Park and Ride,         $1,600,000
                              Exit 5 on I-93--
                              Londonderry, NH...........
1973           PA            Design, engineering, ROW           $160,000
                              acquisition and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in Exeter
                              Borough, Luzerne County...
1974           PA            Extension of River Road in       $1,200,000
                              Reading, PA to provide
                              access to major industrial
                              and brownfields sites.....
1975           AK            Point MacKenzie in               $1,000,000
                              Matanuska-Susitna Borough
                              plan and design road
                              access....................
1976           TX            Repair 4.35 miles of Lake        $4,800,000
                              Ridge Parkway. Widen
                              roadway along with 2
                              bridges from 4 lanes to 6
                              across Joe Poole Lake in
                              Grand Prairie, TX.........
1977           IL            Robert Taylor Homes CHA            $440,000
                              Street Construction, City
                              of Chicago................
1978           OR            Rockwood Town Center for         $2,000,000
                              Stark Street from 190th to
                              197th for pedestrian,
                              bicycle and transit
                              facilities and safety
                              mitigation................
1979           PA            Route 89 Curve Realignment         $240,000
                              one mile north of
                              Titusville on Route 89....
1980           FL            Sand Lake Road Improvements      $4,800,000
                              between Presidents Drive
                              and I-4...................
1981           MI            Sault Ste. Marie,                  $760,000
                              Reconstruct East Spruce
                              Street with drainage,
                              curb, gutter, pavement,
                              traffic control devices...
1982           MI            Study and construct I-96/        $2,000,000
                              U.S. 31/Sternberg Road
                              area improvements.........
1983           PA            Provide access to HOV ramp       $1,600,000
                              from Reedsdale Street with
                              traffic signals, pavement
                              markings, lane control and
                              fast acting gates.........
1984           IL            The extension of MacArthur       $1,200,000
                              Blvd. from Wabash to Iron
                              Bridge Road. Springfield..
1985           IL            Construct Cedar Creek              $400,000
                              Linear Park Trail, Quincy.
1986           IN            Conduct study for U.S. 50          $240,000
                              Corridor Improvements,
                              Dearborn County, Indiana..
1987           IL            Design, land acquisition,        $1,600,000
                              and construct West State
                              St. (US Business 20) from
                              Meridan Rd. to Rockton
                              Ave. in Rockford, IL......
1988           CA            The Foothill South Project,      $8,000,000
                              construct 16 miles of a
                              six-lane limited access
                              highway system............
1989           MI            Construct Road Improvements      $2,400,000
                              to Miller Rd. from I-75 to
                              Linden Rd. Flint Township.
1990           CA            State Route 99 improvements      $3,200,000
                              at Sheldon Road...........
1991           KY            The Kentucky Multi-Highway       $1,280,000
                              Preservation Project......
1992           NY            Town of Warwick, NY. Bridge        $140,000
                              replacement on Buttermilk
                              Falls Rd..................
1993           TN            Improve existing two lane        $8,000,000
                              highway to a four lane
                              facility along the U.S.
                              412 Corridor west of
                              Natchez Trace to U.S. 43
                              at Mount Pleasant.........
1994           NY            Town of Warwick, NY East           $640,000
                              Shore Road reconstruction.
1995           FL            Traffic Reconfiguration of         $800,000
                              SR 934 and U.S. 1 Route,
                              Miami.....................
1996           PA            For design, engineering,           $240,000
                              ROW acquisition, and
                              construction of the third
                              phase of the Marshalls
                              Creek Bypass Project in
                              Monroe County,
                              Pennsylvania..............
1997           MI            Construct North Central          $1,840,000
                              Muskegon County Corridor
                              Improvements at U.S. 31
                              and Russell Road..........
1998           OH            Reconstruct I-75/I-475           $2,400,000
                              Interchange, Toledo.......
1999           NY            College Point 20th Avenue          $700,000
                              Streetscapes Improvements
                              Project in Queens.........
2000           OH            Construct a 4 lane limited         $550,000
                              access road to link
                              Newcomerstown and Cadiz...
2001           CT            Construct trail to extend          $400,000
                              the Pequonnock Valley rail-
                              trail through Trumbull and
                              into Bridgeport, CT.......
2002           AK            Providence Hospital Public       $3,000,000
                              Access Road...............
2003           TX            I Road Between Nolana Loop       $1,520,000
                              and FM 495 in Hidalgo
                              County....................
2004           NC            North Carolina. Add passing      $4,800,000
                              lanes and safety
                              improvements to U.S.
                              Highway 64 in Transylvania
                              County....................
2005           TN            Improve streetscape and            $240,000
                              pavement repair, Blount
                              County, TN................
2006           CT            Reconstruction of State          $1,200,000
                              Route 111 from Purdy Hill
                              Road to Fan Hill Road,
                              Monroe, CT................
2007           IL            Resurface Trumbull Ave. and        $320,000
                              Homan Ave., Evergreen Park
2008           GA            Hwy 78 Corridor Improvement        $400,000
                              Gwinnett County...........
2009           TX            Construct Southwest Bypass       $3,200,000
                              in Georgetown, Texas,
                              between SH 29 and Ranch
                              Road 2243.................
2010           MO            To improve U.S. 54 to a            $800,000
                              four lane highway from the
                              Osage River to MO Route KK
2011           MS            Upgrade roads in                   $160,000
                              Mayersville (U.S. Highway
                              14 and 1), Issaquena
                              County....................
2012           MA            Gainsborough St. and St.           $900,000
                              Botolph St. Improvements..
2013           IN            Construct U.S. 31 Kokomo           $800,000
                              Corridor Project for
                              Kokomo Howard County,
                              Indiana...................
2014           OH            Construction of Tri-State        $1,600,000
                              Outer Belt in Lawrence
                              County....................
2015           PA            Completion of I-79-Kirwin        $1,600,000
                              Heights Interchange and
                              construction of retaining
                              walls, bridge and new
                              ramps.....................
2016           OH            Construction of the Carroll      $3,600,000
                              Area Interchange in
                              Fairfield County..........
2017           CA            Construct the Silicon            $6,400,000
                              Valley Transportation
                              Incident Management Center
                              in San Jose...............
2018           CA            Design and Construction            $800,000
                              Camino Tassajara Crown
                              Canyon to East Town
                              Project, Danville, CA.....
2019           NY            Traffic mitigation on              $120,000
                              Bridge Street and Maple
                              Avenue, Florida, NY.......
2020           WI            North 28th Street Phase 2        $1,024,000
                              roadway safety
                              improvements from Weeks
                              Avenue to Hill Avenue in
                              Superior..................
2021           NC            Upgrade U.S. 74 in Columbus      $5,600,000
                              County....................
2022           MS            Upgrade U.S. 78 to               $8,000,000
                              Interstate Standards from
                              the MS/TN State line to
                              the MS/AL State line......
2023           IN            Improve Bailie Street,             $256,000
                              Kentland..................
2024           CA            Realignment of La Brea           $2,640,000
                              Avenue to reduce
                              congestion, City of
                              Inglewood.................
2025           IL            Resurface Elston Avenue          $1,600,000
                              from Milwaukee to Pulaski,
                              Chicago...................
2026           TN            Sullivan, Washington             $1,600,000
                              Counties, Tennessee SR 75
                              widening..................
2027           GA            U.S. 17/SR 404 Spur, Back        $4,000,000
                              River bridge replacement,
                              Savannah..................
2028           MS            U.S. 98 access improvements      $4,000,000
                              and new I-59 interchange,
                              Lamar County..............
2029           VA            Construct South Airport            $400,000
                              Connector, Richmond
                              International Airport.....
2030           NY            City of Peeskill, NY Street        $104,000
                              Resurfacing Program.
                              Riverview Avenue..........
2031           GA            SR 400 at SR 120 Old Milton        $800,000
                              Parkway intersection
                              improvement Fulton County,
                              Georgia...................
2032           MA            East Boston Haul Road            $5,000,000
                              Construction..............
2033           NY            Town of Goshen Orzeck Road         $320,000
                              reconstruction............
2034           VA            Revitalize Main Street in          $580,000
                              Dumfries..................
2035           FL            Replace Platt Street Bridge      $2,400,000
2036           FL            Access Rd. Streetscaping,          $400,000
                              Sanford Airport...........
2037           NY            Rockland County and City of        $800,000
                              Yonkers to Lower-Manhattan
                              Ferry Boat project........
2038           SC            Complete construction of         $5,600,000
                              Palmetto Parkway (I520)
                              Extension (Phase II) to I-
                              20........................
2039           NM            U.S. 62-180 Reconstruction,      $4,000,000
                              Texas State Line to
                              Carlsbad..................
2040           IL            For U.S. Rt. 30                  $5,600,000
                              intersection signals, turn
                              and deceleration lanes
                              btwn Williams St. and IL
                              Rt. 43 incl. 80th Ave,
                              Wolf Rd., Lincoln Way HS
                              and Locust St.............
2041           OH            Construct Orchard Lane to          $400,000
                              Factory Road Connector,
                              Greene County.............
2042           TX            Construct a bridge impact          $400,000
                              protection system for
                              TxDOT.....................
2043           NC            Design and construction of       $4,000,000
                              the Airport Area Roadway
                              Network, High Point, North
                              Carolina..................
2044           VA            Repair Colorado Street           $1,400,000
                              bridge in Salem, Virginia.
2045           CA            Project to evaluate air             $80,000
                              quality and congestion
                              mitigation benefits of a
                              Hybrid Utility Vehicle in
                              Santa Barbara County......
2046           PA            Mill Street improvements,          $720,000
                              Borough of Lansdale.......
2047           MN            Construction of County           $2,560,000
                              State Aid Highway 21,
                              Scott County, MN..........
2048           ............  ...........................              $0
2049           TX            Two direct connectors in         $4,000,000
                              Houston, Texas between IH
                              10 and SH 99, The Grand
                              Parkway...................
2050           MO            Upgrade of Rt. 71 from          $12,000,000
                              Pineville to Arkansas
                              State Line................
2051           CA            Improve interstates and         $20,000,000
                              roads part of the Inland
                              Empire Goods Movement
                              Gateway project in and
                              around the former Norton
                              Air Force Base............
2052           IL            Preconstruction activities         $400,000
                              for Sangamon Valley
                              Bicycle Trail (IL)........
2053           MI            St. Clair County Parks is          $400,000
                              working with 13 local
                              units to develop the 54-
                              mile Bridge-to-Bay trail..
2054           NJ            New Jersey Underground             $256,000
                              Railroad for preservation,
                              enhancement and promotion
                              of sites in New Jersey....
2055           CA            Construction of an                 $800,000
                              interchange at Lammers
                              Road and I-205, Tracy, CA.
2056           MN            Corridor Preservation            $2,400,000
                              Studies and Right-of-Way
                              acquisition, St. Cloud
                              Metro Area................
2057           NY            Improve CR 39 from NY 27 to      $3,000,000
                              NY 27A, Suffolk County....
2058           PA            Street improvements,               $520,000
                              Borough of Ambler.........
2059           KY            Reconstruction of KY 61            $800,000
                              from Greensburg in Green
                              County to Columbia in
                              Adair County..............
2060           TX            Construct Loop 12-IH 35E           $800,000
                              and SH 183 west extension
                              to MacArthur, Irving,
                              Texas.....................
2061           NC            To plan, design, and               $236,800
                              construct the segment of
                              Berkeley Blvd. from Royal
                              Avenue to Hew Hope Rd. (SR
                              1003) in Goldsboro, NC....
2062           OH            Upgrade Manchester Rd. in        $3,200,000
                              Akron.....................
2063           IL            St. Charles Road, The              $800,000
                              Village of Bellwood.......
2064           TN            Engineer, design and             $7,200,000
                              construction of connector
                              road from I-75 interchange
                              across Enterprise South
                              Industrial Park to Hwy 58
                              in Hamilton County........
2065           TX            Construct 4 lane divided         $1,600,000
                              roadway along SH 71 from
                              the Perdernales River to
                              Bee Creek.................
2066           CT            I-84 Danbury Exits I-11          $2,720,000
                              Upgrade Interchanges......
2067           CA            Complete the engineering         $4,000,000
                              design and acquire the
                              right-of-way needed for
                              the Arch-Sperry project in
                              San Joaquin County........
2068           UT            Increase lane capacity on        $3,000,000
                              bridge over Virgin River
                              on Washington Fields Road
                              in Washington.............
2069           NY            Installation of Utica            $2,400,000
                              Traffic Signal System.....
2070           NC            To construct an interchange        $947,200
                              at an existing grade
                              separation at SR 1602 (Old
                              Stantonsburg Rd.) and U.S.
                              264 Bypass in Wilson
                              County, NC................
2071           WA            U.S. 12 Burbank to Walla         $3,440,000
                              Walla: Construct new four
                              lane highway for portion
                              of U.S. 12................
2072           ............  ...........................              $0
2073           OH            Structural improvements to         $400,000
                              two bridges over the
                              Zimber Ditch between 38th
                              St. and Whipple Ave. in
                              Canton, Ohio..............
2074           OK            U.S. 281, Widen U.S. 281           $800,000
                              from the new U.S. 281 Spur
                              North to Geary Canadian
                              County, OK................
2075           MI            City of Negaunee, Croix            $900,000
                              Street reconstruction-
                              Streetscape and
                              resurfacing from U.S. 41
                              to Maas Street............
2076           KS            Construct I-35 and Lone Elm      $4,000,000
                              Road interchange and widen
                              I-35 from 151st St. to
                              159th St., Olathe.........
2077           MI            Integrated highway                 $400,000
                              realignment and grade
                              separations at Port Huron,
                              MI to eliminate road
                              blockages from NAFTA rail
                              traffic...................
2078           OK            U.S. 60, Widen U.S. 60           $2,400,000
                              between Bartlesville and
                              Pawhuska, Osage County, OK
2079           WA            Construct an off-ramp from         $400,000
                              I-5 to the intersection of
                              Alderwood Mall Blvd. and
                              Alderwood Mall Pkwy.......
2080           CA            Reduce congestion and boost      $5,600,000
                              economies through safer
                              access to the coast by
                              realigning Hwy 299 between
                              Trinity and Shasta
                              Counties..................
2081           IL            Pre-construction and               $800,000
                              construction activities on
                              U.S. 45/LaGrange Road from
                              131st Street to 179th
                              Street....................
2082           AR            Van Buren, Arkansas--Widen       $3,000,000
                              and reconstruct Rena Road.
2083           GA            Construction of                  $4,800,000
                              infrastructure for inter-
                              parcel access, median
                              upgrades, lighting, and
                              beautification along
                              Highway 78 corridor.......
2084           CA            Construct Alviso Bay Trail         $800,000
                              from Gold Street in
                              historic Alviso to San
                              Tomas Aquino Creek in San
                              Jose......................
2085           MS            Construct bicycle and              $680,000
                              trolley path, Hattiesburg.
2086           WI            Construct a bike and               $240,000
                              pedestrian bridge across
                              SH 100 at the 1800 block
                              of S. 108th Street, West
                              Allis.....................
2087           IL            Increasing the height on         $2,400,000
                              the IL Rt. 82 Railroad
                              Underpass in Geneseo, IL..
2088           NC            U.S. 70 Goldsboro Bypass...        $800,000
2089           CA            Vasco Road Safety                  $800,000
                              Improvements, Contra Costa
                              Transportation Authority
                              and the County of Alameda
                              Public Works, California..
2090           NY            Downtown Flushing                  $880,000
                              Multimodal Connection
                              Project, Queens...........
2091           MD            Construct Safety and             $2,000,000
                              Operations Improvements at
                              Martin Luther King, Jr.,
                              Blvd. and W. Baltimore
                              Street in Baltimore.......
2092           NY            Rehabilitate Riis Park             $300,000
                              Boardwalk.................
2093           TX            Construct 25 mile stretch        $9,200,000
                              of the 177-mile loop,
                              between IH-45 south and SH
                              288.......................
2094           UT            Construction of Midvalley          $800,000
                              Highway, Tooele County,
                              Utah......................
2095           WA            Improve Willapa Hills              $700,000
                              bicycle and pedestrian
                              trail between Chehalis and
                              Pacific County............
2096           PA            Design and construct             $4,800,000
                              interchange and related
                              improvements at I-83 Exit
                              18........................
2097           VA            Northern Virginia Potomac          $800,000
                              Heritage National Scenic
                              Trail.....................
2098           NC            Wilmington Area Port Access      $2,400,000
                              Improvements..............
2099           OK            Construction of Midwest            $800,000
                              City Pedestrian Walkway...
2100           ............  ...........................              $0
2101           GA            Construct access roads on        $1,600,000
                              Airport Loop road in
                              Hapeville.................
2102           TN            Construct 2nd Creek                $548,560
                              Greenway, Knoxville,
                              Tennessee.................
2103           NE            Design, right-of-way and         $2,000,000
                              construction for the
                              Louisville Bypass,
                              Nebraska..................
2104           HI            Construct Honoapiilani           $2,400,000
                              Highway Realignment.......
2105           TN            Hamblen County, Tennessee          $800,000
                              U.S. 25E interchange
                              improvements..............
2106           IL            Construction of a new              $960,000
                              bicycle-pedestrian bridge
                              in Wayne, IL..............
2107           PA            David Lawrence Convention          $960,000
                              Center Phase IV-
                              reconstruction of roadways
                              assoc. with HQ hotel
                              project...................
2108           CO            I-70 and SH 58 Interchange:      $5,976,000
                              Reconstruction of existing
                              ramps, building of missing
                              ramps and ROW acquisition.
2109           OH            Reconstruct U.S. Route 6         $2,640,000
                              (Lake Road). Rocky River..
2110           WA            Construct 6 mile span over       $4,108,000
                              I-5 in Thurston County to
                              connect Chehalis Western
                              Trail.....................
2111           IL            Extend Frank Scott Parkway       $2,240,000
                              East Road to Scott AFB,
                              St. Clair County..........
2112           OH            Reconfigure I-480 and              $800,000
                              Transportation Blvd.
                              Interchange, Garfield
                              Heights...................
2113           NY            Rehabilitation of Route 100        $880,000
                              from Virginia Road to
                              Westchester Community
                              College...................
2114           TN            Restoration of historic L&N         $16,000
                              Depot, McMinn County,
                              Tennessee.................
2115           SD            Resurface 10 miles of U.S.       $1,840,000
                              18 from Okreek to Carter
                              on the Rosebud Indian
                              Reservation...............
2116           CA            Route 198 Expansion, from        $2,400,000
                              SR 99 to SR 43............
2117           WA            SR 543 Interstate 5 to           $3,000,000
                              International Boundary
                              Enhancement in Blaine.....
2118           MD            Rockville, MD Construction       $3,200,000
                              of Maryland Avenue and
                              Market Street Intermodal
                              Access Project............
2119           MN            U.S. Highway 212 expansion         $800,000
                              from Carver Cnty Rd. 147
                              to Cologne and from
                              Cologne to Norwood Young
                              America...................
2120           VA            Vienna, VA Maple Avenue          $1,320,000
                              improvement project.......
2121           IL            Village of South                   $762,058
                              Jacksonville--West
                              Vandalia Road upgrades....
2122           ............  ...........................              $0
2123           ............  ...........................              $0
2124           FL            Destiny Rd. Reconstruction,        $800,000
                              Eatonville................
2125           KY            Construct New Technology         $1,600,000
                              Triangle Access Road,
                              Campbell County, Kentucky.
2126           NY            Town of Wawayanda                  $400,000
                              reconstruction of McVeigh
                              Road......................
2127           VA            Virginia Creeper Trail--           $680,000
                              Trail needs, including
                              construction of restroom
                              facilities at Watauga and
                              Alvarado and parking
                              expansion at Watauga......
2128           CA            Construct grade separation      $12,800,000
                              on State College Blvd. at
                              the Burlington Northern
                              Santa Fe railroad,
                              Fullerton.................
2129           MA            Warren Street--Blue Hill         $2,400,000
                              Avenue....................
2130           FL            Design and construct Dunn        $1,600,000
                              Avenue Extension, Volusia
                              County....................
2131           CA            Construct operational and        $2,000,000
                              safety improvements to I-
                              880 N at 29th Ave. in
                              Oakland...................
2132           WA            U.S. 395, North Spokane          $4,640,000
                              Corridor Improvements.....
2133           NY            Route 531 Expansion              $5,920,000
                              Spencerport-Brockport, 4-
                              lane Highway is a project
                              to extend Rt. 531.........
2134           OR            Columbia Intermodal             $11,000,000
                              Corridor for rail
                              congestion relief,
                              improved intersections and
                              access to Interstate-5 for
                              trucks, and grade-separate
                              road from rail, Portland..
2135           OH            Interchange and related          $2,000,000
                              road improvements to SR 44
                              in Painesville, OH........
2136           GA            Greene County, Georgia             $960,000
                              conversion of I-20 and
                              Carey Station Road
                              overpass to full
                              interchange...............
2137           IL            Pioneer Parkway upgrade in       $1,600,000
                              Peoria--Extension from
                              Allen Road to Route 91....
2138           MS            Construct historic bicycle         $120,000
                              path, Pascagoula..........
2139           PA            Crows Run Relocation from        $3,080,000
                              SR 65 to Freedom Crider
                              Road......................
2140           OH            Replace the Edward N.            $8,000,000
                              Waldvogel Viaduct in
                              Cincinnati................
2141           NC            Construct I-540 from NC 55       $8,800,000
                              South to NC 55 North......
2142           NY            Roadway, streetscape,            $3,200,000
                              pedestrian, and parking
                              improvements to the
                              Buffalo Niagara Medical
                              Campus, Buffalo...........
2143           VA            Upgrade DOT crossing                $35,520
                              #470515H to constant
                              warning devices in Halifax
2144           PA            Design, engineering, ROW           $160,000
                              acquisition and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in Avoca
                              Borough, Luzerne County...
2145           WA            Bridge Modification and          $3,000,000
                              Interstate Highway
                              Protection Project, Skagit
                              River, in Skagit County...
2146           TN            Construct welcome center,          $160,000
                              Macon County..............
2147           CA            Construction of new roadway        $800,000
                              lighting on major
                              transportation corridors
                              in the Northwest San
                              Fernando Valley...........
2148           MO            Interchange design and             $800,000
                              construction for the Main
                              Street Extension at I-55,
                              Cape Girardeau County.....
2149           CA            Replace SR 22 interchanges,      $5,200,000
                              construct HOV lanes, and
                              lengthen bridges in Garden
                              Grove.....................
2150           IL            Construction of CAP I-290          $800,000
                              Village of Oak Park.......
2151           RI            Rehabilitation of Bridge         $4,400,000
                              Number 550 in Pawtucket...
2152           WA            Complete analysis,                 $600,000
                              permitting and right-of-
                              way procurement for I-5/SR
                              501 Interchange
                              replacement in Ridgefield.
2153           CA            Design and construct new         $1,600,000
                              interchange at Potrero
                              Blvd. and State Route 60
                              in Beaumont...............
2154           TN            Construction of a                  $800,000
                              pedestrian bridge in
                              Alcoa, TN.................
2155           WV            Construct 4 lane                $35,400,000
                              improvements on U.S. Route
                              35 in Mason County........
2156           OH            Construct Grade Separation         $400,000
                              at Front Street, Berea....
2157           CA            Crenshaw Blvd.                     $640,000
                              Rehabilitation, 182nd St.
                              190th St.; and Crenshaw
                              Blvd. at 182nd St. Fwy on-
                              off Ramp Capacity
                              Enhancement, City of
                              Torrance..................
2158           CA            Construct Interchange at         $4,000,000
                              Intersection of SR 44 and
                              Stillwater Road...........
2159           MN            CSAH 61 improvements, City         $392,000
                              of Coleraine..............
2160           KY            Expansion to four lanes of       $8,000,000
                              Hwy 55 and Hwy 555
                              Heartland Parkway in
                              Taylor County.............
2161           KS            Interchange improvement at       $4,000,000
                              K-7 and 55th St. in
                              Johnson Co................
2162           CA            Construct truck lane on            $440,000
                              Baughman Road from State
                              Route 78/86 to Forrester
                              Road, Westmorland.........
2163           AZ            Construct bridges at Aspen       $3,000,000
                              St., at Birch St., at
                              Cherry St., at Bonito St.,
                              at Thorpe St..............
2164           CT            Construct Putnam curb cuts.         $80,000
2165           OH            Canton, OH Cleveland Ave.          $320,000
                              bridge replacement over
                              the Nimishilen Creek......
2166           MN            Design and right-of-way          $2,400,000
                              acquisition for I-35 and
                              CSAH 2 interchange in
                              Forest Lake, MN...........
2167           PA            Complete the connection of       $8,000,000
                              the American Parkway
                              between the east and west
                              sides of the Lehigh River
                              with bridge and
                              interchanges..............
2168           PA            Design, engineering, ROW           $200,000
                              acquisition and
                              construction of street
                              improvements, parking and
                              safety enhancements Main
                              and Parsonage Streets in
                              Pittston..................
2169           TX            Grade separation bridges at      $6,560,000
                              Wintergreen Rd. and
                              Millers Ferry Rd. in
                              Hutchins and Pleasant Run
                              Rd. and Millers Ferry Rd.
                              in Wilmer.................
2170           GA            I-20 HOV lanes from Evans        $1,200,000
                              Mill Road to Salem Road,
                              Dekalb and Rockdale
                              Counties..................
2171           NV            Improve Las Vegas Beltway-       $3,200,000
                              Airport Connector
                              Interchange...............
2172           CA            Oregon-Page Mill expressway      $3,200,000
                              Improvements between U.S.
                              101 and SR 82, Palo Alto..
2173           MA            Design and construct the           $800,000
                              Quinebaug River Rail Trail
                              Bikeway...................
2174           CA            Park Boulevard-Harbor Drive        $800,000
                              Rail Grade Separation, San
                              Diego.....................
2175           MN            Paul Bunyan Trail, Walker          $560,000
                              to Bemidji segment........
2176           CA            Construct road surface           $1,120,000
                              improvements, and improve
                              road safety from Brawley
                              Water plant to Hwy 86 to
                              9th Street to 18th Street,
                              Brawley...................
2177           TX            Improvements to FM 1017 in         $400,000
                              Hebbronville..............
2178           CA            Alameda Corridor East           $12,400,000
                              Gateway to America Trade
                              Corridor Project, Highway-
                              Railgrade separation along
                              35 mile corridor from
                              Alameda Corridor (Hobart
                              Junction) to Los Angeles/
                              San Bernardino County Line
2179           GA            Phase III Streetscape-             $800,000
                              Columbus..................
2180           IL            Pre-construction and             $5,568,000
                              construction IL 15 over
                              Wabash River at Mount
                              Carmel....................
2181           NY            Queens, Bronx, and Kings,        $4,750,000
                              and Richmond County
                              Graffiti Elimination
                              Program including Kings
                              Highway from Ocean Parkway
                              to McDonald Avenue........
2182           IA            Improvements at the IA 146         $800,000
                              and I-80 interchange,
                              Grinnell..................
2183           TX            Construct Grade separation       $4,000,000
                              at U.S. 277 in Eagle Pass.
2184           LA            Plan, design, and construct      $2,200,000
                              the internal roadway at
                              Port of South Louisiana,
                              Saint John the Baptist
                              Parish and LA 22 in
                              Ascension Parish..........
2185           KS            Construction of a 2-lane on     $10,240,000
                              a 4-lane right-of-way
                              bypass with controlled
                              access on U,S, 400 at
                              Dodge City................
2186           MN            Reconstruct CR 203 between         $268,800
                              U.S. 10 and CSAH 1,
                              Morrison County...........
2187           NY            Reconstruction of York           $2,800,000
                              Street Industrial Corridor
                              Project, Auburn, NY.......
2188           NY            Construction of and                $800,000
                              improvements to Route 62
                              in the Village of Hamburg.
2189           IN            Convention Center Area          $12,280,000
                              Redevelopment Project
                              includes street
                              resurfacing, pedestrian
                              walkway and streetscape
                              improvements,
                              signalization, safety
                              enhancements, plaza and
                              pedestrian area upgrades,
                              and pedestrian bridges on
                              South Street, Capitol
                              Street, West Street,
                              Missouri Street, and
                              McCarty Street,
                              Indianapolis..............
2190           AL            Construct pedestrian urban-      $1,200,000
                              edge riverwalk in
                              Montgomery, AL............
2191           PA            Johnstown, Pennsylvania,         $4,000,000
                              West End bypass safety
                              improvements..............
2192           CA            Construction of traffic and      $1,600,000
                              pedestrian safety
                              improvements in Yucca
                              Valley....................
2193           CA            710 Freeway Study to             $2,400,000
                              Evaluate Technical
                              Feasibility and Impacts of
                              a Tunnel Alternative to
                              Close 710 Freeway Gap.....
2194           CA            Greenleaf right-of-way           $3,200,000
                              Community Enhancement
                              Project-design and
                              construct bikeways,
                              pedestrian walkways and
                              upgrade signalization,
                              Compton...................
2195           KY            Improve Prospect Street          $2,200,000
                              Pedestrian Access, Berea..
2196           OH            Construct Crocker Stearns          $880,000
                              Connection, North Olmsted
                              and Westlake..............
2197           NY            Construction of and                $480,000
                              improvements to Seneca
                              Street in Buffalo.........
2198           CA            Avalon Boulevard/I-405           $4,800,000
                              Interchange modification
                              project, Carson...........
2199           IL            Construct Illinois Route         $1,600,000
                              336 from Macomb to Peoria.
2200           NC            North Carolina. Pack Square      $3,840,000
                              Pedestrian and Roadway
                              Improvements, Asheville...
2201           PA            Provide pedestrian and             $880,000
                              water access to Convention
                              Center from surrounding
                              neighborhoods.............
2202           NY            Reconstruction of Times and      $1,200,000
                              Duffy Squares in New York
                              City......................
2203           LA            Construction of I-10 Access        $880,000
                              Road (Crowley)............
2204           NY            Repaving of I-86 in towns        $6,000,000
                              of Coldspring, Randolph,
                              Allegany, and Olean; City
                              of Olean; Village of
                              Randolph in Cattaraugus
                              County....................
2205           PA            Replace Bridge, SR 106,            $640,000
                              Tunkhannock Creek Bridge
                              2, Clifford Township,
                              Susquehanna County........
2206           NJ            Replace Route 7-Wittpen            $800,000
                              Bridge, Hudson County.....
2207           MN            Right-of-Way acquisition         $3,200,000
                              for 8th Street North and
                              Pinecone Road.............
2208           IL            For Village of Lemont to           $280,000
                              modernize and improve the
                              intersection of McCarthy
                              Road, Derby Road, and
                              Archer Avenue.............
2209           CA            Construct I-80 HOV lanes           $800,000
                              and interchange in Vallejo
2210           PA            Rail Crossing signalization        $165,040
                              upgrade, East Wesner Road,
                              Maidencreek Twp, Berks
                              County....................
2211           OH            Construct road projects and      $5,184,000
                              transportation
                              enhancements as part of
                              RiverScape Phase III,
                              Montgomery County, Ohio...
2212           TN            Riverside Drive Cobblestone        $800,000
                              Restoration and Walkway,
                              Memphis...................
2213           TX            Reconstruction of West             $320,000
                              Airport between U.S. 59
                              and Kirkwood in the City
                              of Meadows Place, Texas...
2214           PA            Construct additional             $1,320,000
                              northbound lane on Rt. 28
                              between Harmar and
                              Creighton Interchange.....
2215           NJ            Roadway and intersection           $800,000
                              modifications on New
                              Jersey Route 82...........
2216           OH            Jackson Township, Ohio.          $1,600,000
                              Intersection improvements
                              at Fulton Drive and Wales.
2217           GA            Rockdale County Veteran's          $400,000
                              Park--Create park trails..
2218           MA            Construct the Blackstone         $1,600,000
                              River Bikeway and
                              Worcester Bikeway Pavilion
                              between Providence, RI and
                              Worcester, MA.............
2219           OH            Improvements to SR 91 in         $1,560,000
                              City of Twinsburg, OH.....
2220           TX            Completion of U.S. 77            $2,400,000
                              relief route around City
                              of Robstown...............
2221           NY            Improve Maple Avenue,            $1,000,000
                              Smithtown.................
2222           HI            Replace and Rehabilitate           $800,000
                              Kamehameha Highway
                              Bridges, Island of Oahu...
2223           TX            SH 71 from W of FM 20 to         $1,600,000
                              Loop 150, Bastrop County..
2224           IN            Construct U.S. 31 Plymouth       $8,800,000
                              to South Bend Freeway
                              Project in Marshall and
                              St. Joseph Counties,
                              Indiana...................
2225           LA            Plan and develop a 4-lane          $160,000
                              roadway, Jeanerette to
                              U.S. 90 connection........
2226           LA            Construct I-12 and LA 1088       $2,400,000
                              Interchange...............
2227           CA            4 lane widening/safety           $2,928,000
                              improvements on State
                              Route 25 from Hollister to
                              Gilroy....................
2228           NY            Comprehensive traffic              $600,000
                              congestion mitigation
                              study of Hauppauge
                              Industrial Park and
                              surrounding area..........
2229           NY            Develop an identity and            $800,000
                              signage program for the
                              Erie Canalway National
                              Heritage Corridor.........
2230           CO            Dillon Drive Overpass at         $3,200,000
                              Interstate 25 in Pueblo...
2231           NY            Improvements at highway-           $900,000
                              rail crossings along the
                              Southern Tier Extension
                              Railroad in Allegany,
                              Cattaraugus, and Steuben
                              Counties..................
2232           FL            Depot Ave. Enhancements,         $4,800,000
                              Gainesville...............
2233           CA            Interstate 15 and                $1,600,000
                              Winchester Road
                              Interchange Project.......
2234           PA            Construct the Eastern Inner      $4,000,000
                              Loop in Centre County
                              around State College, PA..
2235           NJ            Streetscape Improvements           $800,000
                              along Berlin Road between
                              Gibbsboro Road and White
                              Horse Road in Lindenwold
                              Borough...................
2236           FL            SR 70 improvements in            $1,600,000
                              Highland, DeSoto and
                              Okeechobee Counties.......
2237           GA            Streetscape-Albany.........        $400,000
2238           GA            Streetscape-Richland.......        $160,000
2239           MO            Construct four lanes for         $8,000,000
                              Route 5 in Camden County..
2240           IL            Improve Cottage Grove              $800,000
                              intersection, South
                              Chicago Avenue and 71st
                              Street....................
2241           NY            Study, design, and                 $750,000
                              reconstruction of
                              pedestrian walkways, the
                              Bronx.....................
2242           MS            Upgrade roads in Anguilla          $600,000
                              and Rolling Fork, Sharkey
                              County....................
2243           TX            For center to center               $800,000
                              communication link between
                              highway traffic
                              transportation management
                              centers...................
2244           OH            Upgrade the interchange of       $2,105,600
                              Interstates 270 and 71 in
                              Franklin County, Ohio.....
2245           CA            U.S. 101 Corridor                $4,000,000
                              Improvements--Route 280 to
                              the Capitol-Yerba Buena
                              Interchange...............
2246           CA            Rancho Vista Blvd. Widening      $2,800,000
                              Project...................
2247           NJ            Newark Access Variable             $400,000
                              Message Signage System....
2248           IA            Construct SW Connector,          $1,600,000
                              West Des Moines...........
2249           IA            U.S. 30 reconstruction,          $3,200,000
                              near Tama.................
2250           GA            Construction of interchange      $3,200,000
                              on I-985 north of SR 13,
                              Hall County, Georgia......
2251           MI            Marquette County,                  $400,000
                              Realignment of 3200 feet
                              of County Road 492 from
                              U.S. 41 north to County
                              Road HD...................
2252           WI            Realign U.S. 8 near              $1,600,000
                              Cameron, Barron County....
2253           PA            Restoration of PA422, in           $800,000
                              Berks County, including
                              slab repair and diamond
                              grinding..................
2254           CA            Monte Vista Avenue Grade         $1,600,000
                              Separation, Montclair,
                              California................
2255           NY            Deploy intermodal chassis        $1,600,000
                              ITS project in New York...
2256           NY            Reconstruction of Route 590      $6,000,000
                              in the Town of
                              Irondequoit, NY...........
2257           NY            Design and Construction of       $1,600,000
                              Downtown Jamestown
                              Connector Trail...........
2258           LA            Further construction to          $2,640,000
                              improve draining at
                              Clearview Parkway (LA
                              3152) and Earhart
                              Expressway (LA 3139)......
2259           MI            Houghton County,                   $216,000
                              Rehabilitate 2 piers and
                              remove old bridge caissons
                              for Sturgeon River Bridge.
2260           AK            Make necessary improvements      $2,000,000
                              to Indian River Road in
                              City and Borough of Sitka.
2261           MN            Reconstruct CSAH 61 from         $1,680,000
                              Barnum to TH 210 at
                              Carlton, and improve
                              Munger Trail..............
2262           TX            Build I-30 Trinity River           $800,000
                              Bridge, Dallas, Texas.....
2263           AK            Realign rail track to            $5,000,000
                              eliminate highway-rail
                              crossings and improve
                              highway safety and transit
                              times.....................
2264           MS            Relocate SR 44 from SR 198       $3,200,000
                              to Pierce Road, Columbia..
2265           AL            Interstate 565 west              $1,600,000
                              extension towards Decatur.
2266           MO            Roadway Improvements on Rt.      $4,000,000
                              21 from Hayden Road to
                              Lake Lorraine.............
2267           IL            Halsted Bridge over North          $480,000
                              Branch Canal
                              Reconstruction, City of
                              Chicago...................
2268           VA            Town of Pound Riverwalk--           $80,000
                              Construction of pedestrian
                              riverwalk in Town of Pound
2269           IL            U.S. 67 west of                  $1,600,000
                              Jacksonville, IL Bypass to
                              east of IL 100............
2270           NY            Village of Wappingers Falls        $600,000
                              North Mesier Ave..........
2271           AR            War Eagle Bridge                   $640,000
                              Rehabilitation--Benton
                              County, Arkansas..........
2272           WI            Build additional                   $640,000
                              staircases, landscape, and
                              other improvements to the
                              marsupial bridge at the
                              Holton St. Viaduct in
                              Milwaukee.................
2273           TN            Washington County,                 $800,000
                              Tennessee SR 36 widening..
2274           MI            Westland, Ann Arbor Trail        $2,520,000
                              between Farmington and
                              Merriman..................
2275           MI            White Lake and Commerce,           $400,000
                              pave Cooley Lake Road
                              Between Ripple Way and
                              Havenwood.................
2276           GA            Bridge replacement on              $450,000
                              County Road 183-FAS Route
                              1509, Peach County........
2277           NC            I40 I-77 Interchange in          $4,000,000
                              Iredell County, NC........
2278           CA            Construct safe routes to           $800,000
                              school in Cherryland and
                              Ashland...................
2279           CA            Install Central Ave.             $1,656,000
                              Historic Corridor
                              comprehensive streetscape
                              improvements thus
                              improving traffic, ped
                              safety, and economic
                              development, Los Angeles..
2280           VA            Whitetop Station--                  $80,000
                              Completion of renovation
                              of Whitetop Station (which
                              serves as trailhead
                              facility) including
                              construction of trail.....
2281           CT            Make Improvements to             $1,600,000
                              Montville-Preston Mohegan
                              Bridge....................
2282           IL            Widen and improve Pulaski          $560,000
                              Road, Alsip...............
2283           AK            For completion of the            $4,000,000
                              Shotgun Cove Road, from
                              Whittier, Alaska to the
                              area of Decision Point,
                              Alaska....................
2284           NY            Study and Implement              $1,000,000
                              Intelligent Transportation
                              System Sensor Technology
                              to Improve Safety at
                              Bridges and Tunnels in
                              Metropolitan New York City
2285           NY            Warburton Avenue Bridge            $500,000
                              over Factory Lane,
                              Hastings-on-Hudson, New
                              York......................
2286           NY            Improve intersection of Old        $400,000
                              Dock and Church Street,
                              Kings Park................
2287           TN            Widen and improve State          $6,500,000
                              Route 33, Knox County,
                              Tennessee.................
2288           CA            Reconstruct Paramount Blvd.      $1,080,000
                              with medians and improve
                              drainage from north border
                              to south border of city in
                              Lakewood..................
2289           NY            Upgrade Metro North              $2,400,000
                              stations in the Bronx and
                              construct station at
                              Yankee Stadium............
2290           OH            Construct the existing           $4,100,000
                              industrial park road from
                              local to State standards
                              near Cadiz................
2291           LA            Upgrade LA 28 to four lanes      $1,600,000
                              from LA 121 to LA 465.....
2292           NY            Reconstruction of Historic       $1,920,000
                              Eastern Parkway...........
2293           CA            Widen and make ITS                 $800,000
                              improvements on Paramount
                              Blvd. between Telegraph
                              Rd. and Gardendale St. in
                              Downey....................
2294           VA            Conduct planning and             $2,400,000
                              engineering for Hampton
                              Roads Third Crossing and
                              Interconnected Roadways...
2295           IL            Widen Annie Glidden Road to      $6,400,000
                              five lanes with
                              intersection improvements.
                              DeKalb, IL................
2296           CA            Widen California State          $14,400,000
                              Route 132 from California
                              State Route 99 west to
                              Dakota Avenue.............
2297           NC            Widen Derita Road from           $1,600,000
                              Poplar Tent Road in
                              Concord to the Cabarrus
                              Mecklenburg County line...
2298           TX            Widen from 4 to 6 lanes          $5,600,000
                              Interstate 35 East from
                              Lake Lewisville to Loop
                              288.......................
2299           CA            Widen Haskell Avenue               $160,000
                              between Chase St. and
                              Roscoe Blvd...............
2300           TX            Widen Hempstead Highway            $800,000
                              from 12th Street to
                              Washington Avenue from
                              four lanes to six lanes...
2301           NH            Reconstruction and                 $400,000
                              relocation of the
                              intersection of Maple
                              Avenue and Charleston Road
                              in Claremont..............
2302           OH            Construct highway-rail             $240,000
                              crossing safety upgrades
                              at 3 grade crossings in
                              Madison Village, OH.......
2303           WA            Cultural and Interpretive        $1,280,000
                              Center (Hanford Reach
                              National Monument)
                              facility, Richland, WA....
2304           NY            Implement Improvements for         $600,000
                              Pedestrian Safety in New
                              York County...............
2305           NY            Construction of and                $320,000
                              improvements to Main
                              Street in the Town of Eden
2306           GA            SR 85 widening from Adams        $1,200,000
                              DR to I-75 and reconstruct
                              the Forest Parkway
                              interchange, Clayton
                              County....................
2307           GA            Jogging and Bicycle Trails         $400,000
                              around CSU, Columbus......
2308           PA            Design, engineering, ROW           $160,000
                              acquisition and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in Throop
                              Borough, Lackawanna County
2309           IL            Reconstruct Winter Ave,          $4,320,000
                              existing 1 lane RR subway,
                              and 1 lane bridge to
                              provide access to Winter
                              Park in Danville..........
2310           OR            Construct highway and            $7,200,000
                              pedestrian access to
                              Macadam Ave. and street
                              improvements as part of
                              the South Waterfront
                              development, Portland.....
2311           TX            Relocation of 10th Street          $600,000
                              near McAllen-Miller
                              International Airport.....
2312           IL            Construct pedestrian tunnel        $800,000
                              at railroad crossing in
                              Winfield, IL..............
2313           IN            Construct Margaret Avenue        $2,400,000
                              Safety and Capacity
                              Enhancement Project.......
2314           TX            Construct Loop 574 from BU       $1,600,000
                              77 to I-35 in McLennan Co.
2315           NY            Construction of a bicycle/       $1,840,000
                              pedestrian off road scenic
                              pathway from the Niagara
                              Falls City Line to the
                              southerly Lewiston Town/
                              Village Line along the
                              Niagara Gorge, Town of
                              Lewiston, Village of
                              Lewiston, Niagara County..
2316           FL            Construct new bridge from        $4,000,000
                              West-Florida Turnpike to
                              CR 714 to 36th Street--
                              Cross S. Fork of St. Lucie
                              River--Indian Street to
                              U.S. 1 on east side.......
2317           WI            Recondition SH 16 from           $4,000,000
                              Columbus to SH 26 (Dodge
                              County, Wisconsin)........
2318           ............  ...........................              $0
2319           NY            Riverwalk in Irvington             $200,000
                              development...............
2320           OH            Road resurfacing and               $560,000
                              improvements in the
                              Village of Bentleyville,
                              OH........................
2321           PA            Improvements to Stella             $600,000
                              Street rail-highway
                              crossing in Wormleysburg,
                              PA........................
2322           CT            Construct Entrance Ramp at         $800,000
                              Route 8 Exit 11, Shelton,
                              CT........................
2323           AL            Pedestrian Improvements for        $160,000
                              Leeds, AL.................
2324           WA            Federal Way Triangle--           $1,600,000
                              Conduct final engineering
                              work for the
                              reconstruction of the I-5--
                              SR 18 interchange.........
2325           MI            Garden City, Reconstruct           $980,000
                              Maplewood between Inkster
                              and Merriman..............
2326           OR            Lake Road Reconstruction         $4,000,000
                              and Safety Improvements,
                              Milwaukie.................
2327           NY            Resurface Grade Crossing at        $200,000
                              Old State Road............
2328           MN            Construction of Cedar            $4,800,000
                              Avenue Busway, MN.........
2329           IL            Upgrade streets and              $3,920,000
                              implement traffic and
                              pedestrian safety
                              signalization
                              improvements, Oak Lawn....
2330           GA            Streetscape-Thomasville....        $240,000
2331           AZ            State Route 77/Project             $240,000
                              funds for the Ore Trail in
                              the Copper Corridor on SR
                              77........................
2332           PA            To enhance existing                $400,000
                              directional markers and
                              increase wayfinding
                              signage infrastructure in
                              Monroe County.............
2333           CA            Construct and repair lining      $2,400,000
                              in four tunnels on Kanan,
                              Kanan Dume, and Malibu
                              Canyon Roads between U.S.
                              1 and U.S. 101............
2334           GA            Sidewalk revitalization            $400,000
                              project in downtown
                              Eastman...................
2335           TX            Port of Corpus Christi Up          $400,000
                              River Road for upgrade of
                              roadway to and from docks
                              and IH 37.................
2336           GA            Construct U.S. 411              $16,000,000
                              Connector from U.S. 41 to
                              I-75, Bartow County,
                              Georgia...................
2337           NY            Construction of U.S. Route       $4,800,000
                              219 Expressway: Sections V
                              and VI....................
2338           PA            Engineering, design and          $1,600,000
                              construction of an
                              extension of Park Avenue
                              north to Lakemont Park in
                              Altoona...................
2339           MN            Reconstruct I-35E from I-94      $2,800,000
                              to Maryland Avenue in St.
                              Paul......................
2340           CA            Construct truck ramp             $2,400,000
                              linking Interstate 5 to
                              the National City Marine
                              Cargo Terminal, National
                              City......................
2341           GA            Reconstruct the interchange      $1,444,800
                              at Interstate 185 and
                              Victory Drive (SR 520),
                              Columbus, GA Victory Drive
                              (SR 520), Columbus, GA....
2342           OH            Streetscaping, bicycle           $2,800,000
                              trails, and related
                              improvements to the I-90--
                              SR 615 Interchange in
                              Mentor, OH................
2343           IN            Preliminary engineering,         $4,480,000
                              right-of-way, and
                              construction for Perimeter
                              Parkway-West Lafayette/
                              Purdue University, Indiana
2344           TN            Reconstruct Interchange 55         $800,000
                              at Mallory Avenue,
                              Memphis, Shelby County....
2345           CA            Upgrade first responders            $25,600
                              signal pre-emption
                              hardware, Culver City.....
2346           IN            Construction of Maplecrest       $8,800,000
                              Rd. Extension--Allen
                              County, Indiana...........
2347           MS            Upgrade roads in Arcola,         $1,400,000
                              Leland, Greenville, and
                              Hollandale (U.S. Highway
                              61 and 18), Washington
                              County....................
2348           MS            Canal Road Intermodal            $6,400,000
                              Connector, Gulfport.......
2349           NY            Long Pong Road: Larkins          $1,152,000
                              Creek to Lake Ontario
                              State Parkway, Town of
                              Greece....................
2350           NY            Construct the Auburn               $800,000
                              Connector Road Corridor,
                              Auburn, NY................
2351           MA            Engineering and                  $6,400,000
                              construction of Blackstone
                              Valley Visitors Center at
                              intersection of State
                              Route 146 and Millbury
                              Street, Worcester.........
2352           CA            Improve I-8 off ramp to the        $800,000
                              Desert Farming Institute,
                              Imperial County...........
2353           KS            Construct bike and                 $400,000
                              pedestrian path along K-10
                              between Douglas and
                              Johnson Counties..........
2354           HI            Construct Bike Lanes on            $240,000
                              Kalanianaole Highway,
                              vicinity of Makapuu to
                              Keolu Drive...............
2355           TX            Donna/Rio Bravo                  $1,600,000
                              International Bridge......
2356           IL            Improve Sheridan Road,           $1,600,000
                              Evanston..................
2357           MD            Intercounty Connector......      $3,200,000
2358           MI            Resurfacing of Ten Mile            $716,800
                              Road in St. Clair Shores..
2359           NY            Conduct studies to consider      $1,200,000
                              transportation planning
                              and community involvement
                              for infrastructure
                              projects that address
                              congestion relief in New
                              York City.................
2360           MO            Construct an extension of        $2,000,000
                              MO 740 from U.S. 63 to the
                              I-70 Lake of the Woods
                              Interchange...............
2361           LA            Construct improvements to        $3,200,000
                              Enterprise Blvd. in
                              Iberville Parish; and LA 1/
                              I-10 Connector Study; and
                              improvements to LA 10/
                              Zachary Taylor Parkway....
2362           NY            Monroe County ITS project..        $720,000
2363           MO            Roadway improvement on I-44        $800,000
                              in Phelps County, Missouri
2364           MA            Rt. 128/95 ramp Northbound       $1,400,000
                              to Kendrick Street,
                              Needham...................
2365           IN            Realign State Road 312,          $3,330,313
                              Hammond...................
2366           PA            Design, engineering, ROW           $200,000
                              acquisition and
                              construction of surface
                              improvements to the area
                              adjacent to Exit 168 of
                              Interstate 81 at the
                              Wachovia Arena in Wilkes-
                              Barre Township............
2367           GA            SR 92 relocation from            $6,400,000
                              Durelee Road to SR 92 at
                              Malone, including grade
                              separation, Douglas
                              County, Georgia...........
2368           IN            Construct I-69 Evansville       $11,200,000
                              to Indianapolis, Indiana..
2369           CA            Construct fourth bore of         $1,600,000
                              Caldecott Tunnel on SR 24,
                              California................
2370           TN            Construct interchange on I-        $800,000
                              40 in Wilson County.......
2371           IN            Construct service road           $3,200,000
                              parallel to I-69 in the
                              City of Anderson, Indiana.
2372           NY            Croton-on-Hudson, NY             $2,000,000
                              Restoration of Van
                              Cortlandt Manor entrance
                              road......................
2373           OH            Construction and repair of         $231,200
                              pedestrian walkways along
                              Lake Shore Blvd. in
                              Lakeline Village, OH......
2374           MD            Reconstruct MD 32 from MD        $3,040,000
                              108 to I-70 in Howard
                              County....................
2375           NY            Repair and Improve Streets       $1,400,000
                              in Astoria damaged by
                              water main breaks.........
2376           MI            Reconstruct two bridges            $570,000
                              over Black Creek Drain in
                              Sanilac County............
2377           FL            Construction of Little             $800,000
                              Venice Road, Marathon, FL.
2378           CA            Make traffic and safety            $400,000
                              improvements to Atlantic
                              Blvd. in Maywood..........
2379           MN            Stearns County Bridge No.          $320,000
                              73501 Improvements........
2380           LA            Construct LA 16 Interchange     $10,400,000
                              at I-12 and improvements,
                              and Cook Road improvements
2381           MO            Reconstruct Highway 60 and       $1,600,000
                              Highway 65 Interchange....
2382           CO            I-70, Havana, Yosemite           $1,200,000
                              Street Interchange
                              Reconstruction Project,
                              Denver....................
2383           CO            Reconstruct C 470-US 85          $3,200,000
                              Interchange...............
2384           VA            Reconstruction of the              $800,000
                              entranceway to Montpelier
                              on Orange County, Virginia
2385           TN            Construct and widen                $395,440
                              underpass at intersection
                              of Boydstation, Harvey,
                              and McFee Roads, Knox
                              County, TN................
2386           GA            Extend sidewalks, upgrade          $400,000
                              landscaping in downtown
                              Hawkinsville..............
2387           OH            Conduct Sarah St. along SR       $2,080,000
                              18 and 101 enhancement
                              project to calm traffic in
                              the City of Tiffin........
2388           LA            Improvements to Zachary          $1,600,000
                              Taylor Parkway............
2389           CA            Las Tunas Drive Pedestrian         $120,000
                              Enhancement, San Gabriel..
2390           OH            Reconstruction, widening,        $2,400,000
                              and bicycle improvements
                              to Pettibone Road in the
                              City of Solon, OH.........
2391           NH            Replacement of Ash Street        $1,520,000
                              and Pillsbury Road Bridge.
2392           PA            Swamp Road Corridor Safety       $2,400,000
                              and Roadway Improvements,
                              Bucks County..............
2393           FL            Construct St. Augustine to       $2,320,000
                              Palatka Rail Trail,
                              Florida...................
2394           IL            Construction of a traffic        $1,600,000
                              circle to reduce traffic
                              congestion, Museum Campus
                              Chicago...................
2395           AL            Pedestrian Improvements for        $533,334
                              Gardendale, AL............
2396           PA            Extension of Second Street         $880,000
                              from Race to the
                              intersection of Lehigh and
                              Poplar Street in the
                              Borough of Catasauqua.....
2397           NE            Cuming Street                    $3,600,000
                              Transportation Improvement
                              Project, Omaha, Nebraska..
2398           TN            Construct State Route 1          $9,200,000
                              (U.S. 70) to a four lane
                              divided highway on new
                              alignment from Centertown
                              to McMinnville in Warren
                              County....................
2399           CA            Improve access to I-80 at        $1,600,000
                              Eureka Road Interchange...
2400           LA            Expand existing South            $1,440,000
                              Central Planning and
                              Development Commission
                              Intelligent Transportation
                              System program in Houma-
                              Thibodaux area by
                              installing signals,
                              sensors and systems.......
2401           IL            Install traffic control            $192,000
                              devices on traffic signals
                              in Village of Oak Lawn....
2402           CA            Interstate 15, California        $1,600,000
                              Oaks Road Interchange
                              Project...................
2403           TX            Choate Road overpass to          $7,840,000
                              eliminate at-grade
                              intersection between
                              Choate Rd. and SH 146.....
2404           OH            Construction of I-75 Austin      $6,000,000
                              Road Interchange,
                              Montgomery County, Ohio...
2405           CA            Acquire lands for                  $400,000
                              mitigation adjacent to
                              U.S. 101 as part of
                              Southern Santa Clara
                              County Wildlife Corridor
                              Protection and Scenic
                              Enhancement Project.......
2406           TX            Construct U.S. Business 287      $6,400,000
                              through the Trinity Uptown
                              Project from 7th St. NE to
                              11th St. NE in Fort Worth.
2407           KS            Construct K-10 and Lone Elm      $4,000,000
                              Road interchange, Lenexa..
2408           OH            Construct connector road         $5,000,000
                              between SR 79 and
                              Thornwood Drive in Licking
                              County....................
2409           NH            Construct Pedestrian,              $640,000
                              Bicycle bridge in Keene...
2410           FL            Coral Way, SR 972 Highway        $1,200,000
                              Beautification, Phase One,
                              Miami, Florida............
2411           TN            Develop historic                   $108,000
                              preservation
                              transportation enhancement
                              project, Sumner Co. and
                              surrounding counties......
2412           NY            Develop terminal facilities      $4,400,000
                              for water taxi projects in
                              New York City.............
2413           WI            Expand U.S. 151 between          $1,600,000
                              Dickeyville and Belmont...
2414           NY            Improve bicycle and                $240,000
                              pedestrian safety, NY 25,
                              Jamesport.................
2415           PA            PA Route 183 widening and        $1,600,000
                              ramp enhancement, Bern
                              Township..................
2416           IN            Reconstruct Hoosier                $800,000
                              Heartland Highway, Wabash,
                              Huntington and Miami
                              County Indiana segments...
2417           GA            Replace sidewalks, upgrade         $400,000
                              lighting, and install
                              landscaping, Soperton.....
2418           LA            Lafayette, LA                    $8,800,000
                              Implementation of
                              Intelligent Transportation
                              System....................
2419           NY            Conduct improvements to I-       $2,000,000
                              87--Exit 18 Interchange...
2420           IL            To construct an extension        $1,600,000
                              of U.S. 51 from 9 miles
                              south of Moweaqua to 4.6
                              miles south of Moweaqua...
2421           IL            Upgrade roads, The Village         $800,000
                              of Hillside...............
2422           MS            Upgrade safety devices at           $40,000
                              Front Street rail
                              crossing, Ellisville......
2423           CO            U.S. 287--Ports-to-Plains        $6,133,333
                              Corridor in Colorado......
2424           AZ            Many Farms, Apache County--        $480,000
                              For the Construction of
                              N8086 and N8084 on the
                              Navajo Nation.............
2425           VA            Construct I-95 Interchange       $1,600,000
                              at Temple Ave, Colonial
                              Heights...................
2426           KS            Route designation,               $3,200,000
                              environmental clearance,
                              final design and right-of-
                              way acquisition for
                              Crawford County, KS
                              corridor of U.S. Highway
                              69........................
2427           CA            U.S. 395 Realignment and           $400,000
                              Widening Project..........
2428           IL            To connect about a 2-mile        $1,600,000
                              segment through
                              Collinsville at two or
                              three lanes...............
2429           IL            Construct Parking Facility         $192,000
                              and pedestrian walkways at
                              94th and S. Oak Park Ave,
                              Oak Lawn..................
2430           UT            I-15 Freeway                     $3,600,000
                              Reconstruction--Springvill
                              e 200 South Interchange...
2431           MA            Washington St. from High         $1,400,000
                              St. to Water St., Walpole.
2432           VA            White's Mill Trail and             $400,000
                              Renovation--Design and
                              construction of
                              recreational trail and
                              preservation of watermill
                              for use as visitors center
2433           CA            Implement San Francisco          $6,400,000
                              Street Improvements
                              Program...................
2434           MA            Design, engineering, and           $600,000
                              construction of Methuen
                              Rotary alternative at I-93
                              and Routes 110 and 113,
                              Methuen...................
2435           IL            Improve Mill Street, Rock          $400,000
                              Island....................
2436           PA            For the Nanticoke City           $5,600,000
                              Redevelopment Authority to
                              design, acquire land, and
                              construct a parking
                              garage, streetscaping
                              enhancements, paving,
                              lighting and safety
                              improvements, and roadway
                              redesign in Nanticoke.....
2437           MI            Widen and reconstruct            $4,000,000
                              Walton Boulevard Bridge in
                              Auburn Hills between
                              Opdyke and Squirrel Road..
2438           OR            Widen Delaura Beach Lane           $148,800
                              and add a bike lane both
                              directions, Warrenton.....
2439           MA            Design and construct the 3-        $560,000
                              mile long Grand Trunk
                              Trail bikeway from
                              Sturbridge to Southbridge.
2440           TN            Develop trails, bike paths         $200,000
                              and recreational
                              facilities on the Crest of
                              Black Mountain, Cumberland
                              County for Cumberland
                              Trail State Park..........
2441           NY            Study and Improve Traffic        $2,000,000
                              Flow Improvement at
                              Atlantic Yard Arena
                              Development...............
2442           MD            Upgrade and widen MD 237        $12,000,000
                              from Pegg Road to MD 235..
2443           PA            Main Street improvements           $640,000
                              from Broad Street to
                              Richardson Avenue and Main
                              Street to Madison Avenue,
                              Borough of Lansdale.......
2444           CA            Widen Highway 101 in Marin      $12,000,000
                              and Sonoma Counties from
                              Hwy 37 in Novato to Old
                              Redwood Highway in
                              Petaluma..................
2445           NY            Road and pedestrian safety       $1,500,000
                              improvements Main Street,
                              Village of Patchogue......
2446           UT            Widen Highway 92 from Lehi       $2,500,000
                              to Highland...............
2447           AZ            Widen I-10 to 3 lanes in         $1,360,000
                              each direction north of
                              Tucson from Marana
                              Interchange to Cortato
                              Interchange...............
2448           CA            Widen I-238 between I-580          $800,000
                              and I-880 in Alameda
                              County....................
2449           VA            Widen I-66 westbound inside      $5,600,000
                              the Capital Beltway from
                              the Rosslyn Tunnel to the
                              Dulles Connector Road.....
2450           NC            Construction of I-74             $4,000,000
                              between I-40 and U.S. 220,
                              High Point, North Carolina
2451           MD            Widen I-695, Baltimore           $3,440,000
                              Beltway, Southwest........
2452           GA            Replace sidewalks, upgrade         $400,000
                              lighting in downtown
                              Vidalia...................
2453           MN            Construct bicycle and              $700,000
                              pedestrian trails in
                              Cuyuna Recreation Area....
2454           HI            Construct Kapaa Bypass.....      $2,400,000
2455           FL            Temple Terrace Highway           $1,600,000
                              Modification..............
2456           TN            Widen Interstate 240 from          $800,000
                              Poplar Avenue (SR 57) to
                              near Walnut Grove Road (SR
                              23) East of Memphis,
                              Shelby County.............
2457           IL            For the Village of                  $86,400
                              Woodridge to resurface
                              Internationale Parkway....
2458           OR            I-5 Trade Corridor,              $4,220,000
                              Portland, Oregon to
                              Vancouver, Washington
                              segment...................
2459           GA            Streetscape, Pedestrian          $4,000,000
                              Improvements in City
                              Center, City of Clarkston.
2460           KY            Widen KY 1991 from               $1,000,000
                              Maysville Road to Midland
                              Trail Industrial Park,
                              Montgomery County.........
2461           NC            Construct new Route from         $3,200,000
                              Beach Drive (SR 1104) to
                              NC 211 in Brunswick County
2462           NJ            International Trade and          $1,200,000
                              Logistics Center Roadway
                              Improvements at Exit 12 of
                              the New Jersey Turnpike,
                              Carteret..................
2463           IL            Interstate 41 and Route 176        $600,000
                              Interchange replacement...
2464           MA            Northern Avenue Bridge           $2,400,000
                              rehabilitation, Boston....
2465           AK            Planning, design, and          $151,000,000
                              construction of Knik Arm
                              Bridge....................
2466           IN            North Calumet Avenue               $960,000
                              Improvements, Valparaiso..
2467           OR            I-205/Highway 213                  $800,000
                              interchange improvements..
2468           TN            Improving Vehicle                   $45,600
                              Efficiencies at highway At-
                              Grade Railroad Crossing in
                              Loudon, TN................
2469           AZ            Design, right-of-way             $3,200,000
                              acquisition, and
                              construction I-10
                              Collector Distributor
                              Roadway from 40th Street
                              to Baseline Maricopa
                              County, Arizona...........
2470           LA            Improvements to LA 42 in         $8,000,000
                              Ascension Parish; and LA
                              73 improvements in
                              Ascension Parish..........
2471           MN            Construct Paul Bunyan trail        $775,000
                              from Mississippi River
                              Bridge Trail to Crow Wing
                              State Park................
2472           MN            Construct Mesabi Trail from      $2,700,000
                              Grand Rapids to City of
                              Ely.......................
2473           GA            Install sidewalks on               $300,000
                              Highway 23 from Dykes
                              Street to Sarah Street,
                              Cochran...................
2474           AK            Kodiak, AK Construction of       $7,500,000
                              AMHW ferry terminal and
                              approach..................
2475           OK            Reconstruction of SH 66            $800,000
                              from Craig and Rogers
                              Counties to SH 66 and U.S.
                              60 intersection...........
2476           CA            Enhance pedestrian               $1,600,000
                              environment and increase
                              safety along Olympic Blvd.
                              between Vermont and
                              Western Avenues, Los
                              Angeles...................
2477           NY            Enhancement of the Michigan      $1,600,000
                              Avenue Corridor, Buffalo..
2478           NJ            Kapkowski Road Area              $4,560,000
                              Improvements in Elizabeth.
2479           CA            Construct landscape medians        $800,000
                              along Skyline Drive from
                              Sears Avenue to 58th
                              Street, San Diego.........
2480           NY            Jamaica Air Train Station        $4,000,000
                              Area Infrastructure
                              Improvements..............
2481           MO            Construct Highway 465 to         $4,800,000
                              Highway 376 south from Hwy
                              76 to Hwy 376.............
2482           WA            New Country Road on Whidbey        $960,000
                              Island....................
2483           NM            Chaco Wash Bridge and Road       $1,600,000
                              Improvements on Navajo
                              Route 46..................
2484           CA            Reconstruct Interstate 880-      $1,400,000
                              Route 92 interchange in
                              Hayward...................
2485           MA            Relocate Rt. 79 in Fall          $1,800,000
                              River to create 4-lane
                              urban boulevard with
                              landscaped median and
                              developable waterfront....
2486           IL            Road extension for Highway         $534,400
                              22 in Macon County, IL....
2487           NY            Portageville Bridge--            $1,464,000
                              Purchase existing bridge
                              to convert to pedestrian
                              bridge....................
2488           PA            Rt. 422 complete                 $2,400,000
                              preliminary engineering
                              and four lane expansion
                              from Ebensburg to
                              Kittanning................
2489           CA            Upgrade essential road           $1,600,000
                              arterials, connectors,
                              bridges and other road
                              infrastructure
                              improvements in the Town
                              of Desert Hot Springs, CA.
2490           KY            Construct the Heartland            $960,000
                              Parkway in Adair County...
2491           NV            Horse-US-95 Interchange          $4,800,000
                              Project...................
2492           CT            Make Improvements to               $200,000
                              Plainfield Moosup Pond
                              Road......................
2493           FL            Construction design ROW          $8,000,000
                              U.S. 27 from SR 540 to SR
                              544 and from I-4 to U.S.
                              192 in Polk County, FL....
2494           IA            Construction of approaches       $1,280,000
                              and viaduct on Edgewood
                              Rd. SW over the UP
                              Railroad, Prairie Creek,
                              and the CRANDIC railroad..
2495           NJ            Construct Hackensack River       $1,600,000
                              Walkway in Bergen County..
2496           TX            Hwy 80/123 Overpass at Hwy         $240,000
                              181 in Karnes County......
2497           NM            Improvements to U.S.             $1,600,000
                              Highway 87 from Clayton,
                              NM to Raton, NM...........
2498           VA            Route 11 Interchange               $800,000
                              improvements in Lexington,
                              Virginia..................
2499           CA            Improvements to Ben Maddox       $1,600,000
                              Way Bridge................
2500           WA            SR 18 Widening, Maple            $6,000,000
                              Valley to I-90............
2501           NY            City of Beacon construction        $252,000
                              of pedestrian and Bicycle
                              trail.....................
2502           TX            FM 544, widen 2-lane             $1,600,000
                              roadway to 6-lane roadway
                              from SH 121 to Dozier-
                              Parker Road...............
2503           TX            Construct an alternate             $500,000
                              truck route to Interstate
                              35 in Buda................
2504           NY            Improvements on the Cross        $3,376,000
                              Island Bridge Overpass/
                              212th Street and vicinity,
                              Queens....................
2505           MI            Novi, Reconstruct Grand            $800,000
                              River between Novi and
                              Haggerty..................
2506           SD            Resurface U.S. Highway 18          $960,000
                              from Lake Andes to U.S.
                              Highway 50 on Yankton
                              Sioux Reservation.........
2507           TX            Lajitas Relief Route.......      $1,200,000
2508           WY            U.S. 85 Passing Lanes......      $1,600,000
2509           MA            Design and Construct             $2,000,000
                              Blackstone River Bikeway
                              and Worcester Bikeway
                              Pavilion between
                              Providence, RI and
                              Worcester.................
2510           NY            Little Falls Access: Repair        $192,000
                              and reconstruct High
                              School and Lower School
                              Road......................
2511           FL            Replace Columbus Drive           $3,200,000
                              Bridge....................
2512           ............  ...........................              $0
2513           MI            Construction of two              $1,840,000
                              railroad-highway grade
                              separations on Farm Lane
                              north of Mount Hope Road..
2514           CA            Widen Atlantic Bl bridge           $800,000
                              over the Los Angeles River
                              in Vernon.................
2515           CA            Widen Bundy Drive between        $3,400,000
                              Wilshire and Santa Monica
                              Boulevards in the City of
                              Los Angeles...............
2516           AL            To provide four lanes on        $11,200,000
                              U.S. 80, Perry County,
                              Marengo County, and Sumter
                              County....................
2517           CA            Widen Maine Avenue in              $300,000
                              Baldwin Park..............
2518           NM            Ease traffic congestion and      $1,600,000
                              improve intersection
                              safety by identifying
                              alternative alignment to
                              U.S. 84/285 and NM 68
                              through Espanola..........
2519           MS            Widen MS Hwy 19 between         $10,000,000
                              Philadelphia and
                              Collinsville, MS..........
2520           NY            Construct the Fire Island        $1,600,000
                              ferry terminal facility,
                              Patchogue.................
2521           IL            IL 8 from East Peoria to           $762,056
                              Washington, IL............
2522           NJ            Preliminary engineering for      $1,200,000
                              missing connections of NJ
                              23 and I-80...............
2523           ME            Penobscot Riverfront             $2,800,000
                              Development for bicycle
                              trails, amenities, and
                              traffic circulation
                              improvements, Bangor and
                              Brewer....................
2524           IL            Restoration and                    $960,000
                              reconstruction of the
                              central business district
                              street. Cambridge, IL.....
2525           NC            Widen NC 150 from                  $800,000
                              Cherryville to Lincolnton.
2526           NY            Second phase of the Grand        $8,000,000
                              Concourse improvements
                              from East 166th St. to
                              East 171st St.............
2527           VT            U.S. Route 7 and U.S. Route      $2,848,000
                              4 road improvements for
                              the City of Rutland.......
2528           IL            Improve 63rd Street,             $1,600,000
                              Chicago...................
2529           MI            Alcona County,                     $650,400
                              Reconstruction of Ritchie
                              Road from Village of
                              Lincoln to Hubbard Lake
                              road......................
2530           SC            Construct roadway btwn I-26      $1,600,000
                              and U/S/ 1 in Lexington
                              County. Intermodal
                              connector from U.S. 1 to I-
                              26 and I-77. SC 302 and SC
                              602 improvements..........
2531           OR            Agness Road, Curry County..      $2,000,000
2532           NY            Rehabilitation of Sharon           $260,000
                              Drive in the Town of
                              Poughkeepsie..............
2533           TX            Conduct study of I-10 and          $160,000
                              U.S. 190 with a focus on
                              congestion relief and the
                              need for a military and
                              emergency relief
                              transportation corridor...
2534           MD            MD 85 at I270..............      $4,000,000
2535           GA            SR 36 passing lanes north        $2,440,000
                              of Jackson to Newton
                              County line, Butts County,
                              Georgia...................
2536           VA            I-66 and Route 29                $8,000,000
                              Gainesville Interchange
                              Project...................
2537           NY            Construct and extend               $800,000
                              existing pedestrian
                              streetscape areas in
                              Lynbrook..................
2538           CA            Construct traffic                  $200,000
                              intersection island
                              improvements on North side
                              of Olympic Blvd. where
                              Irolo St. and Normandie
                              Ave. split in Koreatown,
                              Los Angeles...............
2539           WA            Improvements in the SR 9         $1,200,000
                              corridor in Snohomish
                              County....................
2540           PA            Replace a highway                $1,720,000
                              railcrossing in Osborne
                              Borough, PA...............
2541           AL            Pedestrian Improvements for        $533,334
                              Centerpoint, AL...........
2542           CA            Replace twin 2 lane bridge         $400,000
                              with single 4 lane bridge
                              on SR 138 over Big Rock
                              Wash......................
2543           CA            State Route 86S and Ave. 50        $800,000
                              highway safety grade
                              separation................
2544           TX            Construct Fredericksburg         $3,040,000
                              Road-Medical Drive grade
                              separation in San Antonio.
2545           PA            For design, engineering,           $400,000
                              ROW acquisition, and
                              construction of a
                              connector road between the
                              Valmont Industrial Park
                              and Pennsylvania Rt. 924
                              at Cranberry Creek........
2546           AR            Interstates 30/440/530           $1,200,000
                              Interchanges/For
                              interchange improvements,
                              Little Rock...............
2547           NJ            Rehabilitation of Benigno          $320,000
                              Boulevard from I295 to
                              Route 168 in Bellmawr.....
2548           PA            Preconstruction studies for        $800,000
                              improvement to U.S. 22
                              from Irving Street to
                              Mickley Road..............
2549           IL            Establish transportation           $432,000
                              museum on Navy Pier,
                              Chicago...................
2550           WA            Continuing construction of       $2,640,000
                              I-90, Spokane to Idaho
                              State Line................
2551           VA            Improve transportation             $425,520
                              infrastructure for
                              visitors to Jamestown 2007
2552           AR            Highway 67: Kiehl Avenue--       $2,960,000
                              Vandenberg Boulevard:
                              rehabilitating and
                              widening Highway 67 from
                              four to six lanes from
                              Kiehl Ave. to Vandenberg
                              Blvd......................
2553           NY            Install Improvements for           $250,000
                              Pedestrian Safety
                              including in the vicinity
                              of PS X81.................
2554           GA            Memorial Drive Corridor....      $1,600,000
2555           VA            Route 11 improvements in           $800,000
                              Maurertown, Virginia......
2556           PA            Street improvements,             $1,200,000
                              Whitemarsh Township.......
2557           VT            Construction of the              $5,814,789
                              Lamoille Valley Rail Trail
                              for the Vermont
                              Association of Snow
                              Travelers.................
2558           CO            I-76: Colorados Northeast        $6,133,334
                              Gateway...................
2559           VA            Construct Maersk Terminal        $1,600,000
                              interchange in Portsmouth.
2560           GA            I-75 Welcom Project........        $200,000
2561           PA            Improve handicapped              $2,400,000
                              accessibility and provide
                              pedestrian overpass in
                              Villanova.................
2562           NY            Install Two Permanent              $500,000
                              Variable Message Signs
                              (VMS) on Belt Parkway.....
2563           MI            Re-surfacing Sebewaing Road        $332,800
                              in Huron County...........
2564           IN            Complete construction of           $300,000
                              paths at Hamilton County
                              Riverwalk, Noblesville,
                              Indiana...................
2565           NY            Study and Implement Traffic        $250,000
                              and Pedestrian Safety
                              Enhancements to Gerritsen
                              Beach, Brooklyn...........
2566           PA            Upgrade circuit for gates          $220,000
                              and lights at Sixth Street
                              in Emmaus, PA USDOT
                              crossing number 592402P to
                              constant warning time
                              devices...................
2567           TN            Plan and construct a               $160,000
                              bicycle and pedestrian
                              trail, Eagleville.........
2568           NY            Improvements for pedestrian        $600,000
                              and vehicular access to
                              Baychester Avenue and
                              Bartow Avenue.............
2569           GA            SR 400 reconstruction from         $800,000
                              I-285 to McFarland Road,
                              Fulton and Forsyth
                              Counties..................
2570           MI            Construct pedestrian and            $64,000
                              bicycle pathway at
                              Chippewa Landing River
                              Park in the Village of
                              Caro......................
2571           GA            Upgrade sidewalks, replace         $400,000
                              street lights, and
                              landscaping, Metter.......
2572           AR            Highway 412: Baxter Co. to       $1,600,000
                              Ash Flat..................
2573           NY            Town of North Salem                $160,000
                              improvements and repaving
                              to Hawley Road............
2574           IA            U.S. 20 Mississippi River       $20,000,000
                              Bridge and approaches,
                              Dubuque Co, IA............
2575           NY            Construct access road and        $2,000,000
                              exit lanes for Center for
                              Advanced Medicine: North
                              Shore LIJ Health System...
2576           NY            Improve key intersections          $600,000
                              and highway segments along
                              Rt. 32 between Route 17-6-
                              NYS Thruway interchange in
                              Harriman and Highland
                              Mills.....................
2577           CA            Widen I-5 to 10 Lanes and        $4,160,000
                              Improve Corridor
                              Arterials, SR 91 to I-710.
2578           IL            For the construction of the        $928,000
                              Grand Avenue Underpass,
                              Village of Franklin Park..
2579           NY            Rehabilitation of North and      $1,728,000
                              South Ridge Street and
                              Wappanocca Avenue in the
                              Village of Rye Brook and
                              City of Rye...............
2580           NY            NYSDOT Route 55                  $1,200,000
                              construction over Fishkill
                              Creek and left turn lane
                              construction..............
2581           AL            Alabama Hwy 36 Extension           $800,000
                              and Widening-Phase II.....
2582           OH            Construct Eagle Avenue             $400,000
                              Viaduct-Demolition bridge,
                              realignment of roadway to
                              replace bridge and
                              reconstruction of two
                              other bridges, Cleveland..
2583           NV            Construct U.S. 93 Corridor--     $8,000,000
                              Boulder City..............
2584           NY            Reconstruction of NYS 5, 8,        $800,000
                              12. Viaduct and Rt. 5A and
                              5S: City of Utica.........
2585           CT            Street and streetscape           $1,200,000
                              improvements along
                              Campbell Ave., West Haven.
2586           MA            Reconstruct North                $4,000,000
                              Washington Street Bridge
                              to connect Boston and
                              Charlestown...............
2587           MS            Upgrade roads in Fayette           $320,000
                              (U.S. Highway 61 and 33),
                              Jefferson County..........
2588           MN            Heritage Center at the           $1,400,000
                              Grand Portage National
                              Monument..................
2589           NY            Redesign and reconstruction        $500,000
                              of the Putnam Rail-Trail,
                              Bronx.....................
2590           OR            Highway 34/Corvallis Bypass      $2,100,000
                              Intersection..............
2591           CA            Install traffic signal on           $96,000
                              Balboa Blvd. at Knollwood
                              Shopping Center...........
2592           MA            Chelsea Street Bridge            $9,000,000
                              Reconstruction............
2593           AL            Pedestrian Improvements for        $213,334
                              Northport, AL.............
2594           NV            Construct widening of U.S.       $4,000,000
                              50A from Fernley to
                              Leeteville Junction.......
2595           WA            Rebuild and widen Cemetery         $160,000
                              Road bridge over U.S.
                              Bureau of Reclamation
                              canal near Othello, WA....
2596           FL            Roadway construction of SW       $1,600,000
                              62--SW 24 Avenue in
                              Gainesville...............
2597           WA            SR 2/Kelsey Street                 $832,000
                              Intersection Improvements
                              in Monroe.................
2598           NY            Town of Southeast                  $240,000
                              construction and repaving
                              of town roads.............
2599           MI            Reconstruct Third Ave. from      $2,400,000
                              Saginaw St. to Flint
                              River, City of Flint......
2600           PA            Upgrade circuit for gates          $220,000
                              and lights at 31st Street
                              in Allentown, PA USDOT
                              crossing number 592410G to
                              constant warning time
                              devices...................
2601           NV            Construct U.S. 95 Widening       $6,400,000
                              from Rainbow Blvd. to Kyle
                              Canyon....................
2602           IN            Improve campus streets to        $1,600,000
                              increase pedestrian safety
                              and ease vehicular
                              congestion in the City of
                              Anderson, Indiana.........
2603           PA            Schaefferstown Bypass, PA        $1,600,000
                              Route 501, Lebanon........
2604           PA            Design, engineering, ROW           $160,000
                              acquisition and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in Dupont
                              Borough, Luzerne County...
2605           GA            Intersection improvement at        $480,000
                              Lake Dow Road and SR 81
                              Harris Drive at SR 42.....
2606           CA            Replace South Access to the      $8,000,000
                              Golden Gate Bridge--Doyle
                              Drive.....................
2607           IL            Resurface Yellow Banks             $320,000
                              Road, Franklin County.....
2608           AL            CR 52 from U.S. 31 (Pelham)      $8,000,000
                              and continuation of CR 52
                              in Jefferson County, known
                              as Morgan Road, to I-459,
                              including proposed Highway
                              261 bypass around old town
                              Helena....................
2609           IL            Intersection Reconstruction        $720,000
                              at U.S. 12-IL 31 Tryon
                              Grove Road................
2610           NY            Streetscape of Herald and          $400,000
                              Greeley Squares in New
                              York City.................
2611           NJ            Construct Cape May and             $600,000
                              Supawna Meadows National
                              Wildlife Refuges Roadway
                              and Parking Improvements..
2612           TX            Del Rio-Laughlin Air Force      $11,600,000
                              Base Relief Route.........
2613           NC            Study feasibility of             $2,800,000
                              widening U.S. 221/NC 226
                              from Woodlawn to Spruce
                              Pine, start planning and
                              design, and make upgrades
                              to improve safety.........
2614           NY            Transportation improvements      $1,920,000
                              to the Far Rock-away
                              Business District, Queens,
                              New York..................
2615           AL            Construction of Patton           $4,000,000
                              Island Bridge Corridor....
2616           NH            Hampton Bridge                   $1,200,000
                              Rehabilitation--Hampton,
                              NH........................
2617           CA            Gale Avenue widening                $80,000
                              between Fullerton Road and
                              Nogales Street, and
                              Nogales Street widening at
                              Gale Avenue...............
2618           CA            Grade Separation at Cesar          $400,000
                              Chavez Parkway and Harbor
                              Drive, San Diego..........
2619           MO            Improve access to I-55 at        $8,000,000
                              River Des Peres...........
2620           PA            PA Route 61 enhancements,        $8,000,000
                              Schuylkill Haven..........
2621           MO            Kansas City SmartPort ITS        $4,000,000
                              for highways..............
2622           PA            City of Philadelphia in          $3,200,000
                              conjunction with American
                              Cities Foundation for
                              neighborhood
                              transportation enhancement
                              and pedestrian safety
                              projects..................
2623           DE            Reconstructing I-95/SR 1         $4,400,000
                              interchange, adding a
                              fifth lane, and replacing
                              toll plaza on Delaware's
                              portion of I-95 corridor..
2624           OH            Study possible road                $100,000
                              upgrades in Tuscarawas
                              County due to flood issues
                              based on dams in Muskingum
                              Watershed District........
2625           OR            Sunrise Corridor, Clackamas      $3,000,000
                              County....................
2626           CA            Construct Cabot-Camino             $670,952
                              Capistrano Bridge Project
                              and related roadway
                              improvements in Cities of
                              Mission Viejo and Laguna
                              Niguel, California........
2627           TX            Construction of mainlanes       $12,800,000
                              and interchanges on SH 121
                              from Hillcrest to U.S. 75.
2628           WA            Enumclaw, WA Welcome Center      $1,200,000
2629           PA            Upgrade narrow existing            $800,000
                              roads, Plank, Otts,
                              Meyers, Seitz Roads, along
                              1 mile corridor to 2 lane
                              road with shoulders,
                              improve intersections.....
2630           GA            Widen Old Petersburg Road-       $3,200,000
                              Old Evans Road from Baston
                              Road to Washington Road,
                              Columbia County, Georgia..
2631           CA            Widen Peyton Drive from          $5,628,888
                              Grand Ave. to Chino Hills
                              Pky., construct Eucalyptus
                              Ave. from Peyton Drive to
                              Galloping Hills, improve
                              English Channel...........
2632           TX            New construction for the SH      $2,000,000
                              349 Reliever Route
                              beginning at the SH 191
                              intersection in Midland...
2633           PA            Widen Route 22 between           $1,160,000
                              Export and Delmont........
2634           CA            Construction of a traffic          $100,000
                              signal at the intersection
                              of Hamlin St. and Corbin
                              Ave.......................
2635           NY            Design/Environmental work        $1,920,000
                              on the Inner Loop from
                              Clinton Avenue to East
                              Main Street, Rochester....
2636           MO            I-35 access modification         $1,200,000
                              planning, City of Kearney.
2637           OH            Construction and road              $400,000
                              improvements to Hubbard
                              Road in Burton Township,
                              OH........................
2638           MN            North-South Corridor with        $1,200,000
                              Railroad Overpass, City of
                              Staples...................
2639           CA            Port of Hueneme Intermodal       $3,760,000
                              Access Improvement
                              Project, including grade
                              separation at Rice Avenue
                              and State Route 34; widen
                              Hueneme Road..............
2640           CA            Reconstruct and deep-lift        $4,800,000
                              asphalt on various roads
                              throughout the district in
                              Ventura County............
2641           GA            Upgrade sidewalks, parking,        $400,000
                              street lighting, and
                              landscaping, Claxton......
2642           MS            Upgrade roads in Itta Bena       $1,200,000
                              (U.S. Highway 82 and 7)
                              and in vicinity of Viking
                              Range Corp. (U.S. Highway
                              7 and 49), Leflore County.
2643           VA            Widen Route 262 in Augusta         $800,000
                              County....................
2644           CA            Forest Highway 171 Upper         $5,800,000
                              Skyway Improvement........
2645           NV            Construct overpass and exit      $2,400,000
                              lane improvements on Lake
                              Mead Parkway to Lake Las
                              Vegas entrance............
2646           IL            Construct Bridge Overpass,         $800,000
                              DuSable Museum-Chicago....
2647           WA            Expand size and improve            $146,000
                              safety Lewis and Clark
                              Discovery Trailhead and
                              Scenic Overlook...........
2648           PA            Construction of access             $520,000
                              improvement at the I-79 SR
                              228 interchange in
                              vicinity of Cranberry Town
                              Center....................
2649           PA            Development of bicycle and       $8,000,000
                              pedestrian trails and
                              access links along North
                              Delaware Riverfront.......
2650           OH            Highway--RR grade                  $240,000
                              separation over the
                              Norfolk Southern Rail Line
                              for the Hines Hill Road--
                              Milford Connector project
                              in Hudson, Ohio...........
2651           CA            Construct crosswalk bump-          $400,000
                              outs and related
                              streetscape improvements
                              on Temple St. between
                              Hoover St. and Glendale
                              Blvd., Los Angeles........
2652           NC            Improve SR 1923 from U.S.        $4,000,000
                              70 Business to U.S. 301
                              Smithfield................
2653           MA            Improvements to Mass. Ave,         $800,000
                              Andover Street, Osgood
                              Street, Salem Street, and
                              Johnson Street in the Old
                              Town Center of North
                              Andover...................
2654           KY            Reconstruct U.S. 127 at            $480,000
                              U.S. 127 South, Mercer
                              County....................
2655           CA            Construct truck lane from        $1,200,000
                              Britannia Blvd. to the
                              Otay Mesa Port of Entry,
                              San Diego County..........
2656           PA            Beford, PA Relocation of        $12,228,000
                              Old Route 220 and Sweet
                              Road. Complete preliminary
                              engineering, purchase
                              right-of-way, construction
2657           GA            Design and construction of         $160,000
                              2.2 miles of multiuse
                              trail in the City of
                              Douglas, Georgia..........
2658           IL            Entry Road to Southern           $1,000,000
                              Illinois University
                              Research Park, Carbondale.
2659           NY            Kingston, Construct              $1,040,000
                              pedestrian waterfront
                              walkway...................
2660           MN            Reconstruction of Airport        $1,700,000
                              Road from TH 53 to CR 296,
                              Cirrus Drive from Airport
                              Road to TH 53 and TH 53
                              from Airport Road to
                              Stebner Road..............
2661           KS            Replacement of U.S. 169          $6,800,000
                              bridge in Kansas City.....
2662           PA            Route 313 Turning Lanes and      $1,600,000
                              Truck Climbing Lanes,
                              Bucks County..............
2663           CA            Purchase of Rosemead Blvd.         $800,000
                              ROW, Temple City..........
2664           NJ            Reconfiguration of Bay           $6,400,000
                              Avenue and Polaris Street
                              in Newark, NJ.............
2665           MI            Reconstruct highway under a        $800,000
                              railroad bridge, Wyoming
                              Ave. from Eagle Pass to
                              Michigan Avenue, Wayne
                              County....................
2666           OK            Construct vehicular bridge         $800,000
                              over the Burlington
                              Northern RR at War Bonnet
                              Crossing, Mannford, OK....
2667           UT            Construction and                 $7,000,000
                              Rehabilitation of 13th
                              East in Sandy City........
2668           VA            Construct 3.6 miles of             $615,680
                              Interstate 73 near
                              Martinsville..............
2669           WA            Maple Valley SR 169 and SR         $800,000
                              516 improvements..........
2670           FL            Construct access road to         $1,600,000
                              entrances to Opa-Locka
                              Airport at Opa-Locka
                              Airport at N.W. 135th
                              Street and N.W. 47th
                              Avenue, including
                              improvements to N.W. 47th
                              Avenue with median strip,
                              City of Opa-Locka.........
2671           UT            Expand Redhills Parkway          $4,000,000
                              from 2 to 5 lanes and
                              improve alignment within
                              rights-of-way in St.
                              George....................
2672           OH            Bethlehem Township, Ohio.        $1,040,000
                              Riverland Avenue Bridge
                              Replacement...............
2673           MD            MD 295, BWI Access               $3,792,000
                              Improvements..............
2674           OR            Connect Boeckman Road to           $800,000
                              Tooze Road, Wilsonville...
2675           LA            Lincoln Parish, LA/I-20          $4,000,000
                              Transportation Corridor
                              Program...................
2676           TX            FM 937 from SH 164 to FM         $1,600,000
                              3371, Limestone Co........
2677           MO            Construct additional exit        $3,856,000
                              ramp access lane from I-44
                              to Kings highway and
                              enhance Shaw Ave. corridor
2678           IN            Construction of I-64             $4,248,000
                              Interchange, Harrison
                              County, Indiana...........
2679           OH            Bridge Replacement at SR 84        $400,000
                              and I-90 on Bishop Road in
                              Willougby Hills, OH.......
2680           TN            Continue Shelby Avenue--         $5,200,000
                              Demonbreun Street project
                              in Nashville..............
2681           WI            Construct a bicycle/             $1,600,000
                              pedestrian path from
                              Waunakee to Westport......
2682           CT            Construct bike and                  $80,000
                              pedestrian paths along
                              Salem Greenway-Salem, CT..
2683           TX            Construct I-635/35E              $3,600,000
                              Interchange in Dallas, TX.
2684           CA            Hwy 199 Narrow Enhancement       $1,800,000
                              to reduce active slides
                              that cause significant
                              road closures on primary
                              connecting route from U.S.
                              101 to I-5................
2685           MD            Construction of New             $12,000,000
                              Interchange at MD5, MD373,
                              and Brandywine Road.......
2686           GA            I-20 West from SR 5 Bill         $5,800,000
                              Arp to SR 6--HOV Lanes....
2687           PA            Install and construct              $360,000
                              signals, calming devices
                              and signs in Mechanicsburg
                              and surrounding
                              municipalities............
2688           FL            44th St. Extension to            $1,200,000
                              Golfair Blvd.,
                              Jacksonville..............
2689           NJ            Passaic River-Newark Bay           $800,000
                              Restoration and Pollution
                              Abatement Project, Route
                              21, River Road, CR 510....
2690           CA            San Gabriel Blvd. and              $160,000
                              Mission Road Intersection
                              Improvements, San Gabriel.
2691           NY            Rehabilitate 125th Street        $2,000,000
                              Corridor from Old Broadway
                              to Marginal Street/
                              Waterfront................
2692           MI            Repair M-10 corridor from I-       $800,000
                              696 to downtown Detroit...
2693           FL            Capital Circle Northwest,        $8,000,000
                              Tallahassee...............
2694           TN            Installation of Intelligent      $1,600,000
                              Transportation System on
                              various major routes in
                              Memphis...................
2695           MI            Planning and Engineering         $1,200,000
                              for The American Road, The
                              Henry Ford Museum,
                              Dearborn..................
2696           TX            Reconstruct Ella/Wheatley        $1,000,000
                              from Little York to West
                              Gulf Bank.................
2697           NY            Implement Improvements for         $600,000
                              Pedestrian Safety in
                              Richmond County...........
2698           FL            Palm Bay Parkway from              $800,000
                              Emerson Drive to U.S. 192,
                              Palm Bay, FL..............
2699           CA            Construct the Los Angeles          $460,000
                              River bicycle and
                              pedestrian path in the San
                              Fernando Valley...........
2700           TX            Construct Santa Fe Trail           $800,000
                              DART LR overpass from Hill
                              St. to Commerce St. along
                              abandoned Santa Fe Rail
                              right-of-way in Dallas....
2701           CA            Construct Route 101 bicycle/     $1,000,000
                              pedestrian overpass at
                              Millbrae Ave. for the San
                              Francisco Bay Trail.......
2702           ............  ...........................              $0
2703           LA            New Iberia Rail Grade            $1,600,000
                              Separation................
2704           PA            Design, engineering, ROW           $160,000
                              acquisition and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in Ashley
                              Borough, Luzerne County...
2705           MN            Reconstruct Grand Avenue           $600,000
                              (from Central Ave. to 59
                              Ave. W), Central Ave.
                              (from Grand Ave. to I-35)
                              and Bristol Street (from
                              Central Ave. to Grand
                              Ave), Duluth..............
2706           TN            Plan and construct a                $80,000
                              bicycle and pedestrian
                              trail, Cannon County......
2707           TX            Develop, deploy and              $2,560,000
                              integrate municipal ITS in
                              San Antonio...............
2708           TN            Jefferson, Hamblen               $1,600,000
                              Counties, Tennessee SR 66
                              relocation................
2709           MD            Rehabilitate Pennington          $1,200,000
                              Avenue Drawbridge in
                              Baltimore.................
2710           PA            Construction of I-79 to Mon-     $1,200,000
                              Fayette Section of
                              Southern Beltway,
                              Pittsburgh, Pennsylvania..
2711           FL            Springfield Rd.                  $1,200,000
                              Improvements, Jacksonville
2712           LA            Elimination of highway-rail        $800,000
                              grade crossings along
                              Louisiana and Delta
                              railroad..................
2713           CA            Conduct necessary planning       $1,120,000
                              and engineering and
                              implement comprehensive
                              Corridor Management Plan
                              for Arroyo Seco Historic
                              Parkway, Los Angeles......
2714           FL            Plant City Traffic               $2,400,000
                              Management System.........
2715           GA            SR 347 widen-new                 $8,000,000
                              construction from I-985 to
                              SR 211, Hall County,
                              Georgia...................
2716           WA            SR 28 and SR 285 Sellar          $4,000,000
                              Bridge Improvements: ramp
                              and roadway network
                              improvements at the west
                              end and a new lane on the
                              Sellar Bridge.............
2717           NY            Stabilize Poughkeepsie             $874,000
                              Railroad Bridge and
                              construct a pedestrian
                              walkway linking the two
                              sides of the Hudson River,
                              Poughkeepsie..............
2718           WA            International Mobility and       $1,040,000
                              Trade Corridor Project for
                              Whatcom County............
2719           CA            State Route 76 Road              $4,000,000
                              Widening, Melrose Drive to
                              Interstate 15.............
2720           NJ            Streetscape Improvements to        $400,000
                              Clements Bridge Road from
                              Newton Avenue to New
                              Jersey Turnpike,
                              Barrington................
2721           FL            Construct Eastern Connector        $800,000
                              from SR 417 to I-95,
                              Volusia and Seminole
                              Counties Florida..........
2722           GA            Construction of the                $160,000
                              McIntosh Path on SR 99,
                              7.15 miles between Darien,
                              Georgia and the Sapelo
                              Island Visitor Center.....
2723           AL            Construction of Sulphur          $4,000,000
                              Springs Road Bypass in
                              City of Hoover, Alabama...
2724           AZ            Pliocene Cliffs                    $800,000
                              reconstruction between
                              Wikieup and the Santa
                              Maria River...............
2725           MN            Construct roadway                  $851,200
                              improvements to CSAH 76,
                              Little Falls..............
2726           IN            Study alternatives along 2         $120,000
                              miles of railroad to
                              eliminate in-town highway-
                              rail crossings to improve
                              safety and reduce
                              congestion in Delaware
                              County....................
2727           NV            Design and construct               $800,000
                              separation of rail-highway
                              crossings in downtown Reno
2728           NJ            Maple Shade Township               $800,000
                              Streetscape Improvements
                              of Mill Road, Rudderow
                              Ave., North and South
                              Coles Ave. and Schoolhouse
                              Lane......................
2729           WA            Conduct study for I-5 and          $300,000
                              SR 503 interchange........
2730           WA            Implement Red Mountain Area      $2,800,000
                              Vision transportation
                              plan, includes Webber
                              Canyon Road realignment at
                              existing I-82 Kiona-Benton
                              interchange and new Red
                              Mountain I-82 interchange
                              at SR 224.................
2731           TX            Downtown Streetscape               $512,000
                              Improvements in Beaumont,
                              Texas.....................
2732           NY            Improve Traffic Flow on            $500,000
                              Lefferts Boulevard by
                              Rehabilitating Facilities
                              Surrounding LIRR/Kew
                              Gardens Eastbound Station.
2733           FL            Construct reliever road to         $800,000
                              SR A-1-A in the City of
                              Deerfield Beach beginning
                              at A-1-A/ Hillsboro Blvd.
                              and ending at A-1-A/NE 2nd
                              Street....................
2734           ............  ...........................              $0
2735           CA            SR 52 East Improvements          $6,000,000
                              (San Diego)...............
2736           OR            Study to evaluate                  $248,000
                              alternatives in support of
                              an eventual Astoria
                              bypass, Astoria...........
2737           GA            Commission a study and              $80,000
                              report regarding the
                              construction and
                              designation of a new
                              Interstate linking
                              Savannah, Augusta, and
                              Knoxville.................
2738           VT            Construction of the St.            $960,000
                              Albans, Vermont intermodal
                              connector roadway with I-
                              89 for the City of St.
                              Albans....................
2739           OR            I-5/Highway 214 interchange        $800,000
                              improvements, Woodburn....
2740           OR            Construction of                    $793,600
                              transportation facilities
                              at the Tualatin River
                              Wildlife Refuge...........
2741           WY            I-80 Rock Springs Marginal.      $1,520,000
2742           ............  ...........................              $0
2743           IL            Improve safety of a                 $70,400
                              horizontal curve on
                              Clarksville St. .25 mile
                              north of 275th Road in
                              Grandview Township, Edgar
                              County, Illinois..........
2744           UT            Provo Reservoir Canal            $6,750,000
                              Trail, Utah...............
2745           MO            South County Riverfront          $3,200,000
                              Access and Trails Project,
                              Lemay.....................
2746           AK            Road improvements in the         $5,000,000
                              City of Fairbanks.........
2747           MD            Construct Ferry Terminal,          $800,000
                              Somerset County, Maryland.
2748           MS            Plan and Construct two           $2,400,000
                              lanes to SR 6 from SR 342
                              to Alabama State line.....
2749           CA            Construct bypass along Hwy       $5,600,000
                              101 around Willits, CA to
                              reduce congestion, improve
                              air quality and enhance
                              economic lifeline of No.
                              Coast.....................
2750           CA            Engineering support to I-5         $120,000
                              Joint Powers Authority to
                              widen I-5 freeway and
                              improve corridor arterials
                              from I-710 to Orange
                              County line...............
2751           LA            Kerner Ferry Bridge,             $1,680,000
                              Jefferson Parish Bayou
                              Barataria.................
2752           WA            Renton, WA SR 167 HOV,             $800,000
                              Strander Boulevard
                              Connection................
2753           NJ            Sussex County, NJ, Vernon        $2,800,000
                              Township, Mountain Creek
                              Rt. 94 Traffic Calming,
                              Ped. Safety and Traffic
                              Congestion, Circulation
                              Improvement...............
2754           PA            Linglestown Square, roadway      $2,400,000
                              and intersection
                              improvements, Lower Paxton
                              Township..................
2755           MD            Rehabilitate road including      $2,320,000
                              bridges over CSX tracks in
                              Baltimore.................
2756           WA            Extend 18th Street between       $3,200,000
                              87th Avenue and NE 192nd
                              Avenue in Vancouver.......
2757           TX            Implement repairs on Old           $403,000
                              Pleasanton Road Bridge in
                              Atascosa County...........
2758           CA            Hazel Avenue Improvements,       $2,400,000
                              U.S. Highway 50 to Madison
                              Avenue....................
2759           MI            Menominee County, County           $224,000
                              Road 557 Bridge
                              Replacement over the Big
                              Cedar River...............
2760           OH            Massillon, Ohio. Tremont         $1,216,000
                              Avenue Bridge
                              Rehabilitation............
2761           MI            Montmorency County,                $640,000
                              Reconstruction of County
                              Road 612 from W. County
                              Line to County Road 491...
2762           ............  ...........................              $0
2763           NM            Planning, design and             $1,600,000
                              construction of bikeways
                              and walkway at the City of
                              Santa Fe's downtown
                              railyard redevelopment
                              project...................
2764           GA            Streetscape-Bainbridge.....        $200,000
2765           PA            Construct SR 706 Corridor,       $1,600,000
                              Susquehanna County,
                              Pennsylvania..............
2766           NY            Town of North Salem                $120,000
                              reconstruction and
                              repaving of Keeler Lane...
2767           FL            Conduct planning and             $3,200,000
                              engineering for U.S. 17
                              widening and improvements
                              in Hardee County, Florida.
2768           IL            Traffic Signalization,             $726,000
                              Matteson..................
2769           MS            Upgrade Poe Road in                $160,000
                              Kilmichael, Montgomery
                              County....................
2770           NC            Upgrade U.S. 220 to I-73/74      $1,600,000
                              interstate standards in
                              Montgomery County.........
2771           WA            U.S. 2/Sultan Basin Road           $480,000
                              Improvements in Sultan....
2772           ............  ...........................              $0
2773           FL            A-1-A Transportation               $800,000
                              Enhancements, Daytona
                              Beach.....................
2774           MI            City of Menominee,                 $180,000
                              Resurface Hattie Street
                              Bridge deck 250 feet from
                              9th avenue in Menominee to
                              Riverside Avenue in
                              Marinette, WI.............
2775           TN            Construct streetscape            $1,600,000
                              improvements near TN
                              Theater in Knoxville, TN..
2776           MI            Emmet County, Ultra thin            $48,000
                              demonstration project
                              resurfacing of Mitchell
                              Road from the City of
                              Petoskey limits east to
                              Division..................
2777           NY            Gowanus Expressway Project.        $400,000
2778           PA            Design, engineering, ROW           $160,000
                              acquisition and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in Moosic
                              Borough, Lackawanna County
2779           AL            Expand to 4 lanes on U.S.        $2,800,000
                              278 from I-65 to U.S. 231.
2780           IL            Preconstruction and                $713,600
                              construction McCarthy
                              Road, Bell Road to U.S. 45
                              and 123rd Street U.S. 45
                              to 86th Avenue in Palos
                              Park......................
2781           WY            Riverton: Reconstruct Hwy          $880,000
                              26--Main St...............
2782           MA            Somerville Bicycle Path            $900,000
                              Improvements--Cedar Street
                              to Central Street.........
2783           MI            U.S. 31 improvements and         $7,200,000
                              relocation between Holland
                              and Grand Haven...........
2784           PA            Replace Messinger Street           $800,000
                              Bridge in the Borough of
                              Bangor....................
2785           NY            Owego, Construct pedestrian      $1,000,000
                              waterfront walkway........
2786           KY            Reconstruct U.S. 127 from        $1,200,000
                              Hustonville Road to the
                              Mercer County Line, Boyle
                              County....................
2787           ............  ...........................              $0
2788           CA            Design and construct access      $6,400,000
                              improvements in North
                              Central Business District,
                              Sacramento................
2789           NC            Construction of the              $5,440,000
                              southbound lane of U.S.
                              321 bridge replacement
                              over the Catawba River....
2790           FL            Grand Lagoon Bridge              $5,200,000
                              Replacement Project. The
                              replacement of a two lane
                              bridge with a four lane
                              bridge....................
2791           FL            Construct SR 9B Extension,       $3,520,000
                              St. Johns County, Florida.
2792           AL            Design and construct a 4-          $800,000
                              lane highway from Muscle
                              Shoals, AL to I-10........
2793           IN            Improve SR 9 Greenfield            $400,000
                              Corridor, Indiana.........
2794           NJ            Interstate 280 Interchange       $8,000,000
                              Improvements, Harrison....
2795           KY            Construct Northern Bypass       $28,000,000
                              of Somerset, KY and I-66
                              from the Cumberland
                              Parkway west of Somerset,
                              Kentucky to I-75 south of
                              London, Kentucky..........
2796           VA            Preliminary Engineer,            $1,200,000
                              Design, and Construct
                              improvements to Virginia
                              Beach Blvd. in Virginia
                              Beach and Norfolk.........
2797           PA            Fayette County,                  $1,600,000
                              Pennsylvania, State Road
                              21 Improvements...........
2798           ME            Replacement of Waldo-           $11,000,000
                              Hancock Bridge............
2799           CT            Reconstruct and widen Homer      $1,600,000
                              St. and Chase Ave. in
                              Waterbury from Waterville
                              Ave. to Nottingham Terrace
2800           FL            Construct new east-west            $800,000
                              road from the intersection
                              of Beeline Highway and PGA
                              Boulevard west to Seminole
                              Pratt Whitney Road........
2801           WI            Enhance West Silver Spring         $320,000
                              Ave. with lighting
                              enhancement, crosswalk
                              improvements, sign-age,
                              landscaping, Milwaukee....
2802           NY            Completion of 1.6 mile              $99,200
                              trail network in the Utica
                              Marsh, NY.................
2803           TX            Construct I-635/I-30            $12,000,000
                              Interchange, Dallas, Texas
2804           IL            Establish transportation           $400,000
                              museum on Navy Pier,
                              Chicago...................
2805           CA            Establish I-15 Interchange       $1,200,000
                              at Nisqualli and Mojave
                              River crossing in San
                              Bernardino County.........
2806           MA            Massachusetts Bay                $1,000,000
                              Transportation Authority
                              Secure Station, Boston....
2807           FL            Construct bridges on SR 710      $2,000,000
                              in Palm Beach County......
2808           PA            Reconstruct intersection of      $1,720,000
                              SR 51 and Franklin Ave,
                              Beaver County.............
2809           NJ            Rehabilitation existing            $800,000
                              structure at the Bridge
                              Street bridge over the CSX
                              Railroad Trenton Line in
                              Manville, NJ..............
2810           OR            Repair and recoat logging          $120,000
                              bridge over Highway 99 E,
                              Canby.....................
2811           CA            San Gabriel Blvd.                  $160,000
                              Rehabilitation Project--
                              Broadway to Las Tunas, San
                              Gabriel...................
2812           CA            Signal upgrades on Avenida         $100,160
                              de las Flores, Melinda
                              Road, Avenida de las
                              Banderas, and Alma Aldea,
                              Rancho Santa Margarita,
                              California................
2813           CA            Construct State Route 905       $12,000,000
                              to connect the Otay Mesa
                              Port of Entry to
                              Interstate 805, San Diego.
2814           MA            Crosby Drive Improvement           $800,000
                              Project...................
2815           WI            Construct North Shore              $350,000
                              Extension of Friendship
                              State Trail, Calumet and
                              Winnebago Counties,
                              Wisconsin.................
2816           AR            Construct and rehabilitate       $5,000,000
                              Fayetteville Expressway
                              Economic Development
                              Corridor..................
2817           PA            Armstrong County,                $1,600,000
                              Pennsylvania, construction
                              of the Freeport Bridge....
2818           IL            Road extension for Redco           $800,000
                              Drive to Skyline Drive,
                              Williamson County.........
2819           CA            Rosecrans Avenue and Bridge      $3,200,000
                              Arterial Reconstruction
                              Project, Compton..........
2820           MA            Canalside Rail Trail               $800,000
                              Construction of the
                              Canalside Rail Trail,
                              Deerfield and Montague....
2821           CA            Conduct study and construct      $7,200,000
                              Daggett Road, Port of
                              Stockton, CA, Access
                              Project...................
2822           WI            Construct a bicycle/             $1,600,000
                              pedestrian path, and two
                              bridges across
                              Starkweather Creek,
                              Madison...................
2823           GA            Construct City of                  $500,000
                              Fayetteville, Ga. School
                              Access Bike Ped Project...
2824           TN            Sevier County, Tennessee SR        $800,000
                              449 extension.............
2825           GA            SR 133 south bound lane            $800,000
                              bridge replacement over
                              the Georgia Florida
                              Railnet line, Dougherty
                              County....................
2826           CA            Construct grade separation       $1,600,000
                              on State Street and Cajon
                              Boulevard along BNSF
                              tracks in San Bernardino..
2827           WA            Construct SR 9 Pedestrian          $880,000
                              Overpass in Arlington.....
2828           CA            Implement streetscape               $80,000
                              improvements along Wilbur
                              Avenue to enhance traffic
                              and pedestrian safety.....
2829           MD            I-95, I-495, MD5 Branch          $3,200,000
                              Avenue Metro Access.......
2830           TN            Improving Vehicle                   $45,600
                              Efficiencies at At-Grade
                              highway-Railroad Crossing
                              in Loudon, TN.............
2831           MO            I-470, I-435 and Rt. 71          $2,400,000
                              Completion of Interstate
                              realignment...............
2832           PA            Ridge Avenue Revitalization        $800,000
                              project in conjunction
                              with Roxborough Dev. Corp.
                              for scenic enhancements
                              and pedestrian safety
                              improvements along a
                              heavily traveled
                              thoroughfare..............
2833           PA            Corridor improvements for          $800,000
                              PA 72 from PA 283 to PA
                              Turnpike..................
2834           AR            Construction of I-49,            $6,000,000
                              Highway 71: Highway 22 to
                              Highway 71 near Jenny Lind
2835           CA            Provide landscape                $1,200,000
                              enhancement of an existing
                              open culvert on Atherton
                              Street, Long Beach........
2836           NY            Rehabilitate Guy Lombardo          $956,000
                              Avenue and construct
                              drainage improvements and
                              new sidewalks and curb
                              cuts in Freeport, NY......
2837           IA            I-35 interchange                 $4,000,000
                              improvements, Ankeny......
2838           PA            Improve Freemansburg Avenue      $1,600,000
                              and its intersections at
                              Route 33..................
2839           NJ            Pedestrian facilities and          $320,000
                              street lighting on Route
                              551 from Route 130 to
                              Chestnut Street, Brooklawn
2840           IL            I-57 and I-294 Interchange.      $2,400,000
2841           FL            New Kings Rd. Pedestrian         $1,600,000
                              Overpass and Enhancements,
                              Jacksonville..............
2842           TX            Grimes Co., TX Bridge              $400,000
                              Improvement Project.......
2843           CA            Crenshaw Blvd.                     $800,000
                              Rehabilitation, Maricopa
                              St. to Sepulveda Blvd.,
                              City of Torrance..........
2844           VA            Engineering and Right-of-        $1,200,000
                              Way for Interstate 73 in
                              Roanoke County............
2845           GA            Johnson Ferry Road               $2,000,000
                              Glenridge Drive Widening,
                              Abernathy Road to Hammond
                              Drive.....................
2846           GA            Install walkways, bridges,       $6,160,000
                              lighting, landscaping in
                              Water Works Park and south
                              along river through
                              Ocmulgee Monument and
                              Central City Park.........
2847           OH            Intersection improvements          $489,600
                              and related road
                              improvements in the City
                              of Chardon, OH............
2848           WV            Construct Coalfields             $5,760,000
                              Expressway................
2849           CA            Improve pedestrian and             $800,000
                              biking trails within East
                              Bay Regional Park
                              District, Contra Costa
                              County....................
2850           MA            Berkshire County Bike            $4,000,000
                              Paths, Design and
                              Construction..............
2851           MI            Ogemaw County, Overlay of          $295,680
                              Fairview Road to improve
                              network of all-season
                              truck routes..............
2852           VA            Old Mill Road Extension....        $800,000
2853           PA            Construct Campbelltown           $2,000,000
                              Connector, Lebanon County.
2854           NJ            Construct Rt. 40                 $2,400,000
                              Reconstruction from Rt. 77
                              to Elmer Lake, Elmer,
                              Salem County..............
2855           OH            Design and Construct             $1,200,000
                              Riverwalk and adjacent
                              facilities, Warren,
                              Trumbull Co...............
2856           CA            Realign SR 4 within the          $1,600,000
                              City of Oakley............
2857           IL            Construct recreational             $320,000
                              trail from Spring Creek
                              Forest Preserve to Greene
                              Valley Forest Preserve in
                              DuPage County, IL.........
2858           MN            Construct trail link             $1,200,000
                              between Bruce Vento
                              Regional Trail and
                              Mississippi River Corridor
                              in St. Paul...............
2859           FL            Construct Interstate-4/            $800,000
                              Crosstown Connector.......
2860           UT            Add lights to road from            $200,000
                              Halchita to Mexican Hat on
                              the Navajo Nation.........
2861           CA            Construct off ramp at            $2,400,000
                              Interstate 8/Imperial
                              Avenue Interchange, El
                              Centro....................
2862           VA            Cranesnest Trail--                 $520,000
                              Construction of hiking,
                              biking, horse trail from
                              Route 83 to Cranesnest
                              Campground................
2863           NC            Durham and Chatham               $1,600,000
                              Counties, NC Completion of
                              American Tobacco Trail....
2864           TX            Austin to Manor Rail Trail,      $1,600,000
                              Texas.....................
2865           PA            Eliminate existing rail          $3,200,000
                              line in Indian, PA to
                              eliminate 37 at grade
                              crossings and reconstruct
                              the line outside the town
                              from Glenn Lock to
                              Middletown................
2866           MN            Extend Cuyuna Range and            $320,000
                              Great River Road Trails,
                              Aitkin....................
2867           NY            Conduct planning,                  $400,000
                              engineering, and eventual
                              construction of Rt. 5 in
                              City of Oneida, from
                              Seneca St. to county line.
2868           NY            Great Neck Road Traffic            $320,000
                              Calming Project...........
2869           NJ            Design and construct new           $800,000
                              streetscape through
                              Irvington Center..........
2870           IL            Construct connector road         $4,800,000
                              between Collinsville Rd.
                              to IL 3/North 1st St, St.
                              Clair County..............
2871           NJ            Carteret, NJ Ferry Service       $1,680,000
                              Terminal..................
2872           AL            Construct I-10/U.S. 231          $2,400,000
                              Connector from Dothan, AL
                              to Florida................
2873           OH            Bicycle Paths for the Magic        $640,000
                              Mile in Willougby, OH.....
2874           NC            Construct I-73/I-74 in          $14,400,000
                              Montgomery County and
                              Richmond County, North
                              Carolina..................
2875           NY            Construct Phase II I-90          $4,800,000
                              Connector ITS Laboratory
                              in Rensselaer County......
2876           NC            Design and Construction of       $2,240,000
                              the Airport Area Roadway
                              Network, High Point.......
2877           WA            Engineering and                    $800,000
                              Construction of the
                              Centennial Trail in
                              Snohomish.................
2878           OR            I-5 Beltline Interchange...     $20,000,000
2879           IL            Extension North from Rt. 30      $3,808,000
                              to Wheeler Road and Galena
                              Boulevard extension west
                              of Rt. 47 in Sugar Grove,
                              IL........................
2880           NY            Newburgh, Improve East End       $1,490,800
                              Roads.....................
2881           ME            Construction of the                $400,000
                              Kennebec River Rail Trail.
2882           CA            Construct Bristol Street         $2,800,000
                              multimodal corridor in
                              Santa Ana.................
2883           CA            Construct pedestrian               $400,000
                              sidewalk enhancements in
                              Bellflower................
2884           KS            Improvement and expansion       $11,600,000
                              for 2.7 miles of K18 in
                              Geary County..............
2885           CA            I-110/SR 47/Harbor Blvd.         $4,000,000
                              Interchange Improvements,
                              San Pedro.................
2886           MA            Oxbow National Wildlife          $1,500,000
                              Refuge, Design and
                              construction of a Visitor
                              Contact Station...........
2887           AL            Pedestrian Improvements for        $266,666
                              Pell City, AL.............
2888           WI            Rehabilitate Highway 51          $1,600,000
                              between CTH S and U.S. 8
                              in Lincoln County.........
2889           OH            Rehabilitate tunnel and            $700,000
                              bridge on National Road
                              Bikeway in St. Clairsville
2890           MD            Pennington Ave. Drawbridge,        $800,000
                              Baltimore.................
2891           MA            Rehabilitation and paving          $200,000
                              of Parker River Road......
2892           MN            Reconstruct CSAH 7 between       $2,560,000
                              Itasca CR 341 and the
                              Scenic State Park entrance
                              to improve safety and
                              structural integrity......
2893           OH            Grading, paving, roads for       $5,200,000
                              the transfer of rail to
                              truck for the intermodal
                              facility at Rickenbacker
                              Airport...................
2894           PA            Relocation of PA 52 at             $960,000
                              Longwood Gardens..........
2895           TX            Construct Interstate 35          $1,000,000
                              improvements in Buda......
2896           TN            Improve streetscape and            $240,000
                              signage, McMinn County, TN
2897           OR            Culvert Replacement, Sweet         $130,000
                              Home......................
2898           AL            AL 5 Widening in Bibb            $2,400,000
                              County....................
2899           CO            Design and build a               $4,000,000
                              multimodal corridor on
                              U.S. 36...................
2900           WA            Development of highway-rail        $800,000
                              crossings in Spokane
                              County, WA and Kootenai
                              County, ID................
2901           OH            Acquire right-of-way land          $800,000
                              along U.S. 24, Lucas
                              County....................
2902           IL            Improve Streets,                   $224,000
                              Westchester...............
2903           NY            Enhance road and                 $2,000,000
                              transportation facilities
                              in the vicinity of W. 65th
                              St. and Broadway, New York
                              City......................
2904           TN            Construction of Knob Creek         $400,000
                              Road in Washington County,
                              Tennessee.................
2905           TN            Improve streetscape and            $240,000
                              pavement repair, Loudon
                              County, TN................
2906           CA            Improvement of intersection      $2,600,000
                              at Inglewood Ave. and
                              Marine Ave. to reduce
                              congestion, City of
                              Lawndale..................
2907           HI            Interstate Route H1              $5,944,000
                              rehabilitation, Kaahumanu
                              Street to Kaimakani Street
2908           ID            Construct Interchange on I-      $1,600,000
                              84 at Ten Mile Rd.,
                              Meridian, Idaho...........
2909           NJ            Pedestrian facilities and          $277,696
                              street lighting on Haddon
                              Avenue from Voorhees
                              Township Line to Bate
                              Avenue, Berlin Township...
2910           WA            267th Street NW Pedestrian         $480,000
                              Path in Stanwood..........
2911           KY            Replace U.S. 68 and U.S.           $600,000
                              150 Bridge over Chaplin
                              River, Perryville.........
2912           UT            Geveva Rd-Provo Center           $6,000,000
                              Street, Orem 1600 North to
                              I-15 FWY, Provo-widen from
                              2 to 4 lanes..............
2913           IL            Construction of a new            $7,600,000
                              roadway and grade
                              separation of the UP West
                              Line east of Elburn.......
2914           VA            Haymarket, VA. Washington          $400,000
                              Street improvements.......
2915           NJ            Improvements to implement          $400,000
                              the Readington Tewksbury
                              Transportation Improvement
                              District..................
2916           IL            Allow IDOT to proceed with       $1,600,000
                              engineering and
                              construction of Airport-
                              Lockport Rd. and Illinois
                              Route 126 interchanges on
                              I-55......................
2917           AR            Caraway Bridge Overpass....      $7,200,000
2918           OH            Construction of an                 $400,000
                              Intermodal Facility at
                              University Circle in the
                              City of Cleveland.........
2919           PA            Jeannette Truck Route......        $400,000
2920           MD            MD45, Cavan to Ridgley           $4,416,000
                              Roads.....................
2921           MD            MD 30 Hampstead Bypass.....        $800,000
2922           MI            Monroe Area Highway-Railway      $5,120,000
                              Crossing Improvements,
                              City of Monroe............
2923           OH            Conduct study of new             $2,000,000
                              interchange at Routes 161/
                              37 and Cherry Valley Road
                              in Licking County, Ohio...
2924           CT            Enfield, Connecticut make        $2,328,000
                              improvements to South
                              Maple Street Bridge.......
2925           NY            Conduct studies, if              $3,200,000
                              necessary, and construct
                              infrastructure projects
                              for Governor's Island.....
2926           NY            Harlem River Park and              $800,000
                              Bikeway...................
2927           CT            Make Improvements to               $160,000
                              Plainfield Cemetery Road..
2928           SC            Construct grade separation         $800,000
                              and interchange
                              improvements at U.S. 521,
                              Lancaster County..........
2929           NJ            Replacement of the Magnolia        $800,000
                              Avenue Bridge over Routes
                              1 and 9...................
2930           ............  ...........................              $0
2931           MI            Resurfacing of Frazho Road       $1,024,000
                              in Roseville..............
2932           CA            Construct 213th Street             $800,000
                              pedestrian bridge to
                              provide safe passage for
                              pedestrians and
                              wheelchairs, Carson.......
2933           MO            Conduct impact studies for       $4,000,000
                              Missouri River Bridge
                              siting in Kansas City, MO.
2934           CA            Construction of Lenwood          $1,200,000
                              Road Grade Separation in
                              Barstow, CA...............
2935           PA            Improvements to Frankford        $1,000,000
                              Avenue from Cottman Avenue
                              to Harbison Avenue........
2936           IN            Revelop Hazeldell Road,            $800,000
                              Hamilton County, Indiana..
2937           AK            Road Improvements and            $5,000,000
                              upgrades to service road
                              areas and miscellaneous
                              projects within Northstar
                              Borough...................
2938           OH            Rehabilitation or                  $288,000
                              replacement of highway-
                              rail grade separations
                              along the West Central
                              Ohio Port Authority route
                              in Champaign and Clark
                              Counties..................
2939           MI            Otsego County, Resurfacing         $294,400
                              and widening of Parmater
                              Rd........................
2940           WA            Realign West Main Street         $2,000,000
                              through Kelso.............
2941           TN            Reconstruct State Route 109        $800,000
                              from I-40 in Wilson County
                              to Portland in Sumner
                              County....................
2942           PA            Redesigning the                  $1,200,000
                              intersection of U.S. 322/
                              High Street and Rosedale
                              Ave.......................
2943           DE            Replacement of the Indian        $4,800,000
                              River Inlet Bridge, Sussex
                              County, Delaware..........
2944           FL            Construct link from I-95 to      $4,000,000
                              I-10 through Clay County
                              with terminus points SR 23
                              to CAR 739B...............
2945           MN            Construct ramps and new          $5,616,595
                              bridge over Interstate 35
                              at CSAH 17, and
                              reconstruct CSAH 17 from
                              west County Line to CSAH
                              30, Chisago County........
2946           CT            Conduct multimodal study of        $800,000
                              Route 8 corridor between
                              Beacon Falls-Seymour town
                              line and Exit 40..........
2947           AR            Hwy 65 improvements in Van       $1,200,000
                              Buren County, including
                              construction of passing
                              lanes, bridge
                              improvements, intersection
                              improvements and other
                              roadway improvements......
2948           AZ            Scott Ranch Road. Navajo         $1,000,000
                              County--Connect White
                              Mountain Road (SR 260) and
                              Penrod Road (SR 77).......
2949           NY            Construction of Pedestrian         $500,000
                              and Bike Trail campus
                              access and improvements,
                              St. Bonaventure, NY.......
2950           NY            Eastern Laurelton Area           $6,880,000
                              Improvements, Queens, New
                              York......................
2951           NY            Bicycle and pedestrian           $1,200,000
                              safety improvements, Main
                              Street, Riverhead.........
2952           AL            Construct County Road 83         $8,000,000
                              corridor from Foley Beach
                              Express to I-10...........
2953           PA            Design and construct             $3,096,400
                              improvements to PA 465
                              from Walnut Bottom Rd. to
                              PA 641 and at I-81 Exit 44
2954           IL            Reconstruct and Widen Route      $9,000,000
                              60 Bridge over I-94 in
                              Lake Forest...............
2955           VA            Improve Downtown Staunton,       $1,200,000
                              Virginia, Streetscape.....
2956           PA            Route 322 Halls Run              $1,360,000
                              Upgrades from the
                              intersection of Horsecreek
                              Road to Mapleshade Road--
                              Venango County............
2957           PA            Design, engineering, ROW         $2,000,000
                              acquisition and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in Wilkes-
                              Barre.....................
2958           IN            SR 56 Reconstruction,            $4,096,000
                              Aurora, Indiana...........
2959           MI            Study and implement              $2,800,000
                              transportation system
                              alternatives in the
                              vicinity of U.S. 31/M 46..
2960           MA            Longfellow Bridge                $3,000,000
                              Rehabilitation............
2961           IL            For Village of Bolingbrook         $400,000
                              to construct Remington
                              Blvd. extension...........
2962           AZ            Design and Construction of       $2,400,000
                              Rio Salado Pedestrian
                              Bridge in Tempe, AZ.......
2963           MI            Study to determine               $3,200,000
                              replacement options for
                              obsolete and structurally
                              deteriorating bridge
                              (Trenton-Grosse Isle
                              Bridge) including approach
                              roadways, Charter County
                              of Wayne..................
2964           PA            Mount Joy Bridge                   $360,000
                              Replacement on Route 230..
2965           CA            Modifies 9 traffic signals         $240,000
                              between Willow Road and
                              Middlefield Road and
                              Hamilton Avenue, Menlo
                              Park......................
2966           OH            Summit County Engineer             $400,000
                              Reconstruct Access Roads
                              to Cuyahoga Valley
                              National Park.............
2967           OR            To study the feasibility of        $992,000
                              widening Hwy 26 from the
                              Hwy 217 interchange to the
                              Cornelius Pass exit.......
2968           GA            Athens-Clarke County             $1,856,000
                              Greenway Enhancement
                              Project...................
2969           WA            Improve Wahkiakum County           $250,000
                              Ferry landing.............
2970           IL            Irving Park Bridge over the      $3,200,000
                              Chicago River.............
2971           MI            Design, right-of-way and         $1,760,000
                              construction of passing
                              relief lanes and
                              improvements necessary on
                              M-55, between M-37 and M-
                              115.......................
2972           NE            Design, right-of-way and         $3,200,000
                              construction of South and
                              West Beltway in Lincoln,
                              Nebraska..................
2973           TX            Tower 55 CMAQ Congestion         $1,600,000
                              and Preliminary
                              Engineering Study.........
2974           NY            Town of Chester, Lake Hill         $120,000
                              Farms subdivision road
                              improvements..............
2975           MN            Improvements on TH 169 east      $1,772,800
                              and west of East Two
                              Rivers Crossing and TH 135
                              from Enterprise Drive to
                              TH 169....................
2976           IN            Reconstruct Standard             $1,040,000
                              Avenue, Whiting...........
2977           TX            Barron Rd. Interchange at        $2,400,000
                              SH 6 (Earl Rudder Freeway)
                              College Station...........
2978           CA            Develop conceptual master          $172,000
                              plan to improve the
                              efficiency of
                              transportation facilities,
                              Covina....................
2979           PA            Transportation enhancements      $2,400,000
                              along the Delaware Canal
                              between Yardley, PA and
                              Bristol, PA...............
2980           VA            Upgrade DOT crossing               $137,360
                              #467661K to constant
                              warning time devices......
2981           UT            Add lighting on Highway 262        $175,000
                              on the Navajo Nation in
                              Aneth.....................
2982           VA            Chestnut Mountain Road--           $400,000
                              Feasibility study, design,
                              and construction start for
                              road improvement on
                              National Forest lands.....
2983           MI            Construction of roads and          $880,000
                              trails Humbug Marsh Unit
                              Linked Greenways System,
                              Detroit International
                              Wildlife Refuge...........
2984           TX            Construct access road            $1,440,000
                              connecting Port of
                              Beaumont property on east
                              bank of Neches River to I-
                              10 access road east of the
                              Neches River..............
2985           ............  ...........................              $0
2986           SC            Lexington County, widen          $1,600,000
                              U.S. 1 and SC 6, and
                              improve U.S. 1, SC 6, and
                              U.S. 378..................
2987           IL            Midlothian Road                    $480,000
                              Signalization, Lake Zurich
2988           VA            Glen Alton--Design and             $800,000
                              construction of recreation
                              trails, access and visitor
                              information center........
2989           MI            Expansion of Cass Avenue in      $7,355,200
                              Clinton Township..........
2990           CO            Bromley Lane and U.S. 85           $664,000
                              interchange feasibility
                              study and construction of
                              needed improvements.......
2991           MD            Constructing Chestertown           $240,000
                              Trail, Chestertown, MD....
2992           IL            Eastern Peoria Bypass and        $2,400,000
                              (Ring Road) study and land
                              acquisition...............
2993           VA            Conduct planning and             $1,600,000
                              engineering for Mayo
                              Bridge in Richmond........
2994           NY            Elevation of road and              $556,000
                              construction of drainage
                              improvements on Sequams
                              Lane Center and Sequams
                              Lane West in the Town of
                              Islip, NY.................
2995           NM            Improvements to San Juan           $800,000
                              County Road 7950..........
2996           WA            116th St/Interstate 5            $1,400,000
                              Interchange Reconstruction
                              in Marysville.............
2997           SC            Construction of public           $4,800,000
                              roads at the International
                              Center for Automotive
                              Research and
                              reconstruction of
                              Fairforest Way in
                              Greenville, South Carolina
2998           PA            Provide 4 through-lanes on       $4,000,000
                              PA 100 by constructing two
                              thru lanes to the east of
                              Ludwigs Corner............
2999           PA            Completion of construction       $1,600,000
                              of final 2 ramps of I-79
                              interchange with Parkway
                              West; widening of 1 mile
                              of Parkway West leading to
                              ramps.....................
3000           CA            Diamond Bar, CA Grand            $1,280,000
                              Avenue Rehabilitation.....
3001           NY            Reconfigure intersection of        $600,000
                              Ridge Street and Hallocks
                              Mill Road and install new
                              traffic signal............
3002           WA            Guard Street Reconstruction        $640,000
                              Project in Friday Harbor..
3003           CO            Roadway widening and             $5,976,000
                              interchange rebuilding on
                              I-225 from I-70 to Parker
                              Road......................
3004           PA            Roosevelt Boulevard              $3,200,000
                              improvements by the
                              Pennsylvania Department of
                              Transportation............
3005           MN            Construct Paul Bunyan Trail        $560,000
                              Walker to Bemidji Segment.
3006           HI            Upgrades to Farrington             $800,000
                              Highway...................
3007           KY            U.S. 41A Phase II Design         $3,200,000
                              and Right-of-Way..........
3008           NM            U.S. 54 Corona, Tularosa,          $800,000
                              and Vaughn Bridges
                              Replacement and
                              Rehabilitation............
3009           OH            Construction of access road        $800,000
                              along east side of SR 8 in
                              Summit County, OH.........
3010           TX            U.S. 281 from Brooks County      $1,600,000
                              Line to FM 3066, Brooks
                              County....................
3011           FL            Construction of an               $4,431,167
                              interchange at Florida's
                              Turnpike and Stirling Rd.
                              in Broward County.........
3012           NY            Construction of the City of      $2,400,000
                              Watertown Streetscape
                              Enhancement Project.......
3013           IL            Improve Streets,                   $480,000
                              Merrionette Park..........
3014           NY            Install Improvements for           $250,000
                              Pedestrian Safety in the
                              vicinity of St. Roberts
                              Bellarmine................
3015           NY            Rebuild Queens Plaza, a 250-     $6,400,000
                              foot wide roadway on the
                              eastern end of the
                              Queensborough Bridge......
3016           PA            Upgrade circuit for gates          $220,000
                              and lights at Seventh
                              Street in Emmaus, PA USDOT
                              crossing number 592401H to
                              constant warning time
                              devices...................
3017           UT            SR 158 Improvements, Pine        $1,680,000
                              View Dam, Weber County,
                              Utah......................
3018           CA            Valley Boulevard Capacity        $1,600,000
                              Improvement between 710
                              Freeway and Marguerita
                              Avenue, Alhambra..........
3019           IL            Offramp and overpass from I-     $4,000,000
                              57 outside of Marion and
                              necessary connector roads.
3020           AK            Construction of and              $3,000,000
                              improvements to roads at
                              Alaska Pacific University.
3021           SC            Upgrade of the I-95/SC 327       $6,000,000
                              Interchange near Florence.
3022           CA            Valley View/Stage Grade            $720,000
                              Separation Project, La
                              Mirada and Santa Fe
                              Springs, California.......
3023           OR            Renewal of Wooden Bridge         $7,500,000
                              West of Albany............
3024           MI            Northville, Taft Road from         $400,000
                              8 Mile North to city
                              limits....................
3025           NY            Village of Pawling                  $80,000
                              Rehabilitation of
                              Grandview Ave. from
                              Lakeside to end...........
3026           SD            Pave and curb Cheyenne           $1,200,000
                              River Tribe Route 900,
                              ``Chinatown'' in Eagle
                              Butte.....................
3027           FL            Church Street Improvements,     $11,200,000
                              Orlando...................
3028           MI            Walled Lake, Widen Maple           $100,000
                              Road, west of Decker to
                              Welch.....................
3029           AR            Washington County,                 $800,000
                              Arkansas--Replace and
                              rebuild Tilly Willy Bridge
3030           AR            Russellville Intermodal          $2,000,000
                              Facility construct access
                              roads from AR Hwy 247,
                              purchase Right-of-Way.....
3031           TX            Construct IH 30 Monty            $1,200,000
                              Stratton Parkway
                              Interchange in Greenville,
                              TX........................
3032           PA            Design and Construction of       $1,600,000
                              Portzer Road Connector,
                              Bucks County..............
3033           IL            For Plainfield Township             $80,000
                              Park District to construct
                              DuPage River Bike and
                              Pedestrian Trail linking
                              Grand Illinois, Midewin,
                              and I&M Canal Trails......
3034           TX            Pedestrian Path and                $400,000
                              Sidewalk Improvements
                              along U.S. 83 in Rio
                              Grande City...............
3035           MS            Upgrade roads at Tougaloo          $400,000
                              College...................
3036           IL            Washington Street Widening,      $2,688,000
                              Gurnee....................
3037           LA            Replacement Bridge for             $400,000
                              Tunnel, Belle Chasse......
3038           FL            Implement Busch Boulevard        $2,000,000
                              corridor improvements to
                              improve safety in Tampa...
3039           MI            Construction of Pittsfield         $160,800
                              Greenways Bridge--Non-
                              motorized bridge
                              enhancement onto existing
                              Bemis Road Bridge,
                              Pittsfield Charter
                              Township..................
3040           NC            North Carolina. Repair and      $11,360,000
                              improve safety features on
                              U.S. Highway 19 from
                              Maggie Valley to Cherokee.
3041           NC            Northern Loop Project, City        $800,000
                              of Wilson.................
3042           OR            Weaver Road Extension and       $17,000,000
                              Bridge Project, Douglas
                              County....................
3043           MI            Complete 58 miles of White       $2,240,000
                              Pine Trail from Grand
                              Rapids to Cadillac........
3044           NY            Elmira Congestion                $1,800,000
                              Mitigation................
3045           IL            Improve Roads and Bridges,       $1,200,000
                              Cicero....................
3046           MI            Carlysle Road                    $2,000,000
                              Reconstruction, Inkster...
3047           UT            Construct pedestrian safety        $325,000
                              project on the Navajo
                              Nation in Montezuma Creek.
3048           MD            Construct MD5, Hughesville       $8,000,000
                              Bypass....................
3049           OH            Repair and Construct Rock          $500,000
                              Spring Bridge, Portage
                              County....................
3050           RI            Replace I-195 Washington         $1,600,000
                              Bridge Eastbound..........
3051           UT            Bear River Migratory Bird        $3,600,000
                              Refuge Access Road
                              Improvements, Box Elder
                              County, UT................
3052           MA            Reconstruction of Union St.      $1,220,000
                              and Rt. 138W, Holbrook....
3053           MI            Replacement of the               $7,200,000
                              interchange at 44th Street
                              and U.S. 131 in Grand
                              Rapids....................
3054           OH            Construct interchange              $450,000
                              improvements at SR 46 and
                              82 in Howland Township,
                              Trumbull Co...............
3055           GA            Widen and construct U.S. 84      $2,400,000
                              Connector Bypass from west
                              of U.S. 84 SR 119 west of
                              Hinesville to U.S. 84 SR
                              196 south of Flemington,
                              Liberty County, Georgia...
3056           IL            Project is a stand-alone           $800,000
                              roadway improvement
                              consisting of the complete
                              reconstruction of the
                              roadway, The Village of
                              Forest Park...............
3057           MI            Jackson Freeway                 $12,800,000
                              Modernization Project. I-
                              94 Modernization Project
                              from Michigan State Route
                              60 [M60] easterly to
                              Sargent Road..............
3058           VA            Smart Travel and Traffic           $400,000
                              Management Systems in
                              Salem and Staunton
                              District, Virginia........
3059           OH            Construct Great Miami River      $1,016,000
                              Multi-Use Trail, Miami
                              County, Ohio..............
3060           DC            Rock Creek Recreational            $800,000
                              Trail study to assess
                              feasibility of
                              constructing recreation
                              trail.....................
3061           MI            Study road runoff in Little        $320,000
                              Black Creek between U.S.
                              31 and Seaway Drive.......
3062           CA            Conducts environmental             $400,000
                              review of proposed
                              improvements related to
                              the connection of
                              Dumbarton Bridge to
                              Highway 101...............
3063           NY            Construction of and                $800,000
                              improvements to Union Road
                              in West Seneca............
3064           WI            Upgrade I-43 between State       $2,400,000
                              Highway 140 and East
                              County Line in Rock
                              County, Wisconsin.........
3065           NJ            Separation of the                  $844,000
                              intersection of 13th
                              Street and the Lehigh Rail
                              Line through bridge or
                              tunnel in Manville, NJ....
3066           CA            Construct parking facility         $302,000
                              and improve access to
                              Imperial Valley Expo......
3067           CA            Develop bicycle paths and          $240,000
                              pedestrian access to Third
                              Avenue, Chula Vista.......
3068           IL            Upgrade County Highways 18       $1,600,000
                              and 22 in conjunction with
                              State I-57 interchange
                              plan north of Mattoon.....
3069           CA            Widen and Reconfigure            $2,192,000
                              Sepulveda and Culver
                              Boulevards, Culver City...
3070           OH            Construct interchange or         $6,935,000
                              other appropriate access
                              on IR 70 west of existing
                              mall road exit in Belmont
                              County....................
3071           AZ            Widen and expand the             $4,000,000
                              existing roadway and
                              railroad overpass in the
                              Houghton Road Corridor....
3072           OK            Construction of Duncan           $2,400,000
                              Bypass Grade Separation...
3073           SC            Pine Needles Widening and        $1,600,000
                              Bridge Replacement........
3074           CA            Olsen Road widening and          $1,680,000
                              roadway improvements in
                              Simi Valley, California...
3075           GA            Streetscape project to             $500,000
                              upgrade sidewalks,
                              lighting and streets,
                              Jeffersonville............
3076           NY            Implement Diamond Grinding         $700,000
                              Measures on I-95, I-278,
                              Mosholu Parkway, I-495,
                              Grand Central Parkway, and
                              Richmond Parkway..........
3077           MD            Upgrade Conduit System for         $960,000
                              Traffic Signal Systems,
                              Street Lighting, and
                              Traffic-related Video
                              Cameras for Baltimore.....
3078           WA            5th Street/US 2                     $80,000
                              Signalization Improvements
                              in Sultan.................
3079           WI            Implementation of                  $480,000
                              recommendations contained
                              in 2005 Safe Routes to
                              School in Superior plan...
3080           LA            Widen and improve LaPalco        $3,200,000
                              Boulevard from Westwood
                              Drive to U.S. 90,
                              Jefferson Parish..........
3081           NY            Realign Kirk Lake Drive in          $88,000
                              Carmel....................
3082           NY            Town of Somers road                $400,000
                              reconstruction............
3083           OH            Upgrade grade crossing             $761,600
                              safety devices in Elyria
                              and North Ridgeville......
3084           MS            Widen and improve Martin         $2,400,000
                              Bluff Road, Gautier.......
3085           CA            Widen and reconstruct            $2,400,000
                              Washington Blvd. from
                              westerly city boundary at
                              Vernon to I-5 Fwy at
                              Telegraph Rd. in Commerce.
3086           CA            San Diego, CA Interstate 5,      $1,600,000
                              Sorrento Valley Road and
                              Genesee Avenue Interchange
                              Project...................
3087           OR            Widen I-5 between Portland,      $3,200,000
                              Oregon and Vancouver,
                              Washington................
3088           LA            North-South Corridor from        $4,000,000
                              Houma/Thibodaux to I-10...
3089           GA            Warren County I-20 Frontage      $4,000,000
                              Road......................
3090           KY            Widen KY 11 from U.S. 460        $2,000,000
                              to the Mount Sterling
                              Bypass, Montgomery County.
3091           OH            Traffic and safety                 $456,000
                              improvements to county
                              roadways in Geauga County,
                              OH........................
3092           CA            Develop bicycle paths and        $4,000,000
                              public park space adjacent
                              to the New River, Calexico
3093           TN            Construction of the              $7,500,000
                              Foothills Parkway in the
                              Great Smoky Mountains
                              National Park.............
3094           PA            Improvements to Torresdale       $1,000,000
                              Avenue from Harbison
                              Avenue to Cottman Avenue..
3095           GA            Butner Road and Stonewall          $800,000
                              Tell Road, Fulton County..
3096           OH            Construction of highway-         $2,600,000
                              rail grade separations at
                              intersections in Lima to
                              improve motorist and
                              pedestrian safety.........
3097           OR            Siuslaw River Bridge,            $4,250,000
                              Florence..................
3098           CA            Construct Cypress Avenue         $2,400,000
                              over-pass to separate
                              Interstate 10 and Union
                              Pacific Railroad tracks in
                              Fontana...................
3099           CA            Modify and reconfigure           $4,000,000
                              Kanan Road interchange
                              along U.S. 101 in Agoura
                              Hills.....................
3100           OH            Upgrade and widen                  $800,000
                              intersection for SR 14 in
                              Washingtonville...........
3101           NM            Upgrade NM 434 from Mora         $1,200,000
                              north to Black Lake.......
3102           NJ            Upgrade of Turnpike/Route        $3,200,000
                              440 Interchange in Bayonne
3103           LA            Widen LA 18 from Northrup        $2,000,000
                              Grumman/ Avondale
                              Shipyards to U.S. 90,
                              Jefferson Parish..........
3104           PA            Widen PA 896 between               $960,000
                              Strasburg Borough and U.S.
                              30........................
3105           MI            Eliminate major roadway on         $400,000
                              Cleary University campus
                              and establish a new
                              roadway...................
3106           PA            Reconstruction of 11 mile          $400,000
                              segment of the Lower Trail
                              between Williamsport and
                              Mt Edna, Blair County, Pa.
3107           KY            Construction of interchange      $1,600,000
                              connecting US31W to I-65
                              at mile marker 32 in
                              Warren County.............
3108           ............  ...........................              $0
3109           NC            Install Sugar Creek Road         $2,400,000
                              Grade Separation,
                              Charlotte.................
3110           LA            Improvements to LA 46 in           $320,000
                              St. Bernard Parish........
3111           IN            Construct Hoham Drive              $400,000
                              Extension in Plymouth,
                              Indiana...................
3112           OR            Construct turn lane on              $90,000
                              Gateway Boulevard, Cottage
                              Grove.....................
3113           TN            Replace Unitia Bridge in           $720,000
                              Loudon County, TN.........
3114           VA            Replacement of Robertson         $1,456,320
                              Bridge in Danville........
3115           MA            Public Improvements to             $240,000
                              Springfield Symphony Hall.
3116           NY            Realign Union Valley Road          $440,000
                              in Town of Carmel.........
3117           NY            Village of Pawling                 $100,000
                              Improvements to Reservoir
                              Road from State Rt. 22 to
                              Prospect St...............
3118           MS            Build connector between SR       $2,400,000
                              609 and State Highway 15
                              near I-10, Jackson and
                              Harrison Counties.........
3119           CO            I-70 West Mountain               $3,200,000
                              Corridor, Denver to
                              Garfield County...........
3120           CA            Completion of Interstate 5       $4,800,000
                              and Interstate 8
                              Connectors, San Diego.....
3121           FL            Construct U.S. 1                 $5,280,000
                              interchange at CR 210, St.
                              Johns County, Florida.....
3122           OH            Construct roadway                  $250,000
                              improvement project along
                              State Routes 37 and 78
                              through Fairfield, Perry,
                              Morgan, Noble, Monroe
                              Counties..................
3123           IL            Construct I-57 Bridge              $480,000
                              Overpass, City of Markham.
3124           NJ            Design, plan and build a           $400,000
                              permanent pedestrian/
                              bicycle path along the
                              banks of the Elizabeth
                              River.....................
3125           NJ            Improve the U.S. Interstate        $800,000
                              78 Interchange at Exit 15
                              in Franklin Township,
                              Union Township, and Town
                              of Clinton................
3126           CA            Reconstruct Rosecrans Ave.         $320,000
                              and construct bus pads
                              from Garfield Ave. to
                              Century Blvd. in Paramount
3127           TN            Bristol, Tennessee highway-         $80,000
                              RR crossing grade
                              improvement--USDOT#731120J
3128           CO            Glenwood Springs South           $5,200,000
                              Bridge (new, off-system
                              bridge)...................
3129           NJ            Improvements of Newark and         $240,000
                              First Streets in Hoboken..
3130           OH            Feasibility Study to               $200,000
                              construct a bridge over
                              the Muskingum River in the
                              vicinity of McConnelsville
3131           MN            Construction of Gitchi-Gami      $1,500,000
                              State Trail from Silver
                              Bay to Tettegouche State
                              Park......................
3132           CA            Improvements/Widening of SR      $6,560,000
                              99 from Goshen to
                              Kingsburg in Tulare
                              County, California........
3133           CA            Design and implement Harbor        $800,000
                              Boulevard ITS in Garden
                              Grove.....................
3134           WI            Complete the Glacial               $240,000
                              Drumlin Trail, from
                              Madison to Waukesha.......
3135           PA            Design and construct turn          $464,000
                              lanes, signal upgrades and
                              improvements at PA 34 and
                              174 intersection..........
3136           PA            Design, engineering, ROW           $160,000
                              acquisition and
                              construction of
                              streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in Wright
                              Township, Luzerne County..
3137           PA            I-70/I-79 South Interchange      $1,600,000
                              Redesign and Upgrade......
3138           KS            Elimination of highway-          $4,584,000
                              railway crossings at the
                              City of Pittsburg Port
                              Authority to increase
                              safety and reduce
                              congestion................
3139           CA            Improve Access Road to           $3,000,000
                              Beale Air Force Base
                              (Smartville Road).........
3140           CA            Interstate 215, Los Alamos       $1,600,000
                              Road Interchange Project..
3141           NE            Missouri River Bridges           $2,800,000
                              between U.S. 34, I-29 in
                              Iowa and U.S. 75 in
                              Nebraska..................
3142           AL            Huntsville Southern Bypass       $2,400,000
                              planning and engineering..
3143           MO            Redesign and reconstruct I-        $320,000
                              170 interchange at Ladue
                              Rd........................
3144           NY            Construct Interstate 87          $2,400,000
                              Exit 3 Airport Connector
                              in Albany.................
3145           CA            Citywide traffic signal            $400,000
                              upgrades requiring the
                              installation of hardware
                              and software at 9 major
                              intersections, Palo Alto..
3146           OH            Construct replacement of         $3,300,000
                              Morgan Township Road 209
                              between SR 60 and SR 78 in
                              Morgan County.............
3147           ............  ...........................              $0
3148           NY            Construct the Setauket/Port      $5,000,000
                              Jefferson Greenway Trail
                              Project...................
3149           AR            Develop a railroad overpass      $2,640,000
                              connecting U.S. Highway 67
                              and U.S. Highway 371 in
                              Prescott..................
3150           FL            Construct SR 312 Extension       $5,300,000
                              Bypass, St. Johns County,
                              Florida...................
3151           GA            Construct Welcome Center,          $300,000
                              and pedestrian trail,
                              Abbeville.................
3152           VA            Improve Erickson Avenue and        $600,000
                              Stone Spring Road
                              connection................
3153           TX            Reconstruct Loop 12 IH 35E       $4,000,000
                              and SH 183 west extension
                              to MacArthur, Irving,
                              Texas.....................
3154           OR            Completion of the first of       $5,000,000
                              three phases of trails in
                              the Regional Trails
                              Program...................
3155           MN            Construct bridge for Paul        $1,500,000
                              Bunyan Trail over
                              Excelsior Road, Baxter....
3156           KY            Reconstruct U.S. 127 at the        $480,000
                              U.S. 127 and U.S. 127
                              North Bypass, Mercer
                              County....................
3157           CA            Rehabilitate street surface         $37,600
                              of Addison St. between
                              Kester Ave. and Lemona Ave
3158           IL            City of Springfield, IL for        $762,058
                              improvements to Cockrell
                              Lane......................
3159           OH            Repair/Construct Mill            $1,240,000
                              Street Bridge, Akron......
3160           MI            Resurface Caseville Road in        $153,600
                              Huron County..............
3161           PA            River Trail and Esplanade          $600,000
                              Development at the
                              Southside Riverfront Park.
3162           IL            Construct access roads to        $1,000,000
                              National Great Rivers
                              Research Center...........
3163           IL            Construct Roadway from           $1,600,000
                              Mississippi River Barge
                              Dock to IL Rt. 3-IL Rt.
                              157, Cahokia..............
3164           PA            Context Sensitive Design         $1,200,000
                              Elements for the Market
                              Street Bridge, Lycoming
                              County, PA................
3165           NY            Implement Pedestrian Safety        $500,000
                              Improvements on Queens
                              Boulevard.................
3166           NV            Design and construct               $800,000
                              interchange on I-15 in
                              Mesquite..................
3167           CA            Construct grade separations        $400,000
                              at Washington Ave. and
                              UPRR crossing east and
                              Washington Ave. and La
                              Cadena Drive in Colton....
3168           MD            Intercounty Connector......      $4,800,000
3169           MA            Charlemont Bridge, Route 2,      $3,840,000
                              Charlemont................
3170           MN            CSAH 47 rehabilitation from        $352,000
                              165th Ave. to TH 25,
                              Morrison County...........
3171           MS            Improve Old Augusta Road         $2,800,000
                              and construct Kaiser Road,
                              Perry County..............
3172           PA            Reconstruction of U.S. 30        $4,000,000
                              from PA 10 to Business
                              U.S. 30 including travel
                              lanes, shoulders, etc.....
3173           NY            Route 78 (Transit Road),         $2,400,000
                              Genesee Street to Main
                              Street, Towns of Amherst,
                              Cheektowaga and Clarence
                              in Erie County............
3174           NY            Planning and design,             $8,560,000
                              construction, and
                              relocations for Southtowns
                              Connector--NY Route 5 from
                              Coast Guard Base to Ohio
                              Street, including Fuhrmann
                              Boulevard.................
3175           CA            SR 91 I-605 Needs                   $12,800
                              Assessment Study,
                              Whittier, CA..............
3176           GA            SR 70/Fulton Industrial          $1,200,000
                              Boulevard widening from
                              Camp Creek Parkway to the
                              SCL RR, Fulton County.....
3177           MO            Ste. Genevieve Co.,              $1,200,000
                              Missouri Rt. 61 bridge
                              replacement over
                              Establishment Creek.......
3178           MN            Construction of                  $2,400,000
                              intersection at County
                              Road 5 and TH 13 in City
                              of Burnsville.............
3179           GA            SR 307 overpass over             $4,000,000
                              Georgia Port Authority
                              rail line, Savannah.......
3180           MO            Study railroad                     $800,000
                              reconfiguration to
                              eliminate highway
                              crossings in and around
                              Springfield, MO...........
3181           NC            Construct relocated NC 16        $1,360,000
                              in Lincoln and Catawba
                              Counties, NC..............
3182           IL            Construction of highway          $1,280,000
                              approaches to the Sullivan
                              Road bridge in Aurora, IL.
3183           IL            Engineering and                    $800,000
                              construction of 15.1 mile
                              Alliance trail between
                              Lock 14 in LaSalle and
                              Lock 2 in Bureau Junction.
3184           CA            Construct parking facility         $800,000
                              and improve museum
                              pedestrian access from
                              trolley station, San Diego
3185           PA            Relocation and upgrade of        $1,320,000
                              Beaner Hallow Rd., Beaver
                              County, PA................
3186           MN            TH 36-Stillwater Bridge,         $4,000,000
                              ROW acquisition and
                              Utility Relocation........
3187           IL            To construct Veterans              $800,000
                              Memorial Drive Extension.
                              Will link Mount Vernon on
                              the east side of I-57 with
                              incorporated area lying
                              west......................
3188           MN            I-494 U.S. 169 Interchange       $4,000,000
                              Reconstruction, Twin
                              Cities Metropolitan Area,
                              Minnesota.................
3189           AL            Jackson County Industrial          $800,000
                              Park Access Road,
                              Hollywood.................
3190           FL            North-South Corridor             $2,400,000
                              between Archer Road and
                              Newberry Road.............
3191           AK            Construct access road and a      $3,000,000
                              bridge crossing the Naknek
                              River terminus points in
                              South Naknek-King Salmon
                              Highway...................
3192           NY            Route 303 Orangeburg Road          $800,000
                              and Route 340 and Erie
                              Street intersection.......
3193           MS            Upgrade roads in Port              $320,000
                              Gibson (U.S. Highway 61),
                              Claiborne County..........
3194           GA            Construct Horsestamp Road          $800,000
                              Interchange on I-95 in
                              Camden County, Georgia....
3195           MO            Upgrade Route 94 in St.          $9,600,000
                              Charles County from East
                              of Harvester road to West
                              of Mid-Rivers Drive.......
3196           OH            Upgrade the I-71                $11,200,000
                              interchange with SR 665
                              and widen SR 665 from
                              Hoover Road on the east to
                              a relocated Haughn Road on
                              the west, in Grove City,
                              OH........................
3197           NY            Village of Highland Falls           $60,000
                              repaving and sidewalk
                              construction of Berry Hill
                              Road......................
3198           PA            Westmoreland County,             $3,200,000
                              Pennsylvania, four lane
                              limited access facility
                              connecting State Road 119
                              to the Pennsylvania
                              Turnpike (Sony Connector).
3199           NJ            Edison National Historic           $192,000
                              Site Traffic Improvement
                              Project to improve traffic
                              flow and promote safety...
3200           IL            Construction of Eldamain         $4,000,000
                              Road over the Fox River...
3201           CA            Construction of a traffic          $100,000
                              signal at the intersection
                              of Oso Ave. and Vanowen St
3202           OR            Reroute U.S. 97 at Redmond,      $5,600,000
                              OR and improve the
                              intersection of U.S. 97
                              and Oregon 126............
3203           CA            Widen and realign Cherry         $3,200,000
                              Avenue from 19th Street to
                              one block south of Pacific
                              Coast Highway, Signal Hill
3204           AR            Fort Smith, Arkansas:            $6,000,000
                              Improvements to Jenny Lind
                              Rd. and Ingersoll Rd......
3205           OH            Widen Pearl Road in                $800,000
                              Strongsville..............
3206           CA            Interstate 5 and State           $4,000,000
                              Route 78 Interchange
                              Improvements..............
3207           OK            Improvements to SH 3 from        $5,000,000
                              Antlers to Broken Bow.....
3208           KY            Construct the Albany Bypass      $4,800,000
                              in Clinton County.........
3209           CA            Highway 74 and Interstate          $800,000
                              215 Interchange Project...
3210           SC            Improve intersection and         $9,600,000
                              corridor on U.S. 278 to
                              improve safety. Poss build
                              frontage roads widen road
                              and change traffic
                              controls..................
3211           WA            Port of Bellingham               $7,280,000
                              Transportation Enhancement
                              Projects..................
3212           OH            Rehabilitation of SR 53            $800,000
                              from Miami St. to North
                              city limits including
                              approaches to the CSX
                              railroad bridge, City of
                              Tiffin....................
3213           OH            Upgrade U.S. Route 30            $8,072,000
                              between State Route 235
                              and Upper Sandusky in
                              Hancock and Wyandot
                              Counties..................
3214           MN            Main Street streetscape          $1,520,000
                              reconstruction, 2nd Street
                              from Ash Ave. to State Hwy
                              2, and Grand Utley Ave.
                              from 2nd Street to 6th
                              Street N. across State Hwy
                              2, Cass Lake..............
3215           NJ            Warren County, NJ Route 57       $2,160,000
                              and County Route 519
                              Intersection Improvements.
3216           HI            Widen Queen Kaahumanu            $2,400,000
                              Highway...................
3217           CT            Widen Route 34, Derby......      $2,400,000
3218           IN            Construction of County Road      $4,000,000
                              17--Elkhart, IN...........
3219           PA            Widen Route 666 in Forest        $1,200,000
                              County....................
3220           CA            Upgrade Jepson Parkway at        $3,200,000
                              North and South Gates of
                              Travis Air Force Base and
                              widen Vanden Road segment,
                              Solano County.............
3221           CT            Widen Route 67, Seymour....        $800,000
3222           ............  ...........................              $0
3223           CT            Widen Canal Street,                $400,000
                              Shelton, CT...............
3224           NJ            Construct CR 521/Ocean           $1,600,000
                              Drive and Middle
                              Thoroughfare Bridge
                              Replacement, Cape May
                              County....................
3225           OR            I-205 widening, Clackamas        $1,600,000
                              County....................
3226           OK            Construct interchange south        $200,000
                              of I-40 along Indian
                              Nation Turnpike near
                              Henryetta.................
3227           MO            Complete upgrade of U.S. 40-     $1,600,000
                              61 to interstate status on
                              two section, from I-70 to
                              Lake St. Louis exit and
                              Highway K to Highway DD...
3228           TX            Abilene, TX, Dyess Air          $11,120,000
                              Force Base North Entry
                              Access Project with
                              related improvements......
3229           CA            Construction and                   $800,000
                              enhancements of trails in
                              the Santa Monica Mountains
                              National Recreation Area..
3230           KY            Construct South Airfield         $2,400,000
                              Road, Boone County,
                              Kentucky..................
3231           LA            Construction of pedestrian         $160,000
                              and bike path adjacent to
                              Tammany Trace Rails-to-
                              Trails Corridor...........
3232           NY            Construction of pedestrian          $80,000
                              walkways in Village of
                              Northport.................
3233           NV            Design and Construction of       $1,600,000
                              I-80 interchange in
                              Fernley...................
3234           OH            Eastgate Area Improvements,      $3,360,000
                              I-275 and SR 32, Clermont
                              County....................
3235           PA            Pennsylvania Turnpike-           $8,000,000
                              Interstate 95 Interchange
                              Project, Bucks County, PA.
3236           GA            Commission a study and              $80,000
                              report regarding
                              construction and
                              designation of a new
                              Interstate linking
                              Augusta, Macon, Columbus,
                              Montgomery, and Natchez...
3237           CT            Construct Shoreline                $800,000
                              Greenway Trail, Madison...
3238           NE            New roads and overpasses to      $7,200,000
                              relieve congestion and
                              improve traffic flow
                              Antelope Valley--Lincoln,
                              NE........................
3239           CA            Reconstruct Atlantic Ave.        $2,600,000
                              and improve drainage from
                              Ardmore St. to Imperial
                              Hwy in South Gate.........
3240           SD            Construct Railroad                 $880,000
                              Underpass on Hwy 34 in
                              Pierre....................
3241           AR            I40-Highway 89 Interchange.      $2,400,000
3242           WA            Kent, WA Willis Street UP          $400,000
                              Railroad Grade Separation
                              Project...................
3243           IL            Replace Interstate 74            $3,200,000
                              Bridge, Moline............
3244           CA            Implement SFgo Van Ness          $5,600,000
                              Corridor Improvements.....
3245           NC            Battleground Avenue Rail to        $800,000
                              Trail Project, Guilford
                              County, NC................
3246           IL            Construction of an               $4,800,000
                              Extension of Atkinson Road
                              to Intersect with IL 120
                              and IL 137................
3247           OH            I-70, I-71 Split                 $6,400,000
                              reconfiguration, Columbus.
3248           MI            Delta County, CR 186 from M-       $192,000
                              35 at Brampton to U.S. 2
                              and U.S. 41--Bituminous
                              overlay with super
                              elevation, correction,
                              curb, and gutter..........
3249           TN            Niota, TN Improving Vehicle         $79,200
                              Effiecies at At-Grade
                              highway-Railroad Crossings
3250           NY            Construct access to the NYS      $1,200,000
                              Thruway--Montezuma
                              National Wildlife Reserve.
3251           MN            Corridor design work, I-94         $400,000
                              and Radio Drive, Woodbury,
                              MN........................
3252           TN            Develop trails, bike paths         $200,000
                              and recreational
                              facilities on Brady
                              Mountain, Cumberland
                              County for Cumberland
                              Trail State Park..........
3253           WA            Access Downtown Phase II: I-     $9,200,000
                              405 Downtown Bellevue
                              Circulation Improvements..
3254           PA            Reconstruct PA Route 274,          $800,000
                              at PA Route 11/15,
                              Duncannon.................
3255           PA            Road and pedestrian              $1,200,000
                              improvements and
                              realignment, through
                              construction, in York City
                              NW Triangle...............
3256           NY            Rockland County highway          $1,400,000
                              railroad grade crossing
                              safety improvements.......
3257           OH            Calm traffic on Greenfield       $1,360,000
                              St. in City of Tiffin and
                              improve intersection of
                              Greenfield St. with Routes
                              18 and 101................
3258           IA            Construction of NW 26th St.        $800,000
                              interchange on I-35, Polk
                              Co........................
3259           NY            To conduct design and            $4,800,000
                              environmental studies
                              along proposed Northern
                              Tier Expressway...........
3260           IL            Undertake Traffic                $1,600,000
                              Mitigation and Circulation
                              Enhancements on 57th and
                              Lake Shore Drive, Chicago.
3261           IL            For the construction of a        $1,400,000
                              highway on new alignment
                              to create a cross town
                              route across Godfrey......
3262           MI            Construct Industrial Park          $395,200
                              Service Road and Caine
                              Road Bridge Replacement.
                              Village of Millington,
                              Tuscola County............
3263           TX            Loop 281 Mobility and            $2,736,000
                              Safety Improvements,
                              Longview, TX..............
3264           TX            Upgrade Fulghum Road Bridge      $2,480,000
                              on I-45 in Dallas County
                              (TX) to provide safety and
                              access for expanded
                              intermodal traffic........
3265           MN            Edge of Wilderness                 $471,000
                              Discovery Center, Marcell.
3266           IN            Construction of Star Hill        $1,772,000
                              Road, Clark County,
                              Indiana...................
3267           TN            Plan and construct a               $320,000
                              bicycle and pedestrian
                              trail, Shelbyville........
3268           TX            Construct Park Row bypass        $1,600,000
                              from Texas State Highway 6
                              to the Eldridge Parkway in
                              Houston, TX...............
3269           CA            Implement Northwest San          $2,444,800
                              Fernando Valley Road and
                              Safety Improvements.......
3270           KY            Construct two bridges           $28,000,000
                              across the Ohio River from
                              Louisville to southern
                              Indiana...................
3271           ME            Construction of the Gorham      $11,220,000
                              Village Bypass, Gorham....
3272           OK            Reconstruction of the I-40      $16,000,000
                              Crosstown Expressway from
                              I-44 to I-35 in downtown
                              Oklahoma City, Oklahoma...
3273           MD            I-695, MD147 to I-695......      $3,792,000
3274           SC            Upgrade Hwy 21 Bypass Grade        $560,000
                              Crossings.................
3275           MD            Upgrade MD 175 in Anne             $800,000
                              Arundel County between MD
                              170 and the Baltimore
                              Washington Parkway........
3276           OK            Construct and widen six          $8,800,000
                              lanes on Interstate 44
                              from the Arkansas River
                              extending east
                              approximately 3.7 miles to
                              Yale Avenue in Tulsa, OK..
3277           OR            North Bend Waterfront              $992,000
                              District Boardwalk
                              Construction..............
3278           CT            Make Improvements to North         $240,000
                              Stonington, CT Westerly,
                              R.I. Pawcatuck River
                              Bridge....................
3279           VA            Construct improvements at I-     $9,400,000
                              264 interchange in
                              Virginia Beach............
3280           CA            Construct Western                $2,400,000
                              Placerville Interchanges
                              on State Route 50.........
3281           CT            Construction of Housatonic         $800,000
                              River Walk, Shelton, CT...
3282           NY            NYS Route 5, 8, 12                 $800,000
                              Interchange
                              reconstruction: Town of
                              New Hartford..............
3283           NY            Implement Improvements for         $600,000
                              Pedestrian Safety in Bronx
                              County....................
3284           CA            Improve West Adams Blvd.           $200,000
                              Streetscape in West Adams
                              Historic District, Los
                              Angeles...................
3285           CA            Improve access from I-8 and        $800,000
                              construct parking lot for
                              the Imperial Sand Dunes
                              Recreation Area Visitor's
                              Center, Imperial Valley...
3286           PA            Construction of low-impact,      $8,000,000
                              spine roadway serving the
                              North Delaware Riverfront
                              corridor, City of
                              Philadelphia..............
3287           AL            Construct interchange on I-      $2,400,000
                              59 between I-59 and 49th
                              Street in Fort Payne, AL..
3288           FL            Coordinated Regional             $1,200,000
                              Transportation Study of
                              U.S. 98 from Pensacola Bay
                              Bridge, Escambia County,
                              to Hathaway Bridge, Bay
                              County, Florida...........
3289           GA            Leesburg North Bypass from         $400,000
                              U.S. 19 to SR 195, Lee
                              County....................
3290           LA            Peters Road improvements in        $800,000
                              Plaquemines Parish........
3291           GA            Upgrade sidewalks,                 $400,000
                              lighting, landscaping from
                              Cherry Street to Hampton
                              Street, Industrial Park to
                              Dooly Street, Montezuma...
3292           ............  ...........................              $0
3293           GA            U.S. 27 Reconstruction from        $800,000
                              Colquit to CR 279.........
3294           TX            Loop 180 (Project code 1190-       $800,000
                              01-035) in Whitney, TX
                              from FM 933/FM 1713 to FM
                              933S of Whitney...........
3295           IA            U.S. 30 widening,                $1,840,000
                              reconstruction in Story
                              and Marshall Counties,
                              Iowa......................
3296           TX            U.S. 377 from SH 144 to the      $3,000,000
                              eastern intersection of
                              BUS 377H, Hood Co.........
3297           NY            Construct and improve              $400,000
                              pedestrian streetscapes
                              along Sunrise Highway in
                              Freeport..................
3298           IA            Construct Principal              $4,000,000
                              Riverwalk, Des Moines.....
3299           NY            Construct access ramps to        $6,400,000
                              Rt. 32-6/17-CR 105 in
                              Orange County.............
3300           IL            Resurface Shawnee College        $1,261,000
                              Road, Pulaski County......
3301           MI            Canton, Pave Cherry Hill         $1,600,000
                              Rd. between Canton Ctr.,
                              and Haggerty..............
3302           AR            Springdale, AR--                 $9,000,000
                              Improvements to Johnson
                              Road from Hwy 412 to I-540
                              through Springdale and
                              Johnson...................
3303           NC            Environmental studies and        $4,800,000
                              construction of Garden
                              Parkway...................
3304           AZ            U.S. 60 and U.S. 93              $1,600,000
                              connection on the eastern
                              edge of central Wickenburg
3305           GA            Construction of I-575 HOV          $800,000
                              Lanes from Sixes Road to
                              SR 20, Cherokee County,
                              Georgia...................
3306           WA            I-405-SR 167 interchange--       $1,600,000
                              Rebuild the interchange
                              and add additional lanes
                              to relieve congestion.....
3307           MN            U.S. 10 corridor                 $2,000,000
                              improvement between Blaine
                              and St. Cloud: design and
                              ROW acquisition...........
3308           CA            Walnut Grove at Broadway           $200,000
                              Intersection Capacity
                              Enhancements, San Gabriel.
3309           KY            Widen and Reconstruct KY           $960,000
                              698 at Mason Gap Road,
                              Lincoln County............
3310           OR            Medford, OR to construct           $800,000
                              sidewalks and improve
                              storm drainage and gutters
                              for the Citys Safe Walk
                              Plan......................
3311           MN            Construct a pedestrian and         $878,080
                              bicycle bridge across TH
                              169, Onamia...............
3312           NY            Improve Montauk Highway          $6,400,000
                              from CR 46 to Barnes Road,
                              Suffolk County............
3313           ............  ...........................              $0
3314           AR            Study and construction of       $35,000,000
                              8th Street, in
                              Bentonville, AR from
                              Interstate 540, (including
                              direct access to I-540) to
                              SW Elm Tree Road..........
3315           MN            Cedar Lake Regional Trail,       $3,000,000
                              Minneapolis...............
3316           TX            Reconstruct Union Pacific          $800,000
                              Railroad bridge over
                              widened Business U.S. 287.
3317           AK            Anchorage Traffic                $5,000,000
                              Congestion Relief.........
3318           VA            Expansion of Battlefield         $1,600,000
                              Parkway from East Market
                              Street at Route 7 to
                              Sycolin Road, SE..........
3319           OR            Construction of the I-84,        $1,600,000
                              U.S. 395 Stanfield
                              Interchange Improvement
                              Project...................
3320           IN            Design and reconstruct             $744,000
                              residential streets in the
                              City of Muncie, Indiana...
3321           CA            Improvement of Main Street--       $800,000
                              Shenandoah Road/SR 49
                              Intersection, Plymouth....
3322           SD            Design and construct new         $3,200,000
                              Meridian Bridge across the
                              Missouri River south of
                              Yankton, South Dakota.....
3323           AK            Earthwork and roadway           $48,000,000
                              construction Gravina
                              Access Project............
3324           GA            Improvement and                    $800,000
                              construction of SR 40 from
                              east of St. Marys cutoff
                              at mile post 5.0, Charlton
                              County to County Route 61,
                              Camden County, Georgia....
3325           NJ            Route 22 Sustainable             $3,000,000
                              Corridor Plan.............
3326           OR            Hood River, OR, Frontage           $400,000
                              Road Crossing Project.....
3327           GA            Construct and Improve            $1,600,000
                              Westside Parkway, Northern
                              Section, in Fulton County.
3328           ............  ...........................              $0
3329           GA            Widen SR 133 from Spence           $800,000
                              Field to SR 35 in Colquitt
                              County, Georgia...........
3330           FL            West Palm Beach, Florida,          $800,000
                              Flagler Drive Re-
                              configuration.............
3331           FL            Implement Snake Road (BIA          $800,000
                              Route 1281) Widening and
                              Improvements..............
3332           NY            Reconstruction of Portland       $2,400,000
                              Ave. from Rochester City
                              line to Titus Ave. in
                              Irondequoit, NY...........
3333           FL            Alleviate congestion at            $400,000
                              Atlantic Corridor Greenway
                              Network, City of Miami
                              Beach, FL.................
3334           ............  ...........................              $0
3335           WA            SR 704 Cross-Base Highway,       $4,000,000
                              Spanaway Loop Road to SR 7
3336           CA            Restoration of Victoria            $400,000
                              Avenue in the City of
                              Riverside, CA.............
3337           MN            I-494 Lane Addition........      $1,600,000
3338           GA            Uptown Jogging, Bicycle,           $400,000
                              Trolley Trail, Columbus,
                              Georgia...................
3339           CA            Study and construct highway     $12,600,000
                              alternatives between
                              Orange and Riverside
                              Counties, directed by the
                              Riverside Orange Corridor
                              Authority working with
                              local government agencies,
                              local transp. authorities,
                              and guided by the current
                              MIS.......................
3340           OH            Rehabilitation or                  $240,000
                              replacement of highway-
                              rail grade separations
                              along the West Central
                              Ohio Port Authority route
                              in Champaign and Clark
                              Counties..................
3341           FL            Improvements to I-75 in the      $1,800,000
                              City of Pembroke Pines,
                              Florida...................
3342           LA            Construction of new              $1,440,000
                              interchange Causeway at
                              Earhart-LA 3139...........
3343           GA            Construction of                    $400,000
                              infrastructure for inter-
                              parcel access, median
                              upgrades, lighting, and
                              beautification along
                              Highway 78 corridor.......
3344           MI            Design, Right-of-Way and         $2,400,000
                              Construction of the I-196
                              Chicago Drive (Baldwin
                              Street) Interchange
                              Modification, Michigan....
3345           VA            I-66 and Route 29                $5,600,000
                              Gainesville Interchange
                              Project...................
3346           FL            SR 688 Ulmerton Road             $8,000,000
                              Widening (Lake Seminole
                              Bypass Canal to El Centro
                              Ranchero).................
3347           OK            Navajoe Gateway                    $800,000
                              Improvements Project, U.S.
                              62 in Altus, OK...........
3348           NV            Construction of Carson City        $800,000
                              Freeway...................
3349           TN            Upgrade lights and gates           $160,000
                              and motion sensor
                              controlling circuitry at
                              the highway rail grade
                              crossing located on
                              Wenasoga Road/ FAS 8224,
                              Middleton, TN.............
3350           WV            Construct connector road           $600,000
                              from north end of RHL
                              Boulevard to State Route
                              601 (Jefferson Road)......
3351           NY            Construct Siena College            $800,000
                              campus perimeter road,
                              Loudonville, NY...........
3352           AL            Construct additional lanes       $1,360,000
                              on SR 77 from Southside,
                              Alabama to Green Valley
                              Road......................
3353           TX            Environmental mitigation         $1,600,000
                              related to the SH 195
                              project and related
                              improvements in Williamson
                              County that had adverse
                              effects on the Karst cave
                              system....................
3354           AL            The City of Calera,              $5,440,000
                              Alabama--Northern Bypass
                              Segment (U.S. Highway 31
                              to Alabama State Highway
                              25).......................
3355           WA            Construct a single point         $1,080,000
                              urban interchange (SPUI)
                              under I-5 at South 272nd
                              St........................
3356           IN            Reconstruct bridges at             $400,000
                              County Roads 200E and 300E
                              in LaPorte County, Indiana
3357           MI            Widen and Reconstruct            $5,920,000
                              Walton Blvd. in Auburn
                              Hills from Opdyke to
                              Squirrel Rd...............
3358           GA            Commission a study and             $240,000
                              report regarding the
                              construction and
                              designation of a new
                              Interstate linking
                              Savannah, Augusta, and
                              Knoxville.................
3359           ............  ...........................              $0
3360           CA            Pedestrian Beach Trail in          $800,000
                              San Clemente, CA..........
3361           TX            U.S. 90--Construct 6             $1,600,000
                              mainlanes from east of
                              Mercury to east of
                              Wallisville...............
3362           PA            Construct highway safety           $720,000
                              and capacity improvements
                              to improve the access to
                              the KidsPeace Broadway
                              Campus....................
3363           GA            GA 400 and McGinnis Ferry          $720,000
                              Road Interchange, Forsyth
                              County, GA................
3364           GA            Construction of bypass             $400,000
                              around town of Hiram, from
                              SR 92 to U.S. 278,
                              Paulding County, Georgia..
3365           GA            Construct U.S. 411                 $800,000
                              Connector from U.S. 41 to
                              I-75, Bartow County,
                              Georgia...................
3366           TX            Construct access road            $1,056,000
                              connecting Port of
                              Beaumont property on east
                              bank of Neches River to I-
                              10 access road east of the
                              Neches River..............
3367           MD            U.S. 220/MD 53 North-South         $800,000
                              Corridor..................
3368           FL            Acquire Right-of-Way for           $200,000
                              Ludlam Trail, Miami,
                              Florida...................
3369           NY            Construct Northern State         $1,360,000
                              Parkway and LIE access at
                              Marcus Ave. and Lakeville
                              Rd. and associated Park
                              and Ride..................
3370           PA            Construct interim U.S. 422         $800,000
                              improvements at Valley
                              Forge river crossing......
3371           NY            Design and construction of       $1,600,000
                              Renaissance Square in
                              Rochester, NY.............
3372           AL            Alabama Hwy 36 Extension           $240,000
                              and Widening--Phase II....
3373           PA            Northfield site roadway            $400,000
                              extension from Rt. 60 to
                              Industrial Park near the
                              Pittsburgh International
                              Airport...................
3374           OH            Plan and construct                 $760,000
                              pedestrian trail along the
                              Ohio and Erie Canal
                              Towpath Trail in downtown
                              Akron, OH.................
3375           TX            Reconstruct I-30 Trinity        $27,200,000
                              River Bridge--Dallas, TX..
3376           TX            Reconstruct I-30 Trinity           $800,000
                              River Bridge--Dallas, TX..
3377           GA            Construction of interchange        $800,000
                              on I-985 north of SR 13,
                              Hall County, Georgia......
3378           ............  ...........................              $0
3379           FL            Temple Terrace Highway             $800,000
                              Modification..............
3380           WY            Burma Rd: Extension from I-      $1,600,000
                              90 to Lakeway Rd..........
3381           NJ            Construct Western Blvd.          $3,200,000
                              extension from Northern
                              Blvd. to S.H. Rt. 9, Ocean
                              County, NJ................
3382           FL            Powerline Rearvision motor         $800,000
                              carrier backover motor
                              carrier safety research...
3383           NH            Environmental mitigation at      $1,200,000
                              Sybiak Farm in Londonderry
                              to offset effects of I-93
                              improvements..............
3384           MI            East Grand River                 $1,600,000
                              Improvements, Brighton
                              Township, Michigan........
3385           KY            Replace Brent Spence             $1,600,000
                              Bridge, Kenton County,
                              Kentucky..................
3386           TX            Construction of projects         $9,600,000
                              that relieve congestion in
                              and around the Texas
                              Medical Center complex....
3387           CA            Hazel Avenue ITS                   $400,000
                              Improvements, Folsom Blvd.
                              to Placer County..........
3388           FL            SR 688 Ulmerton Road             $8,000,000
                              widening (west of 38th
                              street to west of I275)...
3389           NH            Environmental mitigation at      $1,520,000
                              Crystal Lake in Manchester
                              to offset effects of I-93
                              improvements..............
3390           VA            Widening I-95 between Rt.          $800,000
                              123 and Fairfax County
                              Parkway...................
3391           PA            Armstrong County, PA             $1,920,000
                              Slatelick Interchange for
                              PA 28 at SR 3017..........
3392           OK            Reconstruct the I-44--Fort         $800,000
                              Still Key Gate Interchange
3393           GA            Greene County, Georgia           $1,600,000
                              conversion of I-20 and
                              Carey Station Road
                              overpass to full
                              interchange...............
3394           OH            Upgrade overpass and               $800,000
                              interchange at U.S. 24 and
                              SR 66 in the City of
                              Defiance..................
3395           NE            I-80 Interchange at Pflug          $800,000
                              Road, Sarpy County,
                              Nebraska..................
3396           FL            SR 70 improvements in              $400,000
                              Highland, DeSoto and
                              Okeechobee Counties.......
3397           VA            Cathodic Bridge Protection         $560,000
                              for Veterans Memorial
                              Bridge and the Berkely
                              Bridge in the Commonwealth
                              of Virginia...............
3398           IN            Reconstruct McClung Road           $600,000
                              from State Road 39 to Park
                              Street in LaPorte, Indiana
3399           OH            Riversouth Street Network        $2,400,000
                              Improvements in Columbus..
3400           GA            National Infantry Museum         $3,000,000
                              Transportation Network,
                              Georgia...................
3401           AK            Wideband multimedia mobile       $5,000,000
                              emergency communications
                              pilot project Wasilla,
                              Alaska....................
3402           MD            Widen road and improve             $800,000
                              interchanges of I-81 from
                              south of I-70 to north of
                              Halfway Boulevard.........
3403           TX            Expansion of U.S. 385 4-         $1,600,000
                              lane divide south of Crane
                              to McCarney...............
3404           VA            Old Mill Road Extension....      $1,280,000
3405           GA            Commission a study and             $240,000
                              report regarding
                              construction and
                              designation of a new
                              Interstate linking
                              Augusta, Macon, Columbus,
                              Montgomery, and Natchez...
3406           CO            Improvements on U.S. 36          $1,120,000
                              corridor from I-25 to
                              Boulder. Improvements
                              include interchange and
                              overpass reconstruction...
3407           AZ            Design and construct bridge      $2,960,000
                              and roadway approaches
                              across Tonto Creek at
                              Sheeps Crossing south of
                              Payson, AZ................
3408           NE            Missouri River Bridges           $2,000,000
                              between U.S. 34, I-29 in
                              Iowa and U.S. 75 in
                              Nebraska..................
3409           NY            Reconstruct--Orangeport            $680,000
                              Road from NYS Rt. 31 to
                              Slayton Settlement Road--
                              Niagara County, NY........
3410           TN            Construct sound-walls              $664,000
                              between I-65 and Harding
                              Place in Davidson County..
3411           ID            Reconstruct and Realign SH       $1,600,000
                              55 in Idaho between
                              Mileposts 94 and 102......
3412           FL            Pinellas Countywide              $8,000,000
                              Intelligent Transportation
                              System--Phase 2...........
3413           OK            Realignment of U.S. 287            $800,000
                              around Boise City, OK.....
3414           FL            Replace Heckscher Drive (SR      $1,600,000
                              105) Bridge across Broward
                              River.....................
3415           TX            FM 156 Road Relocation at        $6,500,000
                              Alliance Airport, Texas...
3416           TX            Upgrade Caesar Chavez            $2,400,000
                              Boulevard from San Antonio
                              Street to Brazos Street...
3417           FL            Coral Way, SR 972 Highway          $400,000
                              Beautification, Phase One,
                              Miami, Florida............
3418           OR            Cascade Locks Marine Park          $400,000
                              Underpass to address
                              necessary improvements....
3419           NY            Reconstruction of East           $3,360,000
                              Genesee Street connective
                              corridor to Syracuse
                              University in Syracuse, NY
3420           IL            For Cook County to                 $360,000
                              reconstruct and widen
                              127th Street between Smith
                              Road and State Street in
                              Lemont....................
3421           TN            Widen I-65 from SR 840 to          $776,000
                              SR 96, including
                              interchange modification
                              at Goose Creek Bypass,
                              Williamson County.........
3422           CA            Auburn Boulevard                   $400,000
                              Improvements, City of
                              Citrus Heights............
3423           LA            Bossier Parish Congestion        $2,400,000
                              Relief....................
3424           LA            Fund the 8.28 miles of the       $1,600,000
                              El Camino East-West
                              Corridor along LA 6 from
                              LA 485 near Robeline, LA
                              to I-49...................
3425           FL            Bryan Dairy Road                 $3,200,000
                              improvements from Starkey
                              Road to 72nd Street.......
3426           GA            Buckhead Community                 $800,000
                              Improvements to
                              rehabilitate State Road
                              141, including lane
                              straightening, addition of
                              median, installation of
                              left turn bays at two
                              intersections, addition of
                              bicycle lanes, sidewalks,
                              clear zones and landscape
                              buffers...................
3427           VA            Purchase specialized tunnel        $640,000
                              fire safety equipment,
                              Hampton Roads.............
3428           MI            Holmes Road Reconstruction--     $1,600,000
                              From Prospect Road to
                              Michigan Avenue, Charter
                              Township of Ypsilanti.....
3429           TN            Construct a system of              $800,000
                              greenways in Nashville--
                              Davidson County...........
3430           UT            Improve pedestrian and           $2,000,000
                              traffic safety in Holladay
3431           OH            Construction of road             $1,080,000
                              improvements from Richmond
                              Road to Cuyahoga Community
                              College, Warrensville
                              Heights...................
3432           OH            Construct road with access         $800,000
                              to memorial Shoreway,
                              Cleveland.................
3433           TX            North Cameron County East-          $80,000
                              West Railroad Relocation
                              Project...................
3434           OR            Construct Pathway From             $520,000
                              Multimodal Transit Station
                              to Swanson Park, Albany...
3435           NY            Transportation Initiative          $500,000
                              to provide for a parking
                              facility, in the vicinity
                              of the Manhattan College
                              Community.................
3436           NY            Phase II Corning Preserve        $4,800,000
                              Transportation Enhancement
                              Project...................
3437           NY            Study of goods movement          $1,200,000
                              through I-278 in New York
                              City and New Jersey.......
3438           NY            Study and Implement Traffic      $1,000,000
                              Improvements to the area
                              surrounding the Stillwell
                              Avenue train station......
3439           CA            Expand Diesel Emission           $2,480,000
                              Reduction Program of
                              Gateway Cities COG........
3440           TX            Construct pedestrian             $1,000,000
                              walkway on Houston Texas'
                              Main Street Corridor......
3441           CA            Sacramento County,               $3,200,000
                              California--Watt Avenue
                              Multimodal Mobility
                              Improvements, Kiefer
                              Boulevard to Fair Oaks
                              Boulevard.................
3442           NJ            Passaic River--Newark Bay          $400,000
                              Restoration and Pollution
                              Abatement Project, Route
                              21........................
3443           NJ            Downtown West Orange             $1,440,000
                              streetscape and traffic
                              improvement program.......
3444           NY            High-Speed EZ pass at the          $800,000
                              New Rochelle Toll Plaza,
                              New Rochelle..............
3445           TX            Access to Regional               $1,600,000
                              Multimodal Center--FM 1016
                              and SH 115................
3446           AR            For acquisition and                $160,000
                              construction of an
                              alternate transportation
                              (pedestrian/bicycle) trail
                              from East Little Rock to
                              Pinnacle Mountain State
                              Park......................
3447           MN            Construct 4th Street               $159,835
                              overpass grade separation
                              crossing a BNSF Rail Road,
                              City of Carlton...........
3448           TX            North Rail Relocation            $1,600,000
                              Project, Harlingen........
3449           MN            Construct Pfeifer Road,            $201,374
                              remove 10 foot raised
                              crossing, Twin Lakes
                              Township..................
3450           MS            Safety improvements and to         $640,000
                              widen Hardy Street at the
                              intersection of U.S. 49 in
                              Hattiesburg...............
3451           ............  ...........................              $0
3452           MN            Safety improvements to TH       $20,464,331
                              169 between Virginia and
                              Winton....................
3453           LA            U.S. 190 (LA 22 to Little          $800,000
                              Bayou Castine) Widening...
3454           NC            Construct bicycle and            $1,600,000
                              pedestrian trails, Durham
                              and Durham County.........
3455           MN            TH 61 Reconstruction from        $8,053,600
                              2.7 miles to 6.2 miles
                              north of Tofte............
3456           MN            Phase II/part II--CSAH 15        $2,272,000
                              to East of Scenic Highway
                              7 (1.2 miles).............
3457           MN            Reconstruction with some           $800,000
                              rehabilitation of roadway
                              with storm water sewer
                              system construction from
                              eastern boundary of the
                              Bois Forte Indian
                              Reservation and ending at
                              ``T'' intersection of
                              roadway (3.5 miles).......
3458           MS            Widen 4th Street in              $2,560,000
                              Hattiesburg...............
3459           NJ            Study of safe and efficient        $400,000
                              commercial multimodal
                              transportation systems
                              serving the East Coast
                              Port Complex..............
3460           IL            Construct bike/pedestrian        $2,480,000
                              paths, Chicago............
3461           IL            Construct Leon Pass                $768,000
                              overpass, Hodgkins........
3462           IL            Undertake Streetscaping          $3,280,000
                              project on Harlem Avenue
                              initiating from 71st
                              Street to I-80, Cook
                              County....................
3463           IL            Construct bike path,             $1,920,000
                              parking facility, and
                              related transportation
                              enhancement projects,
                              North Riverside...........
3464           IL            Upgrade Roads, Summit......        $768,000
3465           IL            Undertake streetscaping on         $768,000
                              Ridgeland Avenue, Oak Park
                              Avenue, and 26th Street,
                              Berwyn....................
3466           IL            Construct bike/pedestrian          $576,000
                              paths, facilities and
                              infrastructure
                              improvements in Spring
                              Rock Park, Western Springs
                              Park District.............
3467           SD            Extend the Sioux Falls Bike        $960,000
                              Trail to the Great Bear
                              Recreation Area...........
3468           SD            Redesign T corner on BIA #2        $600,000
                              5 miles SW of Kyle on the
                              Pine Ridge Reservation....
3469           SD            Extend bike trail in Pine          $200,000
                              Ridge to the SuAnne Big
                              Crow Boys and Girls Center
3470           SD            Extend bicycle trail system        $640,000
                              in Aberdeen...............
3471           GA            City of Moultrie                   $750,000
                              Streetscape Improvements,
                              Phase III.................
3472           GA            Restore and renovate for           $500,000
                              historic preservation and
                              museum the 1906 AB&A
                              Railroad Building,
                              Fitzgerald................
3473           GA            Improve sidewalks, upgrade         $500,000
                              lighting, and add
                              landscaping, Ocilla.......
3474           GA            Improve sidewalks, upgrade         $750,000
                              lighting, and add
                              landscaping, Newton County
3475           GA            Improve sidewalks, upgrade         $500,000
                              lighting, and add
                              landscaping, Monticello...
3476           GA            City of Sylvester Bicycle          $400,000
                              and Pedestrian Project....
3477           GA            Improve sidewalks, upgrade         $750,000
                              lighting, and add
                              landscaping, Tifton.......
3478           GA            Improve sidewalks and curbs        $500,000
                              on Wheeler Avenue and
                              Carlos Avenues, Ashburn...
3479           GA            Improve sidewalks, upgrade         $500,000
                              lighting, and add
                              landscaping, Jackson......
3480           CA            Construct traffic circle in        $240,000
                              San Ysidro at the
                              intersection of Via de San
                              Ysidro and West San Ysidro
                              Boulevard, San Diego......
3481           CA            Construct and resurface            $800,000
                              unimproved roads in the
                              Children's Village Ranch
                              and improve access from
                              Children's Village Ranch
                              to Lake Morena Drive, San
                              Diego County..............
3482           CA            Project design and               $2,160,000
                              environmental assessment
                              of widening and improving
                              the interchange at ``H''
                              Street and I-5, Chula
                              Vista, Chula Vista........
3483           FL            Jacksonville International       $1,600,000
                              Airport Access Rd. to I-
                              95, Jacksonville..........
3484           FL            Mathews Bridge Replacement,        $800,000
                              Jacksonville..............
3485           FL            Hecksher Bridge                    $800,000
                              Replacement, Jacksonville.
3486           FL            NE 3 Ave. to NE 8th Ave.           $800,000
                              Rd. Reconstruction,
                              Gainesville...............
3487           FL            University Ave. to NE 8          $1,600,000
                              Avenue Rd. Reconstruction,
                              Gainesville...............
3488           KY            Central Kentucky Multi-          $1,840,000
                              Highway Preservation
                              Project...................
3489           WV            Construct East Beckley           $4,000,000
                              Bypass, including $500,000
                              for preliminary
                              engineering and design of
                              the Shady Spring connector
                              (Route 3/Airport Road)....
3490           WV            Construct I-73/I-74 High         $4,000,000
                              Priority Corridor, Wayne
                              County....................
3491           KY            Construct Kidville Road (KY      $1,360,000
                              974) Interchange at the
                              Mountain Parkway, Clark
                              County....................
3492           NY            Construction and                   $400,000
                              improvements to Ridge
                              Road, Lackawanna..........
3493           CA            Construction at I-580 and        $2,000,000
                              California SR 84 (Isabel
                              Avenue) Interchange.......
3494           NY            Construction of and                $160,000
                              improvements to Amherst
                              Street, Buffalo...........
3495           NY            Construction of and                $160,000
                              improvements to Grant
                              Street, Buffalo...........
3496           NY            Construction of and                $160,000
                              improvements to Hertel
                              Avenue, Buffalo...........
3497           NY            Construction of and                $160,000
                              improvements to Hopkins
                              Street, Buffalo...........
3498           NY            Construction of and                $400,000
                              improvements to Main
                              Street in the Town of
                              Aurora....................
3499           NY            Construction of and                $400,000
                              improvements to McKinley
                              Parkway, Buffalo..........
3500           NY            Construction of and                $400,000
                              improvements to Route 5 in
                              the Town of Hamburg.......
3501           NY            Construction of and                $400,000
                              improvements to South Park
                              Avenue and Lake Avenue in
                              the Village of Blasdell...
3502           NY            Construction of and                $160,000
                              improvements to South Park
                              Avenue, Buffalo...........
3503           NY            Construction of Bicycle            $640,000
                              Path and Pedestrian Trail
                              in City of Buffalo........
3504           NY            Construction, redesign, and      $1,600,000
                              improvements to Fargo
                              Street in Buffalo.........
3505           TN            Improve existing two lane        $4,400,000
                              highway to a five lane
                              facility on State Route 53
                              from South of I-24 to Near
                              Parks Creek Road, Coffee
                              County....................
3506           ME            Improve portions of Route        $3,500,000
                              116 between Lincoln and
                              Medway to bring road up to
                              modern standard...........
3507           ME            Improve portions of Route        $1,000,000
                              26 between Bethel and
                              Oxford....................
3508           NY            Road improvements and              $400,000
                              signage in City of
                              Lackawanna................
3509           NJ            Belmont Ave. Gateway               $400,000
                              Community Enhancement
                              Project, Haledon..........
3510           TX            Conduct feasibility study          $800,000
                              for an off ramp on I-30 on
                              to Hall Street for direct
                              access to Baylor
                              University Medical Center
                              in Dallas.................
3511           NJ            Livingston Pedestrian              $720,000
                              Streetscape Project along
                              Mount Pleasant and
                              Livingston Avenues........
3512           MD            MD4 at Suitland Parkway....      $4,000,000
3513           NJ            Pompton Lakes Downtown             $800,000
                              Streetscape...............
3514           PA            Street improvements along          $100,000
                              North Broad Street,
                              Hatfield Borough..........
3515           PA            Street improvements to Old         $800,000
                              York Road, Jenkintown
                              Borough...................
3516           PA            Street improvements to             $640,000
                              Ridge Pike and Joshua
                              Road, Whitemarsh Township.
3517           PA            Street improvements to             $480,000
                              Skippack Pike (Rt. 73),
                              Whitpain Township.........
3518           PA            Street Improvements, Upper       $1,200,000
                              Dublin Township...........
3519           PA            Street Improvements, Upper         $300,000
                              Gwynedd Township..........
3520           VA            Construct access road and        $1,040,000
                              roadway improvements to
                              Chessie development site,
                              Clifton Forge.............
3521           WA            Fruitdale and McGarigle            $760,000
                              Arterial Improvements
                              Project in Sedro Woolley,
                              Washington................
3522           MS            Improve Ridge Road, Pearl          $800,000
                              River County..............
3523           MS            Port Bienville Intermodal        $2,400,000
                              Connector, Hancock County.
3524           WA            Realign Airport Road/              $250,000
                              Springhetti Ave./Marsh
                              Road in Snohomish County,
                              Washington................
3525           LA            U.S. 61 (Airline Highway)        $2,240,000
                              Improvements, Orleans and
                              Jefferson Parishes........
3526           UT            Widen Redwood Road from          $1,000,000
                              Bangerter Highway in Salt
                              Lake County through
                              Saratoga Springs in Utah
                              County....................
3527           VA            Widen Rolfe Highway from           $400,000
                              near the intersection of
                              Rolfe Highway and Point
                              Pleasant Road to the Surry
                              ferry landing approach
                              bridge....................
3528           MI            Bristol Road improvement         $1,600,000
                              project from Interstate 69
                              to North Torrey road......
3529           NJ            Construct parking facility       $1,600,000
                              at the Robert Wood Johnson
                              University Hospital and
                              UMDNJ with access to the
                              intermodal train station,
                              New Brunswick.............
3530           WA            Olympia Infrastructure             $684,000
                              Enhancement Project.......
3531           IN            Downtown Road Improvements,      $5,720,000
                              Indianapolis..............
3532           TX            Continuation of item number      $1,120,000
                              92 of the table contained
                              in section 1602 of the
                              Transportation Equity Act
                              for the 21st Century
                              (Public Law 105-178)......
3533           IL            Upgrade roads, Plainfield..        $240,000
3534           CA            Acquisition of land along          $800,000
                              CA 86 at the Desert
                              Cahuilla Prehistoric Site,
                              Imperial County for
                              environmental mitigation
                              related to reducing
                              wildlife mortality while
                              maintaining habitat
                              connectivity..............
3535           NY            Queens and Bronx Counties          $200,000
                              Graffiti Elimination
                              Program...................
3536           MA            Cambridge Bicycle Path           $1,000,000
                              Improvements..............
3537           CA            Conduct preliminary                $800,000
                              engineering and design
                              analysis for a dedicated
                              intermodal right-of-way
                              link between San Diego and
                              the proposed Regional
                              International Airport in
                              Imperial Valley including
                              a feasibility study and
                              cost benefit analysis
                              evaluating the comparative
                              options of dedicated
                              highway or highway lanes,
                              Maglev and conventional
                              high speed rail or any
                              combination thereof.......
3538           MA            Chelsea Roadway                  $2,000,000
                              Improvements..............
3539           NY            Congestion reduction             $2,000,000
                              measures in Richmond
                              County....................
3540           NJ            Construct Hudson River             $800,000
                              Waterfront Walkway over
                              Long Slip Canal--Hoboken
                              and Jersey City...........
3541           CA            Construct Illinois Street        $3,200,000
                              Bridge/Amador Street
                              Connection and
                              Improvements, San
                              Francisco.................
3542           NY            Construct multi-modal              $240,000
                              facility in the vicinity
                              of Brooklyn Childrens
                              Museum....................
3543           NJ            Construct Parking Facility         $840,000
                              at McGinley Square in
                              Jersey City...............
3544           OR            Construction of access road        $814,000
                              including sidewalks, bike
                              lanes and railroad
                              crossing from Highway 99W
                              to industrial zoned
                              property, Corvallis.......
3545           NY            Continuation of the public         $400,000
                              awareness program to the
                              subcontracting entity
                              which was funded under
                              Section 1212(b) of Public
                              Law 105-178 about
                              infrastructure in Lower
                              Manhattan.................
3546           OR            Continue bridge repair           $8,000,000
                              project authorized under
                              Public Law 105-178, Coos
                              Bay.......................
3547           NJ            Expand TRANSCOM Regional           $800,000
                              ITS System in NJ, NY, and
                              CT........................
3548           CA            Construct new sidewalks in         $400,000
                              the City of Heber, CA.....
3549           NY            Graffiti Elimination               $500,000
                              Program in Riverdale
                              neighborhood of Bronx
                              County....................
3550           NY            Graffiti Elimination               $500,000
                              Program on Smith Street in
                              Kings County..............
3551           ............  ...........................              $0
3552           NJ            Hudson County Fire and             $960,000
                              Rescue Department, North
                              Bergen: Transportation
                              Critical Incident Mobile
                              Data Collection Device....
3553           NJ            Hudson County Pedestrian           $800,000
                              Safety Improvements.......
3554           OR            Hwy 199 Safety                   $2,000,000
                              Improvements, Josephine
                              County....................
3555           OR            Hwy 99E/Geary Street Safety      $1,002,000
                              Improvements, Albany......
3556           NY            Implement Improvements for         $500,000
                              Pedestrian Safety in
                              Riverdale neighborhood of
                              Bronx County..............
3557           WA            Improve Mill Plain Blvd.         $1,250,000
                              between SE 172nd and SE
                              192nd in Vancouver........
3558           WA            Improve signage along               $60,000
                              scenic highways in Clark,
                              Skamania and Pacific
                              counties..................
3559           ............  ...........................              $0
3560           NJ            Jersey City 6th Street           $1,600,000
                              Viaduct Pedestrian and
                              Bicycle Pathway Project...
3561           OR            Middle Fork Willamette           $3,000,000
                              River Path, Springfield...
3562           ............  ...........................              $0
3563           OR            Pedestrian improvements            $600,000
                              including boardwalk
                              extension and sidewalk
                              construction, Port of
                              Brookings Harbor..........
3564           NJ            Port Reading--Improvements         $640,000
                              to air quality through
                              reduction of engine idling
                              behind Rosewood Lane......
3565           OR            Purchase communications          $9,000,000
                              equipment related to
                              traffic incident
                              management in Linn,
                              Benton, Lane, Douglas,
                              Coos, Curry, and Josephine
                              Counties..................
3566           MA            Reconstruction of the I-95/      $1,040,000
                              Rt. 20 Interchange in
                              Waltham...................
3567           NJ            Route 440 Rehabilitation         $1,000,000
                              and Boulevard Creation
                              Project in Jersey City....
3568           MA            Rutherford Avenue                $1,000,000
                              Improvements, Boston......
3569           GA            SR 10/Peters Street/Olympic      $1,600,000
                              Drive interchange, Athens.
3570           ............  ...........................              $0
3571           OR            To construct and enhance           $500,000
                              bikeway between Hood River
                              and McCord Creek..........
3572           NY            To construct greenway along      $1,200,000
                              East River waterfront
                              between East River Park
                              (ERP) and Brooklyn Bridge,
                              and reconstruct South
                              entrance to ERP, in
                              Manhattan.................
3573           OR            Transportation enhancements      $1,000,000
                              at Eugene Depot, Eugene...
3574           OR            U.S. 101 Slide Repair,           $2,895,200
                              Curry County..............
3575           OR            U.S. Highway 20 and Airport        $837,000
                              Road Intersection
                              Improvements, Lebanon.....
3576           IL            Upgrade 31st Street and          $1,200,000
                              Golfview Rd. intersection
                              and construct parking
                              facilities, Brookfield....
3577           NJ            Weehawken Baldwin Avenue         $1,600,000
                              Improvements..............
3578           WA            Widen SR 503 through             $1,000,000
                              Woodland..................
3579           ............  ...........................              $0
3580           NC            Expand Derita Road.........      $1,600,000
3581           IL            Construct Rt. 3 Loop Hog           $600,000
                              Hollow Road to Monsanto
                              Road, St. Clair County....
3582           NY            Planning and design,               $800,000
                              construction, and
                              relocations for Southtowns
                              Connector--NY Route 5 from
                              Coast Guard Base to Ohio
                              Street, including Fuhrmann
                              Boulevard.................
3583           ............  ...........................              $0
3584           NY            Implement a roadway                $800,000
                              evacuation study for the
                              South Shore of Long
                              Island, Mastic............
3585           NY            Improve Brooksite Drive            $720,000
                              from NY 25/25A to Rt. 347,
                              Smithtown.................
3586           NY            Improve Clover Ln. from Bay        $216,000
                              Ave. to Bay Rd., Hamlet of
                              Brookhaven................
3587           ............  ...........................              $0
3588           NY            Improve Dare Rd. from Old          $352,000
                              Town Rd. to Rt. 25, Selden
3589           ............  ...........................              $0
3590           NY            Improve intersection of Old        $100,000
                              Dock and Church Street,
                              Kings Park................
3591           ............  ...........................              $0
3592           NY            Improve Old Town Rd. from          $336,000
                              Rt. 347 to Slattery Rd.,
                              Setauket..................
3593           NY            Improve Old Willets Path           $812,000
                              from NY 454 to Rabro Dr.,
                              Smithtown.................
3594           NY            Improve Pipe Stave Hollow          $200,000
                              Rd. to Harbor Beach Rd.,
                              Miller Place..............
3595           IL            Reconstruction and               $1,339,996
                              Improvement of North
                              Lincoln Ave, O'Fallon.....
3596           IL            Reconstruction of 20th           $1,200,000
                              Street, Granite City......
3597           IL            Road Alignment from                $900,000
                              Caseyville Road to
                              Sullivan Drive, Swansea...
3598           NY            Road Improvements Hamlet of        $400,000
                              Medford, Town of
                              Brookhaven................
3599           NY            Road improvements, Hamlet          $344,000
                              of Gordon Heights, Town of
                              Brookhaven................
3600           NY            Road improvements, Village       $1,200,000
                              of Patchogue..............
3601           NY            Roadway improvements,              $320,000
                              Hamlet of Mastic Beach....
3602           ............  ...........................              $0
3603           NY            WLIU Public Radio Emergency        $900,000
                              and Evacuation
                              Transportation Information
                              Initiative, Southampton...
3604           UT            Reconstruct 500 West,              $250,000
                              including pedestrian and
                              bicycle access, in Moab...
3605           PA            Construct improvements to          $800,000
                              Chambers Hill Road and
                              Lindle Road (SR 441) at
                              its intersections with
                              Interstate 283 and
                              Eisenhower Boulevard......
3606           PA            Construct Regional Trail,          $600,000
                              Muhlenberg Township.......
3607           PA            Rail Crossing signalization        $165,040
                              upgrade, Main Street,
                              Lyons Station, Berks
                              County....................
3608           PA            Rail Crossing signalization        $165,040
                              upgrade at Hill Road,
                              Township of Blandon,
                              County of Berks...........
3609           PA            Safety improvements at           $1,524,560
                              Liberty Street
                              intersection with PA Route
                              61 in W. Brunswick and N.
                              Manheim Twp., Schuylkill
                              County....................
3610           PA            Replace Stossertown Bridge         $400,000
                              (Main Street) over West
                              Creek in Branch Township,
                              Schuylkill County.........
3611           PA            Replace bridge over Little         $200,000
                              Mahantongo Creek at
                              intersection of Hepler and
                              Valley Roads in Upper
                              Mahantongo Twp.,
                              Schuylkill County.........
3612           PA            Replace Union Street Bridge        $400,000
                              over Middle Creek in the
                              borough of Tremont,
                              Schuylkill County.........
3613           PA            Replace Burd St. Bridge            $400,000
                              over Amtrak and Norfolk
                              Southern railroad tracks
                              in the Borough of
                              Royalton, Dauphin County..
3614           PA            Hummelstown Borough, PA for      $1,600,000
                              intersection and
                              pedestrian realignment and
                              drainage..................
3615           MN            City of Moorhead Southeast       $1,600,000
                              Main GSI 34th Street and I-
                              94 interchange............
3616           MN            Paynesville Highway 23           $1,600,000
                              Bypass....................
3617           AR            Construction of I-530           $32,000,000
                              between Pine Bluff and
                              Wilmer....................
3618           NY            Conduct study to develop            $80,000
                              regional transit strategy
                              in Herkimer and Oneida
                              counties..................
3619           NY            Improve town weatherization        $200,000
                              capabilities on Tucker
                              Drive, Poughkeepsie, NY...
3620           NY            Bedell Road improvements,          $104,000
                              Poughkeepsie, NY..........
3621           NY            Land acquisition and               $400,000
                              improvements on Main
                              Street, Beacon, NY........
3622           NY            Construction of sidewalks           $80,000
                              in Sugar Loaf.............
3623           CT            I-84 Expressway                  $1,200,000
                              Reconstruction from
                              Waterbury to Southbury....
3624           DC            Road and trail                     $480,000
                              reconstruction and
                              drainage improvements
                              (APHCC)...................
3625           GA            Central Hall Recreation and      $1,600,000
                              Multi-Use Trail, Hall
                              County, GA................
3626           OH            Land acquisition for               $560,000
                              construction of pedestrian
                              and bicycle trails at
                              Mentor Marsh in Ohio......
3627           OH            Design and construct road          $240,000
                              enhancements Andrews Road
                              and Lakeshore Blvd. in
                              Mentor-on-the-Lake, OH....
3628           OH            Design and construct road        $2,500,000
                              enhancements Cleveland
                              Port Authority in
                              Cleveland, Ohio...........
3629           LA            Red River National Wildlife      $2,400,000
                              Refuge Visitor Center.....
3630           TN            For the advancement of           $1,600,000
                              project development
                              activities for SR 33 from
                              Knox County Line to SR 61
                              at Maynardville, TN.......
3631           CA            To convert a railroad            $4,000,000
                              bridge into a highway
                              bridge spanning over the
                              Feather River between Yuba
                              City and Marysville.......
3632           ............  ...........................              $0
3633           GA            Construction of interchange        $800,000
                              on I-985 north of SR 13,
                              Hall County, Georgia......
3634           ............  ...........................              $0
3635           ............  ...........................              $0
3636           ............  ...........................              $0
3637           CA            Planning design and             $92,000,000
                              construction to widen SR
                              in Kern, CA between San
                              Luis Obispo County Line
                              and I-5...................
3638           ............  ...........................              $0
3639           ............  ...........................              $0
3640           GA            Design and Construct               $300,000
                              Railroad Grade Crossing
                              Gates in Acworth, GA......
3641           ............  ...........................              $0
3642           KS            Northwest Bypass between         $1,600,000
                              K96 and 119th Street West.
3643           ............  ...........................              $0
3644           IL            State Rt. 78 to Lathrop          $1,840,000
                              Street to 2900 E (Township
                              Road)--A 1.5 mile village
                              street extension, bridges,
                              and upgrading of existing
                              street....................
3645           ............  ...........................              $0
3646           ............  ...........................              $0
3647           ............  ...........................              $0
3648           ............  ...........................              $0
3649           CA            Increase Capacity on I-80       $21,600,000
                              between Sacramento/Placer
                              County Line and SR 65.....
3650           IL            Bloomington-Normal East            $800,000
                              Side Highway Corridor.....
3651           ............  ...........................              $0
3652           OH            Morse Road Corridor                $800,000
                              Improvements, Phase II,
                              Columbus..................
3653           ............  ...........................              $0
3654           ............  ...........................              $0
3655           ............  ...........................              $0
3656           ............  ...........................              $0
3657           ............  ...........................              $0
3658           ............  ...........................              $0
3659           ............  ...........................              $0
3660           MI            Holland, Michigan,               $2,320,000
                              Construct River Avenue
                              Corridor Improvements.....
3661           ............  ...........................              $0
3662           ............  ...........................              $0
3663           ............  ...........................              $0
3664           ............  ...........................              $0
3665           ............  ...........................              $0
3666           ............  ...........................              $0
3667           ............  ...........................              $0
3668           ............  ...........................              $0
3669           ............  ...........................              $0
3670           KY            Central Kentucky Multi-            $460,000
                              Highway Preservation
                              Project (plus-up).........
3671           KY            The Kentucky Multi-Highway         $320,000
                              Preservation Project (plus-
                              up).......................
3672           AZ            Pave remaining stretch of        $1,600,000
                              the Turquoise Trail, BIA
                              Route 4, which is a north-
                              south road that joins AZ
                              HW 160 in the north to AZ
                              HW 264 in the south
                              portion of BIA Route 4....
3673           AK            Improve marine intermodal       $14,000,000
                              facilities in Ketchikan...
3674           DC            Highway improvements to          $4,000,000
                              improve access to the
                              Kennedy Center............
3675           KY            Construct two bridges           $10,000,000
                              across the Ohio River from
                              Louisville to southern
                              Indiana (plus-up).........
3676           OR            TransPacific Parkway               $350,000
                              Realignment Project, Coos
                              County....................
3677           AK            Planning, Design, and           $28,425,000
                              Construction of Knik Arm
                              Bridge....................
3678           AK            Intermodel facility             $25,000,000
                              improvements at the Port
                              of Anchorage..............
3679           AK            Upgrade city roads and           $3,700,000
                              construct a road and
                              acquire a hovercraft to
                              transit the bay between
                              King Cove and Cold Bay in
                              King Cove.................
3680           AK            Municipal Road Paving--          $2,000,000
                              Kotzebue..................
3681           AK            Various Road Improvements        $2,000,000
                              in Petersburg.............
3682           AK            Construction and                 $3,000,000
                              Improvements at Alaska
                              Pacific University........
3683           AK            Various road improvements        $1,000,000
                              in the City of Kenai......
3684           AK            Float Plane Road in              $1,000,000
                              Aleknagik.................
3685           AK            Olympic Circle road paving         $500,000
                              in Gridwood...............
3686           AK            Coffman Cove road paving in        $375,000
                              Coffman Cove..............
3687           AK            Port Saint Nicholas road         $3,000,000
                              improvements in Craig.....
3688           AK            Construction of a road           $2,000,000
                              between Lake Lucille and
                              Big Lake in Matanuska-
                              Sustina Borough...........
3689           AK            Hatcher Pass Ski                 $1,000,000
                              Development Road in
                              Matanuska-Sustina Borough.
3690           AK            Access roads for the Barrow      $3,000,000
                              Arctic Research Center in
                              Barrow....................
3691           AK            Intermodal ferry dock in         $2,000,000
                              Hoonah....................
3692           AK            Construction of relocation       $5,000,000
                              road in Shishmaref........
3693           AK            Improvements to Lake Camp        $3,000,000
                              Road in Bristol Bay
                              Borough...................
3694           AK            Study on the feasibility of      $2,000,000
                              constructing a natural gas
                              pipeline from the North
                              Star Borough to South
                              Central Alaska along the
                              existing transportation
                              corridors.................
3695           AK            Soldotna: Keystone Drive         $3,000,000
                              Road improvements in
                              Soldotna..................
3696           AK            Metlakatla: Walden Point         $5,000,000
                              Road......................
3697           AK            Anchorage: Traffic               $5,000,000
                              Congestion Relief.........
3698           AK            Bristol Bay: Transportation      $3,000,000
                              improvements to the access
                              road and a bridge crossing
                              at the Naknek River.......
3699           AK            Statewide: Road culvert          $5,000,000
                              replacement and repair to
                              improve fish habitat......
3700           AK            Construction of a ferry          $5,000,000
                              between Anchorage and Port
                              MacKenzie.................
3701           AK            Aleknagik: Wood River            $3,000,000
                              Bridge, or design,
                              engineering, permitting,
                              and construction..........
3702           AK            Chignik: Inter-Village           $5,000,000
                              Road, for design,
                              engineering, permitting,
                              and construction..........
3703           AK            Kotzebue: Cape Blossom           $5,000,000
                              Road, for design,
                              engineering, permitting,
                              and construction..........
3704           AK            Fairbanks: Tanana River          $5,000,000
                              Bridge replacement, for
                              design, engineering,
                              permitting, and
                              construction..............
3705           AK            Transportation Improvements      $2,000,000
                              in Cook Inlet for the
                              Westside development/
                              Williamsport-Pile Bay Road
3706           AK            Fairbanks/North Star             $5,000,000
                              Borough: Road improvements
                              to service roads and other
                              misc......................
3707           AK            Upgrades for road access to      $5,000,000
                              McCarthy, AK, for design,
                              engineering, permitting,
                              and construction..........
3708           AK            Upgrades on the Dalton           $4,500,000
                              Highway, for design,
                              engineering, permitting,
                              and construction..........
3709           AK            Kotzebue: Municipal Road         $2,000,000
                              Paving Project............
3710           AK            Crooked Creek: Road to           $2,000,000
                              Donlin Mine, for design,
                              engineering, permitting,
                              and construction..........
3711           AK            Kenai: Borough road              $2,500,000
                              improvements..............
3712           AK            Wrangell: Road improvements      $4,000,000
3713           AK            Petersburg: Road                 $1,500,000
                              improvements, including
                              but not limited to design,
                              engineering, permitting,
                              and construction..........
3714           AK            Ketchikan: Improve marine        $2,000,000
                              dry-dock and facilities...
3715           AK            Southeast: Planning,             $2,000,000
                              design, and EIS of
                              Bradfield Canal Road......
3716           AK            Gustavus: Dock replacement       $3,000,000
                              for the Alaska Marine
                              Highway...................
3717           AK            Upgrades on the Richardson       $4,500,000
                              Highway, including but not
                              limited to design,
                              engineering, permitting,
                              and construction..........
3718           AK            Bethel: Dust Control             $1,500,000
                              Mitigation for Rural Roads
3719           AK            Nome: Dust Control               $1,500,000
                              Mitigation for Rural Roads
3720           AK            Sitka: Improvements to             $500,000
                              Indian River Road,
                              including but not limited
                              to design, engineering,
                              permitting, and
                              construction..............
3721           AK            Anchorage: handicapped and       $2,000,000
                              pedestrian access
                              construction, surfacing
                              and other improvements for
                              2006 National Veterans'
                              Wheelchair Games..........
3722           AK            Statewide: Mobility                $250,000
                              coalition--Job access
                              transportation............
3723           AK            AK-North Pole: Homestead           $500,000
                              Road/North Pole High
                              School Boulevard Extension
                              Project...................
3724           AK            Fairbanks: O'Connor Road           $250,000
                              Bridge Replacement........
3725           AK            Anchorage: Transportation        $3,000,000
                              Improvements to the
                              Creekside development.....
3726           AK            Anchorage: Dimond Center         $2,500,000
                              Intermodal Facility,
                              including but not limited
                              to design, engineering,
                              permitting, and
                              construction..............
3727           AK            Anchorage: Transportation        $1,000,000
                              needs for Glacier/Winner
                              Creek Development.........
3728           AL            Preliminary Engineering,        $25,000,000
                              Design, ROW Acquisition
                              and Construction of the
                              Tuscaloosa Bypass.........
3729           AL            Preliminary Engineering,        $15,000,000
                              Design, ROW Acquisition
                              and Construction of the I-
                              10 Connector..............
3730           AL            Preliminary Engineering,        $50,000,000
                              Design, ROW Acquisition
                              and Construction of the I-
                              85 Extension..............
3731           AL            To construct approximately      $18,000,000
                              13 mile four lane
                              thoroughfare to connect
                              the Foley Beach Express to
                              I-10/Highway 83 Baldwin
                              County....................
3732           AL            To construct a new              $18,000,000
                              interchange on I-85 at
                              Beehive Road in Auburn, AL
3733           AL            To widen Highway 84 to 4         $4,000,000
                              lanes west of I-65 from
                              Evergreen to Monroeville
                              and beyond to the Alabama
                              State line................
3734           AL            I-65 Widening from U.S. 31       $5,000,000
                              in Alabaster (Exit 238) to
                              AL 25 in Calera (Exit 228)
3735           AR            Northeast Arkansas              $10,600,000
                              Connector (relocation of
                              Highway 226)..............
3736           AR            Interchange Modification to     $15,000,000
                              I-430/I-630...............
3737           AR            Hot Springs Extension, East-    $10,000,000
                              West Arterial: Highway 70
                              to Highways 5/7...........
3738           AR            Caraway Bridge Overpass....      $1,800,000
3739           AR            Highway 67: Kiehl Avenue--       $4,000,000
                              Vandenberg Boulevard:
                              rehabilitating and
                              widening Highway 67 from
                              four to six lanes from
                              Kiehl Ave. to Vandenberg
                              Blvd......................
3740           AR            Improve State Hwy 88             $3,000,000
                              (Higdon Ferry Road) in Hot
                              Springs...................
3741           AR            I-40/Highway 89 Interchange      $3,000,000
                              Planning and Construction.
3742           AR            Conway, AR Western Loop--        $2,000,000
                              For engineering, rights-of-
                              way, relocations, and
                              continued planning and
                              design....................
3743           AR            Develop a railroad overpass        $528,000
                              connecting U.S. Highway 67
                              and U.S. Highway 371 in
                              Prescott..................
3744           AR            Highway 77 Rail Grade            $3,000,000
                              Separation in Marion......
3745           AR            Maumelle Interchange--For        $1,500,000
                              third entrance into
                              Maumelle..................
3746           AR            Rogers--Construct new            $3,372,000
                              interchange on I-540 near
                              the existing Perry Road
                              overpass..................
3747           AR            Construction of I-49,            $1,000,000
                              Highway 71: Highway 22 to
                              Highway 71 near Jenny Lind
3748           AR            Highway 165: Railroad            $2,000,000
                              Overpass Construction.....
3749           AR            Improve Highway 412: Baxter      $1,000,000
                              Co. to Ash Flat...........
3750           AR            Highway 412 Relocation:          $1,000,000
                              Paragould South Bypass....
3751           AR            Widening of Highway 65/82:       $2,000,000
                              Pine Bluff-Greenville
                              Bridge....................
3752           AR            Highway 167 Widening:            $2,000,000
                              Fordyce to Sheridan Bypass
3753           AR            Fort Smith: Improvements to      $1,200,000
                              Jenny Lind Rd. and
                              Ingersoll.................
3754           AR            Van Buren--Widen and               $600,000
                              reconstruct Rena Road.....
3755           AR            Russellville Intermodal            $400,000
                              Facility: construct access
                              roads from AR Hwy 247,
                              purchase Right-of-Way.....
3756           AR            Springdale--Improvements to      $7,000,000
                              Johnson Road from Hwy 412
                              to I-540 through
                              Springdale and Johnson....
3757           AR            Construct and rehabilitate       $4,000,000
                              Fayetteville Expressway
                              Economic Development
                              Corridor..................
3758           AR            Construct and rehabilitate       $2,000,000
                              University of Arkansas
                              Technology Corridor
                              Enhancement Project.......
3759           AR            Develop U.S. Highway 71 (I-      $3,000,000
                              49) to Interstate
                              standards on new location
                              between Mena, AR and LA
                              State line................
3760           AZ            Arizona Department of           $41,335,473
                              Transportation; for those
                              projects it has identified
                              as its highest priorities.
3761           AZ            Replacement of Safford           $3,664,527
                              Bridge which crosses the
                              Gila River directly north
                              of Safford, AZ on North
                              8th Avenue................
3762           CA            Widen Highway 101 in Marin      $15,000,000
                              and Sonoma Counties from
                              Hwy 37 in Novato to Old
                              Redwood Highway in
                              Petaluma..................
3763           CA            Construct Hwy 101 bicycle-         $500,000
                              pedestrian project in
                              Marin and Sonoma Counties
                              from north of Atherton
                              Ave. to south of Petaluma
                              River bridge..............
3764           CA            ITS and Intersection             $1,000,000
                              Improvements, LAX.........
3765           CA            Complete Monterey Bay            $1,000,000
                              Sanctuary Scenic Trail
                              between Monterey and Santa
                              Cruz counties.............
3766           CA            Airport Boulevard                $4,000,000
                              Interchange Improvements,
                              Salinas and Vicinity,
                              Monterey County...........
3767           CA            Improvements to Bay Road         $6,000,000
                              and Northern Access (City
                              of East Palo Alto)........
3768           CA            Compton Arterial                 $2,500,000
                              Reconstruction and
                              Improvement Program,
                              Compton...................
3769           CA            University Avenue Overpass:      $2,000,000
                              Construction of bicycle
                              and pedestrian lanes--East
                              Palo Alto.................
3770           CA            Sealing unpaved roads in         $1,000,000
                              Calaveras County..........
3771           CA            Mission Boulevard/State          $3,000,000
                              Route 71 Interchange--
                              Corridor Improvements in
                              Pomona....................
3772           CA            Construct Bristol Street         $1,000,000
                              multimodal corridor in
                              Santa Ana.................
3773           CA            Reconstruct I-710                $5,500,000
                              Interchanges at I-405, at
                              SR 91, and at I-105.......
3774           CA            Riverside Highway Grade          $5,000,000
                              Separation................
3775           CA            Hunts Lane Rail Grade            $5,000,000
                              Separation, San Bernardino
3776           CA            Construct truck lane from        $3,000,000
                              Britannia Blvd. to the
                              Otay Mesa Port of Entry,
                              San Diego County..........
3777           CA            Park Boulevard-Harbor Drive      $2,000,000
                              Rail Grade Separation, San
                              Diego.....................
3778           CA            Virginia Corridor Rails to       $3,000,000
                              Trails: Reconstruct Union
                              Pacific Right-of-Way to
                              bicycle and pedestrian
                              trail, City of Modesto,
                              Stanislaus County.........
3779           CA            Construct bicycle and            $1,000,000
                              pedestrian trail between
                              Port Costa and Martinez as
                              part of the San Francisco
                              Bay Trail, Contra Costa
                              County....................
3780           CA            Improve air quality in the       $5,000,000
                              Sacramento region,
                              Sacramento Area Council of
                              Governments...............
3781           CA            Builds a pedestrian bridge       $1,000,000
                              from Hiller Street to the
                              Bay Trail, Belmont........
3782           CA            Plan and improve Orange          $1,000,000
                              County's transportation
                              system to reduce
                              congestion, Orange County
                              Council of Governments....
3783           CA            Construct 20 mile managed        $5,000,000
                              lanes on Interstate 15
                              between State Route 163
                              and State Route 78 (San
                              Diego)....................
3784           CA            Design and construct access      $2,000,000
                              improvements in North
                              Central Business District,
                              Sacramento................
3785           CA            Modify I-880 and Stevens         $3,000,000
                              Creek Boulevard
                              Interchange to ease
                              traffic congestion in San
                              Jose......................
3786           CA            Construction of Cross            $5,000,000
                              Valley Connector between I-
                              5 and SR 14...............
3787           CA            I-680: Construct High            $2,000,000
                              Occupancy Toll Lanes in
                              Alameda County............
3788           CA            Interchange Improvements:        $4,000,000
                              Laval and I-5, City of
                              Lebec.....................
3789           CA            Planning, design,                $5,000,000
                              engineering, and
                              construction of Naval Air
                              Station, North Island
                              access tunnel on SR 75-282
                              corridor, San Diego.......
3790           CA            ITS Improvements--City of        $2,000,000
                              Pasadena..................
3791           CA            Construct Interchange at         $1,000,000
                              Harbor Blvd. and I-80 in
                              West Sacramento...........
3792           CA            Road and signage                   $500,000
                              improvements, Southeast
                              corner of Tahquitz Canyon
                              Way and Hermosa Drive,
                              Agua Caliente Museum, Palm
                              Springs...................
3793           CA            To improve California            $1,000,000
                              Avenue between Willow and
                              Spring Streets, Long Beach
3794           CA            For Environmental Review           $500,000
                              Process at I-5
                              Interchanges, Stockton,
                              North Grove, Eight Mile
                              Road, Otto Drive, and
                              Hammer Lane...............
3795           CA            Folsom Boulevard Corridor        $1,000,000
                              Transportation
                              Enhancements, between Rod
                              Beaudry Drive and Sunrise
                              Boulevard, City of Rancho
                              Cordova...................
3796           CA            Construct I-80 HOV lanes         $2,000,000
                              and interchange in Vallejo
3797           CA            Alameda Corridor SR 47 Port      $2,000,000
                              Access Expressway design..
3798           CA            Rehabilitation, repair and/      $1,500,000
                              or reconstruction of
                              deficient 2-lane roads
                              that connect to Interstate
                              5, SR 180, SR 41 and SR 99
                              countywide, Fresno County.
3799           CA            Improvement of intersection      $2,000,000
                              at Aviation Blvd. and
                              Rosecrans Ave. to reduce
                              congestion (El Segundo)...
3800           CA            Improvements/Widening of SR      $8,000,000
                              99 from Goshen to
                              Kingsbury in Tulare
                              County, California........
3801           CA            Modesto, Riverbank and           $4,000,000
                              Oakdale, CA Improve SR 219
                              to 4 lanes................
3802           CA            Improvements of State Route      $1,000,000
                              4 in Calaveras County
                              between Stockton and
                              Angels Camp...............
3803           CA            Expansion of Kelseyville/        $5,000,000
                              Lower Lake Expressway in
                              Lake County...............
3804           CA            Widening of State Route 156      $5,000,000
                              in Monterey between
                              Castroville and U.S. 101..
3805           CA            Planning, design, and            $2,000,000
                              preliminary engineering of
                              on/off ramp system at
                              intersection of I-10 and
                              Robertson/National
                              Boulevards in Culver City.
3806           CA            Construct eastern loop of        $2,000,000
                              Campus Parkway in Merced..
3807           CA            Diesel Emission Reduction        $2,000,000
                              Program of South Coast Air
                              Quality Management
                              District..................
3808           CA            Replace South Access to the      $6,000,000
                              Golden Gate Bridge--Doyle
                              Drive.....................
3809           CO            Transportation Improvements      $3,000,000
                              to I-70/Havana/Yosemite
                              Interchange...............
3810           CO            Transportation Improvements      $2,000,000
                              to Wadsworth and U.S. 36
                              Interchange in Broomfield.
3811           CO            Transportation Improvements      $3,000,000
                              to Wadworth Bypass
                              (Grandview Grade
                              Separation)...............
3812           CO            Transportation Improvements      $2,000,000
                              to U.S. 287, Ports-to-
                              Plains Corridor...........
3813           CO            Transportation Improvements      $5,000,000
                              to I-70 and SH 58
                              Interchange...............
3814           CO            Transportation Improvements      $8,000,000
                              to Powers Blvd. and
                              Woodman Road Interchange..
3815           CO            Transportation Improvements      $5,000,000
                              to I-25 South, Douglas/
                              Arapahoe Co. line to El
                              Paso Co...................
3816           CO            Transportation Improvements      $4,000,000
                              to U.S. 36 Corridor.......
3817           CO            Transportation Improvements      $2,000,000
                              to U.S. 24--Tennessee Pass
3818           CO            Transportation Improvements      $1,000,000
                              to Bromley Lane and U.S.
                              85 Interchange............
3819           CO            Transportation Improvements      $1,000,000
                              to 104th and U.S. 85
                              Intersection..............
3820           CO            Transportation Improvements      $4,000,000
                              to I-25 North, Denver to
                              Fort Collins..............
3821           CO            Transportation Improvements      $2,000,000
                              to I-70 East Multimodal
                              Corridor (Highway Portion)
3822           CO            Transportation Improvements      $2,000,000
                              to Parker and Arapahoe
                              Road Interchange..........
3823           CO            Transportation Improvements      $6,000,000
                              to I-225, Parker Road to I-
                              70........................
3824           CO            Transportation Improvements      $3,000,000
                              to I-70 West Mountain
                              Corridor, Denver to
                              Garfield Co...............
3825           CO            Transportation Improvements      $3,000,000
                              to I-76--Northeast Gateway
3826           CO            Transportation Improvements      $2,000,000
                              to C 470 and U.S. 85
                              Interchange...............
3827           CO            Transportation Improvements      $2,000,000
                              to Wadsworth and Bowles
                              Intersection..............
3828           CO            Transportation Improvements      $2,000,000
                              to U.S. 160--SH 3 to the
                              Florida River.............
3829           CO            Transportation Improvements      $4,000,000
                              to U.S. 160, Wolf Creek
                              Pass......................
3830           CO            Transportation Improvements      $4,000,000
                              to 56th Avenue and Quebec
                              Street....................
3831           CO            U.S. 287/Ports to Plains/        $5,000,000
                              Reconstruction of Existing
                              Roadways/Expansion to Four
                              Lanes/Concrete............
3832           CO            U.S. 160/Wolf Creek Pass:        $5,000,000
                              widen lanes and shoulders.
3833           CO            U.S. 36/Widen lanes and          $5,000,000
                              construct new interchanges
3834           CO            Fort Carson: I-25 and            $5,000,000
                              Highway 12/Improvements
                              and upgrades of
                              interchange and renovation
                              to handle increased
                              capacity..................
3835           CO            U.S. 50 East/Pueblo to           $5,000,000
                              Kansas Border/Road
                              widening and improvements.
3836           CO            Heartland Expressway             $5,000,000
                              improvements..............
3837           CO            I-25 North Denver to Fort        $5,000,000
                              Collins/Improved
                              interchanges and road
                              construction..............
3838           CO            Pueblo Dillon Drive at I-25      $2,000,000
                              overpass and ramp--
                              Construction of a Dillon
                              Drive overpass and ramp
                              connections to I-25.......
3839           CO            Denver Union Station/            $3,000,000
                              Renovations...............
3840           CO            Improvements to 56th Avenue      $5,000,000
                              from Quebec St. to Havana
                              St. and to Quebec St. from
                              I-70 to 56th Ave. in
                              Denver....................
3841           CT            Undertake road improvements      $7,000,000
                              associated with Coltsville
                              Area Redevelopment,
                              Hartford..................
3842           CT            Upgrade Mark Twain Drive,        $1,750,000
                              Hartford..................
3843           CT            Realign, widen, and              $2,000,000
                              reconstruct Arch Street
                              and connect pedestrian
                              walkways to Constitution
                              Plaza in Hartford.........
3844           CT            Construct Farmington Canal       $3,500,000
                              Greenway enhancements in
                              New Haven, Connecticut and
                              connect Greenway to
                              waterfront at Longwharf
                              Pier......................
3845           CT            Land acquisition,                $5,000,000
                              remediation, improvements
                              and construction for ferry-
                              highway-rail terminal at
                              junction of Interstates 91
                              and 95 adjacent to East
                              Street and Forbes Avenue
                              in New Haven..............
3846           CT            Planning, design,                $5,000,000
                              engineering, and
                              improvements converting
                              Route 34 highway between I-
                              95 and Park Street with
                              corresponding site
                              recovery in New Haven.....
3847           CT            Construct terminal               $3,000,000
                              facilities in Bridgeport
                              for high-speed ferry......
3848           CT            Restructure and widen            $2,000,000
                              Seaview Avenue in
                              Bridgeport, to accommodate
                              future developments.......
3849           CT            Construction of Intermodal       $5,000,000
                              Transportation facility in
                              Bridgeport................
3850           CT            Design and widen Route 34        $2,000,000
                              in Derby..................
3851           CT            Streetscape and pedestrian-      $2,000,000
                              oriented improvements to
                              and around Campbell Avenue
                              in West Haven.............
3852           CT            Construct high-speed ferry       $2,000,000
                              terminal in Stamford,
                              Connecticut to facilitate
                              transportation between
                              Connecticut and New York..
3853           CT            Construct walking bridge         $1,500,000
                              and trail connecting Mill
                              River Revitalization
                              Project with west side of
                              river in Stamford.........
3854           CT            Relocate Route 72 in             $3,800,000
                              Bristol...................
3855           CT            Reconfigure four rail            $7,000,000
                              underpasses in Stamford,
                              Connecticut to accommodate
                              commuter and commercial
                              traffic...................
3856           CT            Upgrade Storrs Road in           $2,500,000
                              Mansfield, Connecticut and
                              accompanying streetscape
                              to improve safety and
                              mitigate congestion.......
3857           CT            Improve roads for Norwalk-       $2,000,000
                              Center--West Avenue
                              Corridor Municipal
                              Development Plan area and
                              the Academy Street
                              Extension Project in
                              Norwalk...................
3858           CT            Construct improvements and       $2,000,000
                              upgrades to riverwalk in
                              Ansonia...................
3859           CT            Replace existing parking         $8,000,000
                              garage in Middletown, with
                              4-story, handicapped
                              accessible parking garage.
3860           CT            Acquire and develop Rails-       $2,000,000
                              to-Trails project in park
                              next to Willimantic River
                              in Windham................
3861           CT            Construct access drive to        $4,000,000
                              Reidsville Industrial Park
                              in Waterbury..............
3862           CT            Design and construct             $1,000,000
                              Quinnipiac River Linear
                              Trail in Meriden..........
3863           CT            Fund University of               $1,000,000
                              Connecticut for improving
                              air quality and reducing
                              emissions.................
3864           CT            Construct Farmington Canal       $3,750,000
                              Greenway, City of New
                              Haven and City of Hamden..
3865           CT            Refurbish and upgrade              $200,000
                              Powder Hollow Bridge
                              connecting State Route 190
                              and Interstate 91 in
                              Enfield...................
3866           CT            Construct and expand roads       $2,000,000
                              to relieve congestion on
                              Route 6 between Commerce
                              Road and I-84 in Newtown..
3867           CT            Construct pedestrian and           $250,000
                              vehicular access road to
                              Riverfront Park in
                              Glastonbury...............
3868           CT            Widen Route 82 in Norwich..      $1,000,000
3869           CT            Extend Rails-to-Trails             $250,000
                              project from Southington
                              to Chesire................
3870           CT            Reconstruct Pearl Harbor        $10,000,000
                              Memorial Bridge, New Haven
3871           CT            Widen Interstate 95 between      $7,500,000
                              Branford and North
                              Stonington................
3872           CT            Widen Interstate 84 between      $7,500,000
                              Danbury and Waterbury.....
3873           CT            Make improvements to South       $1,000,000
                              Maple Street Bridge in
                              Enfield...................
3874           CT            Widen Route 34, Derby......      $1,000,000
3875           CT            Construct and Widen              $1,000,000
                              Stamford Rail Underpass
                              and Road Realignment
                              Project...................
3876           CT            Reconstruct and widen Homer      $1,000,000
                              St. and Chase Ave. in
                              Waterbury from Waterville
                              Avenue to Nottingham
                              Terrace...................
3877           CT            Make improvements to Groton        $750,000
                              Bicycle and Pedestrian
                              Trails and Facilities.....
3878           CT            Street and streetscape             $750,000
                              improvements along
                              Campbell Ave., West Haven.
3879           CT            Construct New Arterial             $750,000
                              Roadway from Boston Avenue
                              North to proposed Lake
                              Success Business Park in
                              Bridgeport................
3880           CT            Make improvements to               $500,000
                              Plainfield Moosup Pond
                              Road......................
3881           CT            Construct UCONN Storrs             $500,000
                              Campus-Hillside Road......
3882           CT            Construct Shoreline                $250,000
                              Greenway Trail, Guilford,
                              Banford, East Haven.......
3883           DE            Improve Access to the           $20,000,000
                              Wilmington Riverfront from
                              I-95 including design and
                              construction of an
                              interchange and street
                              grid redesign.............
3884           DE            Replacement of the Indian       $41,400,000
                              River Inlet Bridge, Sussex
                              County....................
3885           DE            Reconstructing I-95/SR 1        $20,000,000
                              interchange, adding a
                              fifth lane, and replacing
                              toll plaza on Delaware's
                              portion of I-95 corridor..
3886           DE            City of Dover                    $1,000,000
                              Transportation and
                              Community and System
                              Preservation..............
3887           DE            Wilmington Train Station         $6,500,000
                              Restoration...............
3888           DE            Replacement of the Lake          $1,600,000
                              Gerar Bridge in Rehoboth
                              Beach.....................
3889           DE            Wyoming Mill Road                $1,500,000
                              Realignment, Dover........
3890           DE            Replacement of the Woodland      $2,500,000
                              Ferry on the Naticoke
                              River between Seaford and
                              Laurel....................
3891           DE            Hydrogen Storage Research        $2,000,000
                              at Delaware State
                              University in Dover.......
3892           DE            Northeast Corridor Commuter      $5,000,000
                              Rail Project from
                              Wilmington to Newark......
3893           DE            Replacement of Railroad          $1,500,000
                              Crossings in Wilmington
                              and Marshallton...........
3894           DE            Rehabilitate Auto Tour           $5,000,000
                              Route at the Bombay Hook
                              National Wildlife Refuge..
3895           DE            Improve pedestrian and           $1,000,000
                              bicycle access at the
                              University of Delaware in
                              Newark....................
3896           DE            Replacement of Fixed Route       $3,000,000
                              Transit Buses.............
3897           DE            Enhance and expand the           $3,000,000
                              DelTrac Integrated
                              Transportation Management
                              System....................
3898           FL            I-75 Widening and               $15,000,000
                              improvements in Collier
                              and Lee County, Florida...
3899           FL            Sand Lake Road improvements      $9,000,000
                              between President's Drive
                              and I-4...................
3900           FL            Construction of Gulf Coast      $10,000,000
                              Parkway, Gulf County/Port
                              St. Joe with Bay County/
                              Panama City...............
3901           FL            Improvements to                  $1,000,000
                              Jacksonville International
                              Airport Access Road to I-
                              95, Jacksonville..........
3902           FL            New systems interchange          $2,000,000
                              ramps at SR 417 and Boggy
                              Creek Road in Orange
                              County, Florida...........
3903           FL            Widening (four lanes) of SR      $4,000,000
                              87 North from Whiting
                              Field to the Alabama
                              border....................
3904           FL            Widen SR 710 by two lanes          $600,000
                              from Congress Avenue to
                              U.S. 1....................
3905           FL            Widen Palm Coast Parkway         $1,000,000
                              and I-95 Interchange and
                              overpass, Flagler County,
                              Florida...................
3906           FL            Construction of new multi-       $1,000,000
                              lane tunnel below the
                              channel to link the Port
                              of Miami on Dodge Island
                              with I-395 on Watson
                              Island and I-95 in
                              Downtown Miami............
3907           FL            Construct Flagler Avenue           $500,000
                              improvements, City of Key
                              West, Florida.............
3908           FL            Improvements to SR 52 in           $800,000
                              Pasco County, FL..........
3909           FL            Four-Laning SR 281 (Avalon       $3,000,000
                              Boulevard) in Santa Rosa
                              County from I-10 to north
                              of CSX RR Bridge..........
3910           FL            Widen SR 80, Hendry County.      $3,000,000
3911           FL            Construct new bridge from        $1,000,000
                              West Florida Turnpike to
                              CR 714 to 36th Street--
                              Cross S. Fork of St. Lucie
                              River--Indian Street to
                              U.S. 1 on east side.......
3912           FL            Construction of four lane        $2,000,000
                              highway around
                              Jacksonville connecting
                              U.S. 1 to Route 9A........
3913           FL            Expansion of Capital             $1,100,000
                              Circle, NW/SW (SR 263)
                              from Tallahassee Regional
                              Airport to Interstate 10..
3914           FL            Construct I-4 crosstown          $8,200,000
                              connector in Hillsborough
                              from I-4 to Port of Tampa.
3915           FL            Gulf Coast Parkway--Design,      $8,000,000
                              engineering, and
                              construction of a 2-lane
                              Gulf Coast/US 98 bypass...
3916           FL            City of Hollywood, U.S. Rt.      $1,000,000
                              1 Young Circle Safety
                              improvements..............
3917           FL            City of Miami Greenway           $1,000,000
                              Roadway, construction and
                              design of Miami Greenway
                              Road improvements and 5th
                              St. improvements..........
3918           FL            Orlando, Lake County, widen      $5,000,000
                              to four lanes State Road
                              50 from U.S. 27 to Orange
                              County Line, with
                              interchange U.S. 27.......
3919           FL            Gainesville, Alachua             $1,500,000
                              County, Improve North-
                              South corridor between
                              Archer Rd. and Newberry
                              Rd. to provide congestion
                              relief to I-75 corridor,
                              SR 21, SR 24, SR 26.......
3920           FL            I-75 improvements, widen to      $8,500,000
                              six lanes I-75 from Golden
                              Gate Parkway in Collier
                              County to Daniels Parkway
                              in Lee County.............
3921           FL            Orlando, Church Street,          $5,800,000
                              design and re-construction
                              of the segment of Church
                              Street from Terry Avenue
                              to Westmoreland in
                              Parramore Neighborhood....
3922           FL            West Palm Beach,                 $2,000,000
                              Construction of U.S. 1,
                              Flagler Drive Waterfront
                              Redevelopment and Traffic
                              Calming Project...........
3923           FL            Leon County FL: Capital          $7,000,000
                              Circle, NW/SW, widen
                              Capital Circle, NW/SW to 4
                              lanes from I-10 to West
                              U.S. 90...................
3924           FL            Snake Road, improvements,        $2,000,000
                              widen and improve Snake
                              Road (BIA 1281) in Hendry
                              and Broward Counties......
3925           GA            Hwy 78 Corridor Improvement      $4,000,000
                              Gwinnett County...........
3926           GA            Transportation improvements     $18,000,000
                              to I-285 interchange at
                              Atlanta Rd. Cobb Co.......
3927           GA            Queens Road widening and         $1,500,000
                              reconstruction Cobb Co....
3928           GA            Widening Cedarcrest Rd.            $500,000
                              from Paulding Co. to
                              Governor's Towne..........
3929           GA            City of Duluth sidewalk and        $300,000
                              streetscape improvements..
3930           GA            East Hiram Parkway, from SR      $1,000,000
                              92 to U.S. 278, Paulding
                              County new location.......
3931           GA            Transportation improvements      $1,000,000
                              to U.S. 84 Connector/
                              Bypass from west of U.S.
                              84/SR 119 west of
                              Hinesville to U.S. 84/SR
                              196 south of Flemington,
                              Liberty County............
3932           GA            Transportation improvements      $1,000,000
                              to SR 746/SE Rome Bypass
                              from SR 101 U.S. 411 Floyd
                              Co........................
3933           GA            Transportation improvements      $1,000,000
                              to I-575 from I-75/Cobb
                              north to Sixes Rd/Cherokee
                              for HOV...................
3934           GA            Upgrade SR 316 from I-85 to      $1,000,000
                              SR 10 Loop, Gwinnett,
                              Barrow, Oconee Counties
                              new interchanges and HOV
                              lanes.....................
3935           GA            SR 204/Abercorn Street from      $1,000,000
                              King George Boulevard to
                              Rio Road widening.........
3936           GA            SR 96 from I-75 to old           $1,000,000
                              Hawkinsville Road widening
                              and reconstruction........
3937           GA            SR 40 from west of CR 61 to      $1,000,000
                              SR 25/US 17 widening......
3938           GA            SR 247 Connector                 $2,000,000
                              Improvements from SR 11/US
                              41 to SR 247, Warner
                              Robbins widening and
                              intersection..............
3939           GA            I-285/I-20 West--                $2,000,000
                              Reconstruct interchange...
3940           GA            Johnson Ferry Road/              $2,500,000
                              Glenridge Drive widening
                              from Abernathy Road to
                              Hammond Drive, Fulton
                              County....................
3941           GA            SR 15 From Clayton City          $2,000,000
                              limits to North Carolina
                              lane widening.............
3942           GA            SR 105 from Cannon Bridge        $2,000,000
                              Road to Walnut Street
                              widening..................
3943           GA            SR 369 from Cherokee Circle      $1,500,000
                              to CR 267/Hightower Circle
                              Truck Lanes, Forsyth
                              County passing lanes......
3944           GA            SR 369 widening from SR 9        $1,900,000
                              to SR 306 and interchange
                              at SR 400, Forsyth County.
3945           GA            Widen SR 20 from CR 293 to       $1,600,000
                              CS 5231, Forsyth County...
3946           GA            Transportation improvements      $2,200,000
                              to SR 306 at CR 65/Waldrip
                              Road, Forsyth County......
3947           GA            Transportation improvements      $2,000,000
                              to U.S. 411 Connector from
                              U.S. 41 to I-75, Bartow
                              County....................
3948           GA            Construct access roads on        $3,000,000
                              Airport Loop road in
                              Hapeville.................
3949           GA            Warren County I-20 Frontage      $5,000,000
                              Road......................
3950           GA            Kennesaw National                $3,000,000
                              Battlefield Park for land
                              acquisition in carrying
                              out viewshed protection
                              and wildlife abatement....
3951           GA            State of Georgia road           $10,000,000
                              infrastructure
                              improvements associated
                              with capacity increases at
                              statewide military
                              installations.............
3952           GA            State Road 133, widening         $2,000,000
                              and improvements from
                              Moultrie to Valdosta......
3953           GA            Highway 78, improvements to        $500,000
                              7 mile corridor,
                              Snellville, GA, Gwinnett
                              County....................
3954           GA            Greene County, Conversion          $800,000
                              of I-20 and Carey Station
                              Road to a full interchange
3955           GA            Southeastern Economic            $2,000,000
                              Alliance, Next Generation
                              High Speed Rail
                              Development...............
3956           GA            Commission a study and           $1,000,000
                              report regarding the
                              construction and
                              designation of a new route
                              linking Savannah, Augusta,
                              and Knoxville.............
3957           GA            Commission a study and           $1,000,000
                              report regarding
                              construction and
                              designation of a new
                              Interstate linking
                              Augusta, Macon, Columbus,
                              Montgomery, and Natchez...
3958           GA            Dekalb County, Northlake           $800,000
                              Streetscape...............
3959           GA            Dekalb County Schools            $1,000,000
                              bicycle and pedestrian
                              upgrades..................
3960           GA            Dekalb County, Buford            $1,000,000
                              Highway pedestrian safety
                              improvements..............
3961           GA            Transportation improvements      $1,000,000
                              to Dekalb County, Stone
                              Mountain Side/Bike Lanes..
3962           GA            Dekalb County, Rockbridge        $2,000,000
                              Road Corridor improvements
3963           GA            Transportation improvements        $500,000
                              to Dekalb County,
                              Southeast DeKalb Arterial
                              Analysis..................
3964           GA            City of Macon, Second            $3,000,000
                              Street Bridge Replacement,
                              Reconstruction of ROW.....
3965           GA            Middle Georgia Clean Air         $4,500,000
                              Coalition for congestion
                              mitigation transportation
                              projects..................
3966           GA            Transportation improvements      $2,000,000
                              to Chattahoochee Hill
                              Country Regional Greenway
                              Trail Master Plan.........
3967           GA            City of East Point, Semmes       $1,000,000
                              Street Construction.......
3968           GA            Transportation Improvements        $500,000
                              to Broad Avenue Bridge,
                              Albany, GA................
3969           GA            Fulton County, Atlanta,          $2,000,000
                              Georgia, right-of-way
                              acquisition to complete a
                              multimodal corridor on SR
                              1019 by closing property
                              ownership gap.............
3970           GA            Tift County Bypass U.S. 82/      $4,500,000
                              SR 520 W to U.S. 319/SR 35
                              E Truck Route U.S. Highway
                              82........................
3971           GA            Cherokee County, SR 20           $2,000,000
                              Widening from I-575 to SR
                              369.......................
3972           GA            Transportation improvements      $2,500,000
                              to Paulding County, East
                              Hiram Parkway from SR 92
                              to U.S. 278...............
3973           GA            Columbia County, SR 104,         $2,000,000
                              improvements from SR 383
                              to CR 515.................
3974           GA            Columbia County, Old             $1,000,000
                              Petersburg Road/Old Evans
                              Road improvements from
                              Baston Way to Washington
                              Road......................
3975           GA            Transportation improvements      $2,000,000
                              to White County, West
                              Cleveland Bypass from U.S.
                              129 to SR 75..............
3976           GA            Transportation improvements      $2,000,000
                              to Stephens County, Toccoa
                              Bypass Extension from SR
                              17 to SR 365..............
3977           GA            Hall County, Widen SR 53         $5,000,000
                              from Duckett Mill Rd. to
                              Lake Ranch Court and Old
                              Sardis Road from SR 53 to
                              Chestatee Road............
3978           GA            Bartow County, U.S. 411          $3,000,000
                              Connector from U.S. 41 to
                              I-75......................
3979           GA            Coffee County, Broxton           $2,200,000
                              Rocks Restoration Project,
                              Coffee, and Jeff Davis
                              Counties..................
3980           GA            City of Smyrna, Railroad         $1,000,000
                              Quiet Zone................
3981           GA            City of Smyrna, Brawner          $1,000,000
                              Park development and
                              construction..............
3982           GA            City of Smyrna, Railroad         $1,000,000
                              Pedestrian Bridge.........
3983           GA            City of Duluth,                    $800,000
                              intersection realignment
                              and road extension of
                              Davenport Rd. at Buford
                              Hwy.......................
3984           GA            City of Duluth, sidewalks          $500,000
                              along Davenport Road......
3985           GA            Pickens County, Repair of          $500,000
                              Steve Tate Road...........
3986           GA            Gwinnett County, Extension       $5,000,000
                              of Sugarloaf Parkway, Hwy
                              120.......................
3987           GA            City of Macon, Bloomfield        $1,500,000
                              Road, purchase of right-of-
                              way and engineering.......
3988           GA            City of Macon, Wimbish             $500,000
                              Road, widening and
                              striping for bike lanes...
3989           GA            Pierce Avenue, widening/           $500,000
                              striping to create bike
                              lanes from Ingelside Ave.
                              to Riverside Drive........
3990           GA            City of Macon, Rivoli              $900,000
                              Drive, widening, striping
                              to create bike lanes......
3991           GA            Rockdale County, Georgia           $500,000
                              Veterans Memorial Park
                              pedestrian walkway........
3992           GA            City of Macon, Riverside           $500,000
                              Drive Streetscapes and
                              Bike Pedestrian Amenities.
3993           HI            Kapolei transportation          $35,000,000
                              improvements, Island of
                              Oahu......................
3994           HI            Widen Queen Kaahumanu           $15,000,000
                              Highway...................
3995           HI            Construct Honoapiilani          $10,000,000
                              Highway Realignment.......
3996           HI            Improvements to Saddle Road     $40,000,000
                              on the Island of Hawaii...
3997           IA            Transportation improvements     $11,000,000
                              to U.S. 20, 4-lane in
                              Webster, Sac, Calhoun, and
                              Webster Counties..........
3998           IA            Transportation improvements     $12,000,000
                              to U.S. 30, 4-lane in
                              Marshall, Story, and Boone
                              Counties..................
3999           IA            Transportation improvements     $12,000,000
                              to U.S. 34 Missouri River
                              Bridges, Mills County.....
4000           IA            Transportation improvements      $6,000,000
                              to I-74, including
                              Mississippi River
                              preliminary work, in Scott
                              County, Iowa..............
4001           IA            U.S. 63 improvements,            $5,000,000
                              Chickasaw, Bremer, and
                              Black Hawk Counties,......
4002           IA            Transportation improvements      $8,000,000
                              to Hoven Corridor/Outer
                              Drive Project, Sioux City.
4003           IA            Transportation improvements      $6,000,000
                              to East Beltway,
                              Pottawattamie County......
4004           IA            Transportation improvements      $6,000,000
                              to U.S. 30 ``Liberty
                              Square'', Clinton.........
4005           IA            Transportation improvements      $5,000,000
                              to Edgewood Road Viaduct,
                              Cedar Rapids..............
4006           IA            Transportation improvements      $3,000,000
                              to I-80 Interchange at
                              Alice's Road/105th Street,
                              Waukee....................
4007           IA            Transportation improvements      $2,000,000
                              to U.S. 61 Bypass, Fort
                              Madison...................
4008           IA            Transportation improvements      $2,000,000
                              to U.S. 61 and Hershey
                              Avenue Interchange,
                              Muscatine.................
4009           IA            Transportation improvements      $3,000,000
                              to U.S. 63, Waterloo......
4010           IA            Transportation improvements      $4,000,000
                              to Grand Avenue, Ames.....
4011           IA            Transportation improvements      $3,000,000
                              to SE Connector/Martin
                              Luther King, Jr., Parkway,
                              Des Moines................
4012           IA            Transportation improvements      $3,000,000
                              to Highland Acres Road,
                              Marshalltown..............
4013           IA            Transportation improvements      $2,000,000
                              to 65th/67th Street,
                              Davenport.................
4014           IA            Transportation improvements      $1,000,000
                              to Highway 4 underpass in
                              Jefferson.................
4015           IA            Transportation improvements      $1,000,000
                              to I-235 reconstruction,
                              Des Moines................
4016           IA            Transportation improvements      $2,000,000
                              to Lake Belva Deer
                              Transportation Project,
                              Sigourney.................
4017           IA            Construct SE Connector/          $5,000,000
                              Martin Luther King, Jr.,
                              Pkwy, Des Moines..........
4018           IA            I-35 interchange                 $2,000,000
                              improvements, Ankeny......
4019           IA            City of Council Bluffs and       $3,000,000
                              Pottawattamie County East
                              Beltway Roadway and
                              Connectors Project........
4020           IA            Trail Planning in the Des          $100,000
                              Moines MPO area...........
4021           IA            Highway 63 in Waterloo,          $3,000,000
                              Iowa improvements.........
4022           IA            Cedar Falls recreational         $2,000,000
                              trails including Highway
                              58 intersection...........
4023           IA            Rail extension to the            $3,000,000
                              Eastern Iowa Industrial
                              Center, Davenport, IA.....
4024           IA            Design and construct               $650,000
                              trails, Carlisle to Des
                              Moines....................
4025           IA            Improve Great Western               $25,000
                              Trail, Warren County......
4026           IA            Highway 61 improvements,         $1,500,000
                              Muscatine.................
4027           IA            Improve, construct, and          $3,000,000
                              land acquisition, Central
                              Iowa Loop Trail, Ankeny to
                              Woodward including the Des
                              Moines River High Bridge..
4028           IA            Collins Road Improvements,       $2,000,000
                              Cedar Rapids..............
4029           IA            I-74 improvements in Scott       $2,000,000
                              County Iowa including
                              Mississippi River bridge
                              design....................
4030           IA            Access and transportation          $400,000
                              enhancements to access
                              Lake Belva Deer, Sigourney
4031           IA            Widening of Hwy 44, Grimes.        $200,000
4032           IA            Highway 92 improvements            $200,000
                              including Design in Warren
                              County....................
4033           IA            Construction of approaches       $1,500,000
                              and viaduct on Edgewood
                              Rd. SW over the UP
                              Railroad, Prairie Creek,
                              and the CRANDIC railroad..
4034           IA            NW 70th Ave.                     $1,000,000
                              reconstruction, Johnston..
4035           IA            Construction of Sioux City,      $3,000,000
                              Iowa Hoeven Corridor--
                              Outer Drive Project.......
4036           IA            U.S. 34 Missouri River           $1,425,000
                              bridge relocation and
                              replacement...............
4037           ID            Transportation improvements     $20,000,000
                              to Widen U.S. 95, Worley
                              to Mica Creek.............
4038           ID            Transportation improvements     $16,000,000
                              to Improve SH 75,
                              Timmerman to Ketchum......
4039           ID            Transportation improvements     $12,000,000
                              to U.S. 20, Menan-Lorenzo
                              Interchange...............
4040           ID            Construct interchange on I-     $16,000,000
                              84 at Ten-Mile Road,
                              Meridian, Idaho...........
4041           ID            Transportation improvements     $13,000,000
                              to U.S. 93, Twin Falls
                              Alternate Route, Stages II
                              and III...................
4042           ID            Transportation improvements     $11,000,000
                              to U.S. 30, McCammon to
                              Lava East.................
4043           ID            Reconstruct Grangemont Road      $7,000,000
                              (ID Forest Hwy 67) from
                              Orofino to MP 9.3, Segment
                              I, II, and III............
4044           ID            Widen Amity Road from            $3,000,000
                              Chestnut St. to Robinson
                              Road, Nampa, Idaho........
4045           ID            Construct Washington St.         $1,000,000
                              North From Addison Ave. to
                              Pole Line Road, Twin
                              Falls, Idaho..............
4046           ID            Transportation improvements      $5,000,000
                              to Bridging the Valley,
                              Kootenai County...........
4047           ID            Transportation improvements      $3,000,000
                              to Three Cities River
                              Crossing, Eagle...........
4048           ID            Transportation improvements      $4,000,000
                              to SH 55, Between Miles
                              Posts 94 and 102..........
4049           ID            Transportation improvements      $4,000,000
                              to Amity Road Widening to
                              Kings Overpass, Nampa.....
4050           IL            Construct extension of U.S.      $5,000,000
                              51 from .9 miles south of
                              Moweaqua to 4.6 miles
                              south of Moweaqua.........
4051           IL            Construction of Galena and       $5,000,000
                              Freeport bypasses, U.S. 20
4052           IL            Widen U.S. 30, Fulton-Rock       $2,250,000
                              Falls (Morrison),
                              Whiteside County..........
4053           IL            Construction of 11th Street      $6,000,000
                              Extension, Springfield....
4054           IL            Construction of Capital          $4,000,000
                              Avenue Project, 7th--11th
                              Streets, Springfield......
4055           IL            Design, land acquisition,        $5,000,000
                              and construction of West
                              State St. (US Business 20)
                              from Meridian Rd. to
                              Rockton Ave. in Rockford..
4056           IL            To conduct study of U.S. 67      $4,000,000
                              bridge over Illinois
                              River, Beardstown.........
4057           IL            Construction to improve          $2,000,000
                              access of Interstate 57/
                              64, Mount Vernon..........
4058           IL            Expand U.S. 67, Brighton to      $1,000,000
                              Bunker Hill Road, Macoupin
                              County....................
4059           IL            Improvements to Harrison         $1,500,000
                              Street, Quincy............
4060           IL            Construction of Joliet           $2,000,000
                              Arsenal Road improvements,
                              Will County...............
4061           IL            Continue expansion of IL         $2,000,000
                              336, Macomb-Peoria........
4062           IL            Construct I-290, The             $2,000,000
                              Village of Oak Park.......
4063           IL            Improve U.S. Route 34 from         $500,000
                              Kewanee to Kentville Road.
4064           IL            Construction of IL Route         $3,000,000
                              31--Algonquin Bypass to
                              Rakow Road................
4065           IL            Road improvements in             $1,000,000
                              Elmwood Park, Franklin
                              Park, Northlake, Oak Park,
                              River Forest, River Grove,
                              and Stone Park............
4066           IL            Bourbonnais road                 $1,500,000
                              improvements, Bourbonnais.
4067           IL            Bayview Bridge                     $250,000
                              improvements, Adams County
4068           IL            Improvements to Maple/           $1,000,000
                              Manteno Lake Road, Manteno
4069           IL            Replace Interstate 74            $1,500,000
                              Bridge, Moline............
4070           IL            Constitution Trail                 $750,000
                              Extension--Grove Street
                              south to Lafayette Street,
                              Bloomington...............
4071           IL            Improve transportation           $1,500,000
                              accessibility at Chicago
                              Botanic Garden, Glencoe...
4072           IL            Loyola University-Chicago          $750,000
                              vehicular-pedestrian right-
                              of-way, Chicago...........
4073           IL            Construct extension of           $1,500,000
                              Route 3 from Loop Hog
                              Hollow Road to Monsanto
                              Road, Cahokia/Sauget......
4074           IL            Engineering,                    $10,000,000
                              Preconstruction and
                              Construction of North-
                              South Wacker Drive,
                              Chicago...................
4075           IL            Upgrade Roads, Summit......        $750,000
4076           IL            Widen U.S. Highway 30 in         $2,200,000
                              Whiteside County..........
4077           IL            For the construction of the      $1,000,000
                              Grand Avenue Underpass,
                              Village of Franklin Park..
4078           IL            Illinois 31 Roadway              $7,000,000
                              improvements, Algonquin
                              Bypass--Rakow Road........
4079           IL            Road improvements                  $700,000
                              associated with
                              Diversatech Campus,
                              Manteno...................
4080           IL            Upgrade Veterans Drive in        $4,000,000
                              Pekin Illinois............
4081           IL            Street Resurfacing, City of        $500,000
                              Centreville...............
4082           IL            Design, land acquisition,        $5,000,000
                              and construction of South
                              Main Street (IL 2)
                              Corridor from Beltline
                              Road to Cedar Street in
                              Rockford..................
4083           IL            Preconstruction and              $7,500,000
                              construction activities
                              for U.S. 51...............
4084           IL            Construct I-290, The             $2,000,000
                              Village of Oak Park.......
4085           IL            Mitchell Road to Farnsworth      $2,500,000
                              Avenue improvements,
                              Aurora....................
4086           IL            Preconstruction and              $3,000,000
                              construction, East New
                              York Street, Aurora.......
4087           IL            Improve Great River Road,          $500,000
                              Mercer County.............
4088           IL            Improve Great River Road,          $250,000
                              Warsaw....................
4089           IL            Undertake traffic                $1,200,000
                              mitigation and circulation
                              enhancements on 57th and
                              Lakeshore Drive, Chicago..
4090           IL            Upgrade 31st Street and          $1,000,000
                              Golfview Road intersection
                              and construct parking
                              facilities, Brookfield....
4091           IL            Phase II Road Construction,      $1,500,000
                              Outer Belt West, Effingham
4092           IL            Construct four lane              $1,000,000
                              extension of IL Rt. 29
                              from Rochester to
                              Taylorville...............
4093           IL            Preconstruction and              $7,000,000
                              construction activities on
                              U.S. 67 from Macomb to
                              Alton.....................
4094           IL            Preconstruction and              $5,000,000
                              construction activities on
                              U.S. 34 from Monmouth to
                              Plano.....................
4095           IL            Improve Lightfoot Road,            $500,000
                              City of Farmington........
4096           IL            Pioneer Parkway                  $1,000,000
                              improvements, Peoria......
4097           IL            Transportation enhancements      $1,000,000
                              and road improvements
                              necessary for Downtown
                              Plaza improvements in
                              Jacksonville..............
4098           IL            City of Havana, Illinois           $500,000
                              upgrades to Broadway
                              Street....................
4099           IL            Improvements to County           $1,000,000
                              Highway One, Calhoun
                              County....................
4100           IL            Resurfacing of East Main           $500,000
                              Street in Staunton,
                              Macoupin County...........
4101           IL            Bike trail extension for           $400,000
                              the Kankakee River Trail
                              Project, Kankakee.........
4102           IL            Improve Highway-Railroad           $500,000
                              Crossings, Galesburg......
4103           IL            Improvements to township           $500,000
                              roads in Shawnee National
                              Forest, Pope County.......
4104           IL            Associated improvements for        $500,000
                              the Intersection of IL 13
                              and 37, Marion............
4105           IL            Construction of 11th Street        $800,000
                              Extension in Springfield..
4106           IL            Widen U.S. 30 in Whiteside         $550,000
                              County....................
4107           IL            Upgrade 31st Street and          $1,000,000
                              Golfview Road and
                              construct parking
                              facilities in Brookfield..
4108           IL            Bayview Bridge improvements        $250,000
                              in Adams County...........
4109           IL            Preconstruction and              $2,000,000
                              construction of IL 13
                              connector in Harrisburg...
4110           IL            Expansion of U.S. 67 from        $1,000,000
                              Brighton to Bunker Hill
                              Road in Macoupin County...
4111           IL            Loyola University-Chicago          $250,000
                              vehicular-pedestrian right-
                              of-way in Chicago.........
4112           IL            Constitution Trail                 $250,000
                              Extension (Grove Street
                              south to Lafayette Street)
                              in Bloomington............
4113           IL            Improvements to 11th Avenue      $1,500,000
                              streetscape, campus trails
                              and bridges at Augustana
                              College in Rock Island....
4114           IL            Improvements to Oakland,         $1,500,000
                              Main Street, Elderado and
                              Fairview, streetscape in
                              the vicinity of Millikin
                              University, Decatur.......
4115           IL            The extension of MacArthur       $2,000,000
                              Boulevard from Wabash to
                              Iron Bridge Road in
                              Springfield...............
4116           IL            Restoration of the historic      $1,200,000
                              railroad depot and
                              intermodal in Mattoon.....
4117           IL            Construct overpass, U.S. 40      $1,000,000
                              to Southwest Andrews Drive
                              in Greenville.............
4118           IL            Improvements to Cockrell         $1,200,000
                              Lane in the City of
                              Springfield...............
4119           IL            Construct extension of             $500,000
                              Route 3 from Loop Hog
                              Hollow Road to Monsanto
                              Road in Cahokia/Sauget....
4120           IN            Construct interchange for          $600,000
                              146th and I-69, Hamilton
                              County, Indiana...........
4121           IN            Construction of Dixon Road         $100,000
                              from Markland Avenue to
                              Judson Road in Kokomo,
                              Indiana...................
4122           IN            Widening road (along Gordon      $2,880,000
                              Road, 6th Street, and West
                              Shafer Drive) to three-
                              lane street, with sidewalk
                              and improvements to
                              existing bridge, White
                              County/Monticello, Indiana
4123           IN            Cyntheanne Road Interchange        $200,000
                              and corridor improvements,
                              Town of Fishers...........
4124           IN            Construct interchange at I-      $1,490,844
                              65 and 109th Avenue, Crown
                              Point, Indiana............
4125           IN            Transportation improvements        $250,000
                              to 126th Street Project,
                              Town of Fishers...........
4126           IN            Reconstruct 45th Avenue            $540,000
                              from Colfax Street to
                              Grant Street, Lake County.
4127           IN            Construct grade separation         $400,000
                              underpass on Main Street
                              in Mishawaka..............
4128           IN            Widen Old Meridian Street          $225,000
                              from two to four lanes,
                              City of Carmel............
4129           IN            Upgrade traffic signals            $128,000
                              Phase III in the City of
                              Muncie, Indiana...........
4130           IN            Transportation improvements        $200,000
                              to 100 South, Porter
                              County....................
4131           IN            Widen U.S. 31 Hamilton             $200,000
                              County....................
4132           IN            Resurface and widen Shelby         $200,000
                              County, Indiana 400 North
                              Phases IV-V...............
4133           IN            Reconstruct and widen              $200,000
                              Shelby County, Indiana 500
                              East from 1200 North to
                              U.S. 52...................
4134           IN            Extend Everbrooke Drive            $128,000
                              from SR 332 to Bethel
                              Avenue in the City of
                              Muncie....................
4135           IN            Construct U.S. 231 in            $1,200,000
                              Spencer and Dubois
                              Counties..................
4136           IN            Widening Wheeling Avenue           $192,000
                              from Centennial to
                              McGailliard Road in the
                              City of Muncie............
4137           IN            Upgrade rail crossing at            $40,000
                              93rd Avenue, St. John.....
4138           IN            Study traffic on Muncie             $24,000
                              bypass from Centennial
                              Avenue to McGailliard Road
                              in the City of Muncie and
                              Delaware County...........
4139           IN            Design and construct Tanner        $248,000
                              Creek Bridge on U.S. 50,
                              Dearborn County...........
4140           IN            Reconstruct Boston Street,         $150,000
                              from State Road 2 to Bach
                              Street, Larson-Whirlpool
                              Street in LaPorte, Indiana
4141           IN            45th Street improvements,          $100,000
                              Munster, Indiana..........
4142           IN            Redevelop and complete the         $600,000
                              Cardinal Greenway and
                              Starr-Genett Area in the
                              City of Richmond..........
4143           IN            Improve Intersection at            $112,000
                              Jackson Street and
                              Morrison Road in the City
                              of Muncie, Delaware County
4144           IN            Replace Samuelson Road             $632,578
                              Underpass, Portage........
4145           IN            Design and construct             $4,000,000
                              Indiana Ohio River Bridges
                              Project on I-65 and 265...
4146           IN            Construct Shelby County,           $100,000
                              Indiana Shelbyville
                              Parkway...................
4147           IN            Construct Hoosier Heartland        $600,000
                              Highway in Cass and
                              Carroll County............
4148           IN            Improve State Road 332 and         $600,000
                              Nebo Road Intersection in
                              Delaware County...........
4149           IN            Design, engineering, right-        $400,000
                              of-way acquisition, and
                              construction for the Grant
                              County Economic Corridor..
4150           IN            Construction of multi-use           $50,000
                              paths, Town of Fishers....
4151           IN            Acquire right-of-way for           $600,000
                              and construct University
                              Parkway from Upper Mount
                              Vernon Road to SR 66......
4152           IN            Conduct study for U.S. 50           $60,000
                              Corridor improvements,
                              Dearborn County...........
4153           IN            Construct U.S. 31 Kokomo           $200,000
                              Corridor Project for
                              Kokomo and Howard County..
4154           IN            Improve Bailie Street,              $64,000
                              Kentland..................
4155           IN            Downtown road improvements,      $4,500,000
                              Indianapolis..............
4156           IN            Construct U.S. 31 Plymouth       $2,200,000
                              to South Bend Freeway
                              Project in Marshall and
                              St. Joseph Counties.......
4157           IN            Construct Margaret Avenue          $600,000
                              Safety and Capacity
                              Enhancement Project.......
4158           IN            Preliminary engineering,         $1,120,000
                              right-of-way and
                              construction for Perimeter
                              Parkway--West Lafayette/
                              Purdue University.........
4159           IN            Construction of Maplecrest       $2,200,000
                              Road Extension, Allen
                              County....................
4160           IN            Realign State Road 312,            $832,578
                              Hammond...................
4161           IN            Construct I-69 Evansville        $2,800,000
                              to Indianapolis...........
4162           IN            Construct service road             $800,000
                              parallel in the City of
                              Anderson..................
4163           IN            Reconstruct Hoosier                $200,000
                              Heartland Highway, Wabash,
                              Huntington and Miami
                              County Indiana segments...
4164           IN            North Calumet Avenue               $240,000
                              improvements, Valparaiso..
4165           IN            Complete construction of            $75,000
                              paths at Hamilton County
                              Riverwalk, Noblesville....
4166           IN            Improve campus streets to          $400,000
                              increase pedestrian safety
                              and ease vehicular
                              congestion in the City of
                              Anderson..................
4167           IN            Construction of I-64             $1,062,000
                              interchange, Harrison
                              County, Indiana...........
4168           IN            Study alternatives along 2          $30,000
                              miles of railroad to
                              eliminate in-town highway-
                              rail crossings to improve
                              safety and reduce
                              congestion in Delaware
                              County....................
4169           IN            Improve SR 9 Greenfield            $100,000
                              Corridor..................
4170           IN            Redevelop Hazeldell Road,          $200,000
                              Hamilton County...........
4171           IN            SR 56 Reconstruction,            $1,024,000
                              Aurora....................
4172           IN            Reconstruct Standard               $260,000
                              Avenue, Whiting...........
4173           IN            Construct Hoham Drive              $100,000
                              Extension in Plymouth.....
4174           IN            Construction of County Road      $1,000,000
                              17-Elkhart................
4175           IN            Construction of Star Hill          $443,000
                              Road, Clark County........
4176           IN            Design and reconstruct             $186,000
                              residential streets in the
                              City of Muncie............
4177           IN            Reconstruct bridges at             $100,000
                              County Roads 200 East and
                              300 East in LaPorte County
4178           IN            Reconstruct McClung Road           $150,000
                              from State Road 39 to Park
                              Street in LaPorte.........
4179           IN            Highway-rail crossing            $1,400,000
                              safety related
                              improvements on Route 37
                              between U.S. 35 and U.S.
                              50........................
4180           IN            Maintain full funding of        $20,263,000
                              TEA-LU HPPs as necessary,
                              with balance for other
                              eligible INDOT projects...
4181           IN            Removal of I-65/I-70 Market      $5,000,000
                              Street Ramp and
                              Streetscaping,
                              Indianapolis..............
4182           IN            Downtown Indianapolis road       $6,000,000
                              improvements,
                              transportation
                              enhancements,
                              streetscaping, bicycle
                              paths and pedestrian
                              walkways..................
4183           IN            Relocation of railroad           $7,000,000
                              lines at Gary/Chicago
                              Airport in Gary...........
4184           IN            Design, engineering, right-      $2,000,000
                              of-way acquisition, and
                              construction for the Grant
                              County Economic Corridor..
4185           IN            Improve Clinton Street           $4,000,000
                              Corridor and Replace
                              Clinton Street Bridge
                              spanning St. Mary's River
                              in downtown Fort Wayne....
4186           IN            Widen unsafe U.S. 24             $3,000,000
                              between Fort Wayne and
                              Defiance, OH..............
4187           IN            Construct and Improve ISR        $4,000,000
                              62 (Lloyd Expressway) in
                              Evansville................
4188           IN            Margaret Avenue Safety and       $4,000,000
                              Capacity Enhancement--
                              Construct a 4-lane roadway
                              extending from SR 63 on
                              Terre Haute's west side to
                              SR 46.....................
4189           KS            Construction of 4-lane          $20,000,000
                              improvement on K-18 in
                              Riley County..............
4190           KS            Reconstruction of I-235/        $10,000,000
                              U.S.-54 and I-235/Central
                              interchanges and expansion
                              of I-235 to a 6-lane
                              facility between the
                              interchanges in Wichita...
4191           KS            Replacement or                   $5,000,000
                              rehabilitation of the
                              Amelia Earhart U.S.-59
                              Bridge in Atchison County.
4192           KS            Debt retirement for Dodge        $2,000,000
                              City Depot project, Dodge
                              City......................
4193           KS            Reconstruction and              $10,000,000
                              rehabilitation of the
                              intersection of K-18 and
                              12th Street interchange in
                              Riley County, KS..........
4194           KS            Reconstruction of an             $2,500,000
                              interchange at U.S. 73 and
                              20th Street in the City of
                              Leavenworth...............
4195           KS            Replacement of the Spring        $1,200,000
                              Creek Bridge on U.S. 160
                              in Cowley County..........
4196           KS            Construction, improvements,      $3,500,000
                              and streetscaping for
                              Wyatt Earp Boulevard/U.S.
                              Business 50 in Dodge City.
4197           KS            Construction of an               $3,000,000
                              interchange at K-7 and
                              55th Street/Johnson Drive,
                              an overpass structure for
                              Clear Creek Parkway, and
                              other access improvements
                              to K-7 in the City of
                              Shawnee...................
4198           KS            Reconstruction of K-27 in        $5,000,000
                              Sherman County............
4199           KS            Street and sidewalk              $1,000,000
                              replacement in downtown
                              Fort Scott................
4200           KS            Reconstruction or widening       $3,000,000
                              of 135th Street from
                              Metcalf to Nall in
                              Overland Park.............
4201           KS            Reconstruction of Desoto         $2,000,000
                              Road in the City of
                              Lansing...................
4202           KS            Construct I-35 and Lone Elm      $3,000,000
                              Road interchange and widen
                              I-35 from 51st St. to 59th
                              St. in the City of Olathe.
4203           KS            Reconstruction of I-70 in        $2,000,000
                              Saline County.............
4204           KS            Construction of the Prairie      $3,000,000
                              State Parkway (KS Hwy 7 to
                              Mize Blvd.) in the City of
                              Lenexa....................
4205           KS            Rehabilitation and               $4,000,000
                              reconstruction of U.S. 169
                              and interchange with U.S.
                              166 in Montgomery County..
4206           KS            Rehabilitation of U.S. 54        $2,550,000
                              in Kingman County.........
4207           KS            Replacement of K-39 bridge       $1,189,000
                              over SKO Railroad in the
                              City of Chanute...........
4208           KS            Reconstruction and                 $561,000
                              relocation of interchanges
                              on U.S. 156 near RS 255
                              and the Horse Thief Canyon
                              Reservoir entrance in
                              Hodgeman County...........
4209           KS            U.S. Highway 50 Shoulder         $4,500,000
                              widening between Dodge
                              City and Garden City......
4210           KS            Research and development of      $4,500,000
                              advanced vehicle
                              technology concepts at the
                              University of Kansas
                              Transportation Research
                              Institute, Lawrence.......
4211           KS            Research and development of      $1,500,000
                              rural transportation
                              infrastructure at Kansas
                              State University,
                              Manhattan.................
4212           KY            Owensboro Riverfront            $30,000,000
                              Development Project in
                              Owensboro.................
4213           KY            Construction of new I-65        $23,000,000
                              Interchange in Warren
                              County....................
4214           KY            Oregon Road Bridge               $1,000,000
                              Replacement Project in
                              Mercer County.............
4215           KY            Ashland Riverfront              $10,220,000
                              Development Project in
                              Ashland...................
4216           KY            Henderson Riverfront            $10,000,000
                              Development Project in
                              Henderson.................
4217           KY            Transportation improvements     $34,000,000
                              to Brent Spence Bridge....
4218           KY            Transportation improvements      $6,000,000
                              to AA--I-275 Connector,
                              Campbell County...........
4219           KY            Abraham Lincoln Project,         $3,500,000
                              LaRue County..............
4220           KY            Breathitt-Pennyrile              $2,500,000
                              Extension, Christian
                              County....................
4221           KY            Transportation improvements      $5,500,000
                              to U.S. 60 Owensboro,
                              Daviess County............
4222           KY            Transportation improvements      $4,000,000
                              to Hwy 163 from Hwy 90 to
                              Tompkinsville, Monroe
                              County....................
4223           KY            Feasibility study of               $500,000
                              construction on U.S. 27 to
                              I-75 connector road,
                              Jessamine County..........
4224           KY            Reconstruction of KY 61          $3,000,000
                              from U.S. 68 in Greensburg
                              to Columbia (the national
                              highway system truck
                              route) 16.1 miles, Green
                              County....................
4225           KY            Southern Connector from KY       $1,000,000
                              139 to KY 9, Caldwell
                              County....................
4226           LA            Transportation improvements     $22,500,000
                              to I-49 North.............
4227           LA            Transportation improvements     $16,000,000
                              to I-49 South.............
4228           LA            Improvements to Louisiana       $20,000,000
                              Highway 1 between the
                              Caminada Bridge and the
                              intersection of Louisiana
                              Highway 1 and U.S. 90.....
4229           LA            Upgrade LA 28 to four lanes     $17,400,000
                              from LA 121 to LA 465.....
4230           LA            Construct Kansas-Garrett         $8,350,000
                              Connector and I-20
                              interchange improvements..
4231           LA            Further construction to          $3,585,000
                              improve draining at
                              Clearview Parkway (LA
                              3152) and Earhart
                              Expressway (LA3139).......
4232           LA            Study of Baton Rouge Loop          $500,000
                              Project...................
4233           LA            Water Well Road Gateway            $831,000
                              Corridor (LA 478)--design,
                              right-of-way, and
                              construction of 3.6 miles
                              from I-49 to LA 1.........
4234           LA            Widen LA 18 from Northrup        $1,325,000
                              Grumman/Avondale Shipyards
                              to U.S. 90, Jefferson
                              Parish....................
4235           LA            Red River National Wildlife        $850,000
                              Refuge Visitor Center.....
4236           LA            Construct ROW improvements         $400,000
                              from Third St. at James
                              St. to LA Hwy One at
                              Broadway St. Acquire
                              property at Third St. and
                              Winn St...................
4237           LA            West Lake Overpass--To make      $2,200,000
                              grade separation
                              interchange improvements
                              at Sampson Street.........
4238           LA            Improve by widening,               $400,000
                              realigning, and resurface
                              3.2 miles of LA Hwy 820
                              between LA Hwy 145 and LA
                              Hwy 821...................
4239           LA            Connection between Highway         $100,000
                              51 By-Pass and Old Baton
                              Rouge Highway 1040--
                              Hammond...................
4240           LA            LA 3224--Hemlock Street at         $519,000
                              U.S. 61 improvements--St.
                              John the Baptist Parish...
4241           LA            Louisiana Interstate 49          $7,500,000
                              South Corridor............
4242           LA            Design and acquire right-of-     $2,500,000
                              way, Louisiana I-69,
                              Louisiana Segment, SIU 15.
4243           LA            Construction to improve            $900,000
                              drainage at Clearview
                              Parkway (LA 3152) and
                              Earhart Expressway (LA
                              3139).....................
4244           LA            Shreveport Intelligent           $1,500,000
                              Transportation System in
                              Northwest, LA.............
4245           LA            Widen I-10 in New Orleans..      $2,000,000
4246           LA            St. Tammany U.S. 11 bicycle      $2,000,000
                              path and sidewalk
                              improvements..............
4247           LA            Bossier Parish Congestion        $1,500,000
                              Relief Program............
4248           LA            I-10 Ryan Street exit ramp       $1,500,000
                              and relocation/
                              realignments..............
4249           LA            Improve Zachary Taylor           $2,000,000
                              Parkway...................
4250           LA            LA-1 drainage and sidewalk       $1,500,000
                              improvements in Grande
                              Isle......................
4251           LA            Construct I-20 interchanges      $1,500,000
                              at U.S. 167 at Tarbutton
                              Rd. Construct East West
                              Frontage Roads along I-20.
4252           LA            Louisiana University             $2,000,000
                              Consortium for Smart
                              Growth Study and
                              Educational Outreach......
4253           LA            Upgrade El Camino East-West      $1,500,000
                              Corridor along LA 6.......
4254           LA            Develop and construct St.        $1,000,000
                              Martinville Bypass, LA 31
                              North to LA 96............
4255           LA            Construct Leeville Bridge        $1,000,000
                              from Port Fouchon to
                              Golden Meadow.............
4256           LA            Improve Natchitoches               $500,000
                              Johnson Chute and Posey
                              Road connection to I-49 to
                              LA 1......................
4257           LA            LA 50 (Almedia) widening           $500,000
                              and I-310/U.S. 90
                              interchange improvements,
                              St. Charles Parish........
4258           LA            Upgrade LA 28 to four lanes      $1,000,000
                              from LA 121 to LA 465.....
4259           LA            Rehabilitation of Street           $500,000
                              Routes Project in Bogalusa
4260           LA            Construction of I-10 Access        $500,000
                              Rd., Crowley, LA..........
4261           LA            Replace Kerner Ferry Bridge        $500,000
                              Jefferson Parish Bayou
                              Barataria.................
4262           LA            Peters Road improvements in        $500,000
                              Plaquemines Parish........
4263           LA            Improvements to LA 46 in           $100,000
                              St. Bernard Parish........
4264           LA            Baton Rouge Intelligent          $1,000,000
                              Transportation System.....
4265           MA            Reconstruct Chelsea Street       $6,000,000
                              Bridge in Boston..........
4266           MA            Design and construct             $4,500,000
                              downtown roadway and
                              streetscape enhancements
                              in Worcester..............
4267           MA            Design and construct Rt. 24      $5,500,000
                              Interchange in Fall River
                              and Freetown..............
4268           MA            Design and construct             $5,500,000
                              multimodal improvements
                              and facilities in New
                              Bedford...................
4269           MA            Construct access                 $2,500,000
                              improvements to the
                              Lawrence Gateway Project,
                              Lawrence..................
4270           MA            Construct pedestrian and           $500,000
                              vehicular access
                              improvements on the
                              existing Brightman Street
                              Bridge in Fall River......
4271           MA            Northern Avenue Bridge           $6,000,000
                              rehabilitation in Boston..
4272           MA            Construct Phase II of the        $6,000,000
                              Quincy Center Concourse
                              Extension in Quincy.......
4273           MA            Design and construct             $2,000,000
                              downtown roadway and
                              streetscape improvements
                              in North Adams............
4274           MA            Construct Holyoke Canalwalk      $3,500,000
                              and streetscape
                              improvements in Holyoke...
4275           MA            Road improvements between        $3,000,000
                              Museum Road and Forsyth
                              Way in Boston.............
4276           MA            Design and construct access      $8,000,000
                              improvements and
                              intermodal facilities at
                              the former South Weymouth
                              Naval Air Station in South
                              Weymouth..................
4277           MA            Design and construct Boston      $7,000,000
                              National Park traveler
                              information system and
                              visitor center in Boston..
4278           MA            Construct Haverhill              $3,000,000
                              intermodal center access
                              and vehicle capacity
                              improvements in Haverhill.
4279           MA            Design and construct             $5,000,000
                              roadway and streetscape
                              improvements in Franklin..
4280           MA            Construct Lechmere Station       $5,000,000
                              area roadway and access
                              improvements in Cambridge.
4281           MA            Design and construct             $5,000,000
                              Assembly Square multimodal
                              access improvements in
                              Somerville................
4282           MA            Construct downtown roadway       $3,000,000
                              and corridor improvements
                              in Gloucester.............
4283           MA            Construct the Blackstone         $2,000,000
                              River Bikeway and
                              Worcester Bikeway Pavilion
                              between Providence, RI and
                              Worcester.................
4284           MA            Construct Melnea Cass            $4,000,000
                              Corridor improvements in
                              Boston....................
4285           MA            Construct Southeastern           $5,000,000
                              Massachusetts freight rail
                              corridor improvements in
                              Bristol County............
4286           MA            Reconstruct Rt. 24/Rt. 140       $4,000,000
                              Interchange, replace
                              bridge and ramps, widen
                              and extend acceleration
                              and deceleration lanes....
4287           MA            Design and construct Rt. 20      $2,000,000
                              access road in Westfield..
4288           MA            Reconfigure Kilby-Gardner-       $2,000,000
                              Hammond area road network
                              in Worcester..............
4289           MD            I-70 Improvement Project:       $13,400,000
                              Frederick, MD.............
4290           MD            Construction and                $11,000,000
                              dualization of MD 404 in
                              Queen Anne's, Talbot and
                              Caroline Counties.........
4291           MD            Construct U.S. 220 MD 53         $9,200,000
                              North/South Corridor......
4292           MD            Upgrade MD 175 in Anne           $6,700,000
                              Arundel county between MD
                              170 and BW Parkway........
4293           MD            Construct a visitor center       $5,300,000
                              and related roads, and
                              parking serving Fort
                              McHenry...................
4294           MD            Construct Assateague Island      $6,300,000
                              National Seashore visitors
                              center and related road
                              improvements..............
4295           MD            Construction of new              $4,000,000
                              interchange at MD 5, MD
                              373 and Brandywine Rd.....
4296           MD            Rehabilitate Pennington          $5,500,000
                              Avenue Drawbridge,
                              Baltimore.................
4297           MD            Construction and                 $3,200,000
                              dualization of U.S. 113...
4298           MD            Construct MD 5 Hughesville       $3,000,000
                              Bypass....................
4299           MD            Construct U.S. 40, MD 715        $3,000,000
                              interchange at Aberdeen
                              Proving Ground............
4300           MD            Construct MD 4 at Suitland       $2,800,000
                              Parkway...................
4301           MD            Baltimore Rail Tunnel            $3,000,000
                              improvement study.........
4302           MD            Construct Allegheny              $2,000,000
                              Highlands pedestrian/
                              bicycle trail.............
4303           MD            Upgrade MD 210 from MD 228       $2,000,000
                              to I-495..................
4304           MD            Patuxent Research Refuge         $3,000,000
                              Road improvements.........
4305           MD            Rehabilitate roadways            $2,200,000
                              around East Baltimore Life
                              Science Park..............
4306           MD            Construction of new              $2,000,000
                              Baltimore water taxi
                              terminals.................
4307           MD            Upgrade I-95, I-495, MD 5/       $1,800,000
                              Branch Avenue Metro Access
4308           MD            Construct Blackwater             $1,500,000
                              National Wildlife Refuge
                              visitors center, trails
                              and road improvements.....
4309           MD            Edgewood, MD train station       $1,500,000
                              streetscaping and parking
                              improvements..............
4310           MD            Roadway improvements from        $2,000,000
                              intersection of U.S. 29 in
                              Montgomery Co. along
                              Industrial Parkway thru to
                              FDA access/Cherry Hill
                              Road......................
4311           MD            Roadway access                   $1,500,000
                              improvements, boardwalks,
                              and pier construction at
                              Hanover Street and West
                              Cromwell, Baltimore.......
4312           MD            MD 295 BWI access                $1,200,000
                              improvements..............
4313           MD            Construction of Maryland           $800,000
                              Ave. and Market St.
                              intermodal access project,
                              including pedestrian
                              safety improvements and
                              Baltimore Rd. corridor,
                              Rockville.................
4314           MD            Construct Woodrow Wilson         $1,600,000
                              Bridge Anacostia River
                              wetlands mitigation
                              project...................
4315           MD            Construct Potomac River            $500,000
                              Gorge stormwater
                              mitigation project........
4316           ME            I-295 improvements in           $15,000,000
                              Portland..................
4317           ME            Construction of Calais/St.       $4,000,000
                              Stephan Border Crossing
                              Project, Calais...........
4318           ME            Improvements and                 $2,000,000
                              construction of the
                              Lewiston-Auburn Highway,
                              Lewiston..................
4319           ME            Replacement of Waldo-           $18,000,000
                              Hancock bridge and
                              construction of related
                              pedestrian walkways.......
4320           ME            Transportation improvements     $18,000,000
                              for Maine East-West
                              Corridor Project..........
4321           ME            Augusta Memorial Bridge          $6,000,000
                              improvements, Augusta.....
4322           ME            Plan and construct North-        $5,000,000
                              South Aroostook highways,
                              to improve access to St.
                              John Valley, including
                              Presque Isle Bypass and
                              other improvements........
4323           ME            Construction of an               $4,000,000
                              Intermodal Center in
                              Acadia Park, Bar Harbor...
4324           ME            Replacement of the Route         $6,000,000
                              201-A ``covered'' bridge,
                              Norridgewock..............
4325           ME            Repair and improvements of       $3,750,000
                              Richmond-Dresden Bridge,
                              Richmond-Dresden..........
4326           ME            Access and traffic               $1,250,000
                              improvements to Route 15
                              in Brewer.................
4327           ME            State of Maine Pedestrian        $1,000,000
                              and Bicycle Trail Project.
4328           ME            Plan and construct North-       $20,000,000
                              South Aroostook highways,
                              to improve access to St.
                              John Valley, including
                              Presque Isle Bypass and
                              other improvements........
4329           ME            Construction of the Gorham       $2,000,000
                              Village Bypass, Gorham....
4330           ME            Improvements for statewide       $1,000,000
                              bike and pedestrian
                              projects..................
4331           ME            Repair and improvement of        $3,000,000
                              Harpswell Cribstone
                              Bridge, Harpswell.........
4332           ME            Repair and improvement of       $10,000,000
                              Deer Isle-Sedgwick Bridge,
                              Deer Isle-Sedgwick........
4333           MI            Plan and construct, land         $9,000,000
                              acquisition, Detroit West
                              Riverfront Greenway.......
4334           MI            Reconstruct and widen I-94       $8,000,000
                              in Kalamazoo..............
4335           MI            Construct Interchange at I-      $8,000,000
                              675 and M-13 (Washington
                              Avenue), Northbound exit,
                              in Saginaw................
4336           MI            Rehabilitate bridge lift         $5,000,000
                              over Black River on 7th
                              Street Bridge in Port
                              Huron.....................
4337           MI            Reconstruct I-75 from North      $6,000,000
                              of U.S.-2 to Sault Ste.
                              Marie and reconstruct the
                              existing roadway, Sault
                              Ste. Marie................
4338           MI            Construct at-grade crossing      $5,000,000
                              and I-75 interchange to
                              reconnect Milbocker and
                              McCoy Roads and construct
                              overpass to reconnect Van
                              Tyle to South Wisconsin
                              Road in Gaylord...........
4339           MI            Improvements to Trowbridge       $9,000,000
                              Road Extension to Farm
                              Lane, Ingham County, Farm
                              Lane between Mount Hope
                              Road and Trowbridge Road
                              with underpasses for CN
                              and CSX railroad crossings
4340           MI            Allen Road under the CN          $6,000,000
                              Railroad Grade Separation,
                              Woodhaven.................
4341           MI            Blue Water Bridge Plaza          $5,000,000
                              improvements and
                              relocation of segments of
                              I-94 and I-69.............
4342           MI            West Portage Avenue              $2,000,000
                              realignment, Sault Ste.
                              Marie.....................
4343           MI            Construct road improvements      $8,000,000
                              to Van Dyke Road, from I-
                              696 to Red Run Drain, City
                              of Warren.................
4344           MI            Construction of the I-696        $3,000,000
                              and Northwestern Highway
                              Interchange Freeway ramps
                              at Franklin Road in
                              Southfield................
4345           MI            Construct road improvements      $2,500,000
                              to Miller Road from I-75
                              to Linden Road, Flint
                              Township..................
4346           MI            University of Michigan           $1,500,000
                              Health Systems auto crash
                              notification system.......
4347           MI            Alger County, repaving a         $1,000,000
                              portion of H-58 between
                              Sullivan Creek towards
                              Little Beaver Road........
4348           MI            Jackson Road Boulevard           $1,000,000
                              Extension, utilizing fly
                              ash and recycled concrete
                              in road surface...........
4349           MN            Transportation improvements      $5,000,000
                              for City of Moorhead SE
                              Main GSI, 34th St. and I-
                              94 Interchange and
                              Moorhead Comprehensive
                              Rail Safety Program in
                              Moorhead..................
4350           MN            Reconstruct I-35E from           $5,000,000
                              University Avenue to
                              Maryland Avenue in St.
                              Paul......................
4351           MN            Construct last segment of        $2,000,000
                              the Victory Drive project
                              to link Victory Drive with
                              Highway 14 in Blue Earth
                              County....................
4352           MN            Phase III construction of        $9,000,000
                              Trunk Highway 610-10......
4353           MN            U.S. Trunk Highway 14 from       $4,000,000
                              One Mile West of Waseca to
                              Owatonna..................
4354           MN            Construction of 8th Street       $2,000,000
                              North: Stearns CR 120 to
                              TH 15 in St. Cloud........
4355           MN            Design, engineering, and           $750,000
                              ROW acquisition to
                              reconstruct Trunk Highway
                              95 bridge in North Branch.
4356           MN            Construction and right-of-       $2,000,000
                              way acquisition for
                              interchange at TH 65 and
                              TH 242 in Blaine..........
4357           MN            Design, construct, and           $2,500,000
                              expand TH 241 in the City
                              of St. Michael............
4358           MN            Design, construct, and           $9,000,000
                              acquire right-of-way for
                              St. Croix River Crossing
                              in Stillwater.............
4359           MN            Design and construction of       $5,000,000
                              Cedar Avenue Busway in
                              Dakota County.............
4360           MN            Planning and Pre-Design for      $3,000,000
                              Twin Cities Bioscience
                              Corridor in St. Paul......
4361           MN            TH 23--Construction of 4-        $2,500,000
                              Lane Bypass in Paynesville
4362           MN            I-494 U.S. 169 interchange       $2,000,000
                              reconstruction, Twin
                              Cities Metropolitan Area..
4363           MN            Replace three at-grade           $3,000,000
                              highway-railroad crossings
                              with grade-separated
                              crossings adjacent to
                              Winona State University...
4364           MN            Reconstruct County Highway       $3,250,000
                              42 Interchange at U.S.
                              Highway 52 in Dakota
                              County....................
4365           MN            34th Street realignment and      $4,000,000
                              interchange at 34th Street
                              and I-94 in Moorhead......
4366           MN            Construct last segment of        $2,000,000
                              the Victory Drive project
                              to link Victory Drive with
                              Highway 14 in Blue Earth
                              County....................
4367           MN            Phase III Construction of        $8,000,000
                              Trunk Highway 610-10......
4368           MN            Construction of U.S.             $4,000,000
                              Highway 14 from Waseca to
                              Owatonna..................
4369           MN            Reimbursement of 8th Street      $2,000,000
                              North in St. Cloud........
4370           MN            Construction and right-of-       $2,000,000
                              way acquisition for
                              interchange at TH 65 and
                              TH 242 in Blaine..........
4371           MN            Construction and widening        $2,500,000
                              of TH 241 in the City of
                              St. Michael...............
4372           MN            Program for replacement and      $3,000,000
                              upgrade of deficient
                              township signs, statewide.
4373           MN            Improvement of State             $3,500,000
                              Highway 11 to 10 ton-
                              status....................
4374           MN            Reconstruct I-35E from I-94      $3,000,000
                              to Maryland Avenue in St.
                              Paul......................
4375           MN            Right-of-way acquisition         $1,000,000
                              for TH 23 Paynesville
                              Bypass....................
4376           MO            Construct four lanes for        $25,000,000
                              Hwy 60 from Willow Springs
                              to Van Buren, Missouri....
4377           MO            Construct four lanes for        $20,000,000
                              Hwy 65 North of I-44 from
                              I-44 N to Route EE........
4378           MO            Construct fours lanes on        $20,000,000
                              Hwy 50 west of Jefferson
                              City to west of
                              California, Missouri (From
                              St. Martens to California,
                              Missouri).................
4379           MO            Construct Hwy 13 Bypass in       $5,000,000
                              Warrensburg...............
4380           MO            Improvements to Hwy 60/65       $10,000,000
                              Interchange...............
4381           MO            Improve Highway 13 from          $5,000,000
                              Springfield, MO to Bolivar
4382           MO            I-470/Strother Road              $5,000,000
                              Interchange in Lee's
                              Summit....................
4383           MO            Improve U.S. 36 to divided      $30,000,000
                              four lane expressway from
                              Macon to Route 24.........
4384           MO            Improve Highway 291 from         $4,000,000
                              Harrisonville to Lee's
                              Summit in Cass County.....
4385           MO            Route 364, Phase II Page         $5,000,000
                              Avenue Extension, St.
                              Charles County............
4386           MO            Transportation Improvements      $4,000,000
                              for U.S. 63 Interchange at
                              Gans Road, Boone County...
4387           MO            Improve Highway 67 from          $5,000,000
                              Fredericktown, MO to
                              Poplar Bluff..............
4388           MO            Upgrade to 4 lanes MO 66         $2,000,000
                              from Duquesne Road to Rt.
                              249 in Jasper County......
4389           MO            Interchange design and           $5,000,000
                              construction for the Main
                              Street Extension at I-55,
                              Cape Girardeau County.....
4390           MO            Relocation and                   $2,000,000
                              reconstruction of Rt. MM
                              from Rt. 21 to Rt. 30.....
4391           MO            Upgrade Route 59 at rail         $3,000,000
                              crossing in St. Joseph, MO
4392           MO            Realignment and bridge           $2,000,000
                              replacement over First
                              Creek from east of 2nd
                              Street to Route 169 on MO
                              92, Clay County...........
4393           MO            Roadway improvements on Rt.      $2,000,000
                              21 from Hayden Road to
                              Lake Lorraine.............
4394           MO            Construct Interstate             $4,000,000
                              flyover at Hughes Road and
                              Liberty Drive to 76th
                              Street. Part of Liberty
                              Parkway Project, Liberty..
4395           MO            I-55 Redesign, Cape              $2,000,000
                              Girardeau County..........
4396           MS            Widening of I-55 from           $20,240,000
                              Highway 304 in DeSoto
                              County to TN State line...
4397           MS            Upgrade U.S. 78 to               $8,000,000
                              Interstate standards from
                              the MS/TN State line to
                              the MS/AL State line......
4398           MS            For construction and ROW        $26,400,000
                              acquisition U.S. 49 from
                              South of Florence to I-20.
4399           MS            To upgrade Old Fannin Road       $6,400,000
                              connecting Highway 25 to
                              Spillway Road in Rankin
                              County....................
4400           MS            Plan and construct an           $10,000,000
                              intermodal connector
                              linking I-20 to Hwy 49,
                              Pearl-Richland............
4401           MS            Airport Parkway/Pearl River      $8,960,000
                              Bridge for ROW acquisition
                              and construction of west
                              segment between I-55 and
                              Highway 475 at Jackson
                              International Airport,
                              with connector to Highway
                              25........................
4402           MS            Byram-Clinton/Norrell           $15,000,000
                              Corridor--Connects the
                              Norrell Road Interchange
                              on I-20 to the Byram-
                              Clinton Multimodal
                              Corridor on I-55..........
4403           MS            Lake Harbour Drive              $10,000,000
                              Extension, Ridgeland--
                              Connects U.S. Highway 51
                              to Highland Colony Parkway
4404           MS            Transportation Improvements     $10,000,000
                              for Greenville Bypass--
                              Highway 82--U.S. Highway
                              82 bypass between
                              Greenville and Leland.....
4405           MS            Transportation Improvements     $10,000,000
                              for Port Connector Road,
                              Claiborne County..........
4406           MS            Transportation Improvements     $10,000,000
                              for South Entrance Loop--
                              Mississippi State
                              University................
4407           MS            Lynch Street Extension to        $5,000,000
                              Metro Parkway, Jackson--An
                              extension of the Metro
                              Parkway that connects
                              intermodal traffic between
                              the Metro Center Area and
                              Jackson State University..
4408           MS            Transportation improvements      $5,000,000
                              for Highway 7 and Highway
                              49 Connector, Greenwood...
4409           MS            Transportation improvements      $5,000,000
                              for Pearl-Pirates Cove
                              Interchange, Pearl........
4410           MS            Transportation improvements      $5,000,000
                              for Washington Street/Old
                              U.S. Highway 61, Vicksburg
4411           MS            Star Landing Corridor,           $5,000,000
                              Southaven.................
4412           MT            Transportation improvements     $10,000,000
                              for MT 78 Corridor
                              Development...............
4413           MT            Transportation improvements     $17,000,000
                              for Bench Boulevard
                              Connection and Corridor
                              Project, Billings.........
4414           MT            Transportation improvements      $5,000,000
                              for Babcock to Kagy
                              Project, Bozeman..........
4415           MT            Transportation improvements     $10,000,000
                              for Townsend--South
                              Project, U.S. 287.........
4416           MT            Transportation improvements      $6,000,000
                              for Cutbank Railroad
                              Overpass, Cutbank.........
4417           MT            Transportation improvements     $10,000,000
                              for Havre--East Project,
                              including Glasgow to
                              Poplar, U.S. 2............
4418           MT            Transportation improvements      $7,000,000
                              for Lonepine North and
                              East Project, MT 28.......
4419           MT            U.S. 93 transportation          $15,000,000
                              improvement projects
                              between Lolo and Hamilton.
4420           MT            U.S. 2 transportation           $20,000,000
                              improvement projects
                              between North Dakota State
                              Line and Browning.........
4421           MT            MT 3 transportation             $15,000,000
                              improvement projects
                              between Billings and Great
                              Falls.....................
4422           MT            MT 16, reconstruction of         $7,000,000
                              roadway and structures
                              northeast of Glendive.....
4423           MT            Develop and reconstruct Two     $25,000,000
                              Medicine Bridge, U.S. 2,
                              East of Glacier National
                              Park......................
4424           MT            U.S. 93 Ninepipe to Ronan        $8,000,000
                              transportation improvement
                              projects..................
4425           NC            Construction of the              $2,160,000
                              southbound lane of U.S.
                              321 bridge replacement
                              over the Catawba River in
                              Caldwell and Catawba
                              Counties..................
4426           NC            Construction and expansion       $3,155,000
                              of Little Sugar Creek
                              Greenway Charlotte........
4427           NC            Falls of Neuse Road              $3,000,000
                              Widening and Improvement,
                              Raleigh...................
4428           NC            Interstate 20 Extension          $5,000,000
                              study.....................
4429           NC            Transportation improvements      $2,000,000
                              at Piedmont Triad Research
                              Park, Winston Salem.......
4430           NC            Plan, design, and construct      $1,500,000
                              the 10th street Connector
                              Project in Greenville.....
4431           NC            Randall Parkway Widening         $3,000,000
                              and Improvement,
                              Wilmington................
4432           NC            Widen Derita Road from           $3,400,000
                              Poplar Tent Road in
                              Concord to the Cabarrus
                              Mecklenburg County line,
                              Concord...................
4433           NC            Construction improvements        $1,020,000
                              to Highway 10 in Newton...
4434           NC            U.S. 64 upgrade and              $5,000,000
                              improvement between
                              Raleigh, NC and Rocky
                              Mount.....................
4435           NC            Construction and                 $2,200,000
                              improvement of I-73, I-74,
                              U.S. 220, in Montgomery
                              and Randolph Counties.....
4436           NC            U.S. 1 Bypass and                $1,000,000
                              improvements around
                              Rockingham................
4437           NC            Norfolk Southern Intermodal      $4,000,000
                              System, Charlotte.........
4438           NC            Design and construction of       $1,000,000
                              the Airport Area Roadway
                              Network, High Point.......
4439           NC            Independence Boulevard           $3,000,000
                              Extension, Wilmington.....
4440           NC            Design, engineering, and         $5,000,000
                              construction of I-77/
                              Catawba Avenue Interchange
                              Cornelius.................
4441           NC            Eliminate highway-railway        $4,000,000
                              crossings in City of
                              Fayetteville..............
4442           NC            Construction of I-74             $6,000,000
                              between I-40 and U.S. 220,
                              High Point................
4443           NC            Environmental studies and        $4,200,000
                              construction of U.S. 74
                              Bypass Extension, Monroe..
4444           NC            Greenways Expansion and          $1,600,000
                              Improvement Project,
                              Greenville................
4445           NC            Northern Loop Project,           $3,000,000
                              Wilson....................
4446           NC            Rail Track Replacement,            $565,000
                              Spencer...................
4447           NC            Construction of Interstate      $10,000,000
                              73 and Interstate 74......
4448           NC            Construction of Charlotte        $7,500,000
                              Douglas International
                              Airport Freight Intermodal
                              Distribution Center.......
4449           NC            Rehabilitate existing            $2,500,000
                              roadway, make safety
                              improvements and add lanes
                              to Interstate 95 in North
                              Carolina..................
4450           NC            Construction of the              $2,000,000
                              southbound lane of U.S.
                              321 bridge replacement
                              over the Catawba River in
                              North Carolina............
4451           NC            Widening of Beckford Drive,        $192,000
                              City of Henderson.........
4452           NC            Transportation improvements      $2,000,000
                              for Peters Creek Pkwy, 1st
                              St., 2nd St., and
                              Brookstown Ave. in Winston-
                              Salem.....................
4453           NC            Environmental studies and        $5,000,000
                              construction of U.S. 74
                              Monroe Bypass Extension...
4454           NC            To plan, design and              $2,500,000
                              construct the 10th Street
                              connector project in
                              Greenville................
4455           NC            Transportation                   $2,500,000
                              improvementsat Piedmont
                              Triad Research Park,
                              Winston-Salem.............
4456           NC            Acquisition of rail              $2,000,000
                              corridors for use as
                              bicycle and pedestrian
                              trails, Durham............
4457           NC            Northern Loop Project, City      $2,933,000
                              of Wilson.................
4458           NC            Widen Derita Road from           $3,350,000
                              Poplar Tent Road in
                              Concord to the Cabarrus
                              Mecklenburg County line...
4459           NC            Winston-Salem Northern           $1,300,000
                              Beltway, Eastern Section
                              and Extension.............
4460           NC            To perform a study to be         $2,000,000
                              performed by East Carolina
                              University to find the
                              feasibility of
                              constructing a mid-
                              Currituck Sound bridge....
4461           NC            Transportation improvements        $725,000
                              at the Marion Diehl
                              Center, Charlotte.........
4462           NC            Pack Square pedestrian and         $700,000
                              roadway improvements,
                              Asheville.................
4463           NC            Study feasibility of               $700,000
                              widening U.S. 221/NC 226
                              from Woodlawn to Spruce
                              Pine, start planning and
                              design, and make upgrades
                              to improve safety.........
4464           NC            Continued development of           $400,000
                              Cary, NC pedestrian bike
                              paths.....................
4465           NC            Extend M. L. King, Jr.,          $1,000,000
                              Boulevard in Monroe.......
4466           NC            Design and Construction of         $900,000
                              the Airport Area Roadway
                              Network, High Point.......
4467           ND            I-29 Reconstruction from        $10,000,000
                              Main Avenue N. to County
                              Road 20 in Fargo..........
4468           ND            Reconstruct U.S. 281 in          $6,000,000
                              Jamestown--South Corporate
                              limits to 17th St., SW....
4469           ND            Reconstruction of U.S. 2         $7,000,000
                              from Towner to Rugby--WB..
4470           ND            Reconstruct ND 1804 from         $5,900,000
                              University of Mary to 48th
                              St. South of Bismarck.....
4471           ND            Reconstruction of U.S. 85        $6,500,000
                              north of Grassy Butte to
                              Long-X Bridge near Teddy
                              Roosevelt National Park
                              North Unit................
4472           ND            ND 22 Reconstruction from        $2,000,000
                              15th St. to North
                              Corporate Limits in
                              Dickinson.................
4473           ND            ND 200 Reconstruction from       $3,500,000
                              Jct. ND 49 at Beulah to
                              Hazen.....................
4474           ND            North Bound I-29                 $8,000,000
                              Reconstruction from south
                              of ND 15 to Near Grand
                              Forks.....................
4475           ND            East Bound I-94                  $7,000,000
                              Reconstruction from Near
                              South Heart to Dickinson..
4476           ND            ND 294/12th Avenue N            $11,000,000
                              Reconstruction and Bridge
                              Widening in Fargo.........
4477           ND            Replace Red River Valley         $3,100,000
                              Bridge at Drayton, ND.....
4478           ND            U.S. 12 improvements            $10,000,000
                              between Bowman and
                              Hettinger.................
4479           ND            U.S. 83/North Broadway          $10,000,000
                              Reconstruction in Minot...
4480           ND            Mandan Avenue                    $2,000,000
                              Reconstruction in Mandan..
4481           ND            ND 127 Reconstruction from       $3,000,000
                              ND 11 N. to Wahpeton......
4482           ND            U.S. 83 Reconstruction from      $6,000,000
                              Max to ND 23 SB...........
4483           ND            U.S. 281 Reconstruction          $4,000,000
                              from Carrington to Jct. ND
                              15........................
4484           NE            Construction of the              $1,400,000
                              Columbus, Nebraska North
                              Arterial Road.............
4485           NE            U.S. 34 Missouri River             $500,000
                              Bridge relocation and
                              replacement...............
4486           NE            Missouri River Bridges           $1,200,000
                              between U.S. 34, I-29 in
                              Iowa and U.S. 75 in
                              Nebraska..................
4487           NE            Design, right-of-way and         $4,000,000
                              construction of Nebraska
                              Highway 35 between Norfolk
                              to South Sioux City.......
4488           NE            Transportation improvements      $1,800,000
                              for U.S. 81 Meridian
                              Bridge, Yankton...........
4489           NE            Railroad Grade Separation        $6,000,000
                              Structures, Statewide.....
4490           NE            Engineering, right-of-way          $700,000
                              and construction of the
                              23rd Street Viaduct in
                              Fremont, Nebraska.........
4491           NE            Design, right-of-way and           $400,000
                              construction of the
                              Louisville bypass,
                              Nebraska..................
4492           NE            Construction of I-80/Cherry      $1,000,000
                              Avenue Interchange and
                              East bypass, Kearney,
                              Nebraska..................
4493           NE            Interstate 80 Interchange          $600,000
                              at Pflug Road, Sarpy
                              County, Nebraska..........
4494           NE            Construction of Heartland        $8,000,000
                              Expressway between
                              Alliance and Minatare, NE.
4495           NE            New roads and overpass to        $3,000,000
                              relieve congestion and
                              improve traffic flow for
                              Antelope Valley--Lincoln,
                              NE........................
4496           NE            Design of right-of-way and       $2,000,000
                              construction of South and
                              West beltway in Lincoln,
                              NE........................
4497           NE            Cuming Street                      $900,000
                              Transportation improvement
                              project in Omaha, NE......
4498           NE            Nebraska Intelligent             $1,000,000
                              Transportation Systems
                              Statewide.................
4499           NE            Midwest Roadside Safety          $1,000,000
                              Facility, UNL--Lincoln, NE
4500           NE            U.S. Highway 75 expressway,      $5,000,000
                              Plattsmouth to Bellevue,
                              Nebraska..................
4501           NE            U.S. 275 So. Omaha Veterans      $3,000,000
                              Memorial Bridge...........
4502           NE            Lincoln East Beltway, NE...        $500,000
4503           NE            I-80 six lane (I-80 to 56th      $3,000,000
                              Street) Lincoln, NE.......
4504           NE            Antelope Valley                 $10,000,000
                              Transportation Improvement
                              Project in Lincoln........
4505           NE            Design and construction of       $5,000,000
                              the South and West Beltway
                              in Lincoln................
4506           NE            Cuming Street                    $5,500,000
                              Transportation Improvement
                              Project in Omaha..........
4507           NE            Design and construction of       $9,500,000
                              Highway 35 between Norfolk
                              and South Sioux City......
4508           NE            I-80/Cherry Avenue               $8,000,000
                              Interchange and East
                              Bypass in Kearney.........
4509           NE            Construction of the              $5,000,000
                              Heartland Expressway
                              between Alliance and
                              Minatare..................
4510           NE            Plan and design I-80             $1,000,000
                              Interchange at Pflug Road.
4511           NE            Design and construction of       $3,000,000
                              Missouri River Bridges
                              between U.S. 34, I-29 in
                              Iowa and U.S. 75 in
                              Nebraska..................
4512           NE            Construction of the North        $2,000,000
                              Arterial Road in Columbus.
4513           NE            Design and construction of       $1,000,000
                              Meridian Bridge between
                              Nebraska and Yankton,
                              South Dakota..............
4514           NH            Construction, including         $20,000,000
                              widening and structural
                              improvements, of Little
                              Bay Bridge to eliminate
                              congestion--Portsmouth, NH
4515           NH            I-93 water quality study         $4,000,000
                              project...................
4516           NH            Reconfiguration of Pelham        $2,000,000
                              Intersection to Improve
                              Safety....................
4517           NH            Reconstruction of NH 11 and      $1,400,000
                              NH 28 Intersection in
                              Alton.....................
4518           NH            Construct and upgrade            $2,000,000
                              intersection of Route 3
                              and Franklin Industrial
                              Drive in Franklin.........
4519           NH            Design and construction of       $2,000,000
                              intersection of Rt. 101A
                              and Rt. 13 in Milford.....
4520           NH            Relocation and                   $2,600,000
                              reconstruction of
                              intersection at Route 103
                              and North Street in
                              Claremont.................
4521           NH            Improve Meredith Village         $1,600,000
                              Traffic Rotary............
4522           NH            Construct intersection at        $1,400,000
                              U.S. 3 and Pembroke Hill
                              Road in Pembroke..........
4523           NH            Reconstruction and               $3,600,000
                              improvements to NH Route
                              110 in Berlin.............
4524           NH            South Road Mitigation in         $2,000,000
                              Londonderry...............
4525           NH            Construct Park and Ride,         $2,000,000
                              Exit 5 on I-93--
                              Londonderry, NH...........
4526           NH            Reconstruction and               $1,000,000
                              relocation of the
                              intersection of Maple
                              Avenue and Charleston Road
                              in Claremont..............
4527           NH            Replacement of Ash Street        $1,400,000
                              and Pillsbury Road Bridge.
4528           NH            Hampton Bridge                   $3,000,000
                              Rehabilitation--Hampton...
4529           NJ            PATCO Rolling Stock             $40,000,000
                              acquisition and/or
                              renovation for use on line
                              between Lindenwold and
                              Locust Street in
                              Philadelphia..............
4530           NJ            Construct new ramps between     $15,000,000
                              I-295 and Route 42........
4531           NJ            Route 46 Corridor upgrades.      $9,500,000
4532           NJ            Route 18 Reconstruction in       $7,500,000
                              downtown New Brunswick....
4533           NJ            Interstate 280 Interchange       $2,000,000
                              improvements, Harrison....
4534           NJ            Construct Waterfront             $8,000,000
                              Walkway from North Sinatra
                              Drive and 12th St. south
                              to Sinatra Drive in
                              Hoboken...................
4535           NJ            Widening of Route 1 and          $3,500,000
                              intersection improvements
                              in South Brunswick........
4536           NJ            Route 29 conversion project      $4,000,000
                              to a full access freeway..
4537           NJ            Improvements to River Road       $4,000,000
                              in Camden.................
4538           NJ            Design and Construct Newark      $2,000,000
                              Waterfront Pedestrian and
                              Bicycle Access............
4539           NJ            Route 9W operational and         $4,000,000
                              safety improvements,
                              including I-95 Southbound
                              entrance alterations......
4540           NJ            New Jersey Underground             $100,000
                              Railroad for preservation,
                              enhancement and promotion
                              of sites in New Jersey....
4541           NJ            International Trade and          $1,000,000
                              Logistics Center roadway
                              improvements at Exit 12 of
                              the New Jersey Turnpike,
                              Carteret..................
4542           NJ            Kapkowski road area              $1,000,000
                              improvements in Elizabeth.
4543           NJ            Expand TRANSCOM Regional         $1,900,000
                              ITS System in NJ, NY, and
                              CT........................
4544           NJ            Construct Rt. 49 Cohansey        $1,500,000
                              River Bridge Replacement,
                              Cumberland County.........
4545           NM            Double Eagle II aviation         $8,000,000
                              facility for road
                              construction..............
4546           NM            Double Eagle II aviation        $12,000,000
                              facility for interchange
                              construction..............
4547           NM            Extension of University          $5,000,000
                              Blvd. in Albuquerque......
4548           NM            For construction work on NM-     $5,000,000
                              176 in Lea County.........
4549           NM            Rio Rancho, Iris Rd. to         $14,600,000
                              U.S. Highway 550..........
4550           NM            For U.S. 62/180 in Carlsbad      $5,000,000
4551           NM            Transportation improvements      $2,000,000
                              for I-10 reconstruction in
                              Las Cruces................
4552           NM            I-10/I-25 bridge                 $7,000,000
                              reconstruction in Las
                              Cruces....................
4553           NM            Transportation improvements      $1,400,000
                              to FS 235 and access to
                              Magdalena Ridge
                              Observatory...............
4554           NM            Reconstruction of I-25/         $20,000,000
                              Paseo del Norte and
                              Jefferson Interchange,
                              Albuquerque...............
4555           NM            Reconstruction of NM 524         $5,000,000
                              South Truck Bypass in
                              Carlsbad..................
4556           NM            Reconstruction of I-10 and       $7,000,000
                              I-25 Interchange, Las
                              Cruces....................
4557           NM            Extend College Blvd.,            $2,000,000
                              Roswell...................
4558           NM            Widen U.S. 64 between            $7,000,000
                              Farmington and Bloomfield.
4559           NM            Rehabilitate Espanola Main       $4,000,000
                              Street, Espanola..........
4560           NV            Blue Diamond Hwy/SR 160         $20,000,000
                              Widening..................
4561           NV            I-15 Widening and                $8,000,000
                              Interchanges, Las Vegas
                              Valley....................
4562           NV            Transportation improvements      $6,000,000
                              to I-80 at Fernley
                              Interchange...............
4563           NV            Transportation improvements     $12,000,000
                              to Pyramid Highway
                              Corridor, Sparks..........
4564           NV            U.S. 95 Widening and             $7,000,000
                              interchanges, Las Vegas...
4565           NV            Railroad Reconstruction,         $2,000,000
                              Ely and White Pine County.
4566           NV            I-15 Widening northbound        $25,000,000
                              from Primm to Sloan
                              Interchange, Clark County.
4567           NV            I-580/U.S. 395 Capacity         $25,000,000
                              improvements, Washoe
                              County....................
4568           NV            Construct I-15/Las Vegas         $3,000,000
                              Beltway Interchange.......
4569           NV            Construct U.S. 95/Las Vegas      $3,000,000
                              Beltway Interchange.......
4570           NV            Construct Las Vegas Beltway/     $3,000,000
                              Airport Connector
                              Interchange...............
4571           NV            Transportation improvements      $2,000,000
                              on Henderson Lake Mead
                              Parkway, Henderson, Nevada
4572           NV            Transportation improvements      $3,000,000
                              on Laughlin-Bullhead City
                              Colorado Bridge...........
4573           NV            Transportation improvements      $8,000,000
                              for Mesquite Airport
                              Access....................
4574           NV            U.S. 395 Design............      $3,000,000
4575           NY            I-86/Route 17 Upgrade for        $9,000,000
                              Broome, Delaware, Chemung,
                              Orange, Sullivan, and
                              Cattaraugus Counties......
4576           NY            Roadway and intermodal           $5,000,000
                              improvements to the Nassau
                              County Hub................
4577           NY            For Studies, Design, and         $9,000,000
                              Construction of the High
                              Line Trail Project, New
                              York City.................
4578           NY            Improvements to the Harlem       $7,000,000
                              River Bridges.............
4579           NY            Road improvements for the        $2,000,000
                              Village of Kyrias Joel....
4580           NY            I-86/Route 17 Upgrade for        $1,000,000
                              Tioga County..............
4581           NY            Reconstruction of Ashburton      $4,000,000
                              Avenue in Yonkers.........
4582           NY            To Conduct Scoping and           $1,500,000
                              Planning Studies for the
                              Northern Tier Expressway..
4583           NY            Improvements to Route 12 in      $9,000,000
                              Broome and Oneida Counties
4584           NY            Improvements for West 125th      $2,500,000
                              Street in West Harlem.....
4585           NY            Enhance Road and                 $5,000,000
                              Transportation Facilities
                              Near W. 65th Street and
                              Broadway, New York City...
4586           NY            Design and Construction of       $6,000,000
                              the Short Clove Crossing
                              in Haverstraw.............
4587           NY            Planning and Construction        $1,000,000
                              of Fort Drum Connector
                              Road......................
4588           NY            Design and Construction for      $4,000,000
                              a Syracuse University
                              Transportation Facility in
                              Syracuse..................
4589           NY            Road and transportation          $5,000,000
                              improvements near the
                              Brooklyn Children's Museum
4590           NY            Construction and                 $5,000,000
                              improvements to U.S. Route
                              219 Expressway............
4591           NY            For research at the              $4,000,000
                              Rochester Institute of
                              Technology Alternative
                              Fuels and Life-Cycle
                              Engineering...............
4592           NY            Improve Bronx Zoo                $4,000,000
                              Intermodal Facility.......
4593           NY            Conversion of NY Route 15        $3,000,000
                              to I-99 Road improvements.
4594           NY            University of Buffalo            $3,000,000
                              Multidisciplinary Center
                              for Earthquake Engineering
                              Research (MCEER)..........
4595           NY            Tappan Zee Bridge to I-287       $1,500,000
                              Transportation Corridor
                              Study, Assessments, and
                              Design....................
4596           NY            Corning Preserve                 $2,000,000
                              improvements Phase II.....
4597           NY            Siena College Perimeter            $500,000
                              Road improvements and
                              construction..............
4598           NY            Southtown connector              $8,000,000
                              improvements on NY Route 5
                              from the Coast Guard Base
                              to Ohio Street, Buffalo,
                              NY/Buffalo Outer Harbor
                              Road improvements.........
4599           NY            Miller Highway improvements      $4,000,000
4600           NY            Roadway, pedestrian, and         $2,000,000
                              streetscape Improvements
                              for the New Cassel
                              Revitalization Project in
                              North Hempstead...........
4601           NY            Farm to Fork Transportation        $200,000
                              Distribution Network Study
                              and Support in Upstate....
4602           NY            Reconstruction of East           $2,000,000
                              Avenue from Main Street to
                              Henry Street in Hornell...
4603           NY            Improvements to Widmer Road        $500,000
                              in the Town of Wappinger..
4604           NY            Improvements to Erie             $2,000,000
                              Boulevard in Schenectady..
4605           NY            Construction of highway          $1,500,000
                              noise suppression barriers
                              bordering I-84 in Newburgh
4606           NY            Improve Traffic Flow on          $1,000,000
                              Noel Road between Church
                              and Crossbay Boulevard
                              Including Work Necessary
                              to Demolish and
                              Reconstruct the Firehouse
                              Facility in Broad Channel.
4607           NY            Design, Planning, and            $5,000,000
                              Construction of a
                              Community Transportation
                              Center from Broadway to
                              Manhattan College Parkway.
4608           NY            Construction of Pedestrian       $1,500,000
                              and Bike Trail Campus
                              Improvements at St.
                              Bonaventure...............
4609           NY            For the CargoWatch               $3,500,000
                              Transportation Management
                              Project for Study and
                              Implementation............
4610           NY            Design and Construction of         $500,000
                              an Access Road to
                              Plattsburgh International
                              Airport...................
4611           NY            Improvements and                 $2,000,000
                              Enhancements for Oak Beach
                              Road in the Town of
                              Babylon...................
4612           NY            Design and Construction of       $1,000,000
                              Downtown Jamestown
                              Connector Trail...........
4613           NY            Restoration of the Van           $1,000,000
                              Cortlandt Manor Entrance
                              near Croton...............
4614           NY            Sound Shore Medical Center       $1,000,000
                              of Westchester Intermodal
                              Facility Improvements.....
4615           NY            Route 17 Widening Study and      $1,000,000
                              Design....................
4616           NY            Erie Community College           $1,000,000
                              Transportation
                              Improvements..............
4617           NY            Roadway and Traffic              $1,500,000
                              Improvements for Suffolk
                              County....................
4618           NY            Construction and                   $800,000
                              Improvements to Soundview
                              Connection Greenway from
                              Bruckner Boulevard to
                              Soundview Park............
4619           OH            Reconstruction of Cleveland     $21,970,000
                              Inner Belt and
                              rehabilitation of the
                              Central Viaduct Bridge,
                              Cleveland, OH.............
4620           OH            Grading, paving, roads, and      $8,200,000
                              the transfer of rail-to-
                              truck for the intermodal
                              facility at Rickenbacker
                              Airport Columbus, OH......
4621           OH            Ramp and Roadway approaches     $10,000,000
                              on I-75 toward Brent
                              Spence Bridge. Cincinnati,
                              OH........................
4622           OH            Rehabilitation of the            $2,000,000
                              Martin Luther King, Jr.,
                              Bridge. Toledo, OH........
4623           OH            Reconstruction, widening,        $5,000,000
                              and interchange upgrades
                              to I-75 between Cincinnati
                              and Dayton. Dayton, OH....
4624           OH            Replace the Edward N.            $6,000,000
                              Waldvogel Viaduct.
                              Cincinnati, OH............
4625           OH            SR 8 safety improvement and      $2,600,000
                              road expansion project in
                              Northern Summit County. OH
4626           OH            Reconstruction of the 70/71      $8,000,000
                              split in downtown
                              Columbus, OH..............
4627           OH            Widen U.S. 35 to three           $4,000,000
                              contiguous lanes from I-75
                              to I-675 in Montgomery
                              County, OH................
4628           OH            Construct pedestrian bridge      $3,300,000
                              from east of Dock 32 to
                              park. Cleveland, OH.......
4629           OH            South Connector in Waverly       $4,100,000
                              from U.S. 23 to SR 104 to
                              SR 220 for new development
                              areas in a depressed
                              Appalachian region.
                              Waverly, OH...............
4630           OH            Construct full movement            $750,000
                              interchange on I-75 at
                              Austin/Miamisburg-
                              Springboro Rd. and widen
                              Miamisburg-Springboro Rd.
                              from Wood Rd. to SR 741,
                              Dayton, OH................
4631           OH            Reconstruct I-75/I-475           $5,000,000
                              Interchange. Toledo, OH...
4632           OH            Construct 1,100 foot             $1,280,000
                              bulkhead/riverwalk
                              connecting Front and Maine
                              Ave. public rights-of-way.
                              Cleveland, OH.............
4633           OH            Construction of new bridges      $3,300,000
                              that will replace two
                              unsafe spans that carry
                              U.S. Route 62 across the
                              Scioto River. Columbus, OH
4634           OH            Construction of a full 4-          $400,000
                              way interchange at SR 44
                              and Shamrock Boulevard to
                              replace current 2-way
                              interchange of SR 44 and
                              Jackson St. Painesville,
                              OH........................
4635           OH            Construction of interchange      $2,800,000
                              at SR 8 and Season Road,
                              Cuyahoga Falls, OH........
4636           OH            Eliminate at-grade               $3,000,000
                              signalized intersections
                              between North Fairfield
                              Road and the Xenia Bypass
                              on U.S. 35 in Greene
                              County, OH................
4637           OH            Design and construct a           $1,800,000
                              Towpath Trail from
                              southern Cuyahoga County
                              through downtown Cleveland
                              to Lake Erie. Cleveland,
                              OH........................
4638           OH            Reconstruct and widen SR         $1,000,000
                              82, North Royalton, OH....
4639           OH            Construct connector between        $500,000
                              Crocker and Stearns County
                              Highways. Westlake and
                              North Olmsted, OH.........
4640           OH            Construct I-75/SR 122            $2,000,000
                              interchange and related
                              improvements. Middletown,
                              OH........................
4641           OH            NW Butler County TID U.S.       $14,000,000
                              27 widening, bypass,
                              intersection improvements,
                              and safety projects.......
4642           OH            Allen County SR 309 road         $5,000,000
                              reconstruction and safety
                              improvements..............
4643           OH            Licking County SR 79             $4,090,000
                              service road construction,
                              safety improvements, and
                              congestion relief.........
4644           OH            Clermont County SR 125 turn      $2,400,000
                              lane additions and related
                              safety improvements.......
4645           OH            Portage County SR 14 turn          $500,000
                              lane addition,
                              signalization, and related
                              safety improvements.......
4646           OH            Mahoning County U.S. 224         $4,000,000
                              turn lane addition,
                              widening, signage, and
                              safety improvements.......
4647           OH            I-75 at Austin/Miamisburg-         $750,000
                              Springboro interchange
                              construction, Miamisburg-
                              Springboro Rd. from Wood
                              Rd. to SR 741 widening....
4648           OH            Delaware County U.S. 23            $935,000
                              turn lane addition,
                              realignment, and related
                              safety improvements.......
4649           OH            Fairfield County U.S. 33         $2,000,000
                              safety improvements and
                              signalization, including
                              section 13.2 to 15.01.....
4650           OH            City of Springfield North        $3,715,000
                              Street relocation, land
                              acquisition, utility
                              replacement, and repaving.
4651           OH            Grading, paving, roads for       $5,000,000
                              the transfer of rail to
                              truck for the intermodal
                              facility at Rickenbacker
                              Airport...................
4652           OH            Knox County SR 13 rail-            $480,000
                              grade crossing
                              improvements, realignment,
                              and related safety
                              measures..................
4653           OH            Jackson County SR 93               $730,000
                              widening, turn-lane
                              addition, and related
                              safety improvements.......
4654           OH            Stark County SR 172 safety       $2,500,000
                              construction and related
                              improvements..............
4655           OH            City of Cincinnati               $2,500,000
                              Waldvogel Viaduct
                              reconstruction project....
4656           OH            Delaware County SR 750           $1,300,000
                              realignment and safety
                              improvements (PID 79367)..
4657           OH            Highway rail crossing              $110,000
                              safety upgrades at three
                              locations in Madison
                              Village, OH...............
4658           OH            Highway rail grade                  $60,000
                              separation over NS rail
                              line for Hines Hill Road/
                              Milford Connector.........
4659           OH            Mill Street Bridge               $3,500,000
                              reconstruction and related
                              improvements, Akron OH....
4660           OH            Columbiana County Port           $1,000,000
                              Authority construct
                              intermodal facility,
                              transportation safety
                              improvements..............
4661           OH            Transportation Improvements      $2,000,000
                              to downtown Columb
                              RiverSouth Bridge.........
4662           OH            Transportation Improvements      $1,000,000
                              for Ohio River Trail from
                              Salem to Downtown.........
4663           OH            Transportation Improvements      $2,000,000
                              for Montgomery County I-75
                              at South Dixie Drive/
                              Central Avenue
                              Interchange, W. Carrolton.
4664           OH            Medina County U.S. 224 turn      $2,200,000
                              lane addition,
                              resurfacing, signage, and
                              other improvements........
4665           OH            Washington County SR 7           $3,230,000
                              safety improvements,
                              widening, and signage.....
4666           OH            Establish a Trans-Erie           $1,000,000
                              Ferry line from Cleveland,
                              Ohio to Port Stanley,
                              Ontario...................
4667           OK            To the University of OK to       $5,000,000
                              conduct research on global
                              tracking methods for
                              intermodal containerized
                              freight...................
4668           OK            Improving the I-35                 $400,000
                              Interchange at Milepost 1
                              Near Thackerville.........
4669           OK            Construction of Norman           $8,400,000
                              highway-rail Grade
                              Separation................
4670           OK            Transportation Improvements      $1,600,000
                              for SH 33 Widen SH 33 from
                              the Cimarron River East to
                              U.S. 177 Payne County.....
4671           OK            Reconstruct the Interstate         $600,000
                              44 193rd Street
                              Interchange...............
4672           OK            Widen U.S. 60 from                 $400,000
                              approximately 2 miles east
                              of U.S. 60/U.S. 75
                              interchange east
                              approximately 5.5 miles...
4673           OK            Widen U.S. 54 from North of        $200,000
                              Optima Northeast to Kansas
                              State Line, Texas County,
                              OK........................
4674           OK            Improvement to Hereford            $200,000
                              Lane and U.S. 69
                              Interchange, McAlester....
4675           OK            Construction of rail               $400,000
                              crossing in Claremore at
                              Blue State Drive and SH 66
4676           OK            Complete Reconstruction of         $800,000
                              the I-35-SH 9 West
                              Interchange...............
4677           OK            Texanna Road improvements          $200,000
                              around Lake Eufaula.......
4678           OK            Improvements to SH 412P at      $10,900,000
                              412 Interchange...........
4679           OK            Widen U.S. 281 from the new        $200,000
                              U.S. 281 Spur North to
                              Geary Canadian County.....
4680           OK            Widen U.S. 60 between,             $600,000
                              Bartlesville and Pawhuska,
                              Osage County..............
4681           OK            Construction of Midwest            $200,000
                              City Pedestrian Walkway...
4682           OK            Reconstruction SH 66 from          $200,000
                              Craig and Rogers Counties
                              to SH 66 and U.S. 60
                              intersection..............
4683           OK            Construct vehicular bridge         $200,000
                              over the Burlington
                              Northern RR at War Bonnet
                              Crossing, Mannford........
4684           OK            Construction of Duncan             $600,000
                              Bypass Grade Separation...
4685           OK            Improvements to SH 3 from        $1,250,000
                              Antlers to Broken Bow.....
4686           OK            Reconstruction of the I-40       $4,000,000
                              Cross-town Expressway from
                              I-44 to I-35 in downtown
                              Oklahoma City.............
4687           OK            Construct and widen six-         $2,200,000
                              lanes on Interstate 44
                              from the Arkansas River
                              extending east
                              approximately 3.7 miles to
                              Yale Avenue in Tulsa, OK..
4688           OK            Navajoe Gateway                    $200,000
                              Improvements Projects,
                              U.S. 62 in Altus, OK......
4689           OK            Reconstruct the I-44--Fort         $200,000
                              Sill Key Gate Interchange.
4690           OK            Realignment of U.S. 287            $200,000
                              around Boise City.........
4691           OK            To study the feasibility of        $300,000
                              creating a by-pass around
                              the City of Durant to
                              accommodate the traffic
                              needs of the International
                              Trade Assistance Center...
4692           OK            To construct a viaduct on        $6,400,000
                              U.S. Highway 70 over the
                              railroad tracks in Durant.
4693           OK            Enhancement projects for         $1,000,000
                              Woodward..................
4694           OK            Improvements to highways        $53,150,000
                              and bridges in the State
                              of Oklahoma, divided
                              equally among the eight
                              field divisions...........
4695           OK            For improvements to the         $45,000,000
                              State maintained
                              interstate system in the
                              State of Oklahoma.........
4696           OR            Highway 20 Improvements          $5,000,000
                              from Pioneer Mountain to
                              Eddyville, Lincoln County.
4697           OR            For purchase of right-of-       $15,000,000
                              way, planning, design and
                              construction of a highway,
                              Newberg...................
4698           OR            Upgrade, to add a                $7,000,000
                              southbound lane to a
                              section of I-5 through
                              Portland, between Delta
                              Park and Lombard, Portland
4699           OR            Widening of Oregon Highway       $1,000,000
                              217 between Tualatin
                              Valley Highway and the
                              U.S. 26 Interchange,
                              Beaverton.................
4700           OR            Improve Highway 22, Polk         $1,700,000
                              County....................
4701           OR            Improve I-5/99W Connecter,      $10,000,000
                              Washington County.........
4702           OR            Improvements to U.S 97 from      $3,500,000
                              Modoc Point to Algoma.....
4703           OR            Construct Barber Street            $700,000
                              Extension, Wilsonville....
4704           OR            For Interstate 5                 $1,000,000
                              interchange, City of
                              Coburg....................
4705           OR            Upgrade the I-5 Fern Valley      $5,000,000
                              Interchange at Exit 24,
                              Medford...................
4706           OR            Construction of highway and      $2,000,000
                              pedestrian access to
                              Macadam Ave. and street
                              improvements as part of
                              South Waterfront
                              Development, Portland.....
4707           OR            Plan, design, and acquire,      $15,000,000
                              Sunrise Corridor,
                              Clackamas County..........
4708           OR            Relocate and improve             $1,000,000
                              Cascade Locks Southbank
                              Enhancements, Cascade
                              Locks.....................
4709           OR            Reroute U.S. 97 at Redmond,      $7,000,000
                              and improve intersection
                              of U.S. 97 and Oregon 126.
4710           OR            Construction of I-84, U.S.       $3,400,000
                              395 Stanfield Interchange
                              Improvement Project.......
4711           OR            Plan, design, and construct        $500,000
                              Frontage Road Crossing
                              Project, Hood River.......
4712           OR            Improve Marine Park                $400,000
                              Underpass to address
                              necessary transportation
                              improvements, Cascade
                              Locks.....................
4713           OR            Improve Barnhart Road,           $3,900,000
                              Umatilla County...........
4714           OR            P&W Rehabilitation Project,        $700,000
                              Yamhill County............
4715           OR            Transportation Improvements      $1,000,000
                              Around the Eugene, Oregon
                              Federal Courthouse........
4716           OR            Plan, design, and construct      $1,800,000
                              the Dalles, Oregon
                              Riverfront Access.........
4717           OR            Troutdale Interchange            $1,000,000
                              enhancements at I-84 and
                              257th St, Troutdale.......
4718           OR            Interchange Improvements to      $1,000,000
                              I-205 at Airport Way......
4719           OR            Beaverton Hillsdale/Scholls      $3,000,000
                              Ferry/Oleson Rd.
                              Intersection
                              Reconfiguration,
                              Washington County.........
4720           OR            Rehabilitate Sellwood            $3,000,000
                              Bridge, Multnomah County,
                              Oregon....................
4721           OR            I-5 Franklin-Glenwood              $400,000
                              Interchange Study.........
4722           PA            Road improvements for North      $1,500,000
                              Shore Transportation
                              Connection, HOV
                              modification, Pittsburgh..
4723           PA            Planning, environment and        $1,000,000
                              preliminary engineering
                              for East-West Corridor
                              Rapid Transit, Pittsburgh.
4724           PA            Warrendale-Bayne Road            $2,000,000
                              improvements from I-79 to
                              SR 19, in Allegheny County
4725           PA            New interchange off Route          $200,000
                              60 into proposed
                              industrial park in
                              Neshannock Township.......
4726           PA            Upgrade of Route 60              $1,000,000
                              Interchange with Route 22/
                              30, Allegheny County......
4727           PA            Streetscape improvements,        $1,345,000
                              Geneva College............
4728           PA            Construct the Alle-Kiski         $1,000,000
                              Bridge and Connector,
                              Pennsylvania..............
4729           PA            Relocation of existing two       $1,000,000
                              lane road, Rose Street,
                              Indiana County............
4730           PA            I-70/I-79 South Interchange      $2,000,000
                              Redesign and Upgrade......
4731           PA            Construct 2 flyover ramps        $3,000,000
                              and S Linden St. extension
                              for access to industrial
                              sites in the cities of
                              McKeesport and Duquesne...
4732           PA            Crows Run Relocation from          $400,000
                              SR 65 to Freedom Crider
                              Road, Beaver County.......
4733           PA            Transportation Improvements        $100,000
                              to Jeannette Truck Route,
                              Westmoreland County.......
4734           PA            Construction of Central          $5,000,000
                              Susquehanna Valley Thruway
4735           PA            Construction of ramps on I-      $5,000,000
                              95 and U.S. 322 widening
                              of streets and
                              intersections.............
4736           PA            Construct parking facility       $2,000,000
                              in Upper Darby............
4737           PA            Improve Freemansburg Avenue      $1,000,000
                              and its intersections at
                              Route 33..................
4738           PA            For design, engineering,         $2,000,000
                              ROW acquisition, and
                              construction of the third
                              phase of the Marshalls
                              Creek Bypass Project in
                              Monroe County,
                              Pennsylvania..............
4739           PA            Construct Campbelltown           $1,000,000
                              Connector, Lebanon County.
4740           PA            Widen the Route 412              $5,000,000
                              corridor from I-78 into
                              the City of Bethlehem.....
4741           PA            Asbury Road and associated       $3,700,000
                              intersection improvement
                              projects, Erie............
4742           PA            ROW acquisition and              $1,000,000
                              construction for the South
                              Valley Parkway, Luzerne
                              County....................
4743           PA            Widening of SR 68 S. of I-       $1,000,000
                              80 interchange, Clarion
                              County....................
4744           PA            State Street Bridge              $1,000,000
                              Replacement, Sharon.......
4745           PA            Intersection improvements        $1,000,000
                              and upgrades of SR 62/257
                              in Cranberry Township.....
4746           PA            Design-build in-house,           $1,000,000
                              bridge rehabilitation of
                              six bridges in Warren
                              County....................
4747           PA            Engineering, design and          $2,000,000
                              construction of an
                              extension of Park Avenue
                              north to Lakemont Park in
                              Altoona...................
4748           PA            Widening of Rt. 22 and SR        $1,000,000
                              26 in Huntingdon, upgrades
                              to the interchange at U.S.
                              Rt. 22 and SR 26..........
4749           PA            Road impact study along            $250,000
                              Potomac River tributaries,
                              Pennsylvania..............
4750           PA            Construct Dubois Regional          $600,000
                              Medical Center Access
                              Road, Clearfield County...
4751           PA            Road Improvements and              $750,000
                              upgrades related to the
                              Pennsylvania State
                              Baseball Stadium..........
4752           PA            Construction of turn lanes,        $425,000
                              increase curve radius at
                              the intersection of SR
                              3041 and Industrial Park
                              Road, Somerset............
4753           PA            Construct Johnsonburg            $2,000,000
                              Bypass, Elk County........
4754           PA            DuBois-Jefferson County          $2,000,000
                              Airport Access Road
                              Construction..............
4755           PA            Replacement of existing          $1,000,000
                              bypass on U.S. 219, McKean
                              County....................
4756           PA            Complete heritage tourism          $300,000
                              work plans for communities
                              along SR 6, Pennsylvania..
4757           PA            Improvements and                 $1,000,000
                              resurfacing on U.S. 6
                              through the Borough of
                              Mansfield.................
4758           PA            Construction of a road to        $3,000,000
                              join Route 247 and Salem
                              Road, Lackawanna County...
4759           PA            PA Route 61 enhancements,        $1,600,000
                              Schuylkill Haven..........
4760           PA            PA Route 309 roadway               $400,000
                              construction and
                              signalization improvements
                              in Tamaqua Borough........
4761           PA            Design, engineering, ROW         $1,000,000
                              acquisition construction
                              of streetscaping
                              enhancements, paving,
                              lighting, safety
                              improvements, parking and
                              roadway redesign in Wilkes-
                              Barre.....................
4762           PA            Construct Valley Business          $400,000
                              Park Access Road C,
                              Bradford County...........
4763           PA            Construct PA 706 Wyalusing         $200,000
                              Bypass Bradford County,
                              Pennsylvania..............
4764           PA            Construct SR 29 to River           $340,000
                              Betterment, Eaton
                              Tunkhannock, Wyoming
                              County....................
4765           PA            Modernize traffic signals,         $100,000
                              complete minor roadway
                              realignment, and improve
                              channelization at U.S. 322
                              and PA 10 intersection....
4766           PA            Replace Bridge, SR 106,            $160,000
                              Tunkhannock Creek Bridge
                              2, Clifford Township,
                              Susquehanna County........
4767           PA            Construction SR 3024,              $140,000
                              Middle Creek Bridge II,
                              South Canaan, Wayne County
4768           PA            Restore Route 222 in               $280,000
                              Maxatawny and Richmond
                              Townships, Berks County...
4769           PA            Widening and improvements        $1,000,000
                              to SR 10, New Morgan
                              Borough, Berks County.....
4770           PA            Construct parking facility       $2,000,000
                              in Norristown, Montgomery
                              County....................
4771           PA            Design and construct French      $1,000,000
                              Creek Parkway and
                              connector roads in
                              Phoenixville..............
4772           PA            Design and Construction of       $1,600,000
                              Portzer Road Connector,
                              Bucks County..............
4773           PA            Construction of pedestrian       $2,000,000
                              tunnel under Cherry Street
                              in Philadelphia...........
4774           PA            U.S. Route 13 Corridor           $1,000,000
                              Reconstruction,
                              Redevelopment and
                              Beautification, Bucks
                              County....................
4775           PA            Two-lane Extension of              $400,000
                              Bristol Road, Bucks County
4776           PA            Relocation of PA 52 at             $200,000
                              Longwood Gardens, Chester
                              County....................
4777           PA            Improvements to SR 39/I-81,        $500,000
                              West Hanover Township.....
4778           PA            Construction of alternate        $1,000,000
                              truck route for SR 441,
                              Columbia Borough..........
4779           PA            Concord Road Extension,            $500,000
                              Springettsbury Township...
4780           PA            Widen PA 896 between               $500,000
                              Strasburg Borough and U.S.
                              30........................
4781           PA            Design and construct               $750,000
                              relocation of U.S. 11
                              between Ridge Hill and
                              Hempt Roads...............
4782           PA            Construct and widen PA 94          $300,000
                              from the Adams and York
                              County line north to
                              Appler Road...............
4783           PA            Construct a turning lane           $500,000
                              off Route 16 in
                              McConnellsburg, Fulton
                              County....................
4784           PA            Improvements from U.S. 11          $250,000
                              to southbound ramp to I-81
                              in Antrim Township........
4785           PA            Construction of the Montour        $200,000
                              Trail, Great Allegheny
                              Passage...................
4786           PA            Transportation Improvements        $500,000
                              for Armstrong County, PA
                              Slatelick Interchange for
                              PA 28 at SR 3017..........
4787           PA            Widening of Route 40 in            $750,000
                              Wharton Township, Fayette
                              County....................
4788           PA            Completion of I-79-Kirwin          $400,000
                              Heights Interchange and
                              construction of retaining
                              walls, bridge and new
                              ramps.....................
4789           PA            Construction of U.S. 22 to         $300,000
                              I-79 Section of Southern
                              Beltway, Pittsburgh.......
4790           PA            Reconstruct intersection of        $400,000
                              SR 51 and Franklin Ave,
                              Beaver County.............
4791           PA            South Phila. Access Rd.            $500,000
                              Design and construction of
                              port access road from
                              South Phila Port and
                              intermodal facilities,
                              Philadelphia..............
4792           PA            Widen Route 22 between             $260,000
                              Export and Delmont........
4793           PA            Construct a new highway          $4,000,000
                              interchange between the PA
                              Turnpike and I-95 and
                              widen both routes to six
                              lanes.....................
4794           PA            Construct a highway              $4,000,000
                              connecting U.S. 119 near
                              Uniontown with SR 88 near
                              Brownsville...............
4795           PA            Construct a road along the       $4,000,000
                              North Delaware Riverfront
                              Corridor from Buckius
                              Street to Poquessing Creek
4796           PA            Construct an intermodal          $2,000,000
                              center at the Philadelphia
                              Zoo.......................
4797           PA            Widen Route 412 corridor         $2,000,000
                              from I-78 into the City of
                              Bethlehem.................
4798           PA            Improvements to the Erie         $1,000,000
                              Airport corridor..........
4799           PA            Widen I-81 from four to six      $2,000,000
                              lanes in the Wilkes-Barre/
                              Scranton corridor.........
4800           PA            Construct the South Valley       $1,500,000
                              Parkway, Pennsylvania.....
4801           PA            Complete the connection of       $2,000,000
                              the American Parkway
                              between the east and west
                              sides of the Lehigh River
                              with bridges and
                              interchanges..............
4802           PA            Construct safety and             $2,500,000
                              capacity improvements to
                              Route 309 and Old
                              Packhouse Road............
4803           PA            Flyover ramps and                $2,500,000
                              improvements to I-79 and
                              SR 228, Cranberry Township
4804           PA            Construct the Valley View        $1,500,000
                              Business Park Access Road.
4805           PA            Construct the North              $3,000,000
                              Delaware River East Coast
                              Greenway Trail............
4806           PA            Improvements to the              $2,000,000
                              Pleasant Valley and Sandy
                              Hill Roads intersection
                              with SR 130 in Penn
                              Township..................
4807           PA            Construct an intermodal          $1,000,000
                              facility servicing
                              Children's Hospital of
                              Pittsburgh................
4808           PA            Widening and construction        $1,000,000
                              of grade-separated
                              interchanges along SR 28
                              from Pittsburgh to
                              Millvale, Pennsylvania....
4809           PA            Lafayette Street extension         $500,000
                              and interchange
                              improvements..............
4810           PA            Construct the Church Street      $2,000,000
                              Transportation Center in
                              Williamsport..............
4811           PA            For the Children's Hospital      $1,000,000
                              of Philadelphia Partners
                              for Child Passenger Safety
                              program...................
4812           PA            Construct improvements to        $2,400,000
                              SR 29 and SR 113 in Upper
                              Providence Township,
                              Pennsylvania..............
4813           PA            Construct ramps off of I-95      $1,000,000
                              and U.S. 322 and access
                              improvements to Chester,
                              Pennsylvania..............
4814           PA            Improvements to access           $1,000,000
                              roads at the Please Touch
                              Museum, Philadelphia......
4815           PA            Construction of the              $1,000,000
                              Schuylkill Gateway Project
                              in Philadelphia,
                              Pennsylvania..............
4816           PA            Security improvements to         $1,000,000
                              the Commodore Barry
                              Bridge, Pennsylvania......
4817           PA            Improve Freemansburg Avenue      $1,000,000
                              and its intersections at
                              Route 33, Pennsylvania....
4818           PA            Study and construct              $1,000,000
                              improvements to the
                              intersection of the
                              Bucknell University main
                              campus entrance road and
                              SR 15, Pennsylvania.......
4819           PA            Improvements to rural              $450,000
                              corridors in Erie,
                              Pennsylvania..............
4820           PA            Widen the ramp at the              $500,000
                              intersection of Peach
                              Street and I-90,
                              Pennsylvania..............
4821           PA            Implement the Clearfield         $1,000,000
                              Cluster Pennsylvania
                              highway grade crossing
                              project, Clearfield and
                              Clinton Counties..........
4822           PA            Rail traffic safety                $500,000
                              improvements, Homer City,
                              Pennsylvania..............
4823           PA            Design and construct             $1,000,000
                              interchange improvements
                              including sound barriers
                              at I-83, Exit 19, or other
                              projects designated by
                              York County, MPO..........
4824           PA            Construct the Alle-Kiski         $1,000,000
                              Bridge and Connector......
4825           PA            Reconfiguration of the           $1,000,000
                              Rochester Riverfront ramp.
4826           PA            Expand U.S. 422 between          $1,000,000
                              Indiana and Kittaning.....
4827           PA            PATCO high-speed line fleet      $1,000,000
                              upgrade...................
4828           PA            For interpretive signage           $300,000
                              and trails in Pittsburgh
                              urban park land...........
4829           PA            Construct rail crossings to        $600,000
                              access Schuylkill River
                              Park, Philadelphia........
4830           PA            Repair and upgrade Cresheim        $450,000
                              Valley Drive, Philadelphia
4831           PA            Improvements to Penn's             $400,000
                              Landing Ferry Terminal,
                              Philadelphia..............
4832           PA            Shippensburg University            $250,000
                              campus circulation
                              improvements..............
4833           PA            To incorporate a portion of        $400,000
                              Old Delaware Avenue as the
                              South Philadelphia Port
                              Access Road...............
4834           PA            Construct a new interchange        $400,000
                              and additional northbound
                              lane along SR 28 near
                              Tarentum..................
4835           PA            Linglestown Square, Lower          $250,000
                              Paxton Township...........
4836           PA            Study the future needs of          $500,000
                              east-west road
                              infrastructure in Adams
                              County....................
4837           PA            Completion and enhancements        $500,000
                              to the Pittsburgh
                              Riverfront trail system...
4838           PA            Road impact study along            $200,000
                              Potomac River tributaries.
4839           PA            Da Vinci Center hydrogen           $200,000
                              fuel-celled transit
                              vehicles..................
4840           PA            Complete heritage tourism          $100,000
                              work plans for communities
                              along SR 6................
4841           PA            Relocation of East Lake            $100,000
                              Road in Pyamatuning
                              Township..................
4842           RI            Transportation Improvements     $22,000,000
                              for the Apponaug Bypass...
4843           RI            Transportation Improvements      $4,000,000
                              for the Washington
                              Secondary Bicycle Facility/
                              Coventry Greenway/Trestle
                              Trail (Coventry)..........
4844           RI            Transportation Improvements      $6,000,000
                              for the Northwest
                              Biketrail/Woonasquatucket
                              River Greenway
                              (Providence, Johnston)....
4845           RI            New Interchange constructed      $7,000,000
                              from I-195 to Taunton and
                              Warren Avenue in East
                              Providence................
4846           RI            Transportation Improvements     $10,000,000
                              for the Blackstone River
                              Bikeway (Providence,
                              Woonsocket)...............
4847           RI            Transportation Improvements      $4,000,000
                              for the Jamestown Bridge
                              Demolition--Bicycle Access/
                              Trestle Span Demolition/
                              Fishing Pier (N.
                              Kingstown)................
4848           RI            Weybosset Street (200              $750,000
                              Block) Streetscape and
                              Drop-off Lane Improvement--
                              Providence................
4849           RI            Acquisition of fee or            $1,000,000
                              easement, construction of
                              a trail, and site
                              improvements in Foster....
4850           RI            Open space acquisition to        $8,000,000
                              mitigate growth associated
                              with SR 4 and Interstate
                              95, by non-profit land
                              conservation agencies
                              through acquisition of fee
                              or easement, with a match
                              requirement of 50% of the
                              total purchase price......
4851           RI            Replace Sakonnet Bridge....      $7,000,000
4852           RI            Transportation Enhancements        $500,000
                              at Blackstone Valley
                              Heritage Corridor.........
4853           RI            Bury the Power Lines at          $2,500,000
                              India Point...............
4854           RI            Restore and Expand Maritime        $500,000
                              Heritage site in Bristol..
4855           RI            Transportation Improvements      $2,000,000
                              for the Colt State Park
                              Bike Path.................
4856           RI            Construct trails and             $1,000,000
                              facility improvements
                              within the Rhode Island
                              National Wildlife Refuge
                              complex...................
4857           RI            Improvements for the             $5,000,000
                              Commuter rail in Rhode
                              Island....................
4858           RI            Transportation Improvements      $5,000,000
                              for the East Main Road in
                              Middletown................
4859           RI            Downtown Circulation             $2,000,000
                              Improvements Providence...
4860           RI            Transportation Improvements      $4,000,000
                              for the Route 138 (South
                              Kingstown)................
4861           RI            Transportation Improvements      $2,750,000
                              for the Route 1 Gilbert
                              Stuart Turnaround (N.
                              Kingstown)................
4862           RI            Rehabilitate and improve        $12,000,000
                              Rt. 138 from Rt. 108 to
                              Rt. 2.....................
4863           RI            Improve traffic circulation      $5,000,000
                              and road surfacing in
                              downtown Providence.......
4864           RI            Improve access to Pell           $5,000,000
                              Bridge in Newport.........
4865           RI            Completion of Washington         $7,000,000
                              Secondary Bike Path from
                              Coventry to Connecticut
                              Border....................
4866           RI            Replace Warren Bridge in        $11,000,000
                              Warren....................
4867           RI            Rehabilitation of                $5,000,000
                              Stillwater Viaduct in
                              Smithfield................
4868           RI            Completion of                    $5,000,000
                              Woonasquatucket River
                              Greenway from Johnston to
                              Providence................
4869           RI            Replace Natick Bridge in         $5,000,000
                              Warwick and West Warwick..
4870           SC            Construction of I-73 from       $10,000,000
                              Myrtle Beach, SC to I-95,
                              ending at the NC State
                              line......................
4871           SC            Widening of U.S. 278 to six     $15,000,000
                              lanes in Beaufort County,
                              SC between Hilton Head
                              Island and SC 170.........
4872           SC            Engineering, design and         $10,000,000
                              construction of a Port
                              Access Road connecting to
                              I-26 in North Charleston,
                              SC........................
4873           SC            Improvements to U.S. 17 in      $10,000,000
                              Beaufort and Colleton
                              Counties to improve safety
                              between U.S. 21 and SC 64.
4874           SC            Widening of SC 9 in              $2,000,000
                              Spartanburg County from SC
                              292 to Rainbow Lake Road..
4875           SC            Complete Construction of         $3,000,000
                              Palmetto Parkway Extension
                              (I-520) Phase II to I-20..
4876           SC            Complete a multi-lane            $4,000,000
                              widening project on SC Hwy
                              5 Bypass in York County,
                              SC between I-77 and I-85..
4877           SC            Re-construction of an            $2,000,000
                              existing interchange at I-
                              385 and SC 14, in Laurens
                              County....................
4878           SC            Construction of the              $2,000,000
                              Lexington Connector in
                              Lexington County, to
                              alleviate traffic
                              congestion................
4879           SC            Widening of 4.4 miles of         $2,000,000
                              West Georgia Road in
                              Greenville County.........
4880           SC            Extension of Wells Highway       $2,000,000
                              in Oconee County..........
4881           SC            Demolition of the old            $5,000,000
                              Cooper River Bridges in
                              Charleston................
4882           SC            Transportation Improvements      $5,000,000
                              for the I-73 in South
                              Carolina-Proposed
                              interstate corridor
                              beginning at NC State line
                              continuing to the Grand
                              Strand area of SC.........
4883           SC            Transportation Improvements      $2,000,000
                              for the U.S. 278 in
                              Beaufort/Jasper County to
                              alleviate roadway capacity
                              constraints and improve
                              safety and operations.....
4884           SC            ICAR Roads, Greenville,          $2,000,000
                              reconstruction of roads
                              around Fairforest Way for
                              better flow into ICAR.....
4885           SC            Harden Street Improvements       $5,000,000
                              in Columbia. Specific
                              improvements will include:
                              modern traffic control
                              signals, intersections,
                              improved street lighting,
                              driveways etc.............
4886           SC            Palmetto Parkway, Phase 2        $3,000,000
                              is approximately 6 miles
                              long and begins at U.S. 1/
                              78 and terminates at I-20.
4887           SC            Lexington Connector in           $1,000,000
                              South Carolina, to
                              alleviate traffic
                              congestion along three
                              major thoroughfares in
                              Lexington County: U.S. 1,
                              U.S. 378, and SC 6........
4888           SC            I-77/Peach Road Interchange      $3,000,000
                              in Fairfield County, SC,
                              project would create
                              interchange to encourage
                              development at industrial
                              park......................
4889           SC            I-95/SC 327 in Florence,         $3,000,000
                              SC, to construct
                              northbound ramp and expand
                              existing ramps............
4890           SC            Transportation Improvements      $1,000,000
                              for Highway 901, York
                              County, SC................
4891           SC            The Extension of the Mark        $3,000,000
                              Clark Expressway in
                              Charleston County.........
4892           SD            Construction of 4-lane          $27,000,000
                              highway on U.S. 79 between
                              Maverick Junction, and the
                              Nebraska border...........
4893           SD            Reconstruct, S. Rochford         $9,000,000
                              Road from Rochford to
                              Deerfield Rd..............
4894           SD            Reconstruct SD-50 Cherry         $3,000,000
                              Street in Vermillion......
4895           SD            Construct Rush Lake              $8,000,000
                              Crossing U.S. 12 near
                              Webster...................
4896           SD            Construct Phase I/South          $3,600,000
                              Connector Broadway to 29th
                              Street, Watertown.........
4897           SD            Construct Intersection of        $2,500,000
                              State Hwy 212 and U.S. 81,
                              Watertown.................
4898           SD            Reconstruction of U.S. 14/       $3,000,000
                              Medary Ave. to 22nd Ave.,
                              Brookings.................
4899           SD            Extension of Main Street         $1,500,000
                              and replacement of rail
                              crossing, Mobridge........
4900           SD            Reconstruction and paving        $6,000,000
                              of BIA Route 27, Wounded
                              Knee-Porcupine Butte......
4901           SD            Purchase critical                $2,000,000
                              conservation easements
                              along the Heartland
                              Expressway (Highway 79)
                              adjacent to Custer State
                              Park and Wind Cave
                              National Park.............
4902           SD            Reconstruction and paving        $2,000,000
                              of streets on the
                              Flandreau Indian
                              Reservation...............
4903           SD            Construct Exit 61 I-90          $15,116,000
                              Rapid City (Heartland
                              Expressway)...............
4904           SD            Construct SD 1806 from U.S.        $862,000
                              83 East/15.6 miles toward
                              Lower Brule...............
4905           SD            Construct Wagner Community         $200,000
                              Streets, Yankton
                              Reservation...............
4906           SD            Construct Marty Community          $200,000
                              Streets, Yankton
                              Reservation...............
4907           SD            Construct Riverfront               $300,000
                              Walking trail between 4th
                              Ave. and Main Street,
                              Mobridge..................
4908           SD            Reconstruct Exit 79--I-29       $12,323,000
                              in Sioux Falls (12th
                              Street)...................
4909           SD            East Anamosa St. extension       $6,127,000
                              to east/north and lacrosse
                              St. road and bridge.......
4910           SD            To replace bridge over          $15,000,000
                              Missouri River, I-90 in
                              Chamberlain...............
4911           SD            Winter Maintenance Decision      $1,000,000
                              Support System/SD DOT.....
4912           SD            Reconstruct U.S. 14 to U.S.      $2,000,000
                              83 junction, Pierre East..
4913           SD            Resurface U.S. 12 from           $2,472,000
                              McLaughlin east 14.2 miles
                              in Standing Rock
                              Reservation...............
4914           SD            Reconstruct I-90 loop in         $3,000,000
                              Mitchell (Burr to Sanborn)
4915           SD            Road Construction                $1,000,000
                              Activities Turner County..
4916           SD            Pavement restoration U.S.        $1,000,000
                              12 2.1 miles from west of
                              Penn St. to east of
                              Melgaard in Aberdeen......
4917           SD            BIA route 3/ Tribal Farm         $6,000,000
                              Rd. reconstruction and
                              paving....................
4918           SD            BIA route 15 resurfacing         $5,000,000
                              between red scaffold and
                              cherry creek to Ziebach
                              county Rd. 33.............
4919           SD            For Okreek to Carter             $2,250,000
                              grading and resurfacing
                              U.S. 18 west of Okreek to
                              Carter....................
4920           SD            Acquisition of road              $3,000,000
                              maintenance equipment for
                              Oglala, Rosebud and
                              Cheyenne River Sioux
                              Tribes....................
4921           SD            Construct bike path in             $750,000
                              Vermillion................
4922           SD            Construct Rail Spur in             $750,000
                              Brookings.................
4923           SD            Asphalt overlay to extend          $600,000
                              Lewis and Clark Highway
                              1804 in Charles Mix County
                              leading to Platte Creek
                              Recreation Area...........
4924           SD            South Dakota Department of       $3,450,000
                              Transportation; for those
                              projects it has identified
                              as its highest priorities.
4925           TN            University of Tennessee         $20,000,000
                              Joint Institute for
                              Advanced Materials in
                              Knoxville.................
4926           TN            Center for Advanced              $5,000,000
                              Intermodal Transportation
                              Technologies at the
                              University of Memphis.....
4927           TN            College Street Corridor,         $8,000,000
                              Phase II, Great Smoky
                              Mountain Heritage Highway
                              Cultural and Visitors
                              Center, Maryville.........
4928           TN            Plan and construct N.            $6,000,000
                              Tennessee Boulevard
                              enhancements, Murfreesboro
4929           TN            North Second Street             $10,000,000
                              Corridor Upgrade, Memphis.
4930           TN            Engineer, design and            $10,000,000
                              construction of connector
                              road from I-75 interchange
                              across Enterprise South
                              Industrial Park to Hwy 58
                              in Hamilton County........
4931           TN            Construct force protection       $4,000,000
                              barriers along U.S.
                              Highway 41-A at Fort
                              Campbell..................
4932           TN            Upgrade roads for Slack          $1,500,000
                              Water Port facility and
                              industrial park, Lake
                              County, TN................
4933           TN            Plan and construct               $2,000,000
                              Rutherford County
                              visitor's center/
                              transportation information
                              hub, City of Murfreesboro.
4934           TN            Reconstruct connection with      $5,000,000
                              Hermitage Avenue to
                              Cumberland River Bluff in
                              Nashville.................
4935           TN            Six lane extension from          $4,000,000
                              Airways Boulevard to South
                              Highland Avenue in Jackson
4936           TN            Plough Boulevard                 $2,500,000
                              Interchange with
                              Winchester Road in Memphis
4937           TN            Construction of a                  $200,000
                              pedestrian bridge in Alcoa
4938           TN            Construct visitor                $1,800,000
                              interpretive center at the
                              Gray Fossil Site in Gray..
4939           TN            Expansion of SR 11W from         $5,000,000
                              Rutledge to Bean Station
                              in Grainger County........
4940           TN            Construction of Knob Creek       $2,500,000
                              Road in Washington County,
                              Tennessee.................
4941           TN            Riverside Drive Cobblestone      $2,500,000
                              Restoration and Walkway,
                              Memphis...................
4942           TN            Reconstruction of                $5,000,000
                              sidewalks, curbs, and
                              streetscape improvements
                              within the Memphis Central
                              Biomedical District,
                              Memphis, Tennessee........
4943           TN            Develop intelligent              $2,200,000
                              transportation signage for
                              access points at Fort
                              Campbell, Tennessee.......
4944           TN            Construction of SR 32/U.S.       $5,000,000
                              321 from SR 73 at Wilton
                              Springs road to near I-40
                              in Cocke County, Tennessee
4945           TN            Improvements to I-40             $5,000,000
                              interchange at I-240 East
                              of Memphis (Phase II).....
4946           TN            Warren County Mountain View      $1,500,000
                              Industrial Park access
                              road, Warren County, TN...
4947           TN            Widen U.S. Highway 127 to 4      $2,000,000
                              lanes between Jamestown,
                              Tennessee and I-40........
4948           TN            Widen a railroad underpass       $5,000,000
                              and make access
                              improvements to the I-275
                              industrial business park
                              in Knoxville..............
4949           TN            Construct Interpretive             $500,000
                              Visitor Center for the
                              Cherokee Removal Memorial
                              Park Trail of Tears site
                              in Meigs County...........
4950           TN            Construct overpass at            $1,300,000
                              Highway 321 and Highway 11
                              Loudon County.............
4951           TN            Construction of an               $1,250,000
                              Interchange on Highway 64
                              (APD 40) adjacent to I-75
                              Exit 20 in the City of
                              Cleveland, TN for
                              increased safety..........
4952           TN            Construct trails and               $500,000
                              recreational facilities at
                              the Warriors Path State
                              Park in Kingsport.........
4953           TN            Construct the Melton Lake          $650,000
                              greenway in Oak Ridge.....
4954           TN            Access road improvements         $1,000,000
                              for regional hospital in
                              Morristown................
4955           TN            Johnson County, Tennessee          $500,000
                              for a trails system.......
4956           TN            Access road from the James       $1,000,000
                              H. Quillen VA Medical
                              Center to U.S. 11-E in
                              Mountain Home.............
4957           TN            Widen I-65 from SR 840 to        $2,000,000
                              SR 96, including
                              interchange modification
                              at Goose Creek bypass,
                              Williamson County.........
4958           TN            Acquire and construct trail        $500,000
                              and bikeway along S.
                              Chickamauga Creek in
                              Chattanooga...............
4959           TN            Improve Streetscape and            $500,000
                              pavement repair, Carter
                              County....................
4960           TN            Improve Streetscape and            $500,000
                              pavement repair, McMinn
                              County....................
4961           TN            Improve Streetscape and            $500,000
                              pavement repair, Maury
                              County....................
4962           TN            Improve, Streetscape and           $500,000
                              pavement repair, Lincoln
                              County....................
4963           TN            Improve Streetscape and            $500,000
                              pavement repair, Dyer
                              County....................
4964           TN            Improve Streetscape and            $500,000
                              pavement repair, Smith
                              County....................
4965           TN            Improve Streetscape and            $500,000
                              pavement repair, Henry
                              County....................
4966           TN            Improve Streetscape and            $500,000
                              pavement repair, Obion
                              County....................
4967           TN            Improve Streetscape and            $500,000
                              pavement repair, Sumner
                              County....................
4968           TN            Replace Unitia Bridge in           $200,000
                              Loudon County.............
4969           TN            Sullivan, Washington               $500,000
                              Counties, Tennessee SR 75
                              widening..................
4970           TN            Sevier County, TN SR 66            $500,000
                              widening..................
4971           TN            Develop the East Hickman           $200,000
                              County and Oak Hill
                              Community Greenway
                              Projects, Hickman County..
4972           TN            SR 397 extension from SR           $500,000
                              96W to U.S. 431N to
                              Franklin..................
4973           TN            U.S. 412 from the Madison          $500,000
                              County Line to Parsons TN
                              in Henderson and Decatur
                              Counties..................
4974           TN            Construction of the             $10,000,000
                              Foothills Parkway in Smoky
                              Mountains National Park,
                              Sevier County.............
4975           TN            Construct Transportation           $400,000
                              and Heritage museum,
                              Townsend..................
4976           TN            Plan and construct access          $300,000
                              road for the Overton
                              County Industrial Park,
                              Overton County............
4977           TN            Construct system of                $500,000
                              greenways in Nashville--
                              Davidson County...........
4978           TN            Improve Streetscape and            $500,000
                              pavement repair, Roane
                              County....................
4979           TN            Improve Streetscape and            $500,000
                              pavement repair, Scott
                              County....................
4980           TN            Improve Streetscape and            $500,000
                              pavement repair, Morgan
                              County....................
4981           TN            Improve Streetscape and            $500,000
                              pavement repair, Fentress
                              County....................
4982           TN            Street improvements,             $6,000,000
                              streetscape features,
                              signals and signage along
                              3rd Avenue North and Union
                              Street in downtown
                              Nashville, Tennessee......
4983           TN            Improvements to the Blount/      $6,000,000
                              Sevier Corridor in
                              Knoxville, Tennessee to
                              support the South
                              Waterfront Redevelopment
                              project...................
4984           TX            Replacement of the I-30         $17,000,000
                              Bridge over the Trinity
                              River in Dallas...........
4985           TX            Replacement of the              $15,000,000
                              Galveston Causeway
                              Railroad Bridge in
                              Galveston.................
4986           TX            Construction of a new            $4,000,000
                              international rail bridge
                              and rail track west of
                              Brownsville...............
4987           TX            Construction of a three         $10,000,000
                              mile bypass around central
                              San Marcos................
4988           TX            Construction of a railroad       $6,000,000
                              grade separation at Calton
                              Rd. in Laredo, TX (part of
                              the West Laredo Multimodal
                              Trade Corridor)...........
4989           TX            Transportation Improvements      $5,000,000
                              for the San Angelo Ports
                              to Plains Route 306 at FM
                              388.......................
4990           TX            Reconstruct Mile 6 West          $2,000,000
                              from U.S. 83 to SH 107
                              Hidalgo County............
4991           TX            Tyler Outer Loop 49              $3,000,000
                              Construction..............
4992           TX            Transportation Improvements      $3,000,000
                              to Cotton Flat Road
                              Overpass @ Interstate 20..
4993           TX            Construction of a parking        $2,000,000
                              facility at the University
                              of the Incarnate Word, San
                              Antonio, Texas............
4994           TX            Research and construction,       $1,000,000
                              Southwest Center for
                              Transportation Research
                              and Testing, Pecos, TX....
4995           TX            Construct a reliever route       $3,000,000
                              on U.S. 287 south of Dumas
                              to U.S. 287 north of Dumas
4996           TX            Widen FM 60 (University          $2,000,000
                              Drive) from SH 6 to FM
                              158, College Station......
4997           TX            Complete U.S. 77 relief          $4,000,000
                              route around City of
                              Robstown..................
4998           TX            North Rail Relocation            $4,000,000
                              Harlingen.................
4999           TX            Improvements to KellyUSA         $2,000,000
                              36th Street...............
5000           TX            Beaumont, TX Washington          $1,000,000
                              Blvd. Improvements........
5001           TX            Improvements to Cottonwood       $1,000,000
                              Trail.....................
5002           TX            Improvements to FM 110 in        $1,000,000
                              San Marcos................
5003           TX            Improvements to SH 71 from       $2,000,000
                              W of FM 20 to Loop 150
                              Bastrop County............
5004           TX            Construct 6 mainlines from       $2,000,000
                              east of Mercury to east of
                              Wallsville................
5005           UT            Geneva Rd-Provo Center           $2,000,000
                              Street, Orem 1600 North to
                              I-15 FWY, Provo-widen from
                              2 to 4 lanes, Provo.......
5006           UT            Construction of Midvalley        $3,000,000
                              Highway, Tooele County....
5007           UT            Provo, Utah Westside             $1,000,000
                              Connector from I-15 to
                              Provo Municipal Airport,
                              Provo.....................
5008           UT            Reconstruct 500 West,            $1,500,000
                              including pedestrian and
                              bicycle access, in Moab...
5009           UT            Bear River Migratory Bird        $3,000,000
                              Refuge Access Road
                              Improvements, Box Elder
                              County....................
5010           UT            Widen Highway 92 from Lehi       $2,500,000
                              to Alpine/Highland........
5011           UT            I-15 Freeway Reconstruction-     $6,000,000
                              Springville 200 South
                              Interchange, Springville..
5012           UT            Construct 2-lane divided         $7,000,000
                              highway from the
                              Atkinville Interchange to
                              the new airport access
                              road in St. George........
5013           UT            I-15 Reconstruction; Salt        $3,500,000
                              Lake County...............
5014           UT            I-15 North and Commuter          $2,500,000
                              Rail Coordination, Davis
                              County....................
5015           UT            Streetscape a 2-lane road        $3,000,000
                              and add turning lanes at
                              key intersections on Santa
                              Clara Drive in Santa Clara
5016           UT            Widen Redwood Road from          $2,500,000
                              Saratoga Springs to
                              Bangerter Highway in Utah
                              County....................
5017           UT            Grant Tower                      $5,000,000
                              Reconfiguration, Salt Lake
                              City......................
5018           UT            200 East Minor Arterial,         $3,000,000
                              Logan City................
5019           UT            3200 South Project, Nibley/      $3,000,000
                              Cache County..............
5020           UT            Construct Parley's Creek         $5,500,000
                              Trail, Salt Lake City.....
5021           UT            SR 158 Improvements, Pine        $2,100,000
                              View Dam, Weber County....
5022           UT            Provo Reservoir Canal            $5,000,000
                              Trail, Provo..............
5023           UT            Improve pedestrian and           $2,000,000
                              traffic safety in Holladay
5024           UT            Forest Street Improvements,      $3,500,000
                              Brigham City..............
5025           UT            Reconstruct South Moore Cut-     $8,000,000
                              off Road in Emery County,
                              UT........................
5026           UT            Increase lane capacity on        $4,000,000
                              bridge over Virgin River
                              on Washington Fields Road
                              in Washington.............
5027           UT            Construct pedestrian safety        $500,000
                              project on the Navajo
                              Nation in Montezuma Creek.
5028           UT            Add lighting on Highway 262        $500,000
                              on the Navajo Nation in
                              Aneth.....................
5029           UT            Add lights to road from            $400,000
                              Halchita to Mexican Hat in
                              the Navajo Nation.........
5030           UT            Geneva Rd-Provo Center          $10,000,000
                              Street, Orem 1600 North to
                              I-15 FWY, Provo-widen from
                              2 to 4 lanes..............
5031           UT            Transportation Improvements      $5,500,000
                              for the Widen Highway 92
                              from Lehi to Highland.....
5032           UT            Expand Redhills Parkway          $8,000,000
                              from 2 to 5 lanes and
                              improve alignment within
                              rights-of-way in St.
                              George....................
5033           UT            I-15 Freeway Reconstruction-     $4,500,000
                              Springville 200 South
                              Interchange...............
5034           UT            Construct 2-lane divided         $6,000,000
                              highway from the
                              Atkinville Interchange to
                              the new replacement
                              airport access road in St.
                              George....................
5035           UT            Widen Redwood Road from          $4,000,000
                              Bangerter Highway in Salt
                              Lake County through
                              Saratoga Springs in Utah
                              County....................
5036           UT            Construction of 200 North        $5,000,000
                              Street highway-rail graded
                              crossing separation,
                              Kaysville.................
5037           UT            Forest Street Improvements,      $2,500,000
                              Brigham City..............
5038           UT            Bear River Migratory Bird        $5,500,000
                              Refuge Access Road
                              Improvements, Box Elder
                              County....................
5039           UT            Construction and                 $5,000,000
                              Rehabilitation of 13th
                              East in Sandy City........
5040           UT            Transportation Improvements      $1,000,000
                              to 200 East Minor
                              Arterial, Logan City......
5041           UT            Provo, Utah Westside             $1,000,000
                              Connector from I-15 to
                              Provo Municipal Airport...
5042           UT            Improve pedestrian and           $2,000,000
                              traffic safety in Holladay
5043           VA            I-66 Improvements and Route     $20,000,000
                              29 Interchange at
                              Gainesville...............
5044           VA            Construct Meadowcreek           $25,000,000
                              Parkway Interchange,
                              Charlottesville...........
5045           VA            Construct South Airport          $2,000,000
                              Connector Road, Richmond
                              International Airport.....
5046           VA            I-264/Lynnhaven Parkway/         $2,000,000
                              Great Neck Road
                              Interchange...............
5047           VA            Improvements to Coalfields      $12,000,000
                              Connector, Route 460,
                              Buchanan County...........
5048           VA            Rt. 460 Improvements.......      $5,000,000
5049           VA            National Park Service            $2,000,000
                              transportation
                              improvements to Historic
                              Jamestowne in FY 2006.....
5050           VA            Manage freight movement and      $3,500,000
                              safety improvements to I-
                              81........................
5051           VA            Route 50 Traffic Calming,        $8,000,000
                              Gilberts Corner...........
5052           VA            Smart Road Research and          $6,000,000
                              Operations, Blacksburg....
5053           VA            Replacement of Robertson         $5,000,000
                              Bridge, Danville..........
5054           VA            I-64/City Line Road              $5,000,000
                              Interchange...............
5055           VA            Dominion Boulevard               $8,000,000
                              Improvements, Route 17,
                              Chesapeake................
5056           VA            National Park Service,             $500,000
                              Appalachian Trail, High
                              Top Mountain land
                              acquisition, FY 2006......
5057           VA            Widen I-66 westbound inside     $22,000,000
                              the Capital Beltway.......
5058           VA            Construct I-73 near              $7,000,000
                              Martinsville,.............
5059           VA            The Journey Through              $1,000,000
                              Hallowed Ground Rt. 15
                              scenic corridor management
                              planning and
                              implementation, FY 2006...
5060           VA            Widening I-95 between Rt.       $10,000,000
                              123 and Fairfax County
                              Parkway...................
5061           VA            Widen Route 17 in Stafford.      $1,000,000
5062           VA            Construct Old Mill Road          $2,000,000
                              extension.................
5063           VA            Improvements to public           $1,000,000
                              roadways within the campus
                              boundaries of the Virginia
                              Biotechnology Park,
                              Richmond..................
5064           VA            Widen Route 262 in Augusta       $2,000,000
                              County....................
5065           VA            Bristol Train Station--          $1,000,000
                              Historic preservation and
                              rehabilitation of former
                              Bristol, VA train station.
5066           VA            Interstate 81 ITS message          $500,000
                              signs.....................
5067           VA            Improvements to Route 15,        $1,000,000
                              Farmville.................
5068           VA            Route 11 improvements in           $500,000
                              Maurertown (Shenandoah
                              County)...................
5069           VA            Improve Route 42 (Main             $500,000
                              Street) in Bridgewater....
5070           VA            Widen Rolfe Highway to the       $1,000,000
                              Surry Ferry landing
                              approach bridge in FY 2006
5071           VA            Engineering and right-of-        $1,000,000
                              way for Interstate 73 in
                              Roanoke County............
5072           VA            Double stack clearance of        $5,000,000
                              tunnels on the Norfolk and
                              Western Mainline in
                              Virginia located on the
                              Heartland Corridor........
5073           VA            Construction and                 $1,000,000
                              improvements from Route 60
                              to Mariners Museum and USS
                              Monitor Center............
5074           VA            Route 221 improvements in          $500,000
                              Forest....................
5075           VT            U.S. Route 2 Improvements        $5,000,000
                              in Danville...............
5076           VT            Vermont Statewide Rural         $10,000,000
                              Advanced Traveller System
                              and Fiber Construction....
5077           VT            Main Street Bridge, Johnson      $3,600,000
5078           VT            Pearl Street Bridge,             $1,400,000
                              Johnson...................
5079           VT            Church Street Improvements       $6,000,000
                              in Burlington.............
5080           VT            Burlington Waterfront            $3,500,000
                              Transportation
                              Improvements..............
5081           VT            Colchester Campus Road           $1,000,000
                              Project...................
5082           VT            Essex Junction Downtown          $1,000,000
                              Transportation
                              Improvements..............
5083           VT            U.S. Route 2/I-89                $3,000,000
                              Interchange Improvements
                              in South Burlington.......
5084           VT            I-91 Reconstruction at           $6,000,000
                              Derby Line, VT Port of
                              Entry.....................
5085           VT            Design and Construction of       $4,000,000
                              Montpelier Downtown
                              Redevelopment Project.....
5086           VT            Design and construction of       $5,000,000
                              dry span bridge in Swanton
5087           VT            Vermont Transportation           $2,000,000
                              Coordinated Use Facility
                              in Berlin.................
5088           VT            St. Lawrence and Atlantic        $5,000,000
                              Railroad Upgrades in
                              Northeastern Vermont......
5089           VT            Vermont I-89 Exit 14             $4,000,000
                              Upgrades..................
5090           VT            Construct Bennington Bypass     $20,000,000
                              (North Leg)...............
5091           VT            Improve Federal Street, St.      $1,500,000
                              Albans....................
5092           VT            Improvements to U.S. Rt. 7      $15,000,000
                              from Brandon to Pittsford.
5093           VT            Improvements to U.S. Rt. 7       $4,000,000
                              in Charlotte..............
5094           VT            Design and construction of       $2,500,000
                              roundabouts/traffic
                              circles at U.S. Rt. 7/Rt.
                              7A in Manchester and U.S.
                              Rt. 7/VT Rt. 103 in
                              Clarendon.................
5095           VT            Improvements to I-91            $15,000,000
                              between Hartford, VT and
                              Derby line................
5096           VT            Transportation Improvements      $2,500,000
                              to Vermont Park and Ride..
5097           VT            Transportation Improvements      $2,000,000
                              to Bellows Falls Tunnel...
5098           VT            Improvements to River Rd/        $2,000,000
                              U.S. Rt. 2 in Lunenberg...
5099           WA            SR 518 corridor--                $4,000,000
                              Improvements to SR 518-509
                              interchange and addition
                              of eastbound travel lane
                              on a portion of the
                              corridor..................
5100           WA            Design and construct             $2,500,000
                              pedestrian land bridge
                              spanning SR 14............
5101           WA            Riverside Avenue                 $2,500,000
                              Improvements, Phases 2 and
                              3, Spokane................
5102           WA            Hanford Reach National           $1,500,000
                              Monument Road Improvement.
5103           WA            Town Square Roadway and          $2,500,000
                              Pedestrian Improvements,
                              Burien....................
5104           WA            SR 704 Cross-Base Highway        $2,000,000
                              Improvements, Spanaway
                              Loop Road to SR 7.........
5105           WA            Tukwila Southcenter Parkway      $3,000,000
                              Improvements, Tukwila.....
5106           WA            Federal Way Triangle--           $4,000,000
                              Conduct final engineering
                              work for the
                              reconstruction of the I-5--
                              SR 18 interchange.........
5107           WA            U.S. 12 Burbank to Walla         $2,500,000
                              Walla: Construct new four
                              lane highway for portion
                              of U.S. 12................
5108           WA            Reconstruction of SR 99          $1,000,000
                              (Aurora Ave. N) between N
                              145th St. and N 205th St..
5109           WA            Access Downtown Phase II: I-     $1,500,000
                              405 Downtown Bellevue
                              Circulation Improvements..
5110           WA            Seattle Ferry Terminal           $2,000,000
                              Redevelopment and
                              Expansion.................
5111           WA            Port of Bellingham               $2,500,000
                              Transportation Enhancement
                              Projects..................
5112           WA            Toroda Creek Road                $1,650,000
                              Improvements, Ferry County
5113           WA            Toroda Creek Road                  $850,000
                              Improvements, Okanogan
                              County....................
5114           WA            Conduct preliminary              $1,000,000
                              engineering and EIS for
                              Columbia River Crossing in
                              WA and OR.................
5115           WA            U.S. 395, North Spokane          $2,000,000
                              Corridor Improvements.....
5116           WA            116th St/Interstate 5            $1,000,000
                              Interchange Reconstruction
                              in Marysville.............
5117           WA            SR 167--Right-of-way             $7,500,000
                              acquisition for a new
                              freeway connecting SR 509
                              to SR 161.................
5118           WA            Roadway and Pedestrian           $1,500,000
                              Improvements at Burien
                              Town Square, Burien.......
5119           WA            Complete analysis,               $8,400,000
                              permitting and right-of-
                              way procurement for I-5/SR
                              501 Interchange
                              Replacement in Ridgefield.
5120           WA            Construct improvements to        $2,500,000
                              Multimodal Terminal,
                              Bainbridge Island.........
5121           WA            Construct Intermodal             $3,250,000
                              Transit Facility, City of
                              University Place..........
5122           WA            Streetscape University           $2,800,000
                              Place Downtown, City of
                              University Place..........
5123           WA            Plan and Improve freight           $500,000
                              and goods transport--The
                              West Cost Corridor
                              Coalition in Washington
                              State.....................
5124           WA            Continuing construction of       $7,300,000
                              I-90, Spokane to Idaho
                              State Line................
5125           WA            Tukwila Urban Access             $1,750,000
                              Improvement--Address
                              necessary improvements to
                              Southcenter Parkway in
                              Tukwila to relieve
                              congestion................
5126           WA            Takoma--Lincoln Ave. Grade       $1,500,000
                              Separation................
5127           WA            Widen SR 202/SR 520 to           $1,750,000
                              Sahalee Way, King County..
5128           WA            Improve Vancouver traffic          $500,000
                              management--Vancouver
                              Advanced Traffic
                              Management System,
                              Vancouver.................
5129           WA            SR 240/Stevens Drive             $2,750,000
                              Corridor Improvements,
                              interchange construction
                              and graded rail crossing
                              separation at intersection
                              of SR 240 and Van Giesen
                              Street, Richland..........
5130           WI            Reconstruct Interstate 94/      $20,800,000
                              43/794 (Marquette
                              Interchange) in Milwaukee.
5131           WI            Rehabilitate existing            $7,500,000
                              bridge and construct new
                              bridge on Michigan Street
                              in Sturgeon Bay...........
5132           WI            Reconstruct and rebuild St.      $7,500,000
                              Croix River Crossing,
                              connecting Wisconsin State
                              Highway 64 in Houlton,
                              Wisconsin to Minnesota
                              State Highway in
                              Stillwater, Minnesota.....
5133           WI            Reconstruct U.S. Highway         $4,000,000
                              151 (East Washington Ave.)
                              in Madison................
5134           WI            Expand SH 57 between             $3,000,000
                              Dyckesville and Sturgeon
                              Bay.......................
5135           WI            Rehabilitate Highway 53          $2,000,000
                              between Chippewa Falls and
                              New Auburn................
5136           WI            Expand U.S. Highway 151          $2,500,000
                              between Dickeyville and
                              Belmont...................
5137           WI            Develop pedestrian and bike        $400,000
                              connections that link to
                              Hank Aaron State Trail in
                              Milwaukee.................
5138           WI            Reconstruct SH 78 between          $500,000
                              Prairie du Sac and
                              Merrimac, WI, including
                              reuse of rubble from
                              Badger Ammunition Plant
                              building demolition.......
5139           WI            Upgrade Interstate 94            $2,000,000
                              between Wilson Creek and
                              Red Cedar River in Dunn
                              County....................
5140           WI            City of Glendale, WI.            $2,000,000
                              Develop and rehabilitate
                              exit ramps on I-43, and
                              improvements at West
                              Silver Spring Drive and
                              North Port Washington Rd..
5141           WI            Expand U.S. 51 and SH 29 in      $2,500,000
                              Marathon County...........
5142           WI            Upgrade U.S. 2 in Ashland        $2,100,000
                              County....................
5143           WI            Widen Wisconsin State            $1,500,000
                              Highway 64 between Houlton
                              and New Richmond..........
5144           WI            Upgrade U.S. 41 from DePere      $2,000,000
                              to Suamico, Brown County..
5145           WI            Reconstruct and widen CTH        $2,000,000
                              AAA/Oneida St. between
                              Hansen Road and Cormier
                              Road including
                              reconstruction of SH 172
                              overpasses, Brown County..
5146           WI            Reconstruct SH 33,               $1,000,000
                              including the planned
                              bicycle/pedestrian
                              component, between Port
                              Washington and Saukville,
                              Ozaukee County............
5147           WI            Reconstruct U.S. 41/SH 144       $1,000,000
                              interchange near Slinger..
5148           WI            Reconstruct Wisconsin State      $1,000,000
                              Highway 21 at I-94
                              Interchange, Monroe County
5149           WI            Construct bicycle/                 $700,000
                              pedestrian path and
                              facilities in the Central
                              park area of Madison......
5150           WI            Construct a bicycle/               $500,000
                              pedestrian path, Wisconsin
                              Dells.....................
5151           WI            Construct a bicycle/               $500,000
                              pedestrian path from
                              Waunakee to Westport......
5152           WI            Construct an alternative         $1,000,000
                              connection to divert local
                              traffic from I-90, a major
                              highway, and allow
                              movement through the
                              Gateway commercial
                              development project.......
5153           WI            Reconstruct Highway 151          $2,000,000
                              from American Parkway to
                              Main Street, Sun Prairie..
5154           WI            Replace Highway 10 bridge        $2,000,000
                              over the Chippewa River
                              near Durand...............
5155           WI            Construct Eau Claire bypass      $2,000,000
                              on U.S. 53 in Eau Claire..
5156           WI            Replace the 17th Street          $2,000,000
                              Lift Bridge, Two Rivers...
5157           WI            Pioneer Road Rail Grade          $1,000,000
                              Separation (Fond du Lac,
                              Wisconsin)................
5158           WI            Upgrade Highway 26 between       $3,000,000
                              Janesville and Watertown..
5159           WV            Construct King Coal Highway-    $38,000,000
                              Red Jacket Segment, Mingo
                              County....................
5160           WV            Plan, design, and construct     $18,000,000
                              New Ohio River Bridge,
                              South of Wellsburg, Brooke
                              County....................
5161           WV            Plan, design, and construct     $13,000,000
                              Route 9 Martinsburg Bypass
5162           WV            Upgrade Route 10 Logan Co..      $7,000,000
5163           WV            Construct Coalfields            $11,000,000
                              Expressway................
5164           WV            Widen and reconstruct U.S.      $27,000,000
                              Rt. 35, Putnam County.....
5165           WV            Construct Shawnee Parkway..      $1,000,000
5166           WY            Burma Rd: Extension from I-      $2,500,000
                              90 to Lakeway.............
5167           WY            U.S. 26-287: repair road        $25,000,000
                              from Dubois to Moran
                              Junction, Wyoming to
                              improve access to
                              Yellowstone National Park
                              (Togwotee Pass
                              Reconstruction)...........
5168           WY            WYO 59: add lanes between       $10,000,000
                              Gillette and Douglas,
                              Wyoming for improved
                              safety and access.........
5169           WY            Casper West Belt Loop:          $21,000,000
                              connect three National
                              Highway System routes (WYO
                              220, U.S. 20-26 and I-25).
5170           WY            I-80: reconstruct section       $19,000,000
                              of I-80 near Rock Springs,
                              Wyoming for improved
                              safety....................
5171           WY            I-25: Widen and resurface        $5,000,000
                              approximately eight miles
                              of I-25 in Johnson County,
                              Wyoming between Buffalo
                              and Kaycee................
5172           WY            I-90: create I-90/Burma          $2,500,000
                              Road overpass to increase
                              community and emergency
                              access in Gillette,
                              Wyoming...................
5173           WY            U.S. 85: add passing lanes       $5,000,000
                              on U.S. 85 between
                              Newcastle and Lusk,
                              Wyoming to increase safety
------------------------------------------------------------------------

SEC. 1703. TECHNICAL AMENDMENTS TO TRANSPORTATION PROJECTS.

    (a) TEA-21.--The table contained in section 1602 of the
Transportation Equity Act for the 21st Century (112 Stat. 257) is
amended--
        (1) in item number 35 by inserting ``and for other related
    purposes'' after ``Yard'';
        (2) in item number 78 by striking ``Third'' and all that
    follows through ``Bridge'' and inserting ``Bayview Transportation
    Improvements Project'';
        (3) in item number 312 by inserting ``through construction''
    after ``engineering'';
        (4) in item number 566 by striking ``Prunedale Bypass'' and
    inserting ``improvements to Prunedale'';
        (5) in item number 732 by striking ``reviews and other
    preliminary work'' and inserting ``reviews, other preliminary work,
    and transitional construction'';
        (6) in item number 744 by striking ``Preliminary'' and all that
    follows through ``Fitchburg'' and inserting ``Design, construction
    or reconstruction, and right-of-way acquisition for roadway
    improvements along the Route 12 corridor in Leominster and
    Fitchburg to enhance access from Route 2 to North Leominster and
    downtown Fitchburg'';
        (7) in item number 800 by striking ``Fairview Township'' and
    inserting ``or other projects selected by the York County,
    Pennsylvania MPO'';
        (8) in item number 820 by striking ``Conduct'' and all that
    follows through ``interchange'' and inserting ``Conduct a
    transportation needs study and make improvements to I-75
    interchanges in the Grayling area'';
        (9) in item number 863, by adding at the end the following: ``,
    including the Cuyahoga-Woodland Avenue Bridge'';
        (10) in item number 897 by striking ``Road upgrade'' and all
    that follows through ``Hills'' and inserting ``Engineering and
    construction of a new access road to a development near Interstate
    Route 57 and 167th Street in Country Club Hills'';
        (11) in item 1096 by striking ``Construct'' and all that
    follows through ``Independence'' and inserting ``Construction and
    improvements in Reminderville, Ohio (43 percent); streetscaping,
    bicycle trails, and related improvements to the I-90/SR 615
    Interchange in Mentor, Ohio (20 percent); planning and construction
    of a bicycle trail adjacent to such Interchange (14 percent);
    Eastlake Stadium transit intermodal facility (16 percent); and
    purchase of right-of-way for transportation enhancement activities
    in Bainbridge Township, Ohio (7 percent)'';
        (12) in item number 1121 by striking ``Construct'' and all that
    follows through ``Douglaston Parkway'' and inserting ``Provide
    landscaping along both sides of the Grand Central Parkway from
    188th Street to 172nd Street'';
        (13) in item number 1225 by striking ``Construct SR 9 bypass''
    and inserting ``Study, design, and construct transportation
    solutions for SR 9 corridor'';
        (14) in item number 1349 by inserting ``, and improvements to
    streets and roads providing access to,'' after ``along'';
        (15) in item number 1375 by striking ``Preliminary'' and all
    that follows through ``Emmet County'' and inserting ``Petoskey area
    transportation needs study and trunkline preservation and safety in
    the Petoskey area'';
        (16) in item number 1392 by striking ``Construct'' and all that
    follows through ``multimodal center'' and inserting ``Improve the
    ramp configuration at the I-476 PA Turnpike Landsdale
    Interchange'';
        (17) in item number 1447 by striking ``Extend'' and all that
    follows through ``Valparaiso'' and inserting ``Design and
    construction of interchange at I-65 and 109th Avenue, Crown
    Point''; and
        (18) in item number 1474 by adding at the end the following:
    ``, widen Cuyahoga SR 87, and $4,000,000 of the amount authorized
    to construct grading separation at Front Street, Berea''.
    (b) ISTEA.--Item number 32 in the table contained in section
1106(a)(2) of the Intermodal Surface Transportation Efficiency Act of
1991 (105 Stat. 2038) is amended by striking ``Extension of 34th Street
from IL Rt. 15 to County Road 10'' and inserting ``Extension and
improvements of 34th Street''.

                        Subtitle H--Environment

SEC. 1801. CONSTRUCTION OF FERRY BOATS AND FERRY TERMINAL FACILITIES.

    (a) In General.--Section 147 of title 23, United States Code, is
amended to read as follows:

``Sec. 147. Construction of ferry boats and ferry terminal facilities

    ``(a) In General.--The Secretary shall carry out a program for
construction of ferry boats and ferry terminal facilities in accordance
with section 129(c).
    ``(b) Federal Share.--The Federal share of the cost of construction
of ferry boats, ferry terminals, and ferry maintenance facilities under
this section shall be 80 percent.
    ``(c) Allocation of Funds.--The Secretary shall give priority in
the allocation of funds under this section to those ferry systems, and
public entities responsible for developing ferries, that--
        ``(1) provide critical access to areas that are not well-served
    by other modes of surface transportation;
        ``(2) carry the greatest number of passengers and vehicles; or
        ``(3) carry the greatest number of passengers in passenger-only
    service.
    ``(d) Set-Aside for Projects on NHS.--
        ``(1) In general.--$20,000,000 of the amount made available to
    carry out this section for each of fiscal years 2005 through 2009
    shall be obligated for the construction or refurbishment of ferry
    boats and ferry terminal facilities and approaches to such
    facilities within marine highway systems that are part of the
    National Highway System.
        ``(2) Alaska.--$10,000,000 of the $20,000,000 for a fiscal year
    made available under paragraph (1) shall be made available to the
    State of Alaska.
        ``(3) New jersey.--$5,000,000 of the $20,000,000 for a fiscal
    year made available under paragraph (1) shall be made available to
    the State of New Jersey.
        ``(4) Washington.--$5,000,000 of the $20,000,000 for a fiscal
    year made available under paragraph (1) shall be made available to
    the State of Washington.
    ``(e) Period of Availability.--Notwithstanding section 118(b),
funds made available to carry out this section shall remain available
until expended.
    ``(f) Applicability.--All provisions of this chapter that are
applicable to the National Highway System, other than provisions
relating to apportionment formula and Federal share, shall apply to
funds made available to carry out this section, except as determined by
the Secretary to be inconsistent with this section.''.
    (b) Clerical Amendment.--The analysis for such subchapter is
amended by striking the item relating to section 147 and inserting the
following:

``147. Construction of ferry boats and ferry terminal facilities.''.

    (c) Conforming Repeal.--Section 1064 of the Intermodal Surface
Transportation Efficiency Act of 1991 (105 Stat. 2005) is repealed.
    (d) Authorization of Appropriations.--In addition to amounts made
available to carry out section 147 of title 23, United States Code, by
section 1101 of this Act, there are authorized to be appropriated such
sums as may be necessary to carry out such section 147 for fiscal year
2006 and each fiscal year thereafter. Such funds shall remain available
until expended.
    (e) National Ferry Database.--
        (1) Establishment.--The Secretary, acting through the Bureau of
    Transportation Statistics, shall establish and maintain a national
    ferry database.
        (2) Contents.--The database shall contain current information
    regarding ferry systems, including information regarding routes,
    vessels, passengers and vehicles carried, funding sources and such
    other information as the Secretary considers useful.
        (3) Update report.--Using information collected through the
    database, the Secretary shall periodically modify as appropriate
    the report submitted under section 1207(c) of the Transportation
    Equity Act for the 21st Century (23 U.S.C. 129 note; 112 Stat. 185-
    186).
        (4) Requirements.--The Secretary shall--
            (A) compile the database not later than 1 year after the
        date of enactment of this Act and update the database every 2
        years thereafter;
            (B) ensure that the database is easily accessible to the
        public; and
            (C) make available, from the amounts made available for the
        Bureau of Transportation Statistics by section 5101 of this
        Act, not more than $500,000 for each of fiscal years 2006
        through 2009 to establish and maintain the database.
    (f) Territory Ferries.--Section 129(c)(5) of title 23, United
States Code, is amended by striking ``the Commonwealth of Puerto Rico''
each place it appears and inserting ``any territory of the United
States''.

SEC. 1802. NATIONAL SCENIC BYWAYS PROGRAM.

    (a) In General.--Section 162(a) of title 23, United States Code, is
amended--
        (1) in paragraph (1) by striking ``the roads as'' and all that
    follows and inserting ``the roads as--
            ``(A) National Scenic Byways;
            ``(B) All-American Roads; or
            ``(C) America's Byways.''; and
        (2) by striking paragraph (3) and inserting the following:
        ``(3) Nomination.--
            ``(A) In general.--To be considered for a designation, a
        road must be nominated by a State, an Indian tribe, or a
        Federal land management agency and must first be designated as
        a State scenic byway, an Indian tribe scenic byway, or, in the
        case of a road on Federal land, as a Federal land management
        agency byway.
            ``(B) Nomination by indian tribes.--An Indian tribe may
        nominate a road as a National Scenic Byway under subparagraph
        (A) only if a Federal land management agency (other than the
        Bureau of Indian Affairs), a State, or a political subdivision
        of a State does not have--
                ``(i) jurisdiction over the road; or
                ``(ii) responsibility for managing the road.
            ``(C) Safety.--An Indian tribe shall maintain the safety
        and quality of roads nominated by the Indian tribe under
        subparagraph (A).
        ``(4) Reciprocal notification.--States, Indian tribes, and
    Federal land management agencies shall notify each other regarding
    nominations made under this subsection for roads that--
            ``(A) are within the jurisdictional boundary of the State,
        Federal land management agency, or Indian tribe; or
            ``(B) directly connect to roads for which the State,
        Federal land management agency, or Indian tribe is
        responsible.''.
    (b) Grants and Technical Assistance.--Section 162(b) of such title
is amended--
        (1) in paragraph (1) by inserting ``and Indian tribes'' after
    ``provide technical assistance to States'';
        (2) in paragraph (1)(A) by striking ``designated as'' and all
    that follows through ``; and'' and inserting ``designated as--
                ``(i) National Scenic Byways;
                ``(ii) All-American Roads;
                ``(iii) America's Byways;
                ``(iv) State scenic byways; or
                ``(v) Indian tribe scenic byways; and''; and
        (3) in paragraph (1)(B) by inserting ``or Indian tribe'' after
    ``State'';
        (4) in paragraph (2)(A) by striking ``Byway or All-American
    Road'' and inserting ``Byway, All-American Road, or 1 of America's
    Byways'';
        (5) in paragraph (2)(B)--
            (A) by striking ``State-designated'' and inserting ``State
        or Indian tribe''; and
            (B) by striking ``designation as a'' and all that follows
        through ``; and'' and inserting ``designation as--
                ``(i) a National Scenic Byway;
                ``(ii) an All-American Road; or
                ``(iii) 1 of America's Byways; and''; and
        (6) in paragraph (2)(C) by inserting ``or Indian tribe'' after
    ``State''.
    (c) Eligible Projects.--Section 162(c) of such title is amended--
        (1) in paragraph (1) by inserting ``or Indian tribe'' after
    ``State'';
        (2) in paragraph (3)--
            (A) by inserting ``Indian tribe scenic byway,'' after
        ``improvements to a State scenic byway,''; and
            (B) by inserting ``Indian tribe scenic byway,'' after
        ``designation as a State scenic byway,''; and
        (3) in paragraph (4) by striking ``passing lane,''.
    (d) Conforming Amendment.--Section 162(e) of such title is amended
by inserting ``or Indian tribe'' after ``State''.

SEC. 1803. AMERICA'S BYWAYS RESOURCE CENTER.

    (a) In General.--The Secretary shall allocate funds made available
to carry out this section to the America's Byways Resource Center
established pursuant to section 1215(b)(1) of the Transportation Equity
Act for the 21st Century (112 Stat. 209).
    (b) Technical Support and Education.--
        (1) Use of funds.--The Center shall use funds allocated to the
    Center under this section to continue to provide technical support
    and conduct educational activities for the national scenic byways
    program established under section 162 of title 23, United States
    Code.
        (2) Eligible activities.--Technical support and educational
    activities carried out under this subsection shall provide local
    officials and organizations associated with National Scenic Byways,
    All-American Roads, and America's Byways with proactive, technical,
    and on-site customized assistance, including training,
    communications (including a public awareness series), publications,
    conferences, on-site meetings, and other assistance considered
    appropriate to develop and sustain such byways and roads.
    (c) Authorization of Appropriations.--There is authorized to be
appropriated out of the Highway Trust Fund (other than the Mass Transit
Account) to carry out this section $1,500,000 for fiscal year 2005 and
$3,000,000 for each of fiscal years 2006 through 2009.
    (d) Applicability of Title 23.--Funds authorized by this section
shall be available for obligation in the same manner as if such funds
were apportioned under chapter 1 of title 23, United States Code;
except that the Federal share of the cost of any project or activity
carried out under this section shall be 100 percent, and such funds
shall remain available until expended and shall not be transferable.

SEC. 1804. NATIONAL HISTORIC COVERED BRIDGE PRESERVATION.

    (a) Definitions.--In this section, the following definitions apply:
        (1) Historic covered bridge.--The term ``historic covered
    bridge'' means a covered bridge that is listed or eligible for
    listing on the National Register of Historic Places.
        (2) State.--The term ``State'' has the meaning such term has in
    section 101(a) of title 23, United States Code.
    (b) Historic Covered Bridge Preservation.--The Secretary shall--
        (1) collect and disseminate information on historic covered
    bridges;
        (2) conduct educational programs relating to the history and
    construction techniques of historic covered bridges;
        (3) conduct research on the history of historic covered
    bridges; and
        (4) conduct research on, and study techniques for, protecting
    historic covered bridges from rot, fire, natural disasters, or
    weight-related damage.
    (c) Grants.--
        (1) In general.--The Secretary shall make a grant to a State
    that submits an application to the Secretary that demonstrates a
    need for assistance in carrying out one or more historic covered
    bridge projects described in paragraph (2).
        (2) Eligible projects.--A grant under paragraph (1) may be made
    for a project--
            (A) to rehabilitate or repair a historic covered bridge; or
            (B) to preserve a historic covered bridge, including
        through--
                (i) installation of a fire protection system, including
            a fireproofing or fire detection system and sprinklers;
                (ii) installation of a system to prevent vandalism and
            arson; or
                (iii) relocation of a bridge to a preservation site.
        (3) Authenticity requirements.--A grant under paragraph (1) may
    be made for a project only if--
            (A) to the maximum extent practicable, the project--
                (i) is carried out in the most historically appropriate
            manner; and
                (ii) preserves the existing structure of the historic
            covered bridge; and
            (B) the project provides for the replacement of wooden
        components with wooden components, unless the use of wood is
        impracticable for safety reasons.
    (d) Authorization of Appropriations.--There is authorized to be
appropriated to carry out this section, out of the Highway Trust Fund
(other than the Mass Transit Account), $10,000,000 for each of fiscal
years 2006 through 2009.
    (e) Applicability of Title 23.--Funds made available to carry out
this section shall be available for obligation in the same manner as if
the funds were apportioned under chapter 1 of title 23, United States
Code; except that the Federal share of the cost of any project or
activity carried out under this section shall be determined in
accordance with section 120 of such title, and such funds shall remain
available until expended and shall not be transferable.

SEC. 1805. USE OF DEBRIS FROM DEMOLISHED BRIDGES AND OVERPASSES.

    (a) In General.--Any State that demolishes a bridge or an overpass
that is eligible for Federal assistance under the highway bridge
replacement and rehabilitation program under section 144 of title 23,
United States Code, is directed to first make the debris from the
demolition of such bridge or overpass available for beneficial use by a
Federal, State, or local government, unless such use obstructs
navigation.
    (b) Recipient Responsibilities.--A recipient of the debris
described in subsection (a) shall--
        (1) bear the additional cost associated with having the debris
    made available;
        (2) ensure that placement of the debris complies with
    applicable law; and
        (3) assume all future legal responsibility arising from the
    placement of the debris, which may include entering into an
    agreement to hold the owner of the demolished bridge or overpass
    harmless in any liability action.
    (c) Definition.--In this section, the term ``beneficial use'' means
the application of the debris for purposes of shore erosion control or
stabilization, ecosystem restoration, and marine habitat creation.

SEC. 1806. ADDITIONAL AUTHORIZATION OF CONTRACT AUTHORITY FOR STATES
              WITH INDIAN RESERVATIONS.

    Section 1214(d)(5)(A) of the Transportation Equity Act for the 21st
Century (23 U.S.C. 202 note; 112 Stat. 206) is amended by striking
``$1,500,000 for each of fiscal years 1998 through 2003'' and inserting
``$1,800,000 for each of fiscal years 2005 through 2009''.

SEC. 1807. NONMOTORIZED TRANSPORTATION PILOT PROGRAM.

    (a) Establishment.--The Secretary shall establish and carry out a
nonmotorized transportation pilot program to construct, in the
following 4 communities selected by the Secretary, a network of
nonmotorized transportation infrastructure facilities, including
sidewalks, bicycle lanes, and pedestrian and bicycle trails, that
connect directly with transit stations, schools, residences,
businesses, recreation areas, and other community activity centers:
        (1) Columbia, Missouri.
        (2) Marin County, California.
        (3) Minneapolis-St. Paul, Minnesota.
        (4) Sheboygan County, Wisconsin.
    (b) Purpose.--The purpose of the program shall be to demonstrate
the extent to which bicycling and walking can carry a significant part
of the transportation load, and represent a major portion of the
transportation solution, within selected communities.
    (c) Grants.--In carrying out the program, the Secretary may make a
grant of $6,250,000 per fiscal year for each of the communities set
forth in subsection (a) to State, local, and regional agencies that the
Secretary determines are suitably equipped and organized to carry out
the objectives and requirements of this section. An agency that
receives a grant under this section may suballocate grant funds to a
nonprofit organization to carry out the program under this section.
    (d) Statistical Information.--In carrying out the program, the
Secretary shall develop statistical information on changes in motor
vehicle, nonmotorized transportation, and public transportation usage
in communities participating in the program and assess how such changes
decrease congestion and energy usage, increase the frequency of
bicycling and walking, and promote better health and a cleaner
environment.
    (e) Reports.--The Secretary shall submit to Congress an interim
report not later than September 30, 2007, and a final report not later
than September 30, 2010, on the results of the program.
    (f) Funding.--
        (1) Authorization of appropriations.--There is authorized to be
    appropriated to carry out this section, out of the Highway Trust
    Fund (other than the Mass Transit Account), $25,000,000 for each of
    fiscal years 2006 through 2009.
        (2) Contract authority.--Funds authorized to be appropriated by
    this section shall be available for obligation in the same manner
    and to the same extent as if the funds were apportioned under
    chapter 1 of title 23, United States Code; except that the Federal
    share of the cost of the project shall be 100 percent, and the
    funds shall remain available until expended and shall not be
    transferable.
    (g) Treatment of Projects.--Notwithstanding any other provision of
law, projects assisted under this subsection shall be treated as
projects on a Federal-aid system under chapter 1 of title 23, United
States Code.

SEC. 1808. ADDITION TO CMAQ-ELIGIBLE PROJECTS.

    (a) Former 1-Hour Maintenance Areas.--Section 149(b) of title 23,
United States Code, is amended in the matter preceding paragraph (1)(A)
by inserting ``or is required to prepare, and file with the
Administrator of the Environmental Protection Agency, maintenance plans
under the Clean Air Act (42 U.S.C. 7401 et seq.)'' after ``1997,''.
    (b) Eligible Projects.--Section 149(b) of such title is amended--
        (1) by striking paragraph (1) and inserting the following:
        ``(1)(A)(i) if the Secretary, after consultation with the
    Administrator determines, on the basis of information published by
    the Environmental Protection Agency pursuant to section
    108(f)(1)(A) of the Clean Air Act (other than clause (xvi)) that
    the project or program is likely to contribute to--
                ``(I) the attainment of a national ambient air quality
            standard; or
                ``(II) the maintenance of a national ambient air
            quality standard in a maintenance area; and
        ``(ii) a high level of effectiveness in reducing air pollution,
    in cases of projects or programs where sufficient information is
    available in the database established pursuant to subsection (h) to
    determine the relative effectiveness of such projects or programs;
    or,
        ``(B) in any case in which such information is not available,
    if the Secretary, after such consultation, determines that the
    project or program is part of a program, method, or strategy
    described in such section 108(f)(1)(A);''.
        (2) in paragraph (4)--
            (A) by inserting ``, including advanced truck stop
        electrification systems,'' after ``facility or program''; and
            (B) by striking ``or'' at the end;
        (3) in paragraph (5)--
            (A) by inserting ``improve transportation systems
        management and operations that mitigate congestion and improve
        air quality,'' after ``intersections,''; and
            (B) by striking the period at the end and inserting a
        semicolon; and
        (4) by adding at the end the following:
        ``(6) if the project or program involves the purchase of
    integrated, interoperable emergency communications equipment; or
        ``(7) if the project or program is for--
            ``(A) the purchase of diesel retrofits that are--
                ``(i) for motor vehicles (as defined in section 216 of
            the Clean Air Act (42 U.S.C. 7550)); or
                ``(ii) published in the list under subsection (f)(2)
            for non-road vehicles and non-road engines (as defined in
            section 216 of the Clean Air Act (42 U.S.C. 7550)) that are
            used in construction projects that are--

                    ``(I) located in nonattainment or maintenance areas
                for ozone, PM<INF>10</INF>, or PM<INF>2.5</INF> (as
                defined under the Clean Air Act (42 U.S.C. 7401 et
                seq.)); and
                    ``(II) funded, in whole or in part, under this
                title; or

            ``(B) the conduct of outreach activities that are designed
        to provide information and technical assistance to the owners
        and operators of diesel equipment and vehicles regarding the
        purchase and installation of diesel retrofits.''.
    (c) States Receiving Minimum Apportionment.--Section 149(c) of such
title is amended--
        (1) in paragraph (1) by striking ``for any project eligible
    under the surface transportation program under section 133.'' and
    inserting the following: ``for any project in the State that--
            ``(A) would otherwise be eligible under this section as if
        the project were carried out in a nonattainment or maintenance
        area; or
            ``(B) is eligible under the surface transportation program
        under section 133.''; and
        (2) in paragraph (2) by striking ``for any project in the State
    eligible under section 133.'' and inserting the following: ``for
    any project in the State that--
            ``(A) would otherwise be eligible under this section as if
        the project were carried out in a nonattainment or maintenance
        area; or
            ``(B) is eligible under the surface transportation program
        under section 133.''.
    (d) Cost-Effective Emission Reduction Guidance.--Section 149 of
such title is amended by adding at the end the following:
    ``(f) Cost-Effective Emission Reduction Guidance.--
        ``(1) Definitions.--In this subsection, the following
    definitions apply:
            ``(A) Administrator.--The term `Administrator' means the
        Administrator of the Environmental Protection Agency.
            ``(B) Diesel retrofit.--The term `diesel retrofit' means a
        replacement, repowering, rebuilding, after treatment, or other
        technology, as determined by the Administrator.
        ``(2) Emission reduction guidance.--The Administrator, in
    consultation with the Secretary, shall publish a list of diesel
    retrofit technologies and supporting technical information for--
            ``(A) diesel emission reduction technologies certified or
        verified by the Administrator, the California Air Resources
        Board, or any other entity recognized by the Administrator for
        the same purpose;
            ``(B) diesel emission reduction technologies identified by
        the Administrator as having an application and approvable test
        plan for verification by the Administrator or the California
        Air Resources Board that is submitted not later that 18 months
        of the date of enactment of this subsection;
            ``(C) available information regarding the emission
        reduction effectiveness and cost effectiveness of technologies
        identified in this paragraph, taking into consideration air
        quality and health effects.
        ``(3) Priority.--
            ``(A) In general.--States and metropolitan planning
        organizations shall give priority in distributing funds
        received for congestion mitigation and air quality projects and
        programs from apportionments derived from application of
        sections 104(b)(2)(B) and 104(b)(2)(C) to--
                ``(i) diesel retrofits, particularly where necessary to
            facilitate contract compliance, and other cost-effective
            emission reduction activities, taking into consideration
            air quality and health effects; and
                ``(ii) cost-effective congestion mitigation activities
            that provide air quality benefits.
            ``(B) Savings.--This paragraph is not intended to disturb
        the existing authorities and roles of governmental agencies in
        making final project selections.
        ``(4) No effect on authority or restrictions.--Nothing in this
    subsection modifies or otherwise affects any authority or
    restriction established under the Clean Air Act (42 U.S.C. 7401 et
    seq.) or any other law (other than provisions of this title
    relating to congestion mitigation and air quality).''.
    (e) Improved Interagency Consultation.--Section 149 of such title
(as amended by subsection (d)) is amended by adding at the end the
following:
    ``(g) Interagency Consultation.--The Secretary shall encourage
States and metropolitan planning organizations to consult with State
and local air quality agencies in nonattainment and maintenance areas
on the estimated emission reductions from proposed congestion
mitigation and air quality improvement programs and projects.''.
    (f) Evaluation and Assessment of CMAQ Projects.--Section 149 of
such title (as amended by subsection (e)) is amended by adding at the
end the following:
    ``(h) Evaluation and Assessment of Projects.--
        ``(1) In general.--The Secretary, in consultation with the
    Administrator of the Environmental Protection Agency, shall
    evaluate and assess a representative sample of projects funded
    under the congestion mitigation and air quality program to--
            ``(A) determine the direct and indirect impact of the
        projects on air quality and congestion levels; and
            ``(B) ensure the effective implementation of the program.
        ``(2) Database.--Using appropriate assessments of projects
    funded under the congestion mitigation and air quality program and
    results from other research, the Secretary shall maintain and
    disseminate a cumulative database describing the impacts of the
    projects.
        ``(3) Consideration.--The Secretary, in consultation with the
    Administrator, shall consider the recommendations and findings of
    the report submitted to Congress under section 1110(e) of the
    Transportation Equity Act for the 21st Century (112 Stat. 144),
    including recommendations and findings that would improve the
    operation and evaluation of the congestion mitigation and air
    quality improvement program.''.
    (g) Flexibility in the State of Montana.--The State of Montana may
use funds apportioned under section 104(b)(2) of title 23, United
States Code, for the operation of public transit activities that serve
a nonattainment or maintenance area.
    (h) Availability of Funds for State of Michigan.--The State of
Michigan may use funds apportioned under section 104(b)(2) of such
title for the operation and maintenance of intelligent transportation
system strategies that serve a nonattainment or maintenance area.
    (i) Availability of Funds for the State of Maine.--The State of
Maine may use funds apportioned under section 104(b)(2) of such title
to support, through September 30, 2009, the operation of passenger rail
service between Boston, Massachusetts, and Portland, Maine.
    (j) Availability of Funds for Oregon.--The State of Oregon may use
funds apportioned on or before September 30, 2009, under section
104(b)(2) of such title to support the operation of additional
passenger rail service between Eugene and Portland.
    (k) Availabilty of Funds for Certain Other States.--The States of
Missouri, Iowa, Minnesota, Wisconsin, Illinois, Indiana, and Ohio may
use funds apportioned under section 104(b)(2) of such title to purchase
alternative fuel (as defined in section 301 of the Energy Policy Act of
1992 (42 U.S.C. 13211)) or biodiesel.

                       Subtitle I--Miscellaneous

SEC. 1901. INCLUSION OF REQUIREMENTS FOR SIGNS IDENTIFYING FUNDING
              SOURCES IN TITLE 23.

    (a) In General.--Chapter 3 of title 23, United States Code, is
amended by inserting after section 320--
        (1) the following:

``Sec. 321. Signs identifying funding sources'';

    and
        (2) the text of section 154 of the Federal-Aid Highway Act of
    1987 (23 U.S.C. 101 note).
    (b) Clerical Amendment.--The analysis for such chapter is amended
by inserting after the item relating to section 320 the following:

``321. Signs identifying funding sources.''.

    (c) Conforming Repeal.--Section 154 of the Federal-Aid Highway Act
of 1987 (23 U.S.C. 101 note; 101 Stat. 209) is repealed.

SEC. 1902. DONATIONS AND CREDITS.

    Section 323 of title 23, United States Code, is amended--
        (1) in the first sentence of subsection (c) by inserting ``, or
    a local government from offering to donate funds, materials, or
    services performed by local government employees,'' after
    ``services''; and
        (2) by striking subsection (e).

SEC. 1903. INCLUSION OF BUY AMERICA REQUIREMENTS IN TITLE 23.

    (a) In General.--Chapter 3 of title 23, United States Code, is
amended by inserting after section 312--
        (1) the following:

``Sec. 313. Buy America'';

    and
        (2) the text of section 165 of the Highway Improvement Act of
    1982 (23 U.S.C. 101 note; 96 Stat. 2136).
    (b) Clerical Amendment.--The analysis for chapter 3 of such title
is amended by inserting after the item relating to section 312 the
following:

``313. Buy America.''.

    (c) Conforming Amendments.--Section 313 of such title (as added by
subsection (a)) is amended--
        (1) in subsection (a) by striking ``by this Act'' the first
    place it appears and all that follows through ``of 1978'' and
    inserting ``to carry out the Surface Transportation Assistance Act
    of 1982 (96 Stat. 2097) or this title'';
        (2) in subsection (b) by redesignating paragraph (4) as
    paragraph (3);
        (3) in subsection (d) by striking ``this Act,'' and all that
    follows through ``Code, which'' and inserting ``the Surface
    Transportation Assistance Act of 1982 (96 Stat. 2097) or this title
    that'';
        (4) by striking subsection (e); and
        (5) by redesignating subsections (f) and (g) as subsections (e)
    and (f), respectively.
    (d) Conforming Repeal.--Section 165 of the Highway Improvement Act
of 1982 (23 U.S.C. 101 note; 96 Stat. 2136) is repealed.

SEC. 1904. STEWARDSHIP AND OVERSIGHT.

    (a) In General.--Section 106 of title 23, United States Code, is
amended--
        (1) by striking subsection (e) and inserting the following:
    ``(e) Value Engineering Analysis.--
        ``(1) Definition of value engineering analysis.--
            ``(A) In general.--In this subsection, the term `value
        engineering analysis' means a systematic process of review and
        analysis of a project, during the concept and design phases, by
        a multidisciplined team of persons not involved in the project,
        that is conducted to provide recommendations such as those
        described in subparagraph (B) for--
                ``(i) providing the needed functions safely, reliably,
            and at the lowest overall cost;
                ``(ii) improving the value and quality of the project;
            and
                ``(iii) reducing the time to complete the project.
            ``(B) Inclusions.--The recommendations referred to in
        subparagraph (A) include, with respect to a project--
                ``(i) combining or eliminating otherwise inefficient
            use of costly parts of the original proposed design for the
            project; and
                ``(ii) completely redesigning the project using
            different technologies, materials, or methods so as to
            accomplish the original purpose of the project.
        ``(2) Analysis.--The State shall provide a value engineering
    analysis or other cost-reduction analysis for--
            ``(A) each project on the Federal-aid system with an
        estimated total cost of $25,000,000 or more;
            ``(B) a bridge project with an estimated total cost of
        $20,000,000 or more; and
            ``(C) any other project the Secretary determines to be
        appropriate.
        ``(3) Major projects.--The Secretary may require more than 1
    analysis described in paragraph (2) for a major project described
    in subsection (h).
        ``(4) Requirements.--Analyses described in paragraph (1) for a
    bridge project shall--
            ``(A) include bridge substructure requirements based on
        construction material; and
            ``(B) be evaluated--
                ``(i) on engineering and economic bases, taking into
            consideration acceptable designs for bridges; and
                ``(ii) using an analysis of life-cycle costs and
            duration of project construction.''; and
        (2) by striking subsections (g) and (h) and inserting the
    following:
    ``(g) Oversight Program.--
        ``(1) Establishment.--
            ``(A) In general.--The Secretary shall establish an
        oversight program to monitor the effective and efficient use of
        funds authorized to carry out this title.
            ``(B) Minimum requirement.--At a minimum, the program shall
        be responsive to all areas relating to financial integrity and
        project delivery.
        ``(2) Financial integrity.--
            ``(A) Financial management systems.--The Secretary shall
        perform annual reviews that address elements of the State
        transportation departments' financial management systems that
        affect projects approved under subsection (a).
            ``(B) Project costs.--The Secretary shall develop minimum
        standards for estimating project costs and shall periodically
        evaluate the practices of States for estimating project costs,
        awarding contracts, and reducing project costs.
        ``(3) Project delivery.--The Secretary shall perform annual
    reviews that address elements of the project delivery system of a
    State, which elements include one or more activities that are
    involved in the life cycle of a project from conception to
    completion of the project.
        ``(4) Responsibility of the states.--
            ``(A) In general.--The States shall be responsible for
        determining that subrecipients of Federal funds under this
        title have--
                ``(i) adequate project delivery systems for projects
            approved under this section; and
                ``(ii) sufficient accounting controls to properly
            manage such Federal funds.
            ``(B) Periodic review.--The Secretary shall periodically
        review the monitoring of subrecipients by the States.
        ``(5) Specific oversight responsibilities.--
            ``(A) Effect of section.--Nothing in this section shall
        affect or discharge any oversight responsibility of the
        Secretary specifically provided for under this title or other
        Federal law.
            ``(B) Appalachian development highways.--The Secretary
        shall retain full oversight responsibilities for the design and
        construction of all Appalachian development highways under
        section 14501 of title 40.
    ``(h) Major Projects.--
        ``(1) In general.--Notwithstanding any other provision of this
    section, a recipient of Federal financial assistance for a project
    under this title with an estimated total cost of $500,000,000 or
    more, and recipients for such other projects as may be identified
    by the Secretary, shall submit to the Secretary for each project--
            ``(A) a project management plan; and
            ``(B) an annual financial plan.
        ``(2) Project management plan.--A project management plan shall
    document--
            ``(A) the procedures and processes that are in effect to
        provide timely information to the project decisionmakers to
        effectively manage the scope, costs, schedules, and quality of,
        and the Federal requirements applicable to, the project; and
            ``(B) the role of the agency leadership and management team
        in the delivery of the project.
        ``(3) Financial plan.--A financial plan shall--
            ``(A) be based on detailed estimates of the cost to
        complete the project; and
            ``(B) provide for the annual submission of updates to the
        Secretary that are based on reasonable assumptions, as
        determined by the Secretary, of future increases in the cost to
        complete the project.
    ``(i) Other Projects.--A recipient of Federal financial assistance
for a project under this title with an estimated total cost of
$100,000,000 or more that is not covered by subsection (h) shall
prepare an annual financial plan. Annual financial plans prepared under
this subsection shall be made available to the Secretary for review
upon the request of the Secretary.''.
    (b) Conforming Amendments.--Section 114(a) of title 23, United
States Code, is amended--
        (1) in the first sentence by striking ``highways or portions of
    highways located on a Federal-aid system'' and inserting ``Federal-
    aid highway or a portion of a Federal-aid highway''; and
        (2) by striking the second sentence and inserting ``The
    Secretary shall have the right to conduct such inspections and take
    such corrective action as the Secretary determines to be
    appropriate.''.

SEC. 1905. TRANSPORTATION DEVELOPMENT CREDITS.

    Section 120(j)(1) of title 23, United States Code, is amended--
        (1) by striking ``A State'' and inserting the following:
            ``(A) In general.--A State''; and
        (2) by striking the last sentence and inserting the following:
            ``(B) Special rule for use of federal funds.--If the
        public, quasi-public, or private agency has built, improved, or
        maintained the facility using Federal funds, the credit under
        this paragraph shall be reduced by a percentage equal to the
        percentage of the total cost of building, improving, or
        maintaining the facility that was derived from Federal funds.
            ``(C) Federal funds defined.--In this paragraph, the term
        `Federal funds' does not include loans of Federal funds or
        other financial assistance that must be repaid to the
        Government.''.

SEC. 1906. GRANT PROGRAM TO PROHIBIT RACIAL PROFILING.

    (a) Grants.--Subject to the requirements of this section, the
Secretary shall make grants to a State that--
        (1)(A) has enacted and is enforcing a law that prohibits the
    use of racial profiling in the enforcement of State laws regulating
    the use of Federal-aid highways; and
        (B) is maintaining and allows public inspection of statistical
    information for each motor vehicle stop made by a law enforcement
    officer on a Federal-aid highway in the State regarding the race
    and ethnicity of the driver and any passengers; or
        (2) provides assurances satisfactory to the Secretary that the
    State is undertaking activities to comply with the requirements of
    paragraph (1).
    (b) Eligible Activities.--A grant received by a State under
subsection (a) shall be used by the State--
        (1) in the case of a State eligible under subsection (a)(1),
    for costs of--
            (A) collecting and maintaining of data on traffic stops;
            (B) evaluating the results of the data; and
            (C) developing and implementing programs to reduce the
        occurrence of racial profiling, including programs to train law
        enforcement officers; and
        (2) in the case of a State eligible under subsection (a)(2),
    for costs of--
            (A) activities to comply with the requirements of
        subsection (a)(1); and
            (B) any eligible activity under paragraph (1).
    (c) Racial Profiling.--
        (1) In general.--To meet the requirement of subsection (a)(1),
    a State law shall prohibit, in the enforcement of State laws
    regulating the use of Federal-aid highways, a State or local law
    enforcement officer from using the race or ethnicity of the driver
    or passengers to any degree in making routine or spontaneous law
    enforcement decisions, such as ordinary traffic stops on Federal-
    aid highways.
        (2) Limitation.--Nothing in this subsection shall alter the
    manner in which a State or local law enforcement officer considers
    race or ethnicity whenever there is trustworthy information,
    relevant to the locality or time frame, that links persons of a
    particular race or ethnicity to an identified criminal incident,
    scheme, or organization.
    (d) Limitations.--
        (1) Maximum amount of grants.--The total amount of grants made
    to a State under this section in a fiscal year may not exceed 5
    percent of the amount made available to carry out this section in
    the fiscal year.
        (2) Eligibility.--A State may not receive a grant under
    subsection (a)(2) in more than 2 fiscal years.
    (e) Authorization of Appropriations.--
        (1) In general.--There is authorized to be appropriated from
    the Highway Trust Fund (other than the Mass Transit Account) to
    carry out this section $7,500,000 for each of fiscal years 2005
    through 2009.
        (2) Contract authority.--Funds authorized by this subsection
    shall be available for obligation in the same manner as if the
    funds were apportioned under chapter 1 of title 23, United States
    Code, except the Federal share of the cost of activities carried
    out using such funds shall be 80 percent, and such funds shall
    remain available until expended and shall not be transferable.

SEC. 1907. PAVEMENT MARKING SYSTEMS DEMONSTRATION PROJECTS.

    (a) In General.--The Secretary shall conduct a demonstration
project in the State of Alaska, and a demonstration project in the
State of Tennessee, to study the safety impacts, environmental impacts,
and cost effectiveness of different pavement marking systems and the
effect of State bidding and procurement processes on the quality of
pavement marking material employed in highway projects. The
demonstration projects shall each include an evaluation of the impacts
and effectiveness of increasing the width of pavement marking edge
lines from 4 inches to 6 inches and an evaluation of advanced acrylic
water-borne pavement markings.
    (b) Report.--Not later than June 30, 2009, the Secretary shall
submit to Congress a report on the results of the demonstration
projects, together with findings and recommendations on methods that
will optimize the cost-benefit ratio of the use of Federal funds on
pavement marking.
    (c) Funding.--
        (1) Authorization of appropriations.--There is authorized to be
    appropriated to carry out this section, out of the Highway Trust
    Fund (other than the Mass Transit Account), $1,000,000 for each of
    fiscal years 2006 through 2009.
        (2) Contract authority.--Funds authorized to be appropriated by
    this section shall be available for obligation in the same manner
    and to the same extent as if such funds were apportioned under
    chapter 1 of title 23, United States Code; expect that the Federal
    share of the cost of the demonstration projects shall be 100
    percent, and such funds shall remain available until expended and
    shall not be transferable.

SEC. 1908. INCLUSION OF CERTAIN ROUTE SEGMENTS ON INTERSTATE SYSTEM AND
              NHS.

    (a) Interstate System.--
        (1) Creek turnpike, oklahoma.--The Secretary shall designate as
    part of the Interstate System (as defined in section 101 of title
    23, United States Code) in accordance with section 103(c)(4) of
    such title the portion of the Creek Turnpike connecting Interstate
    Route 44 east and west of Tulsa, Oklahoma.
        (2) Certain section of interstate route 181.--The Secretary
    shall designate as part of Interstate Route 26 the 11-mile section
    of Interstate Route 181 lying northwest of the intersection with
    Interstate Route 81, Tennessee.
        (3) Treatment.--The designations under paragraph (2) shall be
    treated, for purposes of title 23, United States Code, as being
    made under section 103(c)(4) of such title.
    (b) National Highway System.--The Secretary shall designate as a
component of the National Highway System in accordance with section
103(b)(4) of title 23, United States Code, the portion of United States
Route 271 from the Arkansas State line, west to the intersection with
United States Route 59, and northwest to the intersection with
Interstate Route 40, Sallisaw, Oklahoma.

SEC. 1909. FUTURE OF SURFACE TRANSPORTATION SYSTEM.

    (a) Declaration of Policy.--Section 101(b) of title 23, United
States Code, is amended--
        (1) by striking ``(b) It is hereby declared'' and all that
    follows through the first undesignated paragraph and inserting the
    following:
    ``(b) Declaration of Policy.--
        ``(1) Acceleration of construction of federal-aid highway
    systems.--Congress declares that it is in the national interest to
    accelerate the construction of Federal-aid highway systems,
    including the Dwight D. Eisenhower National System of Interstate
    and Defense, because many of the highways (or portions of the
    highways) are inadequate to meet the needs of local and interstate
    commerce for the national and civil defense.'';
        (2) in the second undesignated paragraph by striking ``It is
    hereby declared'' and all that follows through ``objectives of this
    Act'' and inserting the following:
        ``(2) Completion of interstate system.--Congress declares that
    the prompt and early completion of the Dwight D. Eisenhower
    National System of Interstate and Defense Highways (referred to in
    this section as the `Interstate System'), so named because of its
    primary importance to the national defense, is essential to the
    national interest''; and
        (3) by striking the third undesignated paragraph and inserting
    the following:
        ``(3) Transportation needs of 21st century.--Congress declares
    that--
            ``(A) it is in the national interest to preserve and
        enhance the surface transportation system to meet the needs of
        the United States for the 21st Century;
            ``(B) the current urban and long distance personal travel
        and freight movement demands have surpassed the original
        forecasts and travel demand patterns are expected to continue
        to change;
            ``(C) continued planning for and investment in surface
        transportation is critical to ensure the surface transportation
        system adequately meets the changing travel demands of the
        future;
            ``(D) among the foremost needs that the surface
        transportation system must meet to provide for a strong and
        vigorous national economy are safe, efficient, and reliable--
                ``(i) national and interregional personal mobility
            (including personal mobility in rural and urban areas) and
            reduced congestion;
                ``(ii) flow of interstate and international commerce
            and freight transportation; and
                ``(iii) travel movements essential for national
            security;
            ``(E) special emphasis should be devoted to providing safe
        and efficient access for the type and size of commercial and
        military vehicles that access designated National Highway
        System intermodal freight terminals;
            ``(F) the connection between land use and infrastructure is
        significant;
            ``(G) transportation should play a significant role in
        promoting economic growth, improving the environment, and
        sustaining the quality of life; and
            ``(H) the Secretary should take appropriate actions to
        preserve and enhance the Interstate System to meet the needs of
        the 21st Century.''.
    (b) National Surface Transportation Policy and Revenue Study
Commission.--
        (1) Establishment.--There is established a commission to be
    known as the ``National Surface Transportation Policy and Revenue
    Study Commission'' (in this subsection referred to as the
    ``Commission'').
        (2) Membership.--
            (A) Composition.--The Commission shall be composed of 12
        members, of whom--
                (i) 1 member shall be the Secretary, who shall serve as
            Chairperson;
                (ii) 3 members shall be appointed by the President;
                (iii) 2 members shall be appointed by the Speaker of
            the House of Representatives;
                (iv) 2 members shall be appointed by the minority
            leader of the House of Representatives;
                (v) 2 members shall be appointed by the majority leader
            of the Senate; and
                (vi) 2 members shall be appointed by the minority
            leader of the Senate.
            (B) Qualifications.--Members appointed under subparagraph
        (A)--
                (i) shall include--

                    (I) individuals representing State and local
                governments, metropolitan planning organizations,
                transportation-related industries, and public interest
                organizations involved with scientific, regulatory,
                economic, and environmental activities relating to
                transportation;
                    (II) individuals with a background in public
                finance, including experience in developing State and
                local revenue resources;
                    (III) individuals involved in surface
                transportation program administration;
                    (IV) individuals that have conducted academic
                research into related issues; and
                    (V) individuals that provide unique perspectives on
                current and future requirements for revenue sources to
                support the Highway Trust Fund and policies impacting
                those revenues; and

                (ii) shall be balanced geographically to the extent
            consistent with maintaining the highest level of expertise
            on the Commission.
            (C) Date of appointments.--The appointment of a member of
        the Commission shall be made not later than 120 days after the
        date of establishment of the Commission.
            (D) Terms.--A member shall be appointed for the life of the
        Commission.
            (E) Vacancies.--A vacancy on the Commission--
                (i) shall not affect the powers of the Commission; and
                (ii) shall be filled in the same manner as the original
            appointment was made.
            (F) Initial meeting.--Not later than 30 days after the date
        on which all members of the Commission have been appointed, the
        Commission shall hold the initial meeting of the Commission.
            (G) Meetings.--The Commission shall meet at the call of the
        Chairperson.
            (H) Quorum.--A majority of the members of the Commission
        shall constitute a quorum, but a lesser number of members may
        hold hearings.
            (I) Vice chairperson.--The Commission shall select a Vice
        Chairperson from among the appointed members of the Commission.
        (3) Duties.--
            (A) In general.--The Commission shall--
                (i) conduct a comprehensive study of--

                    (I) the current condition and future needs of the
                surface transportation system;
                    (II) short-term sources of Highway Trust Fund
                revenues;
                    (III) long-term alternatives to replace or
                supplement the fuel tax as the principal revenue source
                to support the Highway Trust Fund, including new or
                alternate sources of revenue;
                    (IV) revenue sources to fund the needs of the
                surface transportation system over at least the 30-year
                period beginning on the date of enactment of this Act,
                including new or alternate sources of revenue;
                    (V) revenues flowing into the Highway Trust Fund
                under laws in existence on the date of enactment of
                this Act, including individual components of the
                overall flow of the revenues; and
                    (VI) whether the amount of revenues described in
                subclause (V) is likely to increase, decrease, or
                remain constant absent any change in law, taking into
                consideration the impact of possible changes in public
                vehicular choice, fuel use, and travel alternatives
                that could be expected to reduce or increase revenues
                into the Highway Trust Fund;

            (B) develop a conceptual plan, with alternative approaches,
        to ensure that the surface transportation system will continue
        to serve the needs of the United States, including specific
        recommendations regarding design and operational standards,
        Federal policies, and legislative changes;
            (C) consult with the Secretary of the Treasury in
        conducting the study to ensure that the views of the Secretary
        concerning essential attributes of Highway Trust Fund revenue
        alternatives are considered;
            (D) consult with representatives of State departments of
        transportation and metropolitan planning organizations and
        other key interested stakeholders in conducting the study to
        ensure that--
                (i) the views of the stakeholders on alternative
            revenue sources to support State transportation improvement
            programs are considered; and
                (ii) any recommended Federal financing strategy takes
            into account State financial requirements; and
            (E) based on the study, make specific recommendations
        regarding--
                (i) actions that should be taken to develop alternative
            revenue sources to support the Highway Trust Fund; and
                (ii) the time frame for taking those actions.
        (4) Related work.--To the maximum extent practicable, the study
    shall build on related work that has been completed by--
            (A) the Secretary;
            (B) the Secretary of Energy;
            (C) the Transportation Research Board, including the
        findings, conclusions, and recommendations of the recent study
        conducted by the Transportation Research Board on alternatives
        to the fuel tax to support highway program financing; and
            (D) other entities and persons.
        (5) Surface transportation needs.--With respect to surface
    transportation needs, the investigation and study shall
    specifically address--
            (A) the current condition and performance of the Interstate
        System (including the physical condition of bridges and
        pavements and operational characteristics and performance),
        relying primarily on existing data sources;
            (B) the future of the Interstate System, based on a range
        of legislative and policy approaches for 15-, 30-, and 50-year
        time periods;
            (C) the expected demographics and business uses that impact
        the surface transportation system;
            (D) the expected use of the surface transportation system,
        including the effects of changing vehicle types, modes of
        transportation, fleet size and weights, and traffic volumes;
            (E) desirable design policies and standards for future
        improvements of the surface transportation system, including
        additional access points;
            (F) the identification of urban, rural, national, and
        interregional needs for the surface transportation system;
            (G) the potential for expansion, upgrades, or other changes
        to the surface transportation system, including--
                (i) deployment of advanced materials and intelligent
            technologies;
                (ii) critical multistate, urban, and rural corridors
            needing capacity, safety, and operational enhancements;
                (iii) improvements to intermodal linkages;
                (iv) security and military deployment enhancements;
                (v) strategies to enhance asset preservation; and
                (vi) implementation strategies;
            (H) the improvement of emergency preparedness and
        evacuation using the surface transportation system, including--
                (i) examination of the potential use of all modes of
            the surface transportation system in the safe and efficient
            evacuation of citizens during times of emergency;
                (ii) identification of the location of critical
            bottlenecks; and
                (iii) development of strategies to improve system
            redundancy, especially in areas with a high potential for
            terrorist attacks;
            (I) alternatives for addressing environmental concerns
        associated with the future development of the surface
        transportation system;
            (J) the assessment of the current and future capabilities
        for conducting system-wide real-time performance data
        collection and analysis, traffic monitoring, and transportation
        systems operations and management; and
            (K) policy and legislative alternatives for addressing
        future needs for the surface transportation system.
        (6) Financing.--With respect to financing, the study shall
    address specifically--
            (A) the advantages and disadvantages of alternative revenue
        sources to meet anticipated Federal surface transportation
        financial requirements;
            (B) recommendations concerning the most promising revenue
        sources to support long-term Federal surface transportation
        financing requirements;
            (C) development of a broad transition strategy to move from
        the current tax base to new funding mechanisms, including the
        time frame for various components of the transition strategy;
            (D) recommendations for additional research that may be
        needed to implement recommended alternatives; and
            (E) the extent to which revenues should reflect the
        relative use of the highway system.
        (7) Financing recommendations.--
            (A) Factors for consideration.--In developing financing
        recommendations under this subsection, the Commission shall
        consider--
                (i) the ability to generate sufficient revenues from
            all modes to meet anticipated long-term surface
            transportation financing needs;
                (ii) the roles of the various levels of government and
            the private sector in meeting future surface transportation
            financing needs;
                (iii) administrative costs (including enforcement
            costs) to implement each option;
                (iv) the expected increase in nontaxed fuels and the
            impact of taxing those fuels;
                (v) the likely technological advances that could ease
            implementation of each option;
                (vi) the equity and economic efficiency of each option;
                (vii) the flexibility of different options to allow
            various pricing alternatives to be implemented; and
                (viii) potential compatibility issues with State and
            local tax mechanisms under each alternative.
            (B) Need and revenue analysis.--In developing financing
        recommendations under this subsection, the Commission shall
        distinguish between--
                (i) the needs of, and revenues for, the surface
            transportation system that are eligible to receive funds
            from the Highway Trust Fund; and
                (ii) the needs for projects and programs that are not
            eligible to receive funds from the Highway Trust Fund.
        (8) Technical advisory committee.--The Secretary shall
    establish a technical advisory committee, in a manner consistent
    with the Federal Advisory Committee Act (5 U.S.C. App.), to collect
    and evaluate technical input from--
            (A) appropriate Federal, State, and local officials with
        responsibility for transportation;
            (B) appropriate State and local elected officials;
            (C) transportation and trade associations;
            (D) emergency management officials;
            (E) freight providers;
            (F) the general public; and
            (G) other entities and persons determined to be appropriate
        by the Secretary to ensure a diverse range of views.
        (9) Report and recommendations.--Not later than July 1, 2007,
    the Commission shall submit to Congress--
            (A) a final report that contains a detailed statement of
        the findings and conclusions of the Commission; and
            (B) the recommendations of the Commission for such
        legislation and administrative actions as the Commission
        considers to be appropriate.
        (10) Powers of the commission.--
            (A) Hearings.--The Commission may hold such hearings, meet
        and act at such times and places, take such testimony, and
        receive such evidence as the Commission considers advisable to
        carry out this section.
            (B) Information from federal agencies.--
                (i) In general.--The Commission may secure directly
            from a Federal agency such information as the Commission
            considers necessary to carry out this section.
                (ii) Provision of information.--On request of the
            Chairperson of the Commission, the head of a Federal agency
            shall provide the requested information to the Commission.
            (C) Postal services.--The Commission may use the United
        States mails in the same manner and under the same conditions
        as other agencies of the Federal Government.
            (D) Donations.--The Commission may accept, use, and dispose
        of donations of services or property.
        (11) Commission personnel matters.--
            (A) Members.--A member of the Commission shall serve
        without pay but shall be allowed travel expenses, including per
        diem in lieu of subsistence, at rates authorized for an
        employee of an agency under subchapter I of chapter 57 of title
        5, United States Code, while away from the home or regular
        place of business of the member in the performance of the
        duties of the Commission.
            (B) Contractors.--The Commission may enter into agreements
        with appropriate organizations, agencies, and entities to
        conduct the study required under this section, under the
        strategic guidance of the Commission.
            (C) Administrative support.--On the request of the
        Commission, the Administrator of the Federal Highway
        Administration shall provide to the Commission, on a
        reimbursable basis, the administrative support and services
        necessary for the Commission to carry out the duties of the
        Commission under this section.
            (D) Detail of personnel.--
                (i) In general.--On the request of the Commission, the
            Secretary may detail, on a reimbursable basis, any of the
            personnel of the Department to the Commission to assist the
            Commission in carrying out the duties of the Commission
            under this section.
                (ii) Civil service status.--The detail of the employee
            shall be without interruption or loss of civil service
            status or privilege.
        (12) Cooperation.--The staff of the Secretary shall cooperate
    with the Commission in the study required under this section,
    including providing such nonconfidential data and information as
    are necessary to conduct the study.
        (13) Relationship to other law.--
            (A) In general.--Except as provided in subparagraphs (B)
        and (C), funds made available to carry out this section shall
        be available for obligation in the same manner as if the funds
        were apportioned under chapter 1 of title 23, United States
        Code.
            (B) Federal share.--The Federal share of the cost of the
        study and the Commission under this section shall be 100
        percent.
            (C) Availability.--Funds made available to carry out this
        section shall remain available until expended.
        (14) Definition of surface transportation system.--In this
    subsection, the term ``surface transportation system'' includes--
            (A) the National Highway System, as defined in section
        103(b) of title 23, United States Code;
            (B) congressional high priority corridors;
            (C) intermodal connectors;
            (D) intermodal freight facilities;
            (E) public transportation infrastructure and facilities;
        and
            (F) freight and intercity passenger bus and rail
        infrastructure and facilities.
        (15) Authorization of appropriations.--There is authorized to
    be appropriated from the Highway Trust Fund (other than the Mass
    Transit Account) to carry out this section $1,400,000 for each of
    fiscal years 2006 and 2007.
        (16) Applicability of title 23.--Funds made available to carry
    out this section shall be available for obligation in the same
    manner as if such funds were apportioned under chapter 1 of title
    23, United States Code; except that such funds shall remain
    available until expended, and the Federal share of the cost of a
    project under this section shall be as provided in this section.
        (17) Termination.--
            (A) In general.--The Commission shall terminate on the date
        that is 180 days after the date on which the Commission submits
        the report of the Commission under paragraph (9).
            (B) Records.--Not later than the date of termination of the
        Commission under subparagraph (A), all records and papers of
        the Commission shall be delivered to the Archivist of the
        United States for deposit in the National Archives.

SEC. 1910. MOTORIST INFORMATION CONCERNING FULL SERVICE RESTAURANTS.

    Not later than 180 days after the date of enactment of this Act,
the Secretary may initiate a rulemaking to determine whether--
        (1) full service restaurants should be given priority on not
    more than 2 panels of the camping or attractions logo-specific
    service signs in the Manual on Uniform Traffic Control Devices of
    the Department of Transportation when the food logo-specific
    service sign is fully used; and
        (2) full service restaurants should be given priority on not
    more than 2 panels of the food logo-specific service signs in such
    Manual when the camping or attractions logo-specific service signs
    are fully used.

SEC. 1911. APPROVAL AND FUNDING FOR CERTAIN CONSTRUCTION PROJECTS.

    (a) Project Approval.--If the Secretary finds that the project
number STP-189-1(15)CT 3 in Gwinnett County, Georgia, was not listed in
the current regional transportation plan because of a clerical error,
such failure to be listed shall not be a basis for not approving the
project. The Secretary shall make a final decision on the approval of
the project within 30 days after the date of receipt by the Secretary
of a construction authorization request from the department of
transportation for the State of Georgia.
    (b) Conformity Determination.--
        (1) In general.--Approval, funding, and implementation of the
    project referred to in subsection (a) shall not be subject to the
    requirements of part 93 of title 40, Code of Federal Regulations
    (or successor regulations).
        (2) Regional emissions.--Notwithstanding paragraph (1), all
    subsequent regional emission analyses required by section 93.118 or
    93.119 of title 40, Code of Federal Regulations (or successor
    regulations), shall include the project.

SEC. 1912. LEAD AGENCY DESIGNATION.

    The public entity established under California law in 1989 to
acquire rights-of-way in northwestern California to maintain surface
transportation infrastructure is designated as the lead agency for the
purpose of accepting Federal funds authorized under item 13 of the
table contained in section 1108(b) of the Intermodal Surface
Transportation Efficiency Act of 1991 (105 Stat. 2061).

SEC. 1913. BRIDGE CONSTRUCTION, NORTH DAKOTA.

    Notwithstanding any other provision of law, and regardless of the
source of Federal funds, the Federal share of the eligible costs of
construction of a bridge between Bismarck, North Dakota, and Mandan,
North Dakota, shall be 90 percent.

SEC. 1914. MOTORCYCLIST ADVISORY COUNCIL.

    (a) In General.--The Secretary, acting through the Administrator of
the Federal Highway Administration, in consultation with the Committee
on Transportation and Infrastructure of the House of Representatives
and the Committee on Environment and Public Works of the Senate, shall
appoint a Motorcyclist Advisory Council to coordinate with and advise
the Administrator on infrastructure issues of concern to motorcyclists,
including--
        (1) barrier design;
        (2) road design, construction, and maintenance practices; and
        (3) the architecture and implementation of intelligent
    transportation system technologies.
    (b) Composition.--The Council shall consist of not more than 10
members of the motorcycling community with professional expertise in
national motorcyclist safety advocacy, including--
        (1) at least--
            (A) one member recommended by a national motorcyclist
        association;
            (B) one member recommended by a national motorcycle riders
        foundation;
            (C) one representative of the National Association of State
        Motorcycle Safety Administrators;
            (D) two members of State motorcyclists' organizations;
            (E) one member recommended by a national organization that
        represents the builders of highway infrastructure;
            (F) one member recommended by a national association that
        represents the traffic safety systems industry; and
            (G) one member of a national safety organization; and
        (2) at least one, and not more than two, motorcyclists who are
    traffic system design engineers or State transportation department
    officials.

SEC. 1915. LOAN FORGIVENESS.

    Debt outstanding as of the date of enactment of this Act for
project number Q-DPM-0013(001) carried out under section 108(c) of
title 23, United States Code, is deemed satisfied.

SEC. 1916. TREATMENT OF OFF RAMP.

    Notwithstanding any other provision of law, the New Harbor
Boulevard North off-ramp project along the Interstate Route 405
Collector-Distributor Road in Costa Mesa, California (Susan Street
Slip-Ramp), shall be treated for purposes of title 23, United States
Code, as satisfying all Federal requirements, and the California State
department of transportation shall authorize any final environmental,
engineering, or design analyses necessary to approve, as expeditiously
as possible, construction of the project consistent with applicable
California State operational and safety standards.

SEC. 1917. OPENING OF INTERSTATE RAMPS.

    (a) In General.--The Maryland State highway administration and the
Federal Highway Administration shall work cooperatively--
        (1) to expedite the project being developed as of the date of
    enactment of this Act to improve Interstate Route 495 through the
    area of the Arena Drive interchange to allow for safe exit,
    including improvements to the adjacent interchanges upstream and
    downstream along Interstate Route 495; and
        (2) to expedite action on the Interstate access request so that
    the Interstate Route 495/Arena Drive interchange can be opened
    safely to all vehicles 24 hours per day, 7 days per week.
    (b) Report.--Not later than 2 years after the date of enactment of
this Act, the Secretary shall submit to Congress a report on the status
of opening the Interstate Route 495/Arena Drive interchange to full-
time use.

SEC. 1918. CREDIT TO STATE OF LOUISIANA FOR STATE MATCHING FUNDS.

    (a) In General.--The Secretary may provide a credit to the State of
Louisiana in an amount equal to non-Federal Share of the cost of any
planning, engineering, design, or construction work carried out by the
State on any project that the Secretary determines is integral to the
project authorized by item number 202 in the table contained in section
1602 of the Transportation Equity Act for the 21st Century (112 Stat.
264).
    (b) Eligibility of Credit.--The credit may be used for any future
payment relating to the completion of the project referred to in
subsection (a) that is required by the State under title 23, United
States Code.

SEC. 1919. ROAD USER FEES.

    (a) Study.--The Secretary shall enter into an agreement with the
Public Policy Center of the University of Iowa for an analysis and
report to the Secretary and the Secretary of the Treasury on a long-
term field test of an approach to assessing highway use fees based upon
actual mileage driven by a specific vehicle on specific types of
highways by use of an onboard computer--
        (1) which is linked to satellites to calculate highway mileage
    traversed;
        (2) which computes the appropriate highway use fees for each of
    the Federal, State, and local governments as the vehicle makes use
    of the highways;
        (3) the data from which is periodically downloaded by the
    vehicle owner to a collection center for an assessment of highway
    use fees due in each jurisdiction traversed; and
        (4) which includes methods of ensuring privacy of road users.
    (b) Components of Field Test.--The components of the field test
shall include 2 years for preparation, including selection of vendors
and test participants, and a 3-year testing period.
    (c) Reports.--The Secretary shall submit annual reports on the
status of the analysis and, not later than July 1, 2009, a final report
on the results of the analysis, together with findings and
recommendations. The reports shall be submitted to the Secretary of the
Treasury, the Committee on Transportation and Infrastructure and the
Committee on Ways and Means of the House of Representatives, and the
Committee on Environment and Public Works and the Committee on Finance
of the Senate.
    (d) Authorization of Appropriation.--
        (1) In general.--There is authorized to be appropriated from
    the Highway Trust Fund (other than the Mass Transit Account) to
    carry out this section $2,000,000 fiscal year 2006 and $3,500,000
    for each of fiscal years 2007, 2008, and 2009.
        (2) Contract authority.--Funds authorized under this subsection
    shall be available for obligation in the same manner as if the
    funds were apportioned under chapter 1 of title 23, United States
    Code; except the Federal share of the cost of the analysis and
    report shall be 100 percent, and such funds shall remain available
    until expended and shall not be transferable.

SEC. 1920. TRANSPORTATION AND LOCAL WORKFORCE INVESTMENT.

    (a) Findings.--Congress finds the following:
        (1) Federal-aid highway programs provide State and local
    governments and other recipients substantial funds for projects
    that produce significant employment and job-training opportunities.
        (2) Every $1,000,000,000 in Federal infrastructure investment
    creates an estimated 47,500 jobs.
        (3) Jobs in transportation construction, including
    apprenticeship positions, typically pay more than twice the minimum
    wage, and include health and other benefits.
        (4) Transportation projects provide the impetus for job
    training and employment opportunities for low income individuals
    residing in the area in which a transportation project is planned.
        (5) Transportation projects can offer young people,
    particularly those who are economically disadvantaged, the
    opportunity to gain productive employment.
        (6) The Alameda Corridor, a $2,400,000,000 transportation
    project, is an example of a transportation project that included a
    local hiring provision resulting in a full 30 percent of the
    project jobs being filled by locally hired and trained men and
    women.
    (b) Sense of Congress.--It is the sense of Congress that Federal
transportation projects should facilitate and encourage the
collaboration between interested persons, including Federal, State, and
local governments, community colleges, apprentice programs, local high
schools, and other community-based organizations that have an interest
in improving the job skills of low-income individuals, to help leverage
scarce training and community resources and to help ensure local
participation in the building of transportation projects.

SEC. 1921. UPDATE OF OBSOLETE TEXT.

    Section 137(a) of title 23, United States Code, is amended in the
first sentence by striking ``on the Federal-aid urban system'' and
inserting ``on a Federal-aid highway''.

SEC. 1922. TECHNICAL AMENDMENTS TO NONDISCRIMINATION SECTION.

    (a) State Assurances.--Section 140(a) of title 23, United States
Code, is amended--
        (1) in the first sentence by striking ``subsection (a) of
    section 105 of this title'' and inserting ``section 135'';
        (2) in the second sentence by striking ``He'' and inserting
    ``The Secretary'';
        (3) in the third sentence--
            (A) by striking ``shall, where he considers it necessary to
        assure'' and inserting ``if necessary to ensure''; and
            (B) by inserting ``shall'' after ``opportunity,''; and
        (4) in the last sentence--
            (A) by striking ``him'' and inserting ``the Secretary'';
        and
            (B) by striking ``he'' and inserting ``the Secretary of
        Transportation''.
    (b) Highway Construction and Technology Training.--Section 140(b)
of such title is amended--
        (1) in the first sentence by striking ``highway construction''
    and inserting ``surface transportation''; and
        (2) in the second sentence--
            (A) by striking ``he may deem''; and
            (B) by striking ``not to exceed $2,500,000 for the
        transition quarter ending September 30, 1976, and''.
    (c) Minority Business Training Programs.--Section 140(c) of such
title is amended in the second sentence--
        (1) by striking ``subsection 104(b)(3) of this title'' and
    inserting ``section 104(b)(3)''; and
        (2) by striking ``he may deem''.
    (d) Technical Amendment.--Section 140(d) of such title is amended
in the subsection heading by striking ``and Contracting''.

SEC. 1923. TRANSPORTATION ASSETS AND NEEDS OF DELTA REGION.

    (a) Agreement.--Not later than 180 days after the date of enactment
of this Act, the Secretary shall enter into an agreement with the Delta
Regional Authority (in this section referred to as the ``DRA'') to
conduct a comprehensive study of transportation assets and needs for
all modes of transportation (including passenger and freight
transportation) in the 8 States comprising the Delta region (Alabama,
Arkansas, Illinois, Kentucky, Louisiana, Mississippi, Missouri, and
Tennessee).
    (b) Consultation.--Under the agreement, the DRA, in conducting the
study, shall consult with the Department, State transportation
departments, local planning and development districts, local and
regional governments, and metropolitan planning organizations.
    (c) Report.--Under the agreement, the DRA, not later than 2 years
after the date of entry into the agreement, shall submit to the
Secretary and the Committee on Transportation and Infrastructure of the
House of Representatives and the Committee on Environment and Public
Works of the Senate a final report on the results of the study,
together with such recommendations as the DRA considers to be
appropriate.
    (d) Plan.--Under the agreement, the DRA, upon completion of the
report, shall establish a regional strategic plan to implement the
recommendations of the report.
    (e) Funding.--
        (1) Authorization of appropriations.--There is authorized to be
    appropriated out of the Highway Trust Fund (other than the Mass
    Transit Account), to carry out this section $500,000 for each of
    the fiscal years 2005 and 2006.
        (2) Contract authority.--Funds authorized by this section shall
    be available for obligation in the same manner and to the same
    extent as if such funds were apportioned under chapter 1 of title
    23, United States Code; except that such funds shall remain
    available until expended and shall not be transferable.

SEC. 1924. ALASKA WAY VIADUCT STUDY.

    (a) Findings.--Congress finds that--
        (1) in 2001, the Alaska Way Viaduct, a critical segment of the
    National Highway System in Seattle, Washington, was seriously
    damaged by the Nisqually earthquake;
        (2) an effort to address the possible repair, retrofit, or
    replacement of the Viaduct that conforms with the National
    Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) is
    underway; and
        (3) as a result of the efforts referred to in paragraph (2), a
    locally preferred alternative for the Viaduct is being developed.
    (b) Study.--
        (1) In general.--As soon as practicable after the date of
    enactment of this Act, the Secretary, in cooperation with the
    Washington State department of transportation and the City of
    Seattle, Washington, shall conduct a comprehensive study to
    determine the specific damage to the Alaska Way Viaduct from the
    Nisqually earthquake of 2001 that contribute to the ongoing
    degradation of the Viaduct.
        (2) Requirements.--The study under paragraph (1) shall--
            (A) identify any repair, retrofit, and replacement costs
        for the Viaduct that are eligible for additional assistance
        from the emergency fund authorized under section 125 of title
        23, United States Code, consistent with the emergency relief
        manual governing eligible expenses from the emergency fund; and
            (B) determine the amount of assistance from the emergency
        fund for which the Viaduct is eligible.
    (c) Report.--Not later than 180 days after the date of enactment of
this Act, the Secretary shall submit to Congress a report that
describes the findings of the study.

SEC. 1925. COMMUNITY ENHANCEMENT STUDY.

    (a) In General.--The Secretary shall conduct a study on--
        (1) the role of well-designed transportation projects in--
            (A) promoting economic development;
            (B) protecting public health, safety, and the environment;
        and
            (C) enhancing the architectural design and planning of
        communities; and
        (2) the positive economic, cultural, aesthetic, scenic,
    architectural, and environmental benefits of such projects for
    communities.
    (b) Contents.--The study shall address the following:
        (1) The degree to which well-designed transportation projects
    have positive economic, cultural, aesthetic, scenic, architectural,
    and environmental benefits for communities.
        (2) The degree to which such projects protect and contribute to
    improvements in public health and safety.
        (3) The degree to which such projects use inclusive public
    participation processes to achieve quicker, more certain, and
    better results.
        (4) The degree to which positive results are achieved by
    linking transportation, design, and the implementation of community
    visions for the future.
        (5) Facilitating the use of successful models or best practices
    in transportation investment or development to accomplish each of
    the following:
            (A) Enhancement of community identity.
            (B) Protection of public health and safety.
            (C) Provision of a variety of choices in housing, shopping,
        transportation, employment, and recreation.
            (D) Preservation and enhancement of existing
        infrastructure.
            (E) Creation of a greater sense of community through public
        involvement.
    (c) Report.--Not later than September 20, 2007, the Secretary shall
submit to the Committee on Transportation and Infrastructure of the
House of Representatives and the Committee on Environment and Public
Works of the Senate a report on the results of the study.
    (d) Administration.--To carry out this section, the Secretary shall
make a grant to, or enter into a cooperative agreement or contract
with, a national organization representing architects who have
expertise in the design of a wide range of transportation and
infrastructure projects, which include the design of buildings, public
facilities, and surrounding communities.
    (e) Authorization.--Of the amounts made available to carry out the
transportation, community, and system preservation program by section
1117 of this Act $1,000,000 shall be available for each of fiscal years
2006 and 2007 to carry out this section; except that, notwithstanding
section 1117(g) of this Act, the Federal share of the cost of the study
shall be 100 percent.

SEC. 1926. BUDGET JUSTIFICATION.

    The Department of Transportation and each agency in the Department
shall submit to the Committee on Transportation and Infrastructure of
the House of Representatives and the Committee on Environment and
Public Works of the Senate a budget justification concurrently with the
President's annual budget submission to Congress under section 1105(a)
of title 31, United States Code.

SEC. 1927. 14TH AMENDMENT HIGHWAY AND 3RD INFANTRY DIVISION HIGHWAY.

    Not later than December 31, 2005, any funds made available to
commission studies and reports regarding construction of a route
linking Augusta, Georgia, Macon, Georgia, Columbus, Georgia,
Montgomery, Alabama, and Natchez, Mississippi and a route linking
through Savannah, Georgia, Augusta, Georgia, and Knoxville, Tennessee,
shall be provided to the Secretary to--
        (1) carry out a study and submit to the appropriate committees
    of Congress a report that describes the steps and estimated funding
    necessary to construct a route for the 14th Amendment Highway, from
    Augusta, Georgia, to Natchez, Mississippi (formerly designated the
    Fall Line Freeway in the State of Georgia); and
        (2) carry out a study and submit to the appropriate committees
    of Congress a report that describes the steps and estimated funding
    necessary to designate and construct a route for the 3rd Infantry
    Division Highway, extending from Savannah, Georgia, to Knoxville,
    Tennessee, by way of Augusta, Georgia (formerly the Savannah River
    Parkway in the State of Georgia).

SEC. 1928. SENSE OF CONGRESS REGARDING BUY AMERICA.

    It is the sense of Congress that--
        (1) the Buy America test required by section 165 of the Surface
    Transportation Assistance Act of 1982 (23 U.S.C. 101 note) needs to
    be applied to an entire bridge project and not only to component
    parts of such project;
        (2) the law clearly states that domestic materials must be used
    in Federal highway projects unless there is a finding that the
    inclusion of domestic materials will increase the cost of the
    overall project by more than 25 percent;
        (3) uncertainty regarding how to apply Buy America laws for
    major bridge projects threatens the domestic bridge industry;
        (4) because the Nation's unemployment rate continues to hover
    around 5.6 percent, steps are needed to protect American workers
    and the domestic bridge building industry; and
        (5) the Buy American Act (41 U.S.C. 10a et seq.) was designed
    to ensure that, when taxpayer money is spent on direct Federal
    Government procurement and infrastructure projects, these
    expenditures stimulate United States production and job creation.

SEC. 1929. DESIGNATION OF DANIEL PATRICK MOYNIHAN INTERSTATE HIGHWAY.

    (a) Designation.--The portion of Interstate Route 86 in the State
of New York, extending from the Pennsylvania border near Lake Erie
through Orange County, New York, shall be known and designated as the
``Daniel Patrick Moynihan Interstate Highway''.
    (b) References.--Any reference in a law, map, regulation, document,
paper, or other record of the United States to the highway portion
referred to in subsection (a) shall be deemed to be a reference to the
``Daniel Patrick Moynihan Interstate Highway''.

SEC. 1930. DESIGNATION OF THOMAS P. ``TIP'' O'NEILL, JR. TUNNEL.

    (a) Designation.--In honor of his service to the Commonwealth of
Massachusetts and the United States, and in recognition of his
contributions toward the construction of the Central Artery project in
Boston, the northbound and southbound tunnel of Interstate Route 93,
located in the City of Boston, which extends north of the intersection
of Interstate Route 90 and Interstate Route 93 to the Leonard P. Zakim
Bunker Hill Bridge, shall be known and designated as the ``Thomas P.
`Tip' O'Neill, Jr. Tunnel''.
    (b) References.--Any reference in law, map, regulation, document,
paper, or other record of the United States to the tunnel referred to
in subsection (a) shall be deemed to be a reference to the ``Thomas P.
`Tip' O'Neill, Jr. Tunnel''.

SEC. 1931. RICHARD NIXON PARKWAY, CALIFORNIA.

    (a) Designation.--The segment of the Imperial Highway located
between California State Route 91 and Esperanza Road in the State of
California shall be known and designated as the ``Richard Nixon
Parkway''.
    (b) References.--Any reference in a law, map, regulation, document,
paper, or other record of the United States to the highway segment
referred to in subsection (a) shall be deemed to be a reference to the
``Richard Nixon Parkway''.

SEC. 1932. AMO HOUGHTON BYPASS.

    (a) Designation.--The 3-mile segment of Interstate Route 86 between
its interchange with New York State Route 15 in the vicinity of Painted
Post, New York, and its interchange with New York State Route 352 in
the vicinity of Corning, New York, shall be known and designated as the
``Amo Houghton Bypass''.
    (b) References.--Any reference in a law, map, regulation, document,
paper, or other record of the United States to the highway segment
referred to in subsection (a) shall be deemed to be a reference to the
``Amo Houghton Bypass''.

SEC. 1933. BILLY TAUZIN ENERGY CORRIDOR.

    (a) Designation.--Louisiana Route 1 shall be known and designated
as the ``Billy Tauzin Energy Corridor''.
    (b) References.--Any reference in a law, map, regulation, document,
paper, or other record of the United States to the highway segment
referred to in subsection (a) shall be deemed to be a reference to the
``Billy Tauzin Energy Corridor''.

SEC. 1934. TRANSPORTATION IMPROVEMENTS.

    (a) Authorization of Appropriations.--
        (1) In general.--For each of fiscal years 2005 through 2009,
    there are authorized to be appropriated from the Highway Trust Fund
    (other than the Mass Transit Account) such sums as are necessary to
    make allocations in accordance with paragraph (2) to carry out each
    project described in the table contained in subsection (c), at the
    amount specified for each such project in that table.
        (2) Allocation percentages.--Of the total amount specified for
    each project described in the table contained in subsection (c), 10
    percent for fiscal year 2005, 20 percent for fiscal year 2006, 25
    percent for fiscal year 2007, 25 percent for fiscal year 2008, and
    20 percent for fiscal year 2009 shall be allocated to carry out
    each such project in that table.
    (b) Contract Authority.--
        (1) In general.--Funds authorized to be appropriated to carry
    out this subsection shall be available for obligation in the same
    manner as if the funds were apportioned under chapter 1 of title
    23, United States Code, except that the funds shall remain
    available until expended.
        (2) Federal share.--The Federal share of the cost of a project
    under this section shall be determined in accordance with section
    120 of such title.
    (c) Table.--The table referred to in subsections (a) and (b) is as
follows:

                       Transportation Improvements
------------------------------------------------------------------------
    No.          State           Project Description          Amount
------------------------------------------------------------------------
1.           AK             Denali Commission for docks,     $20,000,000
                             waterfront development
                             projects and related
                             transportation
                             infrastructure.............

2.           AK             Improvements to the Knik Arm     $20,000,000
                             Bridge.....................

3.           AK             Upgrades on the Dalton              $500,000
                             Highway, including but not
                             limited to design,
                             engineering, permitting,
                             and construction...........

4.           AK             Upgrades on the Richardson          $500,000
                             Highway, including but not
                             limited to design,
                             engineering, permitting,
                             and construction...........

5.           AK             Anchorage: Intermodal             $7,000,000
                             facility improvements at
                             the Port of Anchorage......

6.           AK             Petersburg: Road                    $500,000
                             improvements, including but
                             not limited to design,
                             engineering, permitting,
                             and construction...........

7.           AK             Tanana: Dust Control                $500,000
                             Mitigation.................

8.           AK             Anchorage: Dimond Center            $500,000
                             Intermodal Facility,
                             including but not limited
                             to design, engineering,
                             permitting, and
                             construction...............

9.           AK             Homer: Intermodal deep-water      $2,000,000
                             dock facility improvements.

10.          AK             Anchorage: Study, design,         $2,000,000
                             and engineering of Knik
                             crossing approach routes to
                             minimize traffic congestion

11.          AK             Sitka: World War II Causeway      $1,000,000
                             Trail and Multi-use Pathway
                             projects...................

12.          AK             McGrath: Road erosion               $500,000
                             control along the Yukon
                             River......................

13.          AK             Ketchikan: Improve marine        $20,000,000
                             dry-dock and facilities....

14.          AL             Preliminary Engineering,          $5,000,000
                             Design, Right-Of-Way
                             Acquisition and
                             Construction of the
                             Tuscaloosa Bypass, Alabama.

15.          AL             Preliminary Engineering,          $5,000,000
                             Design, Right-Of-Way
                             Acquisition and
                             Construction of the I-10
                             Connector, Alabama.........

16.          AL             Preliminary Engineering,         $50,000,000
                             Design, Right-Of-Way
                             Acquisition and
                             Construction of the I-85
                             Extension, Alabama.........

17.          CA             Century Boulevard Pedestrian      $3,000,000
                             Safety and Transportation
                             Improvements in City of
                             Inglewood..................

18.          CA             Hilmar/Turlock California         $1,000,000
                             Highway 99 Interchange
                             Engineering and
                             Construction in Merced
                             County.....................

19.          CA             Port of Hueneme Intermodal        $1,000,000
                             Access Improvement Access
                             Improvement Project,
                             including grade separation
                             at Rice Avenue and State
                             Route 34; widen Hueneme
                             Road.......................

20.          CA             Widen Northbound I-405           $30,000,000
                             between I-10 and U.S. 101
                             for HOV Lane...............

21.          CA             Alameda Corridor East            $30,000,000
                             Construction Authority.....

22.          CO             Improvements to I-70/Havana/      $3,000,000
                             Yosemite Interchange.......

23.          CO             Improvements to Wadsworth         $2,000,000
                             and U.S. 36 Interchange in
                             Broomfield.................

24.          CO             Improvements to Bromley Lane      $1,000,000
                             and U.S. 85 Interchange....

25.          CO             Improvements to C470 and          $4,000,000
                             U.S. 85 Interchange........

26.          CO             Improvements to Hwy 34 and I-     $2,000,000
                             25 Interchange (Loveland/
                             Greeley exit)..............

27.          CO             Improvements to Hwy 16 and I-     $3,000,000
                             25 Interchange (Fort
                             Carson--Phase I)...........

28.          CO             Improvements to Hwy 50 from      $12,000,000
                             Las Animas to Lamar........

29.          CO             Improvements to Hwy 395 and       $2,000,000
                             I-25 (at Windsor exit).....

30.          CO             Improvements to Pecos Street      $3,000,000
                             Overpass (Adams County)....

31.          CO             Improvements to U.S. 285 and      $1,000,000
                             Deer Creek Interchange.....

32.          CO             Improvements to U.S. 50 and       $2,000,000
                             Hwy 115 (safety
                             improvements)..............

33.          CO             Improvements to Glenwood          $1,000,000
                             Springs Bridge.............

34.          CO             Improvements to 104th and         $1,000,000
                             U.S. 85 Intersection.......

35.          CT             Development and                   $5,000,000
                             demonstration in
                             Connecticut of fuel cell
                             technologies for buses in
                             urban areas................

36.          CT             Improvements to I-95 in          $50,000,000
                             Connecticut, including the
                             Pearl Harbor Memorial/Q
                             Bridge, from the State
                             border with New York to the
                             State border with Rhode
                             Island.....................

37.          DE             Planning, Design, and             $1,000,000
                             Construction of the Energy
                             Exploration Center at
                             Destination Station in
                             Rehoboth Beach.............

38.          DE             Preliminary Engineering and       $4,000,000
                             Environmental Analysis of
                             the Middletown to Newark
                             Rail Connection............

39.          DE             Develop and construct an          $8,500,000
                             alternative route for truck
                             traffic in the core
                             downtown area of Harrington

40.          DE             Build the Pomeroy Line            $4,771,000
                             Pedestrian/Bicycle Trail
                             and Facility in Newark.....

41.          DE             Infrastructure and                $6,750,000
                             Streetscape Improvements on
                             Rehoboth Avenue in Rehoboth

42.          DE             University of Delaware's          $4,979,000
                             Automotive Based Fuel Cell
                             Hybrid Bus Program in
                             Newark.....................

43.          DE             Design and Construct the          $5,000,000
                             Indian River Inlet Bridge
                             on SR 1 in Sussex County...

44.          FL             Tamiami Trail Skyway              $1,000,000
                             Transportation Study.......

45.          FL             Sand Lake Road Improvements       $3,000,000
                             between President's Drive
                             and I-4....................

46.          FL             New systems interchange           $2,000,000
                             ramps at SR 417 and Boggy
                             Creek Road in Orange
                             County, Florida............

47.          FL             Florida SIS projects in           $5,000,000
                             Miami-Dade County..........

48.          FL             Hillsborough County I-4           $7,000,000
                             Crosstown Connector--
                             Construction of I-4
                             crosstown connector from I-
                             4 to Port of Tampa.........

49.          FL             Sand Lake Road Improvements       $6,000,000
                             between Presidents Drive
                             and I-4....................

50.          FL             Gulf Coast Parkway, Final         $7,000,000
                             design, engineering, and
                             construction for a 2-lane
                             Gulf Coast/U.S. 98 bypass..

51.          GA             Queens Road widening and          $1,000,000
                             reconstruction Cobb County.

52.          GA             Widening Cedarcrest Rd. from      $1,000,000
                             Paulding County to
                             Governor's Towne...........

53.          GA             U.S. 84 Connector/Bypass          $1,000,000
                             from west of U.S. 84/SR 119
                             west of Hinesville to U.S.
                             84/SR 196 south of
                             Flemington, Liberty County.

54.          GA             SR 746/SE Rome Bypass from        $4,000,000
                             SR 101 U.S. 411 Floyd
                             County.....................

55.          GA             SR 204/Abercorn Street from       $4,000,000
                             King George Boulevard to
                             Rio Road widening..........

56.          GA             SR 96 from I-75 to old            $4,000,000
                             Hawkinsville Road widening
                             and reconstruction.........

57.          GA             SR 40 from west of CR 61 to       $4,000,000
                             SR 25/U.S. 17 widening.....

58.          GA             SR 40 from east of St.            $2,000,000
                             Mary's cut off at mile post
                             5.0, Charlton County, to
                             County Route 61, Camden
                             County Widening............

59.          GA             I-75 interchanges from north      $4,000,000
                             of Tifton to Turner County
                             line interchange
                             reconstruction.............

60.          GA             I-75/Windy Hill Road              $5,000,000
                             interchange reconstruction,
                             Cobb County................

61.          GA             Interchange capacity              $3,000,000
                             improvements at I-285 and
                             Ashford-Dunwoody Road......

62.          GA             I-75/CR 65/Union Grove Road--     $3,500,000
                             New interchange, Gordon
                             County.....................

63.          GA             SR 85 widening from Adams         $3,500,000
                             Drive to I-75 and
                             reconstruct the Forest
                             Parkway interchange........

64.          GA             City of Jesup, Georgia for        $2,500,000
                             transportation improvements

65.          GA             Walker County, Georgia for        $2,500,000
                             transportation improvements

66.          GA             Catoosa County, Georgia for       $2,500,000
                             transportation improvements

67.          GA             I-75/CR 665/Carbondale Road       $4,000,000
                             interchange reconstruction,
                             Whitfield County...........

68.          GA             U.S. 411/SR 20 Access Rights      $3,500,000
                             from Floyd County to U.S.
                             41/SR 3 for transportation
                             improvements...............

69.          HI             Saddle Road traffic              $10,000,000
                             improvements on the Island
                             of Hawaii..................

70.          HI             Kapolei traffic improvements      $5,000,000
                             on the Island of Oahu......

71.          HI             Queen Kaahumanu Highway           $5,000,000
                             traffic improvements on the
                             Island of Hawaii...........

72.          IA             Iowa State University,           $10,000,000
                             National Center for
                             Portland Cement Concrete
                             Pavement Technology........

73.          IA             University of Northern Iowa,      $1,000,000
                             Native Roadside Vegetation
                             Enhancement Center,
                             construction and equipment.

74.          IA             University of Iowa, Public        $4,000,000
                             Policy Center--Field Test
                             of Onboard Computer
                             Assessment of Highway User
                             Fees.......................

75.          IA             Drake University, 28th and        $1,500,000
                             Carpenter Streets
                             Improvements, Des Moines...

76.          IA             Loess Hills Scenic Byways/          $330,000
                             Resource Protection,
                             Western Iowa...............

77.          IA             Great River Road National         $5,000,000
                             Scenic Byway, Rivers to the
                             Sea, Dubuque County........

78.          IA             Great River Road National           $600,000
                             Scenic Byway, Mud Lake
                             Road, Dubuque County.......

79.          IA             Great River Road National            $37,445
                             Scenic Byway, Renovating
                             Old Fort Madision..........

80.          IA             Great River Road National         $1,700,000
                             Scenic Byway, Louisa County

81.          IA             Great River Road National            $73,500
                             Scenic Byway, Montrose.....

82.          IA             Wapsi-Great Western Trail         $2,300,000
                             System, Mitchell and Howard
                             Counties...................

83.          IA             Lewis and Clark Trail Study.        $250,000

84.          IA             Recreation Trail, Comanche        $2,100,000
                             to Clinton.................

85.          IA             Mississippi River Trail,          $1,680,000
                             Heritage Trail, Dubuque
                             County.....................

86.          IA             Mississippi River Trail,          $2,000,000
                             Bridge at Credit Island,
                             Davenport..................

87.          IA             Mississippi River Trail,          $2,165,000
                             Leach Park in Bettendorf to
                             Riverdale..................

88.          IA             American Discovery Trail,           $200,000
                             Hoover Nature Trail connect
                             to Ely.....................

89.          IA             American Discovery Trail,           $450,000
                             connection to Clear Creek
                             Trail, Coralville..........

90.          IA             Downtown Improvement              $1,700,000
                             Project, DeWitt............

91.          IA             19th Avenue North Connector,      $1,500,000
                             Clinton....................

92.          IA             McCollister Boulevard, Iowa       $3,000,000
                             City (HP: 830).............

93.          IA             County Home Road, Linn            $1,200,000
                             County.....................

94.          IA             Collins Road, Cedar Rapids..      $6,000,000

95.          IA             I-80/Middle Road Interchange        $500,000
                             Justification Report with
                             Environmental Assessment,
                             Bettendorf.................

96.          IA             Highway K-35, Woodbury            $1,000,000
                             County.....................

97.          IA             National Transportation           $3,600,000
                             Heroes Center and Regional
                             Transportation Archival,
                             Research, and Library
                             Center, Grinnell...........

98.          IA             Highway 4 Underpass,              $3,000,000
                             Jefferson..................

99.          IA             IA 92 Project, Indianola....      $2,000,000

100.         IA             Rehabilitation and Retrofit         $800,000
                             of Historic Boone County
                             Wagon Bridge...............

101.         IA             Lincoln Highway                     $203,870
                             Rehabilitation and
                             Restoration Project,
                             Woodbine...................

102.         IA             IA 57/West 1st Street             $3,000,000
                             Reconstruction, Cedar Falls

103.         IA             Scotch Ridge Project,             $2,022,000
                             Carlisle...................

104.         IA             U.S. 63 Improvements,             $1,486,185
                             Chickasaw, Bremer, and
                             Black Hawk Counties (HP:
                             858).......................

105.         IA             Study of Direct Link to I-          $110,000
                             80, Pella (HP: 54).........

106.         IA             Construction of 100th Street        $220,000
                             Interchange on I-35/80,
                             Urbandale (HP: 86).........

107.         IA             Central Iowa Trail Loop,            $720,000
                             Ankeny to Woodward (HP:
                             146).......................

108.         IA             Study for NE Beltway, Polk          $110,000
                             County (HP: 209)...........

109.         IA             Widening University                 $220,000
                             Boulevard, Clive (HP: 275).

110.         IA             Reconstruction of NW Madrid         $220,000
                             Drive, Polk County (HP:
                             396).......................

111.         IA             Widening of Highway 44,           $2,020,000
                             Grimes (HP: 834)...........

112.         IA             NW 70th Avenue                    $2,100,000
                             Reconstruction, Johnston
                             (HP: 848)..................

113.         IA             U.S. 6 Final Phase of Safety        $440,000
                             Improvements, Coralville
                             (HP: 1098).................

114.         IA             Construct IA-32 Arterial          $4,180,000
                             from U.S. 20 to U.S. 61 and
                             151, Dubuque (HP: 1145)....

115.         IA             Construct Trail from Musser         $110,000
                             Park to Weggens Road,
                             Muscatine (HP: 1243).......

116.         IA             Reconstruction of Neal Smith        $792,000
                             Trail, Polk County (HP:
                             1284)......................

117.         IA             Reconstruction of NE 56th           $220,000
                             Street, Eastern Polk County
                             (HP: 1540).................

118.         IA             Hoeven Corridor/Outer Drive         $440,000
                             Project, Sioux City (HP:
                             1581)......................

119.         IA             Phase III of Main Street            $220,000
                             Project, Amana (HP: 1791)..

120.         IA             Improvements at IA 146 and I-       $220,000
                             80 Interchange, Grinnell
                             (HP: 2182).................

121.         IA             Construct SW Connector, West      $3,440,000
                             Des Moines (HP: 2248)......

122.         IA             U.S. 20 Mississippi River         $5,500,000
                             Bridges and Approaches,
                             Dubuque (HP: 2574).........

123.         IA             I-35 Interchange                  $1,100,000
                             Improvements, Ankeny (HP:
                             2837)......................

124.         IA             Construction of NW 26th             $220,000
                             Street Interchange I-35,
                             Polk County (HP: 3258).....

125.         IA             Construct Principal               $1,100,000
                             Riverwalk, Des Moines (HP:
                             3298)......................

126.         IA             Design, rehabilitation and          $800,000
                             construction of Clear Creek
                             Greenway and associated
                             trails in Johnson County...

127.         IA             Design and construction of        $1,000,000
                             Central IA Trail Loop from
                             Ankeny to Woodward.........

128.         IA             Design, ROW and construction        $400,000
                             of Ely Connector Trail in
                             Linn County................

129.         IA             Reconstruction of rail line       $1,000,000
                             from Oelwein to DeWar......

130.         IA             Purchase and rehabilitation       $1,000,000
                             of 9 mile Rail spur to
                             Bondurant..................

131.         IA             ROW and construction of           $1,000,000
                             Mississippi River Trail and
                             related trails in Dubuque
                             County.....................

132.         IA             ROW and construction of           $1,000,000
                             Mississippi River Trail and
                             related trails in Scott-
                             Muscatine Counties.........

133.         IA             Construction of SW Arterial,      $6,800,000
                             IA-32 Dubuque..............

134.         IA             Construction of Cedar Falls       $1,000,000
                             trails.....................

135.         IA             Construction of Hwy 63 in         $3,000,000
                             Waterloo...................

136.         IA             Kimberly Road improvements        $3,000,000
                             and construction in
                             Davenport..................

137.         IA             Mississippi River Trail,          $4,900,000
                             Allamakee County...........

138.         IA             U.S. 71 Bypass, Spencer.....      $5,000,000

139.         ID             Transportation improvements       $5,000,000
                             to widen U.S. 95, Worley to
                             Mica Creek.................

140.         ID             Transportation Improvements       $2,000,000
                             to Improve SH 75, Timmerman
                             to Ketchum.................

141.         ID             Construct Interchange on I-       $2,000,000
                             84 at Ten-Mile Road,
                             Meridian, Idaho............

142.         ID             Reconstruct Grangemont Road       $1,000,000
                             (ID Forest Hwy 67) from
                             Orofino to MP 9.3, Segment
                             I, II, and III.............

143.         IL             Preconstruction and               $7,500,000
                             construction activities of
                             U.S. 51 between Decatur and
                             Vandalia...................

144.         IL             Preconstruction and              $15,000,000
                             construction of North-South
                             Wacker Drive in Chicago....

145.         IL             Construct new Mississippi        $14,000,000
                             River Bridge and related
                             roads in the vicinity of
                             East St. Louis.............

146.         IL             Replace I-74 Bridge in Quad       $3,500,000
                             Cities (Moline)............

147.         IL             Conduct study of U.S. 67          $2,000,000
                             bridge over Illinois River
                             in Beardstown..............

148.         IL             Improvements to the               $1,000,000
                             intersection of IL 13 and
                             37 in Marion...............

149.         IL             Construction to improve           $2,000,000
                             access of Interstate 57/64
                             in Mount Vernon............

150.         IL             Construction of Joliet            $1,000,000
                             Arsenal Road Improvements
                             in Will County.............

151.         IL             Continue expansion of IL 336      $2,000,000
                             in Macomb-Peoria...........

152.         IL             Preconstruction and               $2,000,000
                             construction of IL 13
                             Connector in Harrisburg....

153.         IN             Improvements to existing          $5,000,000
                             roadway/railroad crossings,
                             City of Vincennes, Indiana.

154.         IN             Improvements to existing          $5,000,000
                             rail-highway crossings,
                             City of Elkhart, Indiana...

155.         KS             Widen South Meridian Street       $3,000,000
                             from 47th Street South to
                             71st Street South in
                             Sedgwick County, KS........

156.         KS             Widen 21st Street North,          $2,600,000
                             eastward from Hwy K-96 to
                             the Butler County line in
                             Sedgwick County............

157.         KS             Reconstruction of railroad        $2,000,000
                             and road grade separation
                             project eliminating four
                             high volume at grade
                             crossings on Ridgeview
                             Street, Santa Fe Street,
                             Loula Street, and Park
                             Street in Olathe, KS.......

158.         KS             Construction of South Bypass      $2,000,000
                             for Highway 56 in Great
                             Bend.......................

159.         KS             Street and sidewalk                 $400,000
                             replacement in downtown
                             Fort Scott.................

160.         KS             Construction and                  $3,600,000
                             improvements to RS 255
                             south of U.S. Highway 156
                             associated with the Horse
                             Thief Reservoir in Hodgeman
                             County.....................

161.         KS             Bridge replacement on             $1,200,000
                             Johnson Drive and Nall Ave.
                             associated with the Rock
                             Creek Project in Mission...

162.         KS             Reconstruction of the box           $200,000
                             under U.S. Highway 56 on
                             Windsor Lane associated
                             with the Rock Creek Project
                             in Fairway.................

163.         KS             Reconstruction of the             $1,000,000
                             Mission Road Bridge
                             associated with the Rock
                             Creek Project in Fairway,
                             KS.........................

164.         KS             Rehabilitation and                $2,000,000
                             reconstruction of U.S. 169
                             and interchange with U.S.
                             166 in Montgomery County...

165.         KS             U.S. Highway 50 Shoulder          $2,000,000
                             widening between Dodge City
                             and Garden City, KS........

166.         KY             21st Century Parks Project       $38,000,000
                             in Louisville, Kentucky....

167.         KY             Construction of new I-65         $12,000,000
                             Interchange in Warren
                             County, Kentucky...........

168.         KY             Owensboro Riverfront             $10,000,000
                             Development Project in
                             Owensboro, Kentucky........

169.         KY             Transportation Improvements       $8,000,000
                             to AA-I-275 Connector,
                             Campbell County............

170.         KY             Transportation Improvements       $2,000,000
                             to U.S. 60 Owensboro,
                             Daviess County.............

171.         LA             Construction of the Leeville     $10,000,000
                             Bridge from Port Fouchon to
                             Golden Meadow..............

172.         MA             Construct rail freight            $9,000,000
                             corridor improvements
                             between Boston and
                             Worcester..................

173.         MA             Design and construct bicycle      $3,000,000
                             and pedestrian trails in
                             Barnstable County..........

174.         MA             Rutherford Avenue                 $9,000,000
                             Improvements in Boston.....

175.         MA             Design and construct roadway      $5,000,000
                             and streetscape
                             improvements along State
                             Street in Springfield......

176.         MA             Construct I-91 Corridor           $4,000,000
                             Intelligent Transportation
                             System Communications
                             Network, Hampden,
                             Hampshire, and Franklin
                             Counties...................

177.         MA             Design and construct roadway      $2,000,000
                             and streetscape
                             improvements along Main
                             Street and Maywood Street,
                             Worcester, MA..............

178.         MA             Design and construct              $2,000,000
                             downtown roadway and
                             streetscape improvements in
                             Brockton...................

179.         MA             Design, engineering, and          $4,000,000
                             construction at I-93 The
                             Junction Interchange,
                             Andover, Tewksbury, and
                             Wilmington.................

180.         MA             Gainsborough St. and St.          $2,000,000
                             Botolph Street Improvements
                             in Boston..................

181.         MD             Upgrade MD 175 in Anne            $5,000,000
                             Arundel County between MD
                             170 and BW Parkway.........

182.         MD             Improve U.S. 40, MD 715           $5,000,000
                             interchange at Aberdeen
                             Proving Ground.............

183.         MD             Upgrade MD 4 at Suitland          $5,000,000
                             Parkway....................

184.         MD             Construct Fort McHenry            $2,000,000
                             Visitors Center and related
                             parking facilities.........

185.         ME             Plan and construct North-         $5,000,000
                             South Aroostook highways to
                             improve access to the St.
                             John Valley, including
                             Presque Isle Bypass and
                             other improvements.........

186.         ME             Repair and improvement of         $3,000,000
                             Deer Isle-Sedgwick Bridge..

187.         ME             Construction of Calais/St.        $1,000,000
                             Stephen Border Crossing
                             Project....................

188.         ME             Replacement of Waldo-Hancock      $1,000,000
                             Bridge.....................

189.         ME             Improvements and                  $1,500,000
                             construction of U.S. Route
                             1A and State Route 9 in
                             Bangor, Maine..............

190.         ME             Planning and construction of      $2,500,000
                             the Gorham Bypass, Gorham,
                             Maine......................

191.         ME             Access and Traffic                  $500,000
                             Improvements to Route 15 in
                             Brewer, Maine..............

192.         ME             Sedgewick--Deer Isle Bridge,      $3,000,000
                             Sedgewick, Maine...........

193.         ME             Augusta Memorial Bridge           $1,000,000
                             improvements, Augusta,
                             Maine......................

194.         ME             Replacement of Waldo-Hancock      $1,000,000
                             and construction of related
                             pedestrian walkways........

195.         ME             Research development of             $500,000
                             Cathodic Bridge Protection
                             to extend the life of
                             concrete bridges and Marine
                             structures within varied
                             climates...................

196.         MI             Detroit Riverfront               $20,000,000
                             Conservancy, West
                             Riverfront Walkway,
                             Greenway and Adjacent Land
                             Acquisition, from
                             Riverfront Towers to
                             Ambassador Bridge, Detroit.

197.         MI             Reconstruct and widen I-94       $20,000,000
                             in Kalamazoo...............

198.         MI             Construction of a new at-         $7,000,000
                             grade crossing and I-75
                             interchange to reconnect
                             Milbocker and McCoy Roads
                             and a new overpass to
                             reconnect Van Tyle to South
                             Wisconsin Road in Gaylord..

199.         MI             The Trowbridge Road               $6,000,000
                             Extension to Farm Lane,
                             Ingham County, MI, Farm
                             Lane between Mount Hope
                             Road and Trowbridge Road
                             with underpasses for CN and
                             CSX railroad crossings.....

200.         MI             East Riverfront, completion       $3,000,000
                             of Detroit Riverfront East
                             Walkway, Detroit...........

201.         MI             Alger County, Repaving a         $11,000,000
                             portion of H-58 between
                             Sullivan Creek towards
                             Little Beaver Road.........

202.         MI             Jackson Road Boulevard            $5,000,000
                             Project, Scio Township.....

203.         MI             Blue Water Bridge Plaza          $18,000,000
                             Expansion, Improve Highway
                             connections along I-94 and
                             I-69 Port Huron............

204.         MI             Midtown Detroit Greenway          $2,000,000
                             Loop, Detroit Cultural
                             Center in Detroit..........

205.         MI             Pinnacle Aeropark Access          $2,000,000
                             Project in Wayne County....

206.         MI             Washington Ave. Streetscape       $1,000,000
                             and rail relocation in
                             Saginaw....................

207.         MI             U.S. 131 widening from the        $3,000,000
                             Manistee River to north of
                             M-113 in Grand Traverse
                             County.....................

208.         MI             11 Mile Road Reconstruction--     $2,000,000
                             Berkley, Huntington Woods,
                             Oak Park...................

209.         MN             Phase III construction of         $8,000,000
                             Trunk Highway 610-10.......

210.         MN             Polk, Pennington, Marshall        $2,000,000
                             County 10-Ton Corridor in
                             Northwestern Minnesota.....

211.         MO             Mississippi River Bridge St.     $25,000,000
                             Louis, Missouri............

212.         MO             I-29 Paseo Bridge Kansas         $50,000,000
                             City, Missouri.............

213.         MO             Page Ave. Extension, Phase       $20,000,000
                             2, St. Charles County,
                             Missouri...................

214.         MO             U.S. 67 Corridor from Butler     $15,000,000
                             to St. Francois County,
                             Missouri line..............

215.         MO             Lewis and Clark Expressway,      $30,000,000
                             39th Street to Hwy 24,
                             Jackson County, Missouri...

216.         MO             Hwy 54 Lake Ozark Bypass,         $3,000,000
                             Miller and Camden Counties,
                             Missouri...................

217.         MO             Hwy 13 Warrensburg Bypass,       $10,000,000
                             Johnson County, Missouri...

218.         MO             I-55 Interchange at Main          $5,000,000
                             Street, Cape Girardeau,
                             Missouri...................

219.         MO             Rt. 13 in Polk County,           $20,000,000
                             Missouri CR 490 to Pinewood
                             Drive......................

220.         MO             Widen Rt. 66 Duquesne Rd. to     $10,000,000
                             Rt. 249, Jasper County,
                             Missouri...................

221.         MO             Grand Ave. Bridge                $15,000,000
                             Replacement, St. Louis
                             City, Missouri.............

222.         MO             Hwy 36 Macon to Rt. 24,           $7,000,000
                             Marion, Ralls, Monroe,
                             Shelby and Macon Counties..

223.         MO             Ramsey Creek Bridge, Scott        $5,000,000
                             County, Missouri...........

224.         MO             Upgrades to MO Route 14           $6,000,000
                             between U.S. 160 and U.S.
                             65 in Christian County.....

225.         MO             Upgrades to Scott Road (MO        $3,500,000
                             Route TT) between Rollins
                             Road and Brookview Terrace
                             in Boone County............

226.         MO             Construction of riverfront          $500,000
                             trails in the City of
                             Warsaw.....................

227.         MS             Widen State Highway 57 from      $32,000,000
                             I-10 through Vancleave.....

228.         MS             Widening of I-55 from             $8,000,000
                             Highway 304 in DeSoto
                             County to TN State line....

229.         MS             Byram-Clinton/Norrell             $5,000,000
                             Corridor--Connects the
                             Norrell Road Interchange on
                             I-20 to the Byram-Clinton
                             Multimodal Corridor on I-55

230.         MS             South Entrance Loop--             $5,000,000
                             Mississippi State
                             University.................

231.         MS             Highway 44 Extension/Pearl        $5,000,000
                             River Bridge Project,
                             Lawrence and Marion
                             Counties...................

232.         MS             U.S. Highway 78, New Albany       $5,000,000
                             Interchange................

233.         MS             Interstate 69, Unfinished        $35,000,000
                             Sections, Mississippi......

234.         MT             Zimmerman Trail Project,          $7,000,000
                             Billings, Montana..........

235.         MT             Taylor Hill Road                  $3,000,000
                             reconstruction, Secondary
                             234, Montana...............

236.         MT             Develop and construct Shiloh     $10,000,000
                             Road reconstruction
                             project, Billings..........

237.         MT             Develop and construct U.S.       $30,000,000
                             93 Kalispell Bypass project

238.         MT             Develop and construct St.         $8,000,000
                             Mary water project road and
                             bridge infrastructure
                             including: New bridge and
                             approaches across St. Mary
                             River, stabilization and
                             improvements to U.S. 89,
                             and road/canal from Siphon
                             Bridge to Spider Lake......

239.         MT             U.S. 2, corridor feasibility     $10,000,000
                             study, environmental review
                             and construction, which may
                             include construction of a 4-
                             lane highway, for roadway
                             sections from Glasgow east
                             to the North Dakota State
                             line, provided that all
                             currently programmed
                             highway improvement
                             projects move forward......

240.         MT             Develop East Belgrade             $8,000,000
                             Interchange and connecting
                             roadways to include
                             environmental review.......

241.         MT             Reconstruct Marysville Road       $5,000,000
                             consistent with final
                             environmental document,
                             Lewis and Clark County.....

242.         MT             Develop and construct             $5,000,000
                             transportation enhancements
                             including bicycle/
                             pedestrian trails,
                             landscaping, footbridges,
                             parks, and river access on
                             and in the vicinity of the
                             Milltown Dam Site, Missoula
                             County and Deer Lodge
                             County.....................

243.         MT             Develop Billings bypass,          $7,000,000
                             Yellowstone County.........

244.         MT             Develop Great Falls South         $4,500,000
                             Arterial, including
                             environmental review.......

245.         MT             Develop and construct Helena     $10,000,000
                             I-15 corridor consistent
                             with final environmental
                             document and record of
                             decision...................

246.         MT             Develop and construct U.S.       $22,000,000
                             212 Red Lodge North........

247.         MT             Develop and construct             $3,000,000
                             Whitefish pedestrian and
                             bicycle trails.............

248.         MT             Develop and construct             $1,125,000
                             parking lot and
                             transportation enhancements
                             including bicycle/
                             pedestrian trails and urban
                             plaza, serving the City of
                             Bozeman Public Library.....

249.         MT             U.S. 2, Swamp Creek East          $6,000,000
                             roadway and bridge
                             reconstruction, Lincoln
                             County.....................

250.         MT             Russell Street                    $6,000,000
                             reconstruction and bridge
                             expansion over the Clark
                             Fork River, Missoula.......

251.         MT             Conrad I-15 North                 $4,000,000
                             Interchange modifications
                             to provide access east of
                             the current interchange,
                             Pondera County.............

252.         MT             Develop and improve access        $4,000,000
                             road and structure serving
                             the Port of Montana and
                             Silicon Mountain Technology
                             Park.......................

253.         NC             Construction and expansion        $2,000,000
                             of Little Sugar Creek
                             Greenway, Charlotte........

254.         NC             Falls of Neuse Road Widening      $1,000,000
                             and Improvement, Raleigh...

255.         NC             Transportation Improvements       $1,000,000
                             at Piedmont Triad Research
                             Park, Winston Salem........

256.         NC             Plan, design, and construct       $1,000,000
                             the 10th street Connector
                             Project in Greenville......

257.         NC             Randall Parkway Widening and      $1,000,000
                             Improvement, Wilmington....

258.         NC             Construction and improvement      $1,000,000
                             of I-73, I-74, U.S. 220, in
                             Montgomery and Randolph
                             Counties...................

259.         NC             U.S. 1 Bypass and                 $1,000,000
                             improvements around
                             Rockingham.................

260.         NC             Design, engineering, and          $1,000,000
                             construction of I-77/
                             Catawba Avenue Interchange,
                             Cornelius..................

261.         NC             Eliminate highway-railway         $1,000,000
                             crossings in City of
                             Fayetteville...............

262.         NC             Right-of-way acquisition and      $3,000,000
                             construction of U.S. 74
                             bypass, Monroe.............

263.         NC             Transportation improvements       $2,000,000
                             for the Piedmont Triad
                             Research Park, Winston-
                             Salem......................

264.         NC             Acquire right-of-way and          $2,000,000
                             construct a new highway
                             that will begin at NC 58
                             and follow east to U.S.
                             301, Wilson................

265.         NC             Transfer of the Williams          $3,000,000
                             Street railroad switching
                             operation to the Milan Yard
                             switching operation site,
                             Fayetteville...............

266.         ND             Reconstruction of the            $16,000,000
                             Bismarck-Mandan Liberty
                             Memorial Bridge over
                             Missouri River.............

267.         ND             Develop and construct             $2,000,000
                             freight intermodal project
                             in North Dakota, including
                             access road construction...

268.         ND             Rural transportation safety       $2,000,000
                             and security research at
                             the Upper Great Plains
                             Transportation Institute at
                             North Dakota State
                             University.................

269.         ND             U.S. 12 Improvements between      $3,000,000
                             Bowman and Hettinger.......

270.         ND             Replace Red River Valley          $3,000,000
                             Bridge at Drayton, ND......

271.         ND             U.S. 83 Reconstruction from         $500,000
                             Max to ND 23 Southbound....

272.         ND             U.S. 83 Rehabilitation from       $4,500,000
                             Linton to Hazelton.........

273.         ND             I-29 Vertical Clearance           $2,000,000
                             Improvements from Bowesmont
                             to the Canadian Border.....

274.         ND             U.S. 281 Reconstruction from      $7,000,000
                             Edgely to the junction of
                             ND 46......................

275.         NE             Construction of the Antelope      $3,800,000
                             Valley Transportation
                             Improvement Project in
                             Lincoln....................

276.         NE             Design and construction of        $5,700,000
                             the Cuming Street
                             Transportation Improvement
                             Project in Omaha...........

277.         NE             Design and construction of        $2,000,000
                             the I-80-Cherry Avenue
                             Interchange and East Bypass
                             in Kearney.................

278.         NE             Construction of the               $2,500,000
                             Heartland Expressway
                             between Alliance and
                             Minatare...................

279.         NE             Design, right-of-way and          $2,500,000
                             construction of the North
                             Arterial Road in Columbus..

280.         NE             Research at the Midwest           $3,500,000
                             Roadside Safety Facility at
                             the University of Nebraska,
                             Lincoln, Nebraska..........

281.         NJ             PATCO Rolling Stock              $10,000,000
                             acquisition and/or
                             renovation for use on line
                             between Lindenwold and
                             Locust Street in
                             Philadelphia...............

282.         NJ             Construct new ramps between      $10,000,000
                             I-295 and Route 42.........

283.         NJ             Route 46 Corridor upgrades..        $500,000

284.         NJ             Route 18 Reconstruction in        $2,500,000
                             downtown New Brunswick.....

285.         NJ             Interstate 280 Interchange        $3,000,000
                             Improvements, Harrison.....

286.         NJ             Widening of Rt. 1 and             $2,500,000
                             intersection improvements
                             in South Brunswick.........

287.         NJ             Route 29 conversion project       $2,500,000
                             to a full access freeway...

288.         NJ             Improvements to River Road        $1,000,000
                             in Camden..................

289.         NJ             Design and construct Newark       $1,500,000
                             Waterfront Pedestrian and
                             Bicycle Access project.....

290.         NJ             Route 9W operational and          $1,000,000
                             safety improvements,
                             including I-95 Southbound
                             entrance alterations.......

291.         NJ             Expand TRANSCOM Regional ITS        $500,000
                             System in NJ, NY, and CT...

292.         NM             I-25/U.S. 64 Interchange          $2,000,000
                             rehabilitation in Raton....

293.         NM             Reconstruction of NM18 in         $3,000,000
                             Lea County.................

294.         NM             Reconstruction of U.S. 180        $3,000,000
                             in Grant County............

295.         NM             Reconstruction of U.S. 491        $2,000,000
                             from Tohatchi to Shiprock..

296.         NV             Hoover Dam Bypass--Boulder       $26,500,000
                             City Extension.............

297.         NV             California Trail                  $2,000,000
                             Interpretive Center
                             roadside improvements and
                             access infrastructure......

298.         NV             I-15 Widening north from         $26,500,000
                             U.S. 95 to Apex Road in
                             Clark County...............

299.         NV             V and T Railroad                 $10,000,000
                             Reconstruction Project in
                             Carson City................

300.         NV             Carson City Bypass                $2,000,000
                             Enhancement Project (Phase
                             II), Carson City (GROW and
                             NDOT)......................

301.         NV             Laughlin-Bullhead City           $18,000,000
                             Colorado River Bridge......

302.         NV             Rail Access Corridor             $15,000,000
                             Enhancement in Reno........

303.         NY             Peace Bridge Redevelopment       $17,000,000
                             Project, Road Improvements,
                             and Construction, Buffalo..

304.         NY             Improvements to Moynihan         $10,000,000
                             Station....................

305.         NY             Design and Construction of        $4,000,000
                             Renaissance Square
                             Intermodal Facility in
                             Rochester..................

306.         NY             Repair and Restoration of         $3,000,000
                             the Outdoor Area on 82nd
                             Street and 5th Avenue......

307.         NY             Improvements to the New York      $3,000,000
                             Public Library vicinity....

308.         NY             Construction and                  $2,000,000
                             Improvements to York Street
                             in Auburn..................

309.         NY             Streetscape, Roadway, and         $1,000,000
                             Improvements for the
                             College of New Rochelle....

310.         NY             South Lexington and Post          $1,000,000
                             Road Streetscape Expansion
                             in White Plains............

311.         NY             Planning and Interim              $1,000,000
                             Improvements for the
                             Manhattan, Bronx, Yonkers
                             Hudson River Greenway Link.

312.         NY             DestiNY USA Design,               $5,000,000
                             Research, Construction and
                             Improvements...............

313.         NY             Restoration of Vehicle            $2,000,000
                             Traffic to Main Street in
                             Downtown Buffalo...........

314.         NY             Roadway, Streetscape,             $6,000,000
                             Pedestrian, and Parking
                             Improvements to the Buffalo
                             Niagara Medical Campus in
                             Buffalo....................

315.         OH             Reconstruction of Cleveland      $85,000,000
                             Inner Belt and replacement
                             of the Central Viaduct
                             Bridge. Cleveland, OH......

316.         OH             SR 3 intersection/                $2,500,000
                             interchange improvements
                             and signalization, Franklin
                             County, OH (PID 76279).....

317.         OH             SR 81 widening, turn lane         $1,100,000
                             addition, and safety
                             improvements, Allen County,
                             OH (PID 75928).............

318.         OH             U.S. 422 turn lane addition         $600,000
                             and traffic flow
                             improvements at SR 88/SR
                             528, Geauga County OH (PID
                             78343).....................

319.         OH             SR 39 add 2-way left turn         $1,600,000
                             lane, signalization, and
                             safety improvements,
                             Tuscarawas County OH (PID
                             19598).....................

320.         OH             U.S. 36 signal relocation         $2,000,000
                             and related safety
                             improvements, Delaware
                             County, OH (PID 76276).....

321.         OH             SR 39 2-way turn lane               $600,000
                             addition, signalization,
                             and safety improvements,
                             Holmes County, OH (PID
                             23913).....................

322.         OH             Evans Avenue/CSX RR Grade         $1,600,000
                             Separation Improvements,
                             Akron, OH..................

323.         OK             State of Oklahoma I-40          $110,000,000
                             Crosstown Realignment in
                             Oklahoma City..............

324.         OK             The University of Oklahoma        $7,000,000
                             to conduct research in
                             global tracking methods for
                             intermodal containerized
                             freight....................

325.         OK             State of Oklahoma for             $1,000,000
                             control of outdoor
                             advertising................

326.         OK             Reconstruction of SH 20 in        $2,000,000
                             Owasso, Oklahoma...........

327.         OK             Widen Hwy 60 between Ponca       $10,800,000
                             City and Bartletsville.....

328.         OK             Trails in Tulsa, Mingo            $2,000,000
                             Creek, NCOG--Complete and
                             extend Mingo trail from
                             41st to 81st St., from 11th
                             St. to Mohawk Park.........

329.         OK             Signalization, Complete           $2,200,000
                             update of traffic signals
                             with LED illumination
                             technology.................

330.         OR             To add a southbound lane to       $2,000,000
                             a section of I-5 through
                             Portland, OR between Delta
                             Park and Lombard, Portland,
                             Oregon.....................

331.         OR             Sunrise Corridor, Clackamas       $1,000,000
                             County, Oregon.............

332.         OR             Reroute U.S. 97 at Redmond,       $1,400,000
                             Oregon and improvements to
                             intersection of U.S. 97 and
                             Oregon 126.................

333.         OR             Construct Barber Street             $600,000
                             extension, Wilsonville,
                             Oregon.....................

334.         OR             Construct highway and             $1,800,000
                             pedestrian access to
                             Macadam Ave. and street
                             improvements as part of
                             South waterfront
                             development, Portland,
                             Oregon.....................

335.         OR             Sellwood Bridge, Multnomah        $2,000,000
                             County, Oregon.............

336.         OR             Highway 22-Cascade Highway        $1,600,000
                             interchange improvements,
                             Marion County, Oregon......

337.         OR             I-5 Trade Corridor,               $2,000,000
                             Portland, Oregon to
                             Vancouver, Washington
                             Segment....................

338.         OR             Highway 101 Improvements,           $500,000
                             Oregon.....................

339.         OR             I-205 Widening, Clackamas         $1,400,000
                             County, Oregon.............

340.         OR             Phase 1 I-205/Highway 213         $1,500,000
                             Interchange Improvements,
                             Oregon.....................

341.         OR             Kuebler Boulevard                   $500,000
                             Improvements, Salem, Oregon

342.         OR             To construct sidewalks and        $2,000,000
                             improve storm drainage and
                             gutters for the City's Safe
                             Walk Plan, Medford, Oregon.

343.         OR             Highway 140 Transportation        $1,700,000
                             Improvements, Lake County,
                             Oregon.....................

344.         PA             Warrendale-Bayne Road             $2,800,000
                             improvements from I-79 to
                             SR 19, in Allegheny County.

345.         PA             For design, engineering, ROW      $1,000,000
                             acquisition, and
                             construction of the third
                             phase of the Marshalls
                             Creek Bypass Project in
                             Monroe County, Pennsylvania

346.         PA             Construction of Central             $600,000
                             Susquehanna Valley Thruway.

347.         PA             Improvements to SR 130 and          $500,000
                             the College Avenue
                             Underpass, Greensburg, PA..

348.         PA             Mifflin County Industrial           $500,000
                             Park Access Road...........

349.         PA             Improvements to Section 114       $2,500,000
                             of State Route 150, Centre
                             County, PA.................

350.         PA             Upgrade to SR 228, Cranberry      $1,500,000
                             Township, PA...............

351.         PA             Purchase of right-of-way,           $600,000
                             utilities and construction
                             for Northern Access to
                             Altoona from Interstate 99,
                             Blair County, PA...........

352.         PA             Reconfiguration of the              $500,000
                             Rochester Riverfront ramp..

353.         PA             Construct the Alle-Kiski          $1,500,000
                             Bridge and Connector.......

354.         PA             Construct an intermodal           $1,000,000
                             center at the Philadelphia
                             Zoo........................

355.         PA             For interpretive signage and      $2,000,000
                             trails in Pittsburgh urban
                             park land..................

356.         PA             Construct an intermodal           $1,000,000
                             facility in Derry Township.

357.         PA             Construction of the                 $700,000
                             Schuylkill Gateway Project.

358.         PA             Da Vinci Center hydrogen            $200,000
                             fuel-celled transit
                             vehicles...................

359.         PA             Construct a road along the        $1,000,000
                             North Delaware Riverfront
                             Corridor from Buckius
                             Street to Poquessing Creek.

360.         PA             Widen I-81 from four to six       $1,000,000
                             lanes in the Wilkes-Barre/
                             Scranton corridor..........

361.         PA             Improvements to the Pleasant        $300,000
                             Valley and Sandy Hill Roads
                             intersection with SR 130 in
                             Penn Township..............

362.         PA             Improvements to access roads        $300,000
                             at the Please Touch Museum.

363.         PA             Construct the North Delaware        $500,000
                             River East Coast Greenway
                             Trail......................

364.         RI             To enhance the                   $20,000,000
                             infrastructure surrounding
                             and for transportation
                             improvements relative to
                             the intermodal station at
                             Warwick....................

365.         RI             Improvements to Warren           $11,000,000
                             Bridge (Warren)............

366.         RI             Open space acquisition to         $2,000,000
                             mitigate growth associated
                             with SR 4 and Interstate
                             95, by non-profit land
                             conservation agencies
                             through acquisition of fee
                             or easement, with a match
                             requirement of 50% of the
                             total purchase price.......

367.         RI             Ten Mile River Greenway           $3,000,000
                             (Pawtucket, E. Providence).

368.         RI             Washington Secondary Bicycle      $4,000,000
                             Facility/Coventry Greenway/
                             Trestle Trail (Coventry)...

369.         RI             South County Bike Path            $2,000,000
                             (South Kingstown,
                             Narragansett)..............

370.         RI             New Interchange constructed       $1,500,000
                             from I-195 to Taunton and
                             Warren Avenue in East
                             Providence.................

371.         RI             Jamestown Bridge Demolition--    $11,500,000
                             Bicycle Access/Trestle Span
                             Demolition/Fishing Pier (N.
                             Kingstown).................

372.         RI             Sakonnet River Bridge            $15,000,000
                             Replacement................

373.         RI             Rt. 146 Safety Improvements       $5,000,000
                             in North Smithfield........

374.         SD             Construction of 4-lane           $19,000,000
                             highway on U.S. 79 between
                             Maverick Junction, and the
                             Nebraska border............

375.         SD             Rosebud community streets         $6,000,000
                             reconstruction and paving..

376.         SD             Aberdeen bike trail               $1,000,000
                             extension..................

377.         SD             Whether or not otherwise         $40,000,000
                             eligible in title 23,
                             construct Phase II and III
                             of Phillips to the Falls
                             Project. Notwithstanding
                             any other provision of law,
                             with respect to costs for
                             Phase II and III of this
                             project paid for from this
                             $40 million, the Federal
                             share of project costs
                             shall be 100 percent.......

378.         SD             Rapid City Greenway               $2,000,000
                             Pedestrian and bike path
                             expansion..................

379.         SD             Brookings bike path.........        $100,000

380.         SD             Sioux Falls Bike Path--           $1,170,000
                             Dunham Park, Skunk Creek,
                             12th St., and I-29 to
                             Sertoma Park...............

381.         SD             For bike paths and                $2,500,000
                             pedestrian walkways within
                             Yankton, Pierre, Huron,
                             Watertown, and Madison.
                             Allocation for such paths
                             will be determined by the
                             State......................

382.         SD             Directed to SD DOT for            $3,230,000
                             projects it determines to
                             be of high priority........

383.         TN             North Second Street Corridor      $2,000,000
                             Upgrade, Memphis...........

384.         TN             Upgrade roads for Slack           $2,000,000
                             Water Port facility and
                             industrial park, Lake
                             County, TN.................

385.         TN             Plan and construct                $1,000,000
                             Rutherford County visitor's
                             center/transportation
                             information hub, Rutherford
                             County, Tennessee..........

386.         TN             Warren County Mountain View       $1,000,000
                             Industrial Park access
                             road, Warren County, TN....

387.         TN             Construction of an                $2,000,000
                             Interchange on Highway 64
                             (APD 40) adjacent to I-75
                             Exit 20 in the City of
                             Cleveland, TN for increased
                             safety.....................

388.         TN             Sullivan, Washington              $1,000,000
                             Counties, Tennessee SR 75
                             widening...................

389.         TN             Sevier County, TN SR 66             $500,000
                             widening...................

390.         TN             Reconstruct U.S. 79 between       $5,000,000
                             Milan and McKenzie.........

391.         TN             Construct Transportation and        $500,000
                             Heritage museum, Townsend..

392.         UT             Widen Highway 92 from Lehi        $3,000,000
                             to Highland................

393.         UT             Widen Redwood Road from           $2,000,000
                             Bangerter Highway in Salt
                             Lake County through
                             Saratoga Springs in Utah
                             County.....................

394.         UT             Construction of 200 North         $2,000,000
                             Street highway-rail graded
                             crossing separation,
                             Kaysville, Utah............

395.         UT             Bear River Migratory Bird           $500,000
                             Refuge Access Road
                             Improvements, Box Elder
                             County, Utah...............

396.         UT             State Street Reconstruction       $2,500,000
                             Project--10600 South to
                             9400 South, Sandy, Utah....

397.         UT             Geneva Rd./Provo Center           $6,000,000
                             Street, Orem 1600 North to
                             I-15 Fwy, Provo-widen from
                             2 to 4 lanes, Provo........

398.         UT             Provo, Utah Westside              $4,000,000
                             Connector from I-15 to
                             Provo Municipal Airport,
                             Provo......................

399.         UT             Bear River Migratory Bird         $3,000,000
                             Refuge Access Road
                             Improvements, Box Elder
                             County.....................

400.         UT             Widen Highway 92 from Lehi        $5,000,000
                             to Alpine/Highland.........

401.         UT             Construction of 200 North         $7,000,000
                             Street highway-rail graded
                             crossing separation,
                             Kaysville..................

402.         UT             Expand Redhills Parkway from      $8,000,000
                             2 to 5 lanes and improve
                             alignment within rights-of-
                             way in St. George..........

403.         UT             Construction and                  $7,000,000
                             Rehabilitation of 13th East
                             in Sandy City..............

404.         VA             Hampton Roads Third Crossing-    $37,000,000
                             Segment 1..................

405.         VA             Manage Freight movement and      $38,000,000
                             safety improvements to I-81

406.         VA             Construct Old Mill Road           $3,000,000
                             extension..................

407.         VA             Widen Route 262 in Augusta        $3,000,000
                             County.....................

408.         VA             Construct Meadowcreek             $2,000,000
                             Parkway Interchange,
                             Charlottesville............

409.         VA             Widening I-95 between Rt.         $2,000,000
                             123 and Fairfax County
                             Parkway....................

410.         VT             Improvements to Vermont          $30,000,000
                             Small Bridges..............

411.         VT             Improvements to Vermont          $10,000,000
                             interstates................

412.         VT             Vermont Institute of Natural        $300,000
                             Science turning lane on
                             U.S. Rt. 4 in Woodstock....

413.         VT             Western Corridor Rail            $30,000,000
                             Improvements, ABRB&E,
                             Vermont....................

414.         VT             Design and Construction of        $6,500,000
                             the Bennington Welcome
                             Center.....................

415.         VT             Improvements to the E.            $5,000,000
                             Alburg Railroad Trestle
                             Swing Span.................

416.         VT             Rehabilitation of Hartford        $6,500,000
                             Northbound and Southbound
                             rest areas.................

417.         VT             Improvements to the Island        $2,000,000
                             Line at South Street in
                             South Hero.................

418.         VT             Property acquisition and          $2,000,000
                             improvements for public
                             access and viewshed
                             protection for the Cedar
                             Creek Vermont monument at
                             the Cedar Creek and Belle
                             Grove National Historical
                             Park in Virginia...........

419.         VT             Design and construction of        $5,000,000
                             the South Burlington City
                             Center project.............

420.         VT             Rehabilitation of statewide       $6,200,000
                             covered bridges............

421.         VT             Improvements to the Green         $2,500,000
                             Mountain Rail Line between
                             Rutland and Bellows Falls..

422.         VT             Streetscape and road              $1,000,000
                             improvements in the Village
                             of Enosburg Falls..........

423.         VT             Signalization and storm           $3,000,000
                             drainage improvements to
                             Main Street in Brattleboro.

424.         VT             Streetscape, trail and road       $4,000,000
                             improvements in Lamoille,
                             Caledonia, Grand Isle and
                             Chittenden Counties........

425.         VT             Vermont Statewide                 $6,000,000
                             Transportation and
                             Stormwater Projects........

426.         WV             Improvements to U.S. Rt.-35      $25,000,000
                             in Putnam County...........

427.         WV             Raleigh Street Extension         $10,000,000
                             Project in Martinsburg.....

428.         VA             I-64/City Line Road               $5,000,000
                             Interchange in Virginia
                             Beach......................

429.         AS             Shoreline protection and          $1,000,000
                             drainage mitigation for
                             Nuuuli village roads.......

430.         AS             Village road improvements         $1,400,000
                             for Ta'u, Ofu, and Olosega-
                             Sili counties in Manu'a
                             district...................

431.         AS             Shoreline protection and          $1,000,000
                             drainage mitigation for Aua
                             village roads..............

432.         AS             Drainage mitigation in            $1,400,000
                             Malaeloa-Leone village
                             roads......................

433.         AS             To upgrade, repair and            $1,600,000
                             continue construction of
                             Ta'u harbor/ferry terminal
                             facility on Manu'a island..

434.         AS             Village road improvements         $3,000,000
                             for Launiusaelua and Ituau
                             counties in the Central
                             district...................

435.         AS             Village road improvements         $3,000,000
                             for Tualauta, Tualatai,
                             Aitulagi, Fofo, and Alataua
                             counties in the Western
                             district...................

436.         AS             Village road improvements         $2,600,000
                             for Sua and Vaifanua
                             counties in the Eastern
                             district...................

437.         AS             Drainage mitigation for Pago      $1,000,000
                             Pago village roads.........

438.         GU             Reconstruct Hagatna River         $6,600,000
                             Bridges, Municipality of
                             Hagatna....................

439.         GU             Piti, GU Construct Cabras         $6,000,000
                             Island Intermodal Facility.

440.         GU             Guam Mass Transit Authority         $400,000
                             Acquisition of transit
                             vehicles for disabled
                             persons....................

441.         GU             Construct Route 3A                $3,000,000
                             Extension, Municipality of
                             Yigo.......................

442.         MP             Planning design and              $12,000,000
                             construction of East Coast
                             Highway/ Route 36, Saipan..

443.         PR             Construction of 4 lane            $1,950,000
                             connector serving PR 9922,
                             PR 9939 and PR 183.........

444.         PR             Widening of PR 111 at the         $6,000,000
                             intersections of PR-444
                             through PR-423.............

445.         PR             Replacement ferries on            $2,000,000
                             Culebra and Vieques routes.

446.         PR             To build an extension of PR-      $5,000,000
                             53 between Yabucoa and
                             Maunabo....................

447.         PR             To build the missing central      $5,000,000
                             segment of PR-10, to
                             complete one of only two
                             highways crossing Puerto
                             Rico North to South........

448.         PR             To revitalize Old San Juan        $3,000,000
                             Historic District streets..

449.         PR             Widen Route 835 to provide        $6,000,000
                             ready access to Guaynado
                             and facilitate housing,
                             industrial, commercial, and
                             recreational development...

450.         PR             Construct sidewalks, curbs          $500,000
                             and gutters in the
                             Municipality of Loiza. (PR
                             187 from Mediania Baja to
                             Puente Herrera; Community
                             La Torre, Pinones).........

451.         PR             Extension of PR 833, between      $1,000,000
                             the PR-177 and the PR 2.
                             The extension is
                             approximately of 0.8km.....

452.         PR             Reconstruct various roads         $2,000,000
                             throughout the Municipality
                             of Bayamon, including
                             pavings and cold millings
                             as well as construction of
                             gutters. (PR 2; PR 829; PR
                             830; PR 861; PR 862; PR
                             840; PR 29)................

453.         PR             Construct extension of 1.04       $3,000,000
                             km to the ``Caridad del
                             Cobre'' Avenue in Bayamon
                             between the PR 199 and Urb.
                             Canaa......................

454.         PR             Roadway improvements for            $661,000
                             municipal roads in Orocovis

455.         VI             Christiansted By-Pass             $8,000,000
                             Highway, St. Croix.........

456.         VI             Upgrade West-East Corridor        $8,000,000
                             through Charlotte Amalie,
                             St. Thomas.................

457.         MN             Lake Street Access to I-35W,      $6,000,000
                             Minneapolis................

458.         OH             Construction, including           $6,000,000
                             design and engineering, of
                             an approximately 30,000 sq.
                             ft. terminal building to
                             accommodate the Trans-Erie
                             ferry service which departs
                             the Cleveland-Cuyahoga
                             County Port Authority,
                             Cleveland, Ohio............

459.         NY             Various transportation            $5,000,000
                             projects related to the
                             DestiNY USA project........

460.         CA             Construction at Lammers Road      $5,000,000
                             and I-205..................

461.         CA             Feasibility study for             $6,000,000
                             constructing SR 130
                             Realignment project
                             connecting the central
                             valley and San Joaquin
                             County and Santa Clara
                             county.....................

462.         FL             Coconut Rd. interchange I-75/    $10,000,000
                             Lee County.................

463.         AR             Improvements to U.S. 412 in       $6,500,000
                             Northwest Arkansas.........

464.         CA             Construction of and              $10,000,000
                             improvements to State Route
                             239 from State Route 4 in
                             Brentwood area to I-205 in
                             the area of Tracy..........

465.         CA             Design and construction of        $5,000,000
                             Camino Tassajara Crown
                             Canyon to East Town Project

466.         CA             Engineering right-of-way and      $6,000,000
                             construction of I-580 in
                             the Livermore Valley.......
------------------------------------------------------------------------

SEC. 1935. PROJECT FLEXIBILITY.

    (a) In General.--Notwithstanding any other provision of law, funds
allocated for a project described in subsection (b) in a State may be
obligated for any other project in the State for which funds are so
allocated, except that the total amount of funds authorized for any
project for which funds are so allocated shall not be reduced.
    (b) Projects.--The projects described in this subsection are--
        (1) the projects numbered greater than 3676 listed in the table
    contained in section 1702 of this Act;
        (2) the projects numbered greater than 18 listed in the table
    contained in section 1301 of this Act;
        (3) the projects numbered greater than 27 listed in the table
    contained in section 1302 of this Act; and
        (4) the projects listed in the table contained in section 1934
    of this Act.

SEC. 1936. ADVANCES.

    Notwithstanding any other provision of law, funds apportioned to a
State under section 104(b) of title 23, United States Code, may be
obligated to carry out a project designated in any of sections 1301,
1302, 1306, and 1934 of this Act and sections 117 and 144(g) of title
23, United States Code, in an amount not to exceed the amount
authorized for that project, only from a program under which the
project would be eligible, except that any amounts obligated to carry
out the project shall be restored from funds allocated for the project.

SEC. 1937. ROADS IN CLOSED BASINS.

    (a) In General.--The Secretary shall use funds made available to
carry out section 125 of title 23, United States Code, through
advancement or reimbursement, without further emergency declaration, to
construct such measures as the Secretary determines to be necessary for
the continuation of roadway services, or the impoundment of water to
protect roads, or both, at Devils Lake in the State of North Dakota, as
the Secretary determines to be appropriate.
    (b) Requirements.--The Secretary shall carry out construction under
subsection (a) in accordance with--
        (1) the options and needs identified in the report of the
    Devils Lake Surface Transportation Task Force of the Federal
    Highway Administration dated May 4, 2000, and entitled ``Roadways
    Serving as Water Barriers'';
        (2) any needs relating to Devils Lake identified after May 4,
    2000; and
        (3) any monitoring, study, or design or preliminary engineering
    associated with evaluating or constructing the measures.
    (c) Affected Areas.--The Secretary shall carry out construction
under this section in an area that has been the subject of an emergency
declaration issued during the period beginning on January 1, 1993, and
ending on the date of enactment of this Act.
    (d) Funding.--
        (1) In general.--Except as provided in paragraph (2), to the
    extent that expenditures relating to construction under this
    section could not be made pursuant to any other authority under
    section 125 of title 23, United States Code, the expenditures shall
    not exceed--
            (A) $10,000,000 during any fiscal year; and
            (B) a total amount of $70,000,000.
        (2) Exception.--Nothing in paragraph (1) limits any expenditure
    with respect to--
            (A) emergency relief in response to a development occurring
        after the date of enactment of this Act; or
            (B) an authority under any other provision of law
        (including section 125 of such title).
    (e) Effect of Section.--Nothing in this section authorizes or
provides funding for the construction, operation, or maintenance of an
outlet at Devils Lake in the State of North Dakota.

SEC. 1938. TECHNOLOGY.

    States are encouraged to consider using a nondestructive technology
able to detect cracks including sub-surface flaws as small as 0.005
inches in length or depth in steel bridges.

SEC. 1939. BIA INDIAN ROAD PROGRAM.

    (a) Limitation on Applicability of Certain Rule.--The final rule
effective October 1, 2004, published in the Federal Register, July 19,
2004, at pages 43089, relating to the Indian reservation road program
administered by the Bureau of Indian Affairs of the Department of the
Interior, shall not apply to the following Alaska villages with respect
to the following projects:
        (1) Craig, Alaska, Craig Community Association, Point St.
    Nicholas Road improvements.
        (2) Cordova, Alaska, Native Village of Eyak, Shepard's Point
    Road improvements.
        (3) Hydaburg, Alaska, Hydaburg Community Association, Hydaburg
    community street improvements.
        (4) Healy Lake, Alaska, Healy Lake Traditional, Cummings Road
    improvements.
    (b) Special Rule.--For the villages listed in subsection (a), the
Indian reservation road program shall be administered by the Bureau of
Indian Affairs under the rules and regulations in effect before the
adoption of the final rule referred to in subsection (a), and the
Secretary shall pay, from amounts made available to carry out section
202(d) of title 23, United States Code, for fiscal year 2006 each of
the tribal organizations referred to in subsection (a) for the Federal
share of the costs of the projects listed in subsection (a).

SEC. 1940. GOING-TO-THE-SUN ROAD, GLACIER NATIONAL PARK, MONTANA.

    (a) Project Authorization.--There is authorized to be appropriated
to the Secretary from the Highway Trust Fund (other than the Mass
Transit Account) to resurface, repair, rehabilitate, and reconstruct
the Going-to-the-Sun Road at Glacier National Park, Montana, in
accordance with the framework identified in Alternative 3 (shared use
alternative) of the environmental impact statement and record of
decision dated 2003 and relating to the Going-to-the-Sun Road, to
remain available until expended--
        (1) $10,000,000 for fiscal year 2005;
        (2) $10,000,000 for fiscal year 2006;
        (3) $10,000,000 for fiscal year 2007;
        (4) $10,000,000 for fiscal year 2008; and
        (5) $10,000,000 for fiscal year 2009.
    (b) Federal Share.--The Federal share of the costs of the project
described in subsection (a) shall be 100 percent.

SEC. 1941. BEARTOOTH HIGHWAY, MONTANA.

    (a) Project Authorization.--Of funds made available for the State
of Montana for the project for development and construction of United
States Route 212, Red Lodge North, Montana, as described in the table
contained in section 1934 (including amounts transferred to the project
under section 1935), on request of the State of Montana, the Secretary
shall obligate such sums as are necessary to reconstruct the Beartooth
Highway in the State of Montana.
    (b) Reimbursement.--The amounts used for reconstruction under
subsection (a) shall be reimbursed to the project relating to United
States Route 212 described in subsection (a) on the date or dates on
which funding is allocated for the Beartooth Highway under section 125
of title 23, United States Code.
    (c) Federal Share.--The Federal share payable for funds allocated
for the Beartooth Highway under section 125 of such title shall be 100
percent.

SEC. 1943. GREAT LAKES ITS IMPLEMENTATION.

    (a) In General.--The Secretary shall make grants to the State of
Wisconsin to continue intelligent transportation system activities in
the corridor serving the Greater Milwaukee, Wisconsin, Chicago,
Illinois, and Gary, Indiana, areas initiated under the Intermodal
Surface Transportation Efficiency Act of 1991 (Public Law 102-240) and
other areas of the State of Wisconsin.
    (b) Funding.--There is authorized to be appropriated from the
Highway Trust Fund (other than the Mass Transit Account) $2,000,000 for
each of fiscal years 2006 through 2008 and $3,000,000 for fiscal year
2009 to carry out this section.
    (c) Contract Authority.--Funds made available to carry out this
section shall be available for obligation in the same manner as if the
funds were apportioned under chapter 1 of title 23, United States Code.

SEC. 1944. TRANSPORTATION CONSTRUCTION AND REMEDIATION, OTTAWA COUNTY,
              OKLAHOMA.

    (a) In General.--The Secretary shall allocate to the State of
Oklahoma amounts made available to carry out this section for the
activities described in subsection (b).
    (b) Oklahoma Plan for Tar Creek.--The activities referred to in
subsection (a) are all activities described in the Oklahoma Plan for
Tar Creek, including activities under that Plan that are to be carried
out by involved Federal and State entities.
    (c) Funding.--
        (1) Authorization of appropriations.--
            (A) In general.--There is authorized to be appropriated
        from the Highway Trust Fund (other than the Mass Transit
        Account) to carry out this section $10,000,000 for fiscal year
        2006.
            (B) Availability.--Funds authorized to be appropriated
        under subparagraph (A) shall remain available until expended.
        (2) Contract authority.--Except as otherwise provided in this
    section, funds authorized to be appropriated under this section
    shall be available for obligation in the same manner as if the
    funds were apportioned under chapter 1 of title 23, United States
    Code.
        (3) Title 23 eligibility.--Activities described in subsection
    (b) shall be considered to be eligible for funding under any
    program for which funds are apportioned under section 104(b) of
    such title, as in effect on the day before the date of enactment of
    this section.

SEC. 1945. INFRASTRUCTURE AWARENESS PROGRAM.

    (a) In General.--In cooperation with the subcontracting production
entity that received funds under section 1212(b) of the Transportation
Equity Act for the 21st Century (112 Stat. 193), the Secretary shall
fund the production of a documentary about infrastructure that
demonstrates advancements in Alaska, the last frontier.
    (b) Federal Share.--The Federal share of the cost of production of
the documentary under subsection (a) shall be 100 percent.
    (c) Funding.--There is authorized to be appropriated out of the
Highway Trust fund (other than the Mass Transit Account) to carry out
this section $1,500,000 for fiscal year 2005 and $1,450,000 for fiscal
year 2006. Such fund shall remain available until expended.
    (d) Applicability of Title 23.--Funds authorized by this section
shall be available for obligation in the same manner as if such funds
were apportioned under chapter 1 of title 23, United State Code; except
that the Federal share of the cost of production of the documentary
under this section shall be determined in accordance with this section.

SEC. 1946. GATEWAY RURAL IMPROVEMENT PILOT PROGRAM.

    (a) In General.--The Secretary shall establish a pilot program in
the State of Vermont to be known as the ``Gateway Rural Improvement
Pilot Program'' (referred to in this section as the ``program'') to
demonstrate the benefits to a rural rail corridor of a freight
transportation gateway program.
    (b) Eligible Activities.--Under the program--
        (1) funding preference shall be given to selecting a corridor
    in the State of Vermont that includes a border crossing; and
        (2) individual projects shall provide community and highway
    benefits by addressing economic, congestion, security, safety, and
    environmental issues.
    (c) Cost Sharing.--
        (1) Federal share.--The Federal share of the cost of a project
    under this section shall be determined in accordance with section
    120 of title 23, United States Code.
        (2) Non-federal share.--Project user fees may be used to
    provide all or part of the non-Federal share of the cost of a
    project funded under this section.
    (d) Authorization of Appropriations.--In addition to such amounts
as are otherwise authorized to be appropriated for the Department,
there are authorized to be appropriated such sums as may be necessary
to carry out this section.

SEC. 1947. ELIGIBLE SAFETY IMPROVEMENTS.

    Section 120(c) of title 23, United States Code, is amended in the
first sentence by inserting ``traffic circles (also known as
`roundabouts'),'' after ``traffic control signalization,''.

SEC. 1948. EMERGENCY SERVICE ROUTE.

    Notwithstanding any Federal law, regulation, or policy to the
contrary, no Federal funds shall be obligated or expended for the
demolition of the existing Brightman Street Bridge connecting Fall
River and Somerset, Massachusetts, and the existing Brightman Street
Bridge shall be maintained for pedestrian and bicycle access, and as an
emergency service route.

SEC. 1949. KNIK ARM BRIDGE FUNDING CLARIFICATION.

    The Secretary shall provide to the public entity known as the Knik
Arm Bridge and Toll Authority, established by the State of Alaska,
funds provided in items 2465 and 3677 in the table contained in section
1702, item 2 in the table contained in section 1934, and item 14 in the
table contained in section 1302.

SEC. 1950. LINCOLN PARISH, LA/I-20 TRANSPORTATION CORRIDOR PROGRAM.

    (a) In General.--The Secretary shall credit non-Federal
expenditures paid on or after October 23, 2000, by project sponsors of
the Lincoln Parish transportation and community and system preservation
project funded by the Department of Transportation and Related Agencies
Appropriations Act, 2001 (Public Law 106-346), and the United States
Route 167/I-20 interchange Interstate maintenance discretionary project
funded by the Department of Transportation and Related Agencies
Appropriations Act, 2002 (Public Law 107-87), that are in excess of the
non-Federal matching requirements for such projects as non-Federal
contributions toward the non-Federal matching requirements for all LA/
I-20 Transportation Corridor Program elements between Louisiana Route
149 and Louisiana Route 33.
    (b) Expiration of Authority.--The authority to provide credit under
subsection (a) expires on September 30, 2009.

SEC. 1951. BONDING ASSISTANCE PROGRAM.

    Section 332 of title 49, United States Code, is amended by
inserting at the end the following:
    ``(e) Bonding Assistance.--
        ``(1) In general.--The Secretary, acting through the Minority
    Resource Center established under subsection (b), shall provide
    assistance in obtaining bid, payment, and performance bonds by
    disadvantaged business enterprises pursuant to subsection (b)(4).
        ``(2) Authorization of appropriation.--There is authorized to
    be appropriated such sums as may be necessary for each of fiscal
    years 2005 through 2009 to carry out activities under this
    subsection.''.

SEC. 1952. CONGESTION RELIEF.

    The Secretary shall conduct a design and feasibility analysis to
alleviate southbound traffic congestion along the George Washington
Parkway, Virginia, between Interstate Route 495 and the 14th Street
Bridge and shall take appropriate action in response to the results of
that analysis.

SEC. 1953. AUTHORIZATION OF APPROPRIATIONS.

    There is authorized to be appropriated to carry out, in accordance
with title 23, United States Code, projects under section 1301 and 1302
of this Act.

SEC. 1954. BICYCLE TRANSPORTATION AND PEDESTRIAN WALKWAYS.

    Section 217(c) of title 23, United States Code, is amended by
striking ``in conjunction with such trails, roads, highways, and
parkways''.

SEC. 1955. CONVEYANCE TO THE CITY OF ELY, NEVADA.

    Notwithstanding sections 202 and 203 of the Federal Land Policy and
Management Act of 1976 (43 U.S.C. 1711, 1712), the Secretary of the
Interior, acting through the Director of the Bureau of Land Management,
shall convey within 45 days after the date of enactment of this Act to
the City of Ely, Nevada, subject to valid existing rights, without
consideration, all right, title, and interest of the United States in
the land located within the railroad corridor described in rights-of-
way numbered Nev-043230, Nev-043231, Nev-043232, Nev-43240, Nev-043234,
ELKO-03009, ELKO-03514, and CC-05887.

SEC. 1956. BROWNFIELDS GRANTS.

    Section 104(k)(4)(B) of the Comprehensive Environmental Response,
Compensation, and Liability Act of 1980 (42 U.S.C. 9604(k)(4)(B)) is
amended by adding at the end the following:
                ``(iii) Exception.--Notwithstanding clause (i)(IV), the
            Administrator may use up to 25 percent of the funds made
            available to carry out this subsection to make a grant or
            loan under this subsection to eligible entities that
            satisfy all of the elements set forth in section 101(40) to
            qualify as a bona fide prospective purchaser, except that
            the date of acquisition of the property was on or before
            January 11, 2002.''.

SEC. 1957. TRAFFIC CIRCLE CONSTRUCTION, CLARENDON, VERMONT.

    (a) In General.--The State of Vermont agency of transportation
shall--
        (1) not later than August 1, 2005, commence planning for a
    traffic circle at the intersection of United States Route 7 and
    Vermont Route 103 in Clarendon, Vermont; and
        (2) not later than August 1, 2007, complete construction of
    that traffic circle.
    (b) Funding.--From amounts made available to the State of Vermont
by this Act, the Secretary shall provide to the State of Vermont agency
of transportation $1,000,000 for use in carrying out this section.

SEC. 1958. LIMITATION ON PROJECT APPROVAL.

    Notwithstanding any provision of title 23, United States Code, the
Secretary is prohibited from approving any Federal-aid highway project
in Orange and Seminole Counties, Florida, which provides access from
Interstate Route 4 to the right-of-way or median of Interstate Route 4
if tolls or toll facilities are used for the access to the right-of-way
or median.

SEC. 1959. CROSS HARBOR FREIGHT MOVEMENT PROJECT.

    The Secretary shall provide to the public entity known as the Port
Authority of New York and New Jersey, established by the States of New
York and New Jersey, funds provided for project numbered 12 in section
1301 of this Act.

SEC. 1960. DENALI ACCESS SYSTEM PROGRAM.

    The Denali Commission Act of 1998 (42 U.S.C. 3121 note) is
amended--
        (1) by redesignating section 309 as section 310; and
        (2) by inserting after section 308 the following:

``SEC. 309. DENALI ACCESS SYSTEM PROGRAM.

    ``(a) Establishment of the Denali Access System Program.--Not later
than 3 months after the date of enactment of the SAFETEA-LU, the
Secretary of Transportation shall establish a program to pay the costs
of planning, designing, engineering, and constructing road and other
surface transportation infrastructure identified for the Denali access
system program under this section.
    ``(b) Denali Access System Program Advisory Committee.--
        ``(1) Establishment.--Not later than 3 months after the date of
    enactment of the SAFETEA-LU, the Denali Commission shall establish
    a Denali Access System Program Advisory Committee (referred to in
    this section as the `advisory committee').
        ``(2) Membership.--The advisory committee shall be composed of
    nine members to be appointed by the Governor of the State of Alaska
    as follows:
            ``(A) The chairman of the Denali Commission.
            ``(B) Four members who represent existing regional native
        corporations, native nonprofit entities, or tribal governments,
        including one member who is a civil engineer.
            ``(C) Four members who represent rural Alaska regions or
        villages, including one member who is a civil engineer.
        ``(3) Terms.--
            ``(A) In general.--Except for the chairman of the
        Commission who shall remain a member of the advisory committee,
        members shall be appointed to serve a term of 4 years.
            ``(B) Initial members.--Except for the chairman of the
        Commission, of the eight initial members appointed to the
        advisory committee, two shall be appointed for a term of 1
        year, two shall be appointed for a term of 2 years, two shall
        be appointed for a term of 3 years, and two shall be appointed
        for a term of 4 years. All subsequent appointments shall be for
        4 years.
        ``(4) Responsibilities.--The advisory committee shall be
    responsible for the following activities:
            ``(A) Advising the Commission on the surface transportation
        needs of Alaska Native villages and rural communities,
        including projects for the construction of essential access
        routes within remote Alaska Native villages and rural
        communities and for the construction of roads and facilities
        necessary to connect isolated rural communities to a road
        system.
            ``(B) Advising the Commission on considerations for
        coordinatedtransportation planning among the Alaska Native
        villages, Alaska rural villages, the State of Alaska, and other
        government entities.
            ``(C) Establishing a list of transportation priorities for
        Alaska Native village and rural community transportation
        projects on an annual basis, including funding recommendations.
            ``(D) Facilitate the Commission's work on transportation
        projects involving more than one region.
        ``(5) FACA exemption.--The provisions of the Federal Advisory
    Committee Act (5 U.S.C. App.) shall not apply to the advisory
    committee.
    ``(c) Allocation of Funds.--
        ``(1) In general.--The Secretary shall allocate funding
    authorized and made available for the Denali access system program
    to the Commission to carry out this section.
        ``(2) Distribution of funding.--In distributing funds for
    surface transportation projects funded under the program, the
    Commission shall consult the list of transportation priorities
    developed by the advisory committee.
    ``(d) Preference to Alaska Materials and Products.--To construct a
project under this section, the Commission shall encourage, to the
maximum extent practicable, the use of employees and businesses that
are residents of Alaska.
    ``(e) Design Standards.--Each project carried out under this
section shall use technology and design standards determined by the
Commission to be appropriate given the location and the functionality
of the project.
    ``(f) Maintenance.--Funding for a construction project under this
section may include an additional amount equal to not more than 10
percent of the total cost of construction, to be retained for future
maintenance of the project. All such retained funds shall be dedicated
for maintenance of the project and may not be used for other purposes.
    ``(g) Lead Agency Designation.--For purposes of projects carried
out under this section, the Commission shall be designated as the lead
agency for purposes of accepting Federal funds and for purposes of
carrying out this project.
    ``(h) Non-Federal Share.--Notwithstanding any other provision of
law, funds made available to carry out this section may be used to meet
the non-Federal share of the cost of projects under title 23, United
States Code.
    ``(i) Surface Transportation Program Transferability.--
        ``(1) Transferability.--In any fiscal year, up to 15 percent of
    the amounts made available to the State of Alaska for surface
    transportation by section 133 of title 23, United States Code, may
    be transferred to the Denali access system program.
        ``(2) No effect on set-aside.--Paragraph (2) of section 133(d),
    United States Code, shall not apply to funds transferred under
    paragraph (1).
    ``(j) Authorization of Appropriations.--
        ``(1) In general.--There is authorized to be appropriated out
    of the Highway Trust Fund (other than the Mass Transit Account) to
    carry out this section $15,000,000 for each of fiscal years 2006
    through 2009.
        ``(2) Applicability of title 23.--Funds made available to carry
    out this section shall be available for obligation in the same
    manner as if such funds were apportioned under chapter 1 of title
    23, United States Code; except that such funds shall not be
    transferable and shall remain available until expended, and the
    Federal share of the cost of any project carried out using such
    funds shall be determined in accordance with section 120(b).''.

SEC. 1961. I-95/CONTEE ROAD INTERCHANGE STUDY.

    (a) In General.--The Secretary shall conduct a study on the I-95/
Contee Road relocated interchange project located in Prince George's
County, Maryland. The study shall assess how the proposed interchange
will--
        (1) leverage Federal investment in the I-95/Contee Road
    relocated interchange project by encouraging a public-private
    partnership between the State of Maryland and the private financial
    interests supporting the project;
        (2) improve overall transportation efficiency in the area and
    enhance fire, rescue, and emergency response in the area;
        (3) complement planned development in the area by providing
    sufficient access to the Interstate System; and
        (4) otherwise provide public benefits and revenues.
    (b) Data Collection.--As part of the study, the Secretary shall
collect data regarding the economic impact of the project, including
new jobs and State and county revenues in the form of real estate
property taxes, retail sales taxes, and income and hotel sales and
occupancy taxes.
    (c) Report.--Not later than 180 days after the date of enactment of
this Act, the Secretary shall submit to the Committee on Transportation
and Infrastructure of the House of Representatives and the Committee on
Environment and Public Works of the Senate a report on the results of
the study, including any recommendations of the Secretary.
    (d) Funding.--
        (1) Authorization of appropriations.--There is authorized to be
    appropriated to carry out this section, out of the Highway Trust
    Fund (other than the Mass Transit Account), $1,000,000 for fiscal
    year 2006.
        (2) Contract authority.--Funds authorized to be appropriated by
    this section shall be available for obligation in the same manner
    and to the same extent as if such funds were apportioned under
    chapter 1 of title 23, United States Code; except that the Federal
    share of the cost of the project shall be 100 percent, and such
    funds shall remain available until expended and shall not be
    transferable.

SEC. 1962. MULTIMODAL FACILITY IMPROVEMENTS.

    (a) Authorization of Appropriations.--The Secretary shall make
available from funds in the Highway Trust Fund (other than the Mass
Transit Account) $5,000,000 for each of fiscal years 2006 through 2009
for multimodal facility improvements, construction, and ferry
acquisition by North Bay Ferry Service, Inc., located at Port Sonoma in
Petaluma, California.
    (b) Contract Authority.--Funds appropriated to carry out this
section shall be available for obligation in the same manner as if the
funds were apportioned under chapter 1 of title 23, United States Code,
except that such funds shall remain available until expended.
    (c) Limitation.--Not more than 50 percent of funds appropriated to
carry out this section shall be used for facility improvements and
construction.
    (d) Federal Share.--The Federal Share of the cost of a facility
improvement or construction project under this section shall be 80
percent.
    (e) Requirement.--Ferries to which assistance is provided under
this section shall be purchased by a United States company that designs
and builds vessels in the United States.

SEC. 1963. APOLLO THEATER LEASES.

    Notwithstanding the Public Works and Economic Development Act of
1965 (42 U.S.C. 3121 et seq.), or any other provision of law, the
Economic Development Administration shall, in order to facilitate the
further financing of the project, approve, without compensation to the
agency, a series of leases of the Apollo Theater, located in Harlem,
New York, to be improved by Economic Development Administration project
numbers 01-01-7308 and 01-01-07552.

SEC. 1964. PROJECT FEDERAL SHARE.

    (a) In General.--Notwithstanding any other provision of law, only
for the States of Alaska, Montana, Nevada, North Dakota, Oregon, and
South Dakota, the Federal share of the cost of a project described in
subsection (b) shall be determined in accordance with section 120(b) of
title 23, United States Code.
    (b) Projects.--The projects described in this subsection are--
        (1) the projects listed in section 1702;
        (2) the projects listed in section 1301; and
        (3) the projects listed in section 1934.

                        TITLE II--HIGHWAY SAFETY

SEC. 2001. AUTHORIZATION OF APPROPRIATIONS.

    (a) In General.--The following sums are authorized to be
appropriated out of the Highway Trust Fund (other than the Mass Transit
Account):
        (1) Highway safety programs.--For carrying out section 402 of
    title 23, United States Code, $163,680,000 for fiscal year 2005,
    $217,000,000 for fiscal year 2006, $220,000,000 for fiscal year
    2007, $225,000,000 for fiscal year 2008, and $235,000,000 for
    fiscal year 2009.
        (2) Highway safety research and development.--For carrying out
    section 403 of title 23, United States Code, $71,424,000 for fiscal
    year 2005, $110,000,000 for fiscal year 2006, $107,750,000 for
    fiscal year 2007, $107,750,000 for fiscal year 2008, and
    $105,500,000 for fiscal year 2009.
        (3) Occupant protection incentive grants.--For carrying out
    section 405 of title 23, United States Code, $19,840,000 for fiscal
    year 2005, $25,000,000 for fiscal year 2006, $25,000,000 for fiscal
    year 2007, $25,000,000 for fiscal year 2008, and $25,000,000 for
    fiscal year 2009.
        (4) Safety belt performance grants.--For carrying out section
    406 of title 23, United States Code, $124,500,000 for fiscal year
    2006, $124,500,000 for fiscal year 2007, $124,500,000 for fiscal
    year 2008, and $124,500,000 for fiscal year 2009.
        (5) State traffic safety information system improvements.--For
    carrying out section 408 of title 23, United States Code,
    $34,500,000 for fiscal year 2006, $34,500,000 for fiscal year 2007,
    $34,500,000 for fiscal year 2008, and $34,500,000 for fiscal year
    2009.
        (6) Alcohol-impaired driving countermeasures incentive grant
    program.--For carrying out section 410 of title 23, United States
    Code, $39,680,000 for fiscal year 2005, $120,000,000 for fiscal
    year 2006, $125,000,000 for fiscal year 2007, $131,000,000 for
    fiscal year 2008, and $139,000,000 for fiscal year 2009.
        (7) National driver register.--For the National Highway Traffic
    Safety Administration to carry out chapter 303 of title 49, United
    States Code, $3,968,000 for fiscal year 2005, $4,000,000 for fiscal
    year 2006, $4,000,000 for fiscal year 2007, $4,000,000 for fiscal
    year 2008, and $4,000,000 for fiscal year 2009.
        (8) High visibility enforcement program.--For carrying out
    section 2009 of this title $29,000,000 for fiscal year 2006,
    $29,000,000 for fiscal year 2007, $29,000,000 for fiscal year 2008,
    and $29,000,000 for fiscal year 2009.
        (9) Motorcyclist safety.--For carrying out section 2010 of this
    title $6,000,000 for fiscal year 2006, $6,000,000 for fiscal year
    2007, $6,000,000 for fiscal year 2008, and $7,000,000 for fiscal
    year 2009.
        (10) Child safety and child booster seat safety incentive
    grants.--For carrying out section 2011 of this title $6,000,000 for
    fiscal year 2006, $6,000,000 for fiscal year 2007, $6,000,000 for
    fiscal year 2008, and $7,000,000 for fiscal year 2009.
        (11) Administrative expenses.--For administrative and related
    operating expenses of the National Highway Traffic Safety
    Administration in carrying out chapter 4 of title 23, United States
    Code, and this title $17,500,000 for fiscal year 2006, $17,750,000
    for fiscal year 2007, $18,250,000 for fiscal year 2008, and
    $18,500,000 for fiscal year 2009.
    (b) Prohibition on Other Uses.--Except as otherwise provided in
chapter 4 of title 23, United States Code, and this title, (including
the amendments made by this title), the amounts made available from the
Highway Trust Fund (other than the Mass Transit Account) for a program
under such chapter shall only be used to carry out such program and may
not be used by States or local governments for construction purposes.
    (c) Applicability of Title 23.--Except as otherwise provided in
chapter 4 of title 23, United States Code, and this title, amounts made
available under subsection (a) for each of fiscal years 2005 through
2009 shall be available for obligation in the same manner as if such
funds were apportioned under chapter 1 of title 23, United States Code.
    (d) Transfers.--In each fiscal year, the Secretary may transfer any
amounts remaining available under paragraph (3), (5), or (6) of
subsection (a) to the amounts made available under any other of such
paragraphs in order to ensure, to the maximum extent possible, that
each State receives the maximum incentive funding for which the State
is eligible under sections 405, 408, and 410 of title 23, United States
Code.
    (e) Clarifications.--The amounts made available by each of
subsections (a)(1) through (a)(7) shall be less any amounts made
available from the Highway Trust Fund (other than the Mass Transit
Account) by laws enacted before the date of enactment of this Act for
the respective programs referred to in each of such subsections for
fiscal year 2005. Amounts authorized by such subsections are post-
rescission and shall not be subject to any rescission after the date of
enactment of this Act.

SEC. 2002. HIGHWAY SAFETY PROGRAMS.

    (a) Programs To Be Included.--Section 402(a) of title 23, United
States Code, is amended--
        (1) in clause (2) by striking ``and to increase public
    awareness of the benefit of motor vehicles equipped with airbags'';
        (2) by redesignating clause (6) as clause (7);
        (3) by inserting after clause (5) the following: ``(6) to
    reduce accidents resulting from unsafe driving behavior (including
    aggressive or fatigued driving and distracted driving arising from
    the use of electronic devices in vehicles)''; and
        (4) in the 10th sentence by inserting ``aggressive driving,
    fatigued driving, distracted driving,'' after ``school bus
    accidents,''
    (b) Administration of State Programs.--Section 402(b)(1) of such
title is amended--
        (1) in subparagraph (C) by striking ``and'' at the end;
        (2) by redesignating clause (6) as clause (7);
        (3) in subparagraph (D) by striking ``State.'' and inserting
    ``State; and''; and
        (4) by adding at the end the following:
            ``(E) provide satisfactory assurances that the State will
        implement activities in support of national highway safety
        goals to reduce motor vehicle related fatalities that also
        reflect the primary data-related crash factors within a State
        as identified by the State highway safety planning process,
        including--
                ``(i) national law enforcement mobilizations;
                ``(ii) sustained enforcement of statutes addressing
            impaired driving, occupant protection, and driving in
            excess of posted speed limits;
                ``(iii) an annual statewide safety belt use survey in
            accordance with criteria established by the Secretary for
            the measurement of State safety belt use rates to ensure
            that the measurements are accurate and representative; and
                ``(iv) development of statewide data systems to provide
            timely and effective data analysis to support allocation of
            highway safety resources.''.
    (c) Deduction Deletion.--Section 402(c) of such title is amended--
        (1) by striking the second sentence; and
        (2) in the sixth sentence by striking ``three-fourths of 1
    percent'' and inserting ``2 percent''.
    (d) Law Enforcement and Consolidation of Applications.--Section 402
of such title is further amended by adding at the end the following:
    ``(l) Law Enforcement Vehicular Pursuit Training.--A State shall
actively encourage all relevant law enforcement agencies in such State
to follow the guidelines established for vehicular pursuits issued by
the International Association of Chiefs of Police that are in effect on
the date of enactment of this subsection or as revised and in effect
after such date as determined by the Secretary.
    ``(m) Consolidation of Grant Applications.--The Secretary shall
establish an approval process by which a State may apply for all grants
under this chapter through a single application process with one annual
deadline. The Bureau of Indian Affairs shall establish a similar
simplified process for applications for grants from Indian tribes under
this chapter.''.
    (e) Conforming Repeal for Administrative Expenses.--Section 405(d)
of such title is repealed.

SEC. 2003. HIGHWAY SAFETY RESEARCH AND OUTREACH PROGRAMS.

    (a) Revised Authority and Requirements.--Section 403(a) of title
23, United States Code, is amended to read as follows:
    ``(a) Authority of the Secretary.--The Secretary is authorized to
use funds appropriated to carry out this section to--
        ``(1) conduct research on all phases of highway safety and
    traffic conditions, including accident causation, highway or driver
    characteristics, communications, and emergency care;
        ``(2) conduct ongoing research into driver behavior and its
    effect on traffic safety;
        ``(3) conduct research on, launch initiatives to counter, and
    conduct demonstration projects on fatigued driving by drivers of
    motor vehicles and distracted driving in such vehicles, including
    the effect that the use of electronic devices and other factors
    deemed relevant by the Secretary have on driving;
        ``(4) conduct training or education programs in cooperation
    with other Federal departments and agencies, States, private sector
    persons, highway safety personnel, and law enforcement personnel;
        ``(5) conduct research on, and evaluate the effectiveness of,
    traffic safety countermeasures, including seat belts and impaired
    driving initiatives;
        ``(6) conduct research on, evaluate, and develop best practices
    related to driver education programs (including driver education
    curricula, instructor training and certification, program
    administration and delivery mechanisms) and make recommendations
    for harmonizing driver education and multistage graduated licensing
    systems;
        ``(7) conduct research, training, and education programs
    related to older drivers;
        ``(8) conduct demonstration projects; and
        ``(9) conduct research, training, and programs relating to
    motorcycle safety, including impaired driving.''
    (b) International Cooperation.--Section 403 of such title is
amended by adding at the end the following:
    ``(g) International Cooperation.--The Administrator of the National
Highway Traffic Safety Administration may participate and cooperate in
international activities to enhance highway safety.''.
    (c) On-Scene Motor Vehicle Collision Causation.--
        (1) Study.--The Secretary shall conduct under section 403 of
    title 23, United States Code, a nationally representative study to
    collect on-scene motor vehicle collision data and to determine
    crash causation. The Secretary shall enter into a contract with the
    National Academy of Sciences to conduct a review of the research,
    design, methodology, and implementation of the study.
        (2) Consultation.--The study under this subsection may be
    conducted in consultation with other Federal departments and
    agencies with relevant expertise.
        (3) Final report.--Not later than 2 years after the date of
    enactment of this Act, the Secretary shall submit a report on the
    results of the study conducted under this subsection to the
    Committee on Commerce, Science, and Transportation of the Senate
    and the Committee on Transportation and Infrastructure of the House
    of Representatives.
    (d) Research on Distracted, Inattentive, and Fatigued Drivers.--In
conducting research under section 403(a)(3) of title 23, United States
Code, the Secretary shall carry out not less than 2 demonstration
projects to evaluate new and innovative means of combating traffic
system problems caused by distracted, inattentive, or fatigued drivers.
The demonstration projects shall be in addition to any other research
carried out under such section.
    (e) Pedestrian Safety.--
        (1) In general.--The Secretary shall--
            (A) produce a comprehensive report on pedestrian safety
        that builds on the current level of knowledge of pedestrian
        safety countermeasures by identifying the most effective
        advanced technology and intelligent transportation systems,
        such as automated pedestrian detection and warning systems
        (infrastructure-based and vehicle-based), road design, and
        vehicle structural design that could potentially mitigate the
        crash forces on pedestrians in the event of a crash; and
            (B) include in the report recommendations on how new
        technological developments could be incorporated into
        educational and enforcement efforts and how they could be
        integrated into national design guidelines developed by the
        American Association of State Highway and Transportation
        Officials.
        (2) Due date.--The Secretary shall complete the report under
    this subsection not less than 2 years after the date of enactment
    of this Act and submit a copy of the report to the Committee on
    Commerce, Science, and Transportation of the Senate and the
    Committee on Transportation and Infrastructure of the House of
    Representatives.
    (f)  Refusal of Intoxication Testing.--
        (1) Study.--The Secretary shall carry out under section 403 of
    title 23, United States Code, a study of the frequency with which
    persons arrested for the offense of operating a motor vehicle while
    under the influence of alcohol and persons arrested for the offense
    of operating a motor vehicle while intoxicated refuse to take a
    test to determine blood alcohol concentration levels and the effect
    such refusals have on the ability of States to prosecute such
    persons for those offenses.
        (2) Consultation.--In carrying out the study under this
    subsection, the Secretary shall consult with the Governors of the
    States, the States' Attorneys General, and the United States
    Sentencing Commission.
        (3) Report.--
            (A) Requirement for report.--Not later than 2 years after
        the date of the enactment of this Act, the Secretary shall
        submit a report on the results of the study to the Committee on
        Commerce, Science, and Transportation of the Senate and the
        Committee on Transportation and Infrastructure of the House of
        Representatives.
            (B) Content.--The report shall include any recommendation
        for legislation, including any recommended model State
        legislation, and any other recommendations that the Secretary
        considers appropriate for implementing a program designed to
        decrease the occurrence of refusals by arrested persons to
        submit to a test to determine blood alcohol concentration
        levels.
    (g) Impaired Motorcycle Driving.--
        (1) Study.--In conducting research under section 403(a)(9) of
    title 23, United States Code, the Secretary shall conduct a study
    on educational, public information and other activities targeted at
    reducing motorcycle accidents and resulting fatalities and
    injuries, where the operator of the motorcycle is impaired.
        (2) Report.--Not later than 2 years after the date of enactment
    of this Act, the Secretary shall submit to the Committee on
    Transportation and Infrastructure of the House of Representatives
    and the Committee on Commerce, Science, and Transportation of the
    Senate a report on the results of the study, including the data
    collected and statistics compiled and recommendations to reduce the
    number of motorcycle accidents described in paragraph (1) and the
    resulting fatalities and injuries.
    (h) Reducing Impaired Driving Recidivism.--
        (1) Study.--The Secretary shall conduct a study on reducing the
    incidence of alcohol-related motor vehicle crashes and fatalities
    through research of advanced vehicle-based alcohol detection
    systems, including an assessment of the practicability and cost
    effectiveness of such systems.
        (2) Report.--Not later than 2 years after the date of enactment
    of this Act, the Secretary shall transmit to the Committee on
    Transportation and Infrastructure of the House of Representatives
    and the Committee on Commerce, Science, and Transportation of the
    Senate a report on the results of the study.

SEC. 2004. OCCUPANT PROTECTION INCENTIVE GRANTS.

    (a) General Authority.--Section 405(a) of title 23, United States
Code, is amended--
        (1) in paragraph (2) by striking ``Transportation Equity Act
    for the 21st Century'' and inserting ``SAFETEA-LU'';
        (2) in paragraph (3) by striking ``1997'' and inserting
    ``2003''; and
        (3) in each of paragraphs (4)(A), (4)(B), and (4)(C) by
    inserting after ``years'' the following: ``beginning after
    September 30, 2003,''.
    (c) Grant Amounts.--Section 405(c) of such title is amended--
        (1) by striking ``25 percent'' and inserting ``100 percent'';
    and
        (2) by striking ``1997'' and inserting ``2003''.

SEC. 2005. GRANTS FOR PRIMARY SAFETY BELT USE LAWS.

    (a) In General.--Section 406 of title 23, United States Code, is
amended to read as follows:

``Sec. 406. Safety belt performance grants

    ``(a) In General.--The Secretary shall make grants to States in
accordance with the provisions of this section to encourage the
enactment and enforcement of laws requiring the use of safety belts in
passenger motor vehicles.
    ``(b) Grants for Enacting Primary Safety Belt Use Laws.--
        ``(1) In general.--The Secretary shall make a single grant to
    each State that either--
            ``(A) enacts for the first time after December 31, 2002,
        and has in effect and is enforcing a conforming primary safety
        belt use law for all passenger motor vehicles; or
            ``(B) in the case of a State that does not have such a
        primary safety belt use law, has after December 31, 2005, a
        State safety belt use rate of 85 percent or more for each of
        the 2 calendar years immediately preceding the fiscal year of a
        grant, as measured under criteria determined by the Secretary.
        ``(2) Amount.--The amount of a grant available to a State in
    fiscal year 2006 or in a subsequent fiscal year under paragraph (1)
    shall equal 475 percent of the amount apportioned to the State
    under section 402(c) for fiscal year 2003.
        ``(3) July 1 cut-off.--For the purpose of determining the
    eligibility of a State for a grant under paragraph (1)(A), a
    conforming primary safety belt use law enacted after June 30th of
    any year shall--
            ``(A) not be considered to have been enacted in the Federal
        fiscal year in which that June 30th falls; but
            ``(B) be considered as if it were enacted after October 1
        of the next Federal fiscal year.
        ``(4) Shortfall.--If the total amount of grants provided for by
    this subsection for a fiscal year exceeds the amount of funds
    available for such grants for that fiscal year, the Secretary shall
    make grants under this subsection to States in the order in which--
            ``(A) the conforming primary safety belt use law came into
        effect; or
            ``(B) the State's safety belt use rate was 85 percent or
        more for 2 consecutive calendar years (as measured under by
        criteria determined by the Secretary), whichever first occurs.
        ``(5) Catch-up grants.--The Secretary shall make a grant to any
    State eligible for a grant under this subsection that did not
    receive a grant for a fiscal year because of the application of
    paragraph (4), in the next fiscal year if the State's conforming
    primary safety belt use law remains in effect or its safety belt
    use rate is 85 percent or more for the 2 consecutive calendar years
    preceding such next fiscal year (subject to the condition in
    paragraph (4)).
    ``(c) Grants for Pre-2003 Laws.--
        ``(1) In general.--To the extent that amounts made available
    for grants under this section for any of fiscal years 2006 through
    2009 exceed the total amount of grants to be awarded under
    subsection (b) for the fiscal year, including amounts to be awarded
    for catch-up grants under subsection (b)(5), the Secretary shall
    make a single grant to each State that enacted, has in effect, and
    is enforcing a conforming primary safety belt use law for all
    passenger motor vehicles that was in effect before January 1, 2003.
        ``(2) Amount; installments.--The amount of a grant available to
    a State under this subsection shall be equal to 200 percent of the
    amount of funds apportioned to the State under section 402(c) for
    fiscal year 2003. The Secretary may award the grant in annual
    installments.
    ``(d) Allocation of Unallocated Funds.--
        ``(1) Additional grants.--The Secretary shall make additional
    grants under this section of any amounts made available for grants
    under this section that, on July 1, 2009, have not been allocated
    to States under this section.
        ``(2) Allocation.--The additional grants made under this
    subsection shall be allocated among all States that, as of that
    date, have enacted, have in effect, and are enforcing conforming
    primary safety belt laws for all passenger motor vehicles. The
    allocations shall be made in accordance with the formula for
    apportioning funds among the States under section 402(c).
    ``(e) Use of Grant Funds.--
        ``(1) In general.--Subject to paragraph (2), a State may use a
    grant under this section for any safety purpose under this title or
    for any project that corrects or improves a hazardous roadway
    location or feature or proactively addresses highway safety
    problems, including--
            ``(A) intersection improvements;
            ``(B) pavement and shoulder widening;
            ``(C) installation of rumble strips and other warning
        devices;
            ``(D) improving skid resistance;
            ``(E) improvements for pedestrian or bicyclist safety;
            ``(F) railway-highway crossing safety;
            ``(G) traffic calming;
            ``(H) the elimination of roadside obstacles;
            ``(I) improving highway signage and pavement marking;
            ``(J) installing priority control systems for emergency
        vehicles at signalized intersections;
            ``(K) installing traffic control or warning devices at
        locations with high accident potential;
            ``(L) safety-conscious planning; and
            ``(M) improving crash data collection and analysis.
        ``(2) Safety activity requirement.--Notwithstanding paragraph
    (1), the Secretary shall ensure that at least $1,000,000 of amounts
    received by States under this section are obligated for safety
    activities under this chapter.
        ``(3) Support activity.--The Secretary or his designee may
    engage in activities with States and State legislators to consider
    proposals related to safety belt use laws.
    ``(f) Carry-Forward of Excess Funds.--If the amount available for
grants under this section for any fiscal year exceeds the sum of the
grants made under this section for that fiscal year, the excess amount
and obligational authority shall be carried forward and made available
for grants under this section in the succeeding fiscal year.
    ``(g) Federal Share.--The Federal share payable for grants under
this section shall be 100 percent.
    ``(h) Passenger Motor Vehicle Defined.--In this section, the term
`passenger motor vehicle' means--
        ``(1) a passenger car;
        ``(2) a pickup truck; and
        ``(3) a van, minivan, or sport utility vehicle with a gross
    vehicle weight rating of less than 10,000 pounds.''.
    (b) Clerical Amendment.--The analysis for chapter 4 of such title
is amended by striking the item relating to section 406 and inserting
the following:

``406. Safety belt performance grants.''.

SEC. 2006. STATE TRAFFIC SAFETY INFORMATION SYSTEM IMPROVEMENTS.

    (a) In General.--Section 408 of title 23, United States Code, is
amended to read as follows:

``Sec. 408. State traffic safety information system improvements

    ``(a) Grant Authority.--Subject to the requirements of this
section, the Secretary shall make grants to eligible States to support
the development and implementation of effective programs by such States
to--
        ``(1) improve the timeliness, accuracy, completeness,
    uniformity, integration, and accessibility of the safety data of
    the State that is needed to identify priorities for national,
    State, and local highway and traffic safety programs;
        ``(2) evaluate the effectiveness of efforts to make such
    improvements;
        ``(3) link the State data systems, including traffic records,
    with other data systems within the State, such as systems that
    contain medical, roadway, and economic data; and
        ``(4) improve the compatibility and interoperability of the
    data systems of the State with national data systems and data
    systems of other States and enhance the ability of the Secretary to
    observe and analyze national trends in crash occurrences, rates,
    outcomes, and circumstances.
    ``(b) First-Year Grants.--To be eligible for a first-year grant
under this section in a fiscal year, a State shall demonstrate to the
satisfaction of the Secretary that the State has--
        ``(1) established a highway safety data and traffic records
    coordinating committee with a multidisciplinary membership that
    includes, among others, managers, collectors, and users of traffic
    records and public health and injury control data systems; and
        ``(2) developed a multiyear highway safety data and traffic
    records system strategic plan--
            ``(A) that addresses existing deficiencies in the State's
        highway safety data and traffic records system;
            ``(B) that is approved by the highway safety data and
        traffic records coordinating committee;
            ``(C) that specifies how existing deficiencies in the
        State's highway safety data and traffic records system were
        identified;
            ``(D) that prioritizes, on the basis of the identified
        highway safety data and traffic records system deficiencies of
        the State, the highway safety data and traffic records system
        needs and goals of the State, including the activities under
        subsection (a);
            ``(E) that identifies performance-based measures by which
        progress toward those goals will be determined; and
            ``(F) that specifies how the grant funds and any other
        funds of the State are to be used to address needs and goals
        identified in the multiyear plan.
    ``(c) Successive Year Grants.--A State shall be eligible for a
grant under this subsection in a fiscal year succeeding the first
fiscal year in which the State receives a grant under subsection (b) if
the State--
        ``(1) certifies to the Secretary that an assessment or audit of
    the State's highway safety data and traffic records system has been
    conducted or updated within the preceding 5 years;
        ``(2) certifies to the Secretary that its highway safety data
    and traffic records coordinating committee continues to operate and
    supports the multiyear plan;
        ``(3) specifies how the grant funds and any other funds of the
    State are to be used to address needs and goals identified in the
    multiyear plan;
        ``(4) demonstrates to the Secretary measurable progress toward
    achieving the goals and objectives identified in the multiyear
    plan; and
        ``(5) submits to the Secretary a current report on the progress
    in implementing the multiyear plan.
    ``(d) Grant Amount.--Subject to subsection (e)(3), the amount of a
year grant made to a State for a fiscal year under this section shall
equal the higher of--
        ``(1) the amount determined by multiplying--
            ``(A) the amount appropriated to carry out this section for
        such fiscal year, by
            ``(B) the ratio that the funds apportioned to the State
        under section 402 for fiscal year 2003 bears to the funds
        apportioned to all States under such section for fiscal year
        2003; or
        ``(2)(A) $300,000 in the case of the first fiscal year a grant
    is made to a State under this section after the date of enactment
    of this subparagraph; or
        ``(B) $500,000 in the case of a succeeding fiscal year a grant
    is made to the State under this section after such date of
    enactment.
    ``(e) Additional Requirements and Limitations.--
        ``(1) Model data elements.--The Secretary, in consultation with
    States and other appropriate parties, shall determine the model
    data elements that are useful for the observation and analysis of
    State and national trends in occurrences, rates, outcomes, and
    circumstances of motor vehicle traffic accidents. In order to be
    eligible for a grant under this section, a State shall submit to
    the Secretary a certification that the State has adopted and uses
    such model data elements, or a certification that the State will
    use grant funds provided under this section toward adopting and
    using the maximum number of such model data elements as soon as
    practicable.
        ``(2) Data on use of electronic devices.--The model data
    elements required under paragraph (1) shall include data elements,
    as determined appropriate by the Secretary, in consultation with
    the States and appropriate elements of the law enforcement
    community, on the impact on traffic safety of the use of electronic
    devices while driving.
        ``(3) Maintenance of effort.--No grant may be made to a State
    under this section in any fiscal year unless the State enters into
    such agreements with the Secretary as the Secretary may require to
    ensure that the State will maintain its aggregate expenditures from
    all other sources for highway safety data programs at or above the
    average level of such expenditures maintained by such State in the
    2 fiscal years preceding the date of enactment of the SAFETEA-LU.
        ``(4) Federal share.--The Federal share of the cost of adopting
    and implementing in a fiscal year a State program described in
    subsection (a) may not exceed 80 percent.
        ``(5) Limitation on use of grant proceeds.--A State may use the
    proceeds of a grant received under this section only to implement
    the program described in subsection (a) for which the grant is
    made.
    ``(f) Applicability of Chapter 1.--Section 402(d) of this title
shall apply in the administration of this section.''.
    (b) Clerical Amendment.--The analysis for chapter 4 of such title
is amended by striking the item relating to section 408 and inserting
the following:

``408. State traffic safety information system improvements.''.

SEC. 2007. ALCOHOL-IMPAIRED DRIVING COUNTERMEASURES.

    (a) Maintenance of Effort.--Section 410(a)(2) of title 23, United
States Code, is amended--
        (1) by striking ``under this section'' and inserting ``under
    this subsection''; and
        (2) by striking ``Transportation Equity Act for the 21st
    Century'' and inserting ``SAFETEA-LU''.
    (b) Revised Grant Authority.--Section 410 of such title is
amended--
        (1) in subsection (a)--
            (A) by striking paragraph (3);
            (B) by redesignating paragraph (4) as paragraph (3); and
            (C) in paragraph (3) (as so redesignated) by striking the
        second comma following ``sixth'';
        (2) by redesignating subsections (e) and (f) as subsections (h)
    and (i), respectively;
        (3) by striking subsections (b) through (d) and inserting the
    following:
    ``(b) Eligibility Requirements.--To be eligible for a grant under
subsection (a), a State shall--
        ``(1) have an alcohol related fatality rate of 0.5 or less per
    100,000,000 vehicle miles traveled as of the date of the grant, as
    determined by the Secretary using the most recent Fatality Analysis
    Reporting System of the National Highway Traffic Safety
    Administration; or
        ``(2)(A) for fiscal year 2006 by carrying out 3 of the programs
    and activities under subsection (c);
        ``(B) for fiscal year 2007 by carrying out 4 of the programs
    and activities under subsection (c); or
        ``(C) for fiscal years 2008 and 2009 by carrying out 5 of the
    programs and activities under subsection (c).
    ``(c) State Programs and Activities.--The programs and activities
referred to in subsection (b) are the following:
        ``(1) Check point, saturation patrol program.--A State program
    to conduct a series of high visibility, statewide law enforcement
    campaigns in which law enforcement personnel monitor for impaired
    driving, either through the use of sobriety check points or
    saturation patrols, on a nondiscriminatory, lawful basis for the
    purpose of determining whether the operators of the motor vehicles
    are driving while under the influence of alcohol--
            ``(A) if the State organizes the campaigns in cooperation
        with related periodic national campaigns organized by the
        National Highway Traffic Safety Administration, except that
        this subparagraph does not preclude a State from initiating
        sustained high visibility, Statewide law enforcement campaigns
        independently of the cooperative efforts; and
            ``(B) if, for each fiscal year, the State demonstrates to
        the Secretary that the State and the political subdivisions of
        the State that receive funds under this section have increased,
        in the aggregate, the total number of impaired driving law
        enforcement activities at high incident locations (or any other
        similar activity approved by the Secretary) initiated in such
        State during the preceding fiscal year by a factor that the
        Secretary determines meaningful for the State over the number
        of such activities initiated in such State during the preceding
        fiscal year.
        ``(2) Prosecution and adjudication outreach program.--A State
    prosecution and adjudication program under which--
            ``(A) the State works to reduce the use of diversion
        programs by educating and informing prosecutors and judges
        through various outreach methods about the benefits and merits
        of prosecuting and adjudicating defendants who repeatedly
        commit impaired driving offenses;
            ``(B) the courts in a majority of the judicial
        jurisdictions of the State are monitored on the courts'
        adjudication of cases of impaired driving offenses; or
            ``(C) annual statewide outreach is provided for judges and
        prosecutors on innovative approaches to the prosecution and
        adjudication of cases of impaired driving offenses that have
        the potential for significantly improving the prosecution and
        adjudication of such cases.
        ``(3) Testing of bac.--An effective system for increasing from
    the previous year the rate of blood alcohol concentration testing
    of motor vehicle drivers involved in fatal accidents.
        ``(4) High risk drivers.--A law that establishes stronger
    sanctions or additional penalties for individuals convicted of
    operating a motor vehicle while under the influence of alcohol
    whose blood alcohol concentration is 0.15 percent or more than for
    individuals convicted of the same offense but with a lower blood
    alcohol concentration. For purposes of this paragraph, `additional
    penalties' includes--
            ``(A) a 1-year suspension of a driver's license, but with
        the individual whose license is suspended becoming eligible
        after 45 days of such suspension to obtain a provisional
        driver's license that would permit the individual to drive--
                ``(i) only to and from the individual's place of
            employment or school; and
                ``(ii) only in an automobile equipped with a certified
            alcohol ignition interlock device; and
            ``(B) a mandatory assessment by a certified substance abuse
        official of whether the individual has an alcohol abuse problem
        with possible referral to counseling if the official determines
        that such a referral is appropriate.
        ``(5) Programs for effective alcohol rehabilitation and dwi
    courts.--A program for effective inpatient and outpatient alcohol
    rehabilitation based on mandatory assessment and appropriate
    treatment for repeat offenders or a program to refer impaired
    driving cases to courts that specialize in driving while impaired
    cases that emphasize the close supervision of high-risk offenders.
        ``(6) Underage drinking program.--An effective strategy, as
    determined by the Secretary, for preventing operators of motor
    vehicles under age 21 from obtaining alcoholic beverages and for
    preventing persons from making alcoholic beverages available to
    individuals under age 21. Such a strategy may include--
            ``(A) the issuance of tamper-resistant drivers' licenses to
        individuals under age 21 that are easily distinguishable in
        appearance from drivers' licenses issued to individuals age 21
        or older; and
            ``(B) a program provided by a nonprofit organization for
        training point of sale personnel concerning, at a minimum--
                ``(i) the clinical effects of alcohol;
                ``(ii) methods of preventing second party sales of
            alcohol;
                ``(iii) recognizing signs of intoxication;
                ``(iv) methods to prevent underage drinking; and
                ``(v) Federal, State, and local laws that are relevant
            to such personnel; and
            ``(C) having a law in effect that creates a 0.02 percent
        blood alcohol content limit for drivers under 21 years old.
        ``(7) Administrative license revocation.--An administrative
    driver's license suspension or revocation system for individuals
    who operate motor vehicles while under the influence of alcohol
    that requires that--
            ``(A) in the case of an individual who, in any 5-year
        period beginning after the date of enactment of the
        Transportation Equity Act for the 21st Century, is determined
        on the basis of a chemical test to have been operating a motor
        vehicle while under the influence of alcohol or is determined
        to have refused to submit to such a test as proposed by a law
        enforcement officer, the State agency responsible for
        administering drivers' licenses, upon receipt of the report of
        the law enforcement officer--
                ``(i) suspend the driver's license of such individual
            for a period of not less than 90 days if such individual is
            a first offender in such 5-year period; except that under
            such suspension an individual may operate a motor vehicle,
            after the 15-day period beginning on the date of the
            suspension, to and from employment, school, or an alcohol
            treatment program if an ignition interlock device is
            installed on each of the motor vehicles owned or operated,
            or both, by the individual; and
                ``(ii) suspend the driver's license of such individual
            for a period of not less than 1 year, or revoke such
            license, if such individual is a repeat offender in such 5-
            year period; except that such individual to operate a motor
            vehicle, after the 45-day period beginning on the date of
            the suspension or revocation, to and from employment,
            school, or an alcohol treatment program if an ignition
            interlock device is installed on each of the motor vehicles
            owned or operated, or both, by the individual; and
            ``(B) the suspension and revocation referred to under
        clause (i) take effect not later than 30 days after the date on
        which the individual refused to submit to a chemical test or
        received notice of having been determined to be driving under
        the influence of alcohol, in accordance with the procedures of
        the State.
        ``(8) Self sustaining impaired driving prevention program.--A
    program under which a significant portion of the fines or
    surcharges collected from individuals who are fined for operating a
    motor vehicle while under the influence of alcohol are returned to
    communities for comprehensive programs for the prevention of
    impaired driving.
    ``(d) Uses of Grants.--Subject to subsection (g)(2), grants made
under this section may be used for all programs and activities
described in subsection (c), and to defray the following costs:
        ``(1) Labor costs, management costs, and equipment procurement
    costs for the high visibility, Statewide law enforcement campaigns
    under subsection (c)(1).
        ``(2) The costs of the training of law enforcement personnel
    and the procurement of technology and equipment, including video
    equipment and passive alcohol sensors, to counter directly impaired
    operation of motor vehicles.
        ``(3) The costs of public awareness, advertising, and
    educational campaigns that publicize use of sobriety check points
    or increased law enforcement efforts to counter impaired operation
    of motor vehicles.
        ``(4) The costs of public awareness, advertising, and
    educational campaigns that target impaired operation of motor
    vehicles by persons under 34 years of age.
        ``(5) The costs of the development and implementation of a
    State impaired operator information system.
        ``(6) The costs of operating programs that result in vehicle
    forfeiture or impoundment or license plate impoundment.
    ``(e) Additional Authorities for Certain Authorized Uses.--
        ``(1) Combination of grant proceeds.--Grant funds used for a
    campaign under subsection (d)(3) may be combined, or expended in
    coordination, with proceeds of grants under section 402.
        ``(2) Coordination of uses.--Grant funds used for a campaign
    under paragraph (3) or (4) of subsection (d) may be expended--
            ``(A) in coordination with employers, schools, entities in
        the hospitality industry, and nonprofit traffic safety groups;
        and
            ``(B) in coordination with sporting events and concerts and
        other entertainment events.
    ``(f) Allocation.--Subject to subsection (g), funds made available
to carry out this section shall be allocated among States that meet the
eligibility criteria in subsection (b) on the basis of the
apportionment formula under section 402(c).
    ``(g) Grants to High Fatality Rate States.--
        ``(1) In general.--The Secretary shall make a separate grant
    under this section to each State that--
            ``(A) is among the 10 States with the highest impaired
        driving related fatalities as determined by the Secretary using
        the most recent Fatality Analysis Reporting System of the
        National Highway Traffic Safety Administration; and
            ``(B) prepares a plan for grant expenditures under this
        subsection that is approved by the Administrator of the
        National Highway Traffic Safety Administration.
        ``(2) Required uses.--At least one-half of the amounts
    allocated to States under this subsection may only be used for the
    program described in subsection (c)(1).
        ``(3) Allocation.--Funds made available under this subsection
    shall be allocated among States described in paragraph (1) on the
    basis of the apportionment formula under section 402(c), except
    that no State shall be allocated more than 30 percent of the funds
    made available to carry out this subsection for a fiscal year.
        ``(4) Funding.--Not more than 15 percent per fiscal year of
    amounts made available to carry out this section for a fiscal year
    shall be made available by the Secretary for making grants under
    this subsection.''; and
        (4) by adding at the end of subsection (i) (as redesignated by
    paragraph (2)) the following:
        ``(4) Impaired operator.--The term `impaired operator' means a
    person who, while operating a motor vehicle--
            ``(A) has a blood alcohol content of 0.08 percent or
        higher; or
            ``(B) is under the influence of a controlled substance.
        ``(5) Impaired driving related fatality rate.--The term
    `impaired driving related fatality rate' means the rate of alcohol
    related fatalities, as calculated in accordance with regulations
    which the Administrator of the National Highway Traffic Safety
    Administration shall prescribe.''.
    (c) NHTSA To Issue Regulations.--Not later than 12 months after the
date of enactment of this Act, the National Highway Traffic Safety
Administration shall issue guidelines to the States specifying the
types and formats of data that States should collect relating to
drivers who are arrested or convicted for violation of laws prohibiting
the impaired operation of motor vehicles.

SEC. 2008. NHTSA ACCOUNTABILITY.

    (a) In General.--Chapter 4 of title 23, United States Code, is
amended by adding at the end the following:

``Sec. 412. Agency accountability

    ``(a) Triennial State Management Reviews.--At least once every 3
years the Secretary shall conduct a review of each State highway safety
program. The review shall include a management evaluation of all grant
programs funded under this chapter. The Secretary shall provide review-
based recommendations on how each State could improve the management
and oversight of its grant activities and may provide a management and
oversight plan for such grant programs.
    ``(b) Recommendations Before Submission.--In order to provide
guidance to State highway safety agencies on matters that should be
addressed in the goals and initiatives of the State highway safety
program before the program is submitted for review, the Secretary shall
provide data-based recommendations to each State at least 90 days
before the date on which the program is to be submitted for approval.
    ``(c) State Program Review.--The Secretary shall--
        ``(1) conduct a program improvement review of a highway safety
    program under this chapter of a State that does not make
    substantial progress over a 3-year period in meeting its priority
    program goals; and
        ``(2) provide technical assistance and safety program
    requirements to be incorporated in the State highway safety program
    for any goal not achieved.
    ``(d) Regional Harmonization.--The Secretary and the Inspector
General of the Department of Transportation shall undertake an
administrative review of the practices and procedures of the management
reviews and program reviews of State highway safety programs under this
chapter conducted by the regional offices of the National Highway
Traffic Safety Administration and prepare a written report of best
practices and procedures for use by the regional offices in conducting
such reviews. The report shall be completed within 180 days after the
date of enactment of this section.
    ``(e) Best Practices Guidelines.--
        ``(1) Uniform guidelines.--The Secretary shall issue uniform
    management review guidelines and program review guidelines based on
    the report under subsection (d). Each regional office shall use the
    guidelines in executing its State administrative review duties
    under this section.
        ``(2) Publication.--The Secretary shall make publicly available
    on the Web site (or successor electronic facility) of the
    Administration the following documents upon their completion:
            ``(A) The Secretary's management review guidelines and
        program review guidelines.
            ``(B) All State highway safety programs submitted under
        this chapter.
            ``(C) State annual accomplishment reports.
            ``(D) The Administration's Summary Report of findings from
        Management Reviews and Improvement Plans.
        ``(3) Reports to state highway safety agencies.--The Secretary
    may not make publicly available a program, report, or review under
    paragraph (2) that is directed to a State highway safety agency
    until after the date on which the program, report, or review is
    submitted to that agency under this chapter.
    ``(f) GAO Review.--
        ``(1) Analysis.--The Comptroller General shall analyze the
    effectiveness of the Administration's oversight of traffic safety
    grants under this chapter by determining the usefulness of the
    Administration's advice to the States regarding administration and
    State activities under this chapter, the extent to which the States
    incorporate the Administration's recommendations into their highway
    safety programs, and the improvements that result in a State's
    highway safety program that may be attributable to the
    Administration's recommendations.
        ``(2) Report.--Not later than September 30, 2008, the
    Comptroller General shall submit a report on the results of the
    analysis to the Committee on Transportation and Infrastructure of
    the House of Representatives and the Committee on Commerce,
    Science, and Transportation of the Senate.''.
    (b) Clerical Amendment.--The analysis for chapter 4 of such title
is amended by adding at the end the following:

``412. Agency accountability.''.

SEC. 2009. HIGH VISIBILITY ENFORCEMENT PROGRAM.

    (a) In General.--The Administrator of the National Highway Traffic
Safety Administration shall establish and administer a program under
which at least 2 high-visibility traffic safety law enforcement
campaigns will be carried out for the purposes specified in subsection
(b) in each of years 2006 through 2009.
    (b) Purpose.--The purpose of each law enforcement campaign under
this section shall be to achieve either or both of the following
objectives:
        (1) Reduce alcohol-impaired or drug-impaired operation of motor
    vehicles.
        (2) Increase use of seat belts by occupants of motor vehicles.
    (c) Advertising.--The Administrator may use, or authorize the use
of, funds available to carry out this section to pay for the
development, production, and use of broadcast and print media
advertising in carrying out traffic safety law enforcement campaigns
under this section. Consideration shall be given to advertising
directed at non-English speaking populations, including those who
listen, read, or watch nontraditional media.
    (d) Coordination With States.--The Administrator shall coordinate
with the States in carrying out the traffic safety law enforcement
campaigns under this section, including advertising funded under
subsection (c), with a view to--
        (1) relying on States to provide the law enforcement resources
    for the campaigns out of funding available under this section and
    sections 402, 405, 406, and 410 of title 23, United States Code;
    and
        (2) providing out of National Highway Traffic Safety
    Administration resources most of the means necessary for national
    advertising and education efforts associated with the law
    enforcement campaigns.
    (e) Use of Funds.--Funds made available to carry out this section
may only be used for activities described in subsections (a), (c), and
(f).
    (f) Annual Evaluation.--The Secretary shall conduct an annual
evaluation of the effectiveness of campaigns referred to in subsection
(a).
    (g) State Defined.--The term ``State'' has the meaning such term
has under section 401 of title 23, United States Code.

SEC. 2010. MOTORCYCLIST SAFETY.

    (a) Authority To Make Grants.--Subject to the requirements of this
section, the Secretary shall make grants to States that adopt and
implement effective programs to reduce the number of single- and multi-
vehicle crashes involving motorcyclists.
    (b) Maintenance of Effort.--No grant may be made to a State under
this section in a fiscal year unless the State enters into such
agreements with the Secretary as the Secretary may require to ensure
that the State will maintain its aggregate expenditures from all the
other sources for motorcyclist safety training programs and
motorcyclist awareness programs at or above the average level of such
expenditures in its 2 fiscal years preceding the date of enactment of
this Act.
    (c) Allocation.--The amount of a grant made to a State for a fiscal
year under this section may not be less than $100,000 and may not
exceed 25 percent of the amount apportioned to the State for fiscal
year 2003 under section 402 of title 23, United States Code.
    (d) Grant Eligibility.--
        (1) In general.--A State becomes eligible for a grant under
    this section by adopting or demonstrating to the satisfaction of
    the Secretary--
            (A) for the first fiscal year for which the State will
        receive a grant under this section, at least 1 of the 6
        criteria listed in paragraph (2); and
            (B) for the second, third, and fourth fiscal years for
        which the State will receive a grant under this section, at
        least 2 of the 6 criteria listed in paragraph (2).
        (2) Criteria.--The criteria for eligibility for a grant under
    this section are the following:
            (A) Motorcycle rider training courses.--An effective
        motorcycle rider training course that is offered throughout the
        State, provides a formal program of instruction in accident
        avoidance and other safety-oriented operational skills to
        motorcyclists and that may include innovative training
        opportunities to meet unique regional needs.
            (B) Motorcyclists awareness program.--An effective
        statewide program to enhance motorist awareness of the presence
        of motorcyclists on or near roadways and safe driving practices
        that avoid injuries to motorcyclists.
            (C) Reduction of fatalities and crashes involving
        motorcycles.--A reduction for the preceding calendar year in
        the number of motorcycle fatalities and the rate of motor
        vehicle crashes involving motorcycles in the State (expressed
        as a function of 10,000 motorcycle registrations).
            (D) Impaired driving program.--Implementation of a
        statewide program to reduce impaired driving, including
        specific measures to reduce impaired motorcycle operation.
            (E) Reduction of fatalities and accidents involving
        impaired motorcyclists.--A reduction for the preceding calendar
        year in the number of fatalities and the rate of reported
        crashes involving alcohol- or drug-impaired motorcycle
        operators (expressed as a function of 10,000 motorcycle
        registrations).
            (F) Fees collected from motorcyclists.--All fees collected
        by the State from motorcyclists for the purposes of funding
        motorcycle training and safety programs will be used for
        motorcycle training and safety programs.
    (e) Eligible Uses.--
        (1) In general.--A State may use funds from a grant under this
    section only for motorcyclist safety training and motorcyclist
    awareness programs, including--
            (A) improvements to motorcyclist safety training curricula;
            (B) improvements in program delivery of motorcycle training
        to both urban and rural areas, including--
                (i) procurement or repair of practice motorcycles;
                (ii) instructional materials;
                (iii) mobile training units; and
                (iv) leasing or purchasing facilities for closed-course
            motorcycle skill training;
            (C) measures designed to increase the recruitment or
        retention of motorcyclist safety training instructors; and
            (D) public awareness, public service announcements, and
        other outreach programs to enhance driver awareness of
        motorcyclists, such as the ``share-the-road'' safety messages
        developed under subsection (g).
        (2) Suballocations of funds.--An agency of a State that
    receives a grant under this section may suballocate funds from the
    grant to a nonprofit organization incorporated in that State to
    carry out under this section.
    (f) Definitions.--In this section, the following definitions apply:
        (1) Motorcyclist safety training.--The term ``motorcyclist
    safety training'' means a formal program of instruction that is
    approved for use in a State by the designated State authority
    having jurisdiction over motorcyclist safety issues, which may
    include the State motorcycle safety administrator or a motorcycle
    advisory council appointed by the Governor of the State.
        (2) Motorcyclist awareness.--The term ``motorcyclist
    awareness'' means individual or collective awareness of--
            (A) the presence of motorcycles on or near roadways; and
            (B) safe driving practices that avoid injury to
        motorcyclists.
        (3) Motorcyclist awareness program.--The term ``motorcyclist
    awareness program'' means an informational or public awareness
    program designed to enhance motorcyclist awareness that is
    developed by or in coordination with the designated State authority
    having jurisdiction over motorcyclist safety issues, which may
    include the State motorcycle safety administrator or a motorcycle
    advisory council appointed by the Governor of the State.
        (4) State.--The term ``State'' has the same meaning such term
    has in section 101(a) of title 23, United States Code.
    (g) Share-the-Road Model Language.--Not later than 1 year after the
date of enactment of this Act, the Secretary, in consultation with the
Administrator of the National Highway Traffic Safety Administration,
shall develop and provide to the States model language for use in
traffic safety education courses, driver's manuals, and other driver's
training materials instructing the drivers of motor vehicles on the
importance of sharing the roads safely with motorcyclists.

SEC. 2011. CHILD SAFETY AND CHILD BOOSTER SEAT INCENTIVE GRANTS.

    (a) General Authority.--Subject to the requirements of this
section, the Secretary shall make grants to States that are enforcing a
law requiring that any child riding in a passenger motor vehicle in the
State who is too large to be secured in a child safety seat be secured
in a child restraint that meets the requirements prescribed by the
Secretary under section 3 of Anton's Law (49 U.S.C. 30127 note; 116
Stat. 2772).
    (b) Maintenance of Effort.--No grant may be made to a State under
this section in a fiscal year unless the State enters into such
agreements with the Secretary as the Secretary may require to ensure
that the State will maintain its aggregate expenditures from all other
sources for child safety seat and child restraint programs at or above
the average level of such expenditures in its 2 fiscal years preceding
the date of enactment of this Act.
    (c) Federal Share.--The Federal share of the costs of activities
funded using amounts from grants under this section shall not exceed--
        (1) for the first 3 fiscal years for which a State receives a
    grant under this section, 75 percent; and
        (2) for the fourth fiscal year for which a State receives a
    grant under this section, 50 percent.
    (d) Use of Grant Amounts.--
        (1) Allocations.--Of the amounts received by a State in grants
    under this section for a fiscal year not more than 50 percent shall
    be used to fund programs for purchasing and distributing child
    safety seats and child restraints to low-income families.
        (2) Remaining amounts.--Amounts received by a State in grants
    under this section, other than amounts subject to paragraph (1),
    shall be used to carry out child safety seat and child restraint
    programs, including the following:
            (A) A program to support enforcement of child restraint
        laws.
            (B) A program to train child passenger safety
        professionals, police officers, fire and emergency medical
        personnel, educators, and parents concerning all aspects of the
        use of child safety seats and child restraints.
            (C) A program to educate the public concerning the proper
        use and installation of child safety seats and child
        restraints.
    (e) Grant Amount.--The amount of a grant to a State for a fiscal
year under this section may not exceed 25 percent of the amount
apportioned to the State for fiscal year 2003 under section 402 of
title 23, United States Code.
    (f) Applicability of Chapter 1.--The provisions contained in
section 402(d) of such title shall apply to this section.
    (g) Report.--A State that receives a grant under this section shall
transmit to the Secretary a report documenting the manner in which the
grant amounts were obligated and expended and identifying the specific
programs carried out using the grant funds. The report shall be in a
form prescribed by the Secretary and may be combined with other State
grant reporting requirements under of chapter 4 of title 23, United
States Code.
    (h) Definitions.--In this section, the following definitions apply:
        (1) Child restraint.--The term ``child restraint'' means any
    product designed to provide restraint to a child (including booster
    seats and other products used with a lap and shoulder belt
    assembly) that meets applicable Federal motor vehicle safety
    standards prescribed by the National Highway Traffic Safety
    Administration.
        (2) Child safety seat.--The term ``child safety seat'' has the
    meaning such term has in section 405(f) of title 23, United States
    Code.
        (3) Passenger motor vehicle.--The term ``passenger motor
    vehicle'' has the meaning such term has in section 405(f) of such
    title.
        (4) State.--The term ``State'' has the meaning such term has in
    section 101(a) of such title.

SEC. 2012. SAFETY DATA.

    (a) In General.--Using funds made available to carry out section
403 of title 23, United States Code, for fiscal years 2005 through
2009, the Secretary shall collect data and compile statistics on
accidents involving motor vehicles being backed up that result in
fatalities and injuries and that occur on public and nonpublic roads
and residential and commercial driveways and parking facilities.
    (b) Report.--Not later than January 1, 2009, the Secretary shall
transmit to the Committee on Transportation and Infrastructure of the
House of Representatives and the Committee on Commerce, Science, and
Transportation of the Senate a report on accidents described in
subsection (a), including the data collected and statistics compiled
under subsection (a) and any recommendations regarding measures to be
taken to reduce the number of such accidents and the resulting
fatalities and injuries.

SEC. 2013. DRUG-IMPAIRED DRIVING ENFORCEMENT.

    (a) Illicit Drug.--In this section, the term ``illicit drug''
includes substances listed in schedules I through V of section 112(e)
of the Controlled Substances Act (21 U.S.C. 812) not obtained by a
legal and valid prescription.
    (b) Duties.--The Secretary shall--
        (1) advise and coordinate with other Federal agencies on how to
    address the problem of driving under the influence of an illegal
    drug; and
        (2) conduct research on the prevention, detection, and
    prosecution of driving under the influence of an illegal drug.
    (c) Report.--
        (1) In general.--Not later than 18 months after the date of
    enactment of this Act, the Secretary, in cooperation with the
    National Institutes of Health, shall submit to Congress a report on
    the problem of drug-impaired driving.
        (2) Contents.--The report shall include, at a minimum, the
    following:
            (A) An assessment of methodologies and technologies for
        measuring driver impairment resulting from use of the most
        common illicit drugs (including the use of such drugs in
        combination with alcohol).
            (B) Effective and efficient methods for training law
        enforcement personnel, including drug recognition experts, to
        detect or measure the level of impairment of a driver who is
        under the influence of an illicit drug by the use of technology
        or otherwise.
            (C) A description of the role of drugs as causal factor in
        traffic crashes and the extent of the problem of drug-impaired
        driving.
            (D) A description and assessment of current State and
        Federal laws relating to drug-impaired driving.
            (E) Recommendations for addressing the problem of drug-
        impaired driving, including recommendations on levels of
        impairment.
            (F) Recommendations for developing a model statute relating
        to drug-impaired driving.
    (d) Model Statute.--
        (1) In general.--The Secretary shall develop a model statute
    for States relating to drug-impaired driving.
        (2) Contents.--Based on recommendations and findings contained
    in the report submitted under subsection (c), the model statute may
    include--
            (A) threshold levels of impairment for illicit drugs;
            (B) practicable methods for detecting the presence of
        illicit drugs; and
            (C) penalties for drug impaired driving.
        (3) Date.--The model statute shall be provided to States not
    later than 1 year after date of submission of the report under
    subsection (c).
    (e) Research and Development.--Section 403(b) of title 23, United
States Code, is amended by adding at the end the following:
        ``(5) Technology to detect drug use and enable States to
    efficiently process toxicology evidence.
        ``(6) Research on the effects of illicit drugs and the compound
    effects of alcohol and illicit drugs on impairment.''.
    (f) Funding.--Out of amounts made available to carry out section
403 of title 23, United States Code, for each of fiscal years 2006
through 2009, the Secretary shall make available $1,200,000 for such
fiscal year to carry out this section.

SEC. 2014. FIRST RESPONDER VEHICLE SAFETY PROGRAM.

    (a) In General.--Not later than 1 year after the date of enactment
of this Act, the Secretary, in consultation with the Administrator of
the National Highway Traffic Safety Administration, should--
        (1) develop and implement a comprehensive program to promote
    compliance with State and local laws intended to increase the safe
    and efficient operation of first responder vehicles;
        (2) compile a list of best practices by State and local
    governments to promote compliance with the laws described in
    paragraph (1);
        (3) analyze State and local laws intended to increase the safe
    and efficient operation of first responder vehicles; and
        (4) develop model legislation to increase the safe and
    efficient operation of first responder vehicles.
    (b) Partnerships.--The Secretary may enter into partnerships with
qualified organizations to carry out this section.
    (c) Public Outreach.--The Secretary shall use a variety of public
outreach strategies to carry out this section, including public service
announcements, publication of informational materials, and posting
information on the Internet.
    (d) Authorization of Appropriations.--There are authorized to be
appropriated to the Secretary such sums as may be necessary to carry
out this section for fiscal year 2006.

SEC. 2015. DRIVER PERFORMANCE STUDY.

    (a) In General.--Using funds made available to carry out section
403 of title 23, United States Code, for fiscal year 2005, the
Secretary shall make $1,000,000 available to conduct a study on the
risks associated with glare to oncoming drivers, including increased
risks to drivers on 2-lane highways, increased risks to drivers over
the age of 50, and the overall effects of glare on driver performance.
    (b) Report.--Not later than 18 months after the date of enactment
of this Act, the Secretary shall transmit to the Committee on
Transportation and Infrastructure of the House of Representatives and
the Committee on Commerce, Science, and Transportation of the Senate a
report on the results of the study and any recommendations regarding
measures to reduce the risks associated with glare to oncoming drivers.

SEC. 2016. RURAL STATE EMERGENCY MEDICAL SERVICES OPTIMIZATION PILOT
              PROGRAM.

    (a) In General.--From funds made available to carry out section 403
of title 23, United States Code, for fiscal year 2006, the Secretary
shall make $1,000,000 available to conduct a pilot program for
optimizing emergency medical services in a rural State.
    (b) Collecting Data.--The pilot program shall focus on collecting
geo-coded data for highway accidents and resulting injuries, analyzing
data to develop injury patterns and distributions, and improving
placement and management of emergency medical services resources and
personnel.
    (c) Selection.--The Secretary shall enter into an agreement with
the State of Alaska to conduct the pilot program.
    (d) Report.--Not later than 12 months after the completion of the
pilot program, the Secretary shall transmit to the Committee on
Transportation and Infrastructure of the House of Representatives and
the Committee on Commerce, Science, and Transportation of the Senate a
report on the results of the pilot program and recommendations for
application to other rural States.

SEC. 2017. OLDER DRIVER SAFETY; LAW ENFORCEMENT TRAINING.

    (a) Improving Older Driver Safety.--
        (1) In general.--Of the funds made available to carry out
    section 403 of title 23, United States Code, the Secretary shall
    allocate $1,700,000 for each of fiscal years 2006 through 2009 to
    conduct a comprehensive research and demonstration program to
    improve traffic safety pertaining to older drivers.
        (2) Elements of program.--The program shall--
            (A) provide information and guidelines to assist older
        drivers, physicians, and other related medical personnel,
        families, licensing agencies, enforcement officers, and various
        public and transit agencies in enhancing the safety of older
        drivers;
            (B) improve the scientific basis of medical standards and
        screenings strategies used in the licensing of all drivers in a
        non-discriminatory manner;
            (C) conduct field tests to assess the safety benefits and
        mobility impacts of different driver licensing strategies and
        driver assessment and rehabilitation methods;
            (D) assess the value and improve the safety potential of
        driver retraining courses of particular benefit to older
        drivers; and
            (E) conduct other activities to accomplish the objectives
        of this section.
        (3) Formulation of plan.--After consultation with affected
    parties, the Secretary shall formulate an older driver traffic
    safety plan to guide the design and implementation of the program.
        (4) Submision of plan to congress.--Not later than 1 year after
    the date of enactment of this Act, the Secretary shall submit the
    plan to the Committee on Transportation and Infrastructure House of
    Representatives and the Committee on Commerce, Science, and
    Transportation of the Senate.
    (b) Law Enforcement Training.--
        (1) Requirement for program.--The Secretary shall carry out a
    program to provide guidance and support to law enforcement agencies
    in police chase techniques that are consistent with the police
    chase guidelines issued by the International Association of Chiefs
    of Police.
        (2) Amount for program.--Of the funds made available to carry
    out section 403 of title 23, United States Code, the Secretary
    shall allocate $500,000 in each of fiscal years 2006 through 2009
    to carry out this subsection.

SEC. 2018. SAFE INTERSECTIONS.

    (a) In General.--Chapter 2 of title 18, United States Code, is
amended by adding at the end the following:

``Sec. 39. Traffic signal preemption transmitters

    ``(a) Offenses.--
        ``(1) Sale.--Whoever, in or affecting interstate or foreign
    commerce, knowingly sells a traffic signal preemption transmitter
    to a nonqualifying user shall be fined under this title, or
    imprisoned not more than 1 year, or both.
        ``(2) Use.--Whoever, in or affecting interstate or foreign
    commerce, being a nonqualifying user makes unauthorized use of a
    traffic signal preemption transmitter shall be fined under this
    title, or imprisoned not more than 6 months, or both.
    ``(b) Definitions.--In this section, the following definitions
apply:
        ``(1) Traffic signal preemption transmitter.--The term `traffic
    signal preemption transmitter' means any mechanism that can change
    or alter a traffic signal's phase time or sequence.
        ``(2) Nonqualifying user.--The term `nonqualifying user' means
    a person who uses a traffic signal preemption transmitter and is
    not acting on behalf of a public agency or private corporation
    authorized by law to provide fire protection, law enforcement,
    emergency medical services, transit services, maintenance, or other
    services for a Federal, State, or local government entity, but does
    not include a person using a traffic signal preemption transmitter
    for classroom or instructional purposes.''.
    (b) Clerical Amendment.--The analysis for such chapter is amended
by adding at the end the following:

``39. Traffic signal preemption transmitters.''.

SEC. 2019. NATIONAL HIGHWAY SAFETY ADVISORY COMMITTEE TECHNICAL
              CORRECTION.

    Section 404(d) of title 23, United States Code, is amended by
striking ``Commerce'' and inserting ``Transportation''.

SEC. 2020. PRESIDENTIAL COMMISSION ON ALCOHOL-IMPAIRED DRIVING.

    (a) Findings.--Congress finds that--
        (1) there has been considerable progress over the past 25 years
    in reducing the number and rate of alcohol-related highway
    facilities;
        (2) the National Highway Traffic Safety Administration projects
    that fatalities in alcohol-related crashes declined in 2003 for the
    2nd year in a row;
        (3) in spite of this progress, an estimated 17,013 Americans
    died in 2003, in alcohol-related crashes;
        (4) these fatalities comprise 40 percent of the annual total
    highway fatalities;
        (5) about 250,000 are injured each year in alcohol-related
    crashes;
        (6) the past 2 years of decreasing alcohol-related fatalities
    follows a 3-year increase;
        (7) alcohol-impaired driving is the Nation's most frequently
    committed violent crime;
        (8) the annual cost of alcohol-related crashes is over
    $100,000,000,000, including $9,000,000,000 in costs to employers;
        (9) a Presidential Commission on Alcohol Impaired Driving in
    1982 and 1983 helped to lead to substantial progress on this issue;
    and
        (10) these facts point to the need to renew the national
    commitment to preventing these deaths and injuries.
    (b) Sense of the Congress.--It is the sense of Congress that, in an
effort to further change the culture of alcohol-impaired driving on our
Nation's highways, the President should consider establishing a
Presidential Commission on Alcohol-Impaired Driving--
        (1) comprised of representatives of--
            (A) State and local governments, including State
        legislators;
            (B) law enforcement;
            (C) traffic safety experts, including researchers;
            (D) victims of alcohol-related crashes;
            (E) affected industries, including the alcohol, insurance,
        motorcycle, and auto industries;
            (F) the business community;
            (G) labor;
            (H) the medical community;
            (I) public health; and
            (J) Members of Congress; and
        (2) that not later than September 30, 2006, would--
            (A) conduct a full examination of alcohol-impaired driving
        issues; and
            (B) make recommendations for a broad range of policy and
        program changes that would serve to further reduce the level of
        deaths and injuries caused by alcohol impaired driving.

SEC. 2021. SENSE OF THE CONGRESS IN SUPPORT OF INCREASED PUBLIC
              AWARENESS OF BLOOD ALCOHOL CONCENTRATION LEVELS AND
              DANGERS OF ALCOHOL-IMPAIRED DRIVING.

    (a) Findings.--Congress finds that--
        (1) in 2003--
            (A) 17,013 Americans died in alcohol-related traffic
        crashes;
            (B) 40 percent of the persons killed in traffic crashes
        died in alcohol-related crashes; and
            (C) drivers with blood alcohol concentration levels over
        0.15 were involved in 58 percent of alcohol-related traffic
        fatalities;
        (2) research shows that 77 percent of Americans think they have
    received enough information about alcohol-impaired driving and the
    way in which alcohol affects individual blood alcohol levels; and
        (3) only 28 percent of the American public can correctly
    identify the legal limit of blood alcohol concentration of the
    State in which they reside.
    (b) Sense of Congress.--It is the sense of Congress that the
National Highway Traffic Safety Administration should work with State
and local governments and independent organizations to increase public
awareness of--
        (1) State legal limits on blood alcohol concentration levels;
    and
        (2) the dangers of alcohol-impaired driving.

SEC. 2022. EFFECTIVE DATE.

    Sections 2002 through 2007 of this title (and the amendments and
repeals made by such sections) shall take effect October 1, 2005.

                    TITLE III--PUBLIC TRANSPORTATION

SEC. 3001. SHORT TITLE.

    This title may be cited as the ``Federal Public Transportation Act
of 2005''.

SEC. 3002. AMENDMENTS TO TITLE 49, UNITED STATES CODE; UPDATED
              TERMINOLOGY.

    (a) Amendments to Title 49.--Except as otherwise specifically
provided, whenever in this title an amendment or repeal is expressed in
terms of an amendment to, or repeal of, a section or other provision of
law, the reference shall be considered to be made to a section or other
provision of title 49, United States Code.
    (b) Updated Terminology.--Chapter 53 is amended--
        (1) in the chapter heading by striking ``MASS'' and inserting
    ``PUBLIC'';
        (2) in section 5310(h) by striking ``Mass'' and inserting
    ``Public'';
        (3) in the subsection heading for section 5331(b) by striking
    ``Mass'' and inserting ``Public''; and
        (4) by striking ``mass'' each place the term appears before
    ``transportation'' and inserting ``public'', except in sections
    5301(f), 5302(a)(7), 5315, and 5323(a)(1).
    (c) Table of Chapters.--The table of chapters for subtitle III is
amended in the item relating to chapter 53 by striking ``Mass'' and
inserting ``Public''.

SEC. 3003. POLICIES, FINDINGS, AND PURPOSES.

    (a) In General.--Section 5301(a) is amended to read as follows:
    ``(a) Development and Revitalization of Public Transportation
Systems.--It is in the interest of the United States, including its
economic interest, to foster the development and revitalization of
public transportation systems that--
        ``(1) maximize the safe, secure, and efficient mobility of
    individuals;
        ``(2) minimize environmental impacts; and
        ``(3) minimize transportation-related fuel consumption and
    reliance on foreign oil.''.
    (b) General Findings.--Section 5301(b)(1) is amended--
        (1) by striking ``70 percent'' and inserting ``two-thirds'';
    and
        (2) by striking ``urban areas'' and inserting ``urbanized
    areas''.
    (c) Preserving the Environment.--Section 5301(e) is amended--
        (1) by striking ``an urban'' and inserting ``a''; and
        (2) by striking ``under sections 5309 and 5310 of this title''.
    (d) General Purposes.--Section 5301(f) is amended--
        (1) in paragraph (1)--
            (A) by striking ``mass'' the first place it appears and
        inserting ``public''; and
            (B) by striking ``public and private mass transportation
        companies'' and inserting ``both public transportation
        companies and private companies engaged in public
        transportation'';
        (2) in paragraph (2)--
            (A) by striking ``urban mass'' and inserting ``public'';
        and
            (B) by striking ``public and private mass transportation
        companies'' and inserting ``both public transportation
        companies and private companies engaged in public
        transportation'';
        (3) in paragraph (3)--
            (A) by striking ``urban mass'' and inserting ``public'';
        and
            (B) by striking ``public or private mass transportation
        companies'' and inserting ``public transportation companies or
        private companies engaged in public transportation''; and
        (4) in paragraph (5) by striking ``urban mass'' and inserting
    ``public''.

SEC. 3004. DEFINITIONS.

    (a) Lead-in.--Section 5302(a) is amended in the matter preceding
paragraph (1) by striking ``In this chapter'' and inserting ``Except as
otherwise specifically provided, in this chapter''.
    (b) Capital Project.--Section 5302(a)(1) is amended--
        (1) in subparagraph (G) by inserting ``construction,
    renovation, and improvement of intercity bus and intercity rail
    stations and terminals,'' before ``and the renovation and
    improvement of historic transportation facilities,'';
        (2) in subparagraph (G)(ii) by inserting ``(other than an
    intercity bus station or terminal)'' after ``commercial revenue-
    producing facility'';
        (3) in subparagraph (H) by striking ``or'' at the end;
        (4) in subparagraph (I) by striking the period at the end and
    inserting a semicolon; and
        (5) by adding at the end the following:
            ``(J) crime prevention and security--
                ``(i) including--

                    ``(I) projects to refine and develop security and
                emergency response plans;
                    ``(II) projects aimed at detecting chemical and
                biological agents in public transportation;
                    ``(III) the conduct of emergency response drills
                with public transportation agencies and local first
                response agencies; and
                    ``(IV) security training for public transportation
                employees; but

                ``(ii) excluding all expenses related to operations,
            other than such expenses incurred in conducting activities
            described in clauses (i)(III) and (i)(IV);
                ``(K) establishing a debt service reserve, made up of
            deposits with a bondholder's trustee, to ensure the timely
            payment of principal and interest on bonds issued by a
            grant recipient to finance an eligible project under this
            chapter; or
            ``(L) mobility management--
                ``(i) consisting of short-range planning and management
            activities and projects for improving coordination among
            public transportation and other transportation service
            providers carried out by a recipient or subrecipient
            through an agreement entered into with a person, including
            a governmental entity, under this chapter (other than
            section 5309); but
                ``(ii) excluding operating public transportation
            services.''.
    (c) Individual With a Disability.--Section 5302(a)(5) is amended--
        (1) in the paragraph heading by striking ``Handicapped
    individual'' and inserting ``Individual with a disability''; and
        (2) by striking ``handicapped individual'' and inserting
    ``individual with a disability''.
    (d) Mass Transportation.--Section 5302(a)(7) is amended to read as
follows:
        ``(7) Mass transportation.--The term `mass transportation'
    means public transportation.''.
    (e) Public Transportation.--Section 5302(a)(10) is amended to read
as follows:
        ``(10) Public transportation.--The term `public transportation'
    means transportation by a conveyance that provides regular and
    continuing general or special transportation to the public, but
    does not include schoolbus, charter, or intercity bus
    transportation or intercity passenger rail transportation provided
    by the entity described in chapter 243 (or a successor to such
    entity).''.
    (f) Urbanized Area.--Section 5302(a)(17) is amended to read as
follows:
        ``(17) Urbanized area.--The term `urbanized area' means an area
    encompassing a population of not less than 50,000 people that has
    been defined and designated in the most recent decennial census as
    an `urbanized area' by the Secretary of Commerce.''.
    (g) Authority to Modify Definition.--Section 5302(b) is amended--
        (1) in the subsection heading by striking ``Handicapped
    Individual'' and inserting ``Individual With a Disability''; and
        (2) by striking ``handicapped individual'' and inserting
    ``individual with a disability''.

SEC. 3005. METROPOLITAN TRANSPORTATION PLANNING.

    (a) In General.--Section 5303 is amended to read as follows:

``Sec. 5303. Metropolitan transportation planning

    ``(a) Policy.--It is in the national interest to--
        ``(1) encourage and promote the safe and efficient management,
    operation, and development of surface transportation systems that
    will serve the mobility needs of people and freight and foster
    economic growth and development within and between States and
    urbanized areas, while minimizing transportation-related fuel
    consumption and air pollution through metropolitan and statewide
    transportation planning processes identified in this chapter; and
        ``(2) encourage the continued improvement and evolution of the
    metropolitan and statewide transportation planning processes by
    metropolitan planning organizations, State departments of
    transportation, and public transit operators as guided by the
    planning factors identified in subsection (h) and section 5304(d).
    ``(b) Definitions.--In this section and section 5304, the following
definitions apply:
        ``(1) Metropolitan planning area.--The term `metropolitan
    planning area' means the geographic area determined by agreement
    between the metropolitan planning organization for the area and the
    Governor under subsection (e).
        ``(2) Metropolitan planning organization.--The term
    `metropolitan planning organization' means the policy board of an
    organization created as a result of the designation process in
    subsection (d).
        ``(3) Nonmetropolitan area.--The term `nonmetropolitan area'
    means a geographic area outside a designated metropolitan planning
    area.
        ``(4) Nonmetropolitan local official.--The term
    `nonmetropolitan local official' means elected and appointed
    officials of general purpose local government in a nonmetropolitan
    area with responsibility for transportation.
        ``(5) TIP.--The term `TIP' means a transportation improvement
    program developed by a metropolitan planning organization under
    subsection (j).
        ``(6) Urbanized area.--The term `urbanized area' means a
    geographic area with a population of 50,000 or more, as designated
    by the Bureau of the Census.
    ``(c) General Requirements.--
        ``(1) Development of long-range plans and tips.--To accomplish
    the objectives in subsection (a), metropolitan planning
    organizations designated under subsection (d), in cooperation with
    the State and public transportation operators, shall develop long-
    range transportation plans and transportation improvement programs
    for metropolitan planning areas of the State.
        ``(2) Contents.--The plans and TIPs for each metropolitan area
    shall provide for the development and integrated management and
    operation of transportation systems and facilities (including
    accessible pedestrian walkways and bicycle transportation
    facilities) that will function as an intermodal transportation
    system for the metropolitan planning area and as an integral part
    of an intermodal transportation system for the State and the United
    States.
        ``(3) Process of development.--The process for developing the
    plans and TIPs shall provide for consideration of all modes of
    transportation and shall be continuing, cooperative, and
    comprehensive to the degree appropriate, based on the complexity of
    the transportation problems to be addressed.
    ``(d) Designation of Metropolitan Planning Organizations.--
        ``(1) In general.--To carry out the transportation planning
    process required by this section, a metropolitan planning
    organization shall be designated for each urbanized area with a
    population of more than 50,000 individuals--
            ``(A) by agreement between the Governor and units of
        general purpose local government that together represent at
        least 75 percent of the affected population (including the
        largest incorporated city (based on population) as named by the
        Bureau of the Census); or
            ``(B) in accordance with procedures established by
        applicable State or local law.
        ``(2) Structure.--Each metropolitan planning organization that
    serves an area designated as a transportation management area, when
    designated or redesignated under this subsection, shall consist
    of--
            ``(A) local elected officials;
            ``(B) officials of public agencies that administer or
        operate major modes of transportation in the metropolitan area;
        and
            ``(C) appropriate State officials.
        ``(3) Limitation on statutory construction.--Nothing in this
    subsection shall be construed to interfere with the authority,
    under any State law in effect on December 18, 1991, of a public
    agency with multimodal transportation responsibilities to--
            ``(A) develop the plans and TIPs for adoption by a
        metropolitan planning organization; and
            ``(B) develop long-range capital plans, coordinate transit
        services and projects, and carry out other activities pursuant
        to State law.
        ``(4) Continuing designation.--A designation of a metropolitan
    planning organization under this subsection or any other provision
    of law shall remain in effect until the metropolitan planning
    organization is redesignated under paragraph (5).
        ``(5) Redesignation procedures.--A metropolitan planning
    organization may be redesignated by agreement between the Governor
    and units of general purpose local government that together
    represent at least 75 percent of the existing planning area
    population (including the largest incorporated city (based on
    population) as named by the Bureau of the Census) as appropriate to
    carry out this section.
        ``(6) Designation of more than one metropolitan planning
    organization.--More than one metropolitan planning organization may
    be designated within an existing metropolitan planning area only if
    the Governor and the existing metropolitan planning organization
    determine that the size and complexity of the existing metropolitan
    planning area make designation of more than one metropolitan
    planning organization for the area appropriate.
    ``(e) Metropolitan Planning Area Boundaries.--
        ``(1) In general.--For the purposes of this section, the
    boundaries of a metropolitan planning area shall be determined by
    agreement between the metropolitan planning organization and the
    Governor.
        ``(2) Included area.--Each metropolitan planning area--
            ``(A) shall encompass at least the existing urbanized area
        and the contiguous area expected to become urbanized within a
        20-year forecast period for the transportation plan; and
            ``(B) may encompass the entire metropolitan statistical
        area or consolidated metropolitan statistical area, as defined
        by the Bureau of the Census.
        ``(3) Identification of new urbanized areas within existing
    planning area boundaries.--The designation by the Bureau of the
    Census of new urbanized areas within an existing metropolitan
    planning area shall not require the redesignation of the existing
    metropolitan planning organization.
        ``(4) Existing metropolitan planning areas in nonattainment.--
    Notwithstanding paragraph (2), in the case of an urbanized area
    designated as a nonattainment area for ozone or carbon monoxide
    under the Clean Air Act (42 U.S.C. 7401 et seq.) as of the date of
    enactment of the Federal Public Transportation Act of 2005, the
    boundaries of the metropolitan planning area in existence as of
    such date of enactment shall be retained; except that the
    boundaries may be adjusted by agreement of the Governor and
    affected metropolitan planning organizations in the manner
    described in subsection (d)(5).
        ``(5) New metropolitan planning areas in nonattainment.--In the
    case of an urbanized area designated after the date of enactment of
    the Federal Public Transportation Act of 2005 as a nonattainment
    area for ozone or carbon monoxide, the boundaries of the
    metropolitan planning area--
            ``(A) shall be established in the manner described in
        subsection (d)(1);
            ``(B) shall encompass the areas described in paragraph
        (2)(A);
            ``(C) may encompass the areas described in paragraph
        (2)(B); and
            ``(D) may address any nonattainment area identified under
        the Clean Air Act for ozone or carbon monoxide.
    ``(f) Coordination in Multistate Areas.--
        ``(1) In general.--The Secretary shall encourage each Governor
    with responsibility for a portion of a multistate metropolitan area
    and the appropriate metropolitan planning organizations to provide
    coordinated transportation planning for the entire metropolitan
    area.
        ``(2) Interstate compacts.--The consent of Congress is granted
    to any two or more States--
            ``(A) to enter into agreements or compacts, not in conflict
        with any law of the United States, for cooperative efforts and
        mutual assistance in support of activities authorized under
        this section as the activities pertain to interstate areas and
        localities within the States; and
            ``(B) to establish such agencies, joint or otherwise, as
        the States may determine desirable for making the agreements
        and compacts effective.
        ``(3) Lake tahoe region.--
            ``(A) Definition.--In this paragraph, the term `Lake Tahoe
        region' has the meaning given the term `region' in subdivision
        (a) of article II of the Tahoe Regional Planning Compact, as
        set forth in the first section of Public Law 96-551 (94 Stat.
        3234).
            ``(B) Transportation planning process.--The Secretary
        shall--
                ``(i) establish with the Federal land management
            agencies that have jurisdiction over land in the Lake Tahoe
            region a transportation planning process for the region;
            and
                ``(ii) coordinate the transportation planning process
            with the planning process required of State and local
            governments under this section and section 5304.
            ``(C) Interstate compact.--
                ``(i) In general.--Subject to clause (ii), and
            notwithstanding subsection (b), to carry out the
            transportation planning process required by this section,
            the consent of Congress is granted to the States of
            California and Nevada to designate a metropolitan planning
            organization for the Lake Tahoe region, by agreement
            between the Governors of the States of California and
            Nevada and units of general purpose local government that
            together represent at least 75 percent of the affected
            population (including the central city or cities (as
            defined by the Bureau of the Census)), or in accordance
            with procedures established by applicable State or local
            law.
                ``(ii) Involvement of federal land management
            agencies.--

                    ``(I) Representation.--The policy board of a
                metropolitan planning organization designated under
                clause (i) shall include a representative of each
                Federal land management agency that has jurisdiction
                over land in the Lake Tahoe region.
                    ``(II) Funding.--In addition to funds made
                available to the metropolitan planning organization for
                the Lake Tahoe region under other provisions of this
                chapter and title 23, 1 percent of the funds allocated
                under section 202 of title 23 shall be used to carry
                out the transportation planning process for the Lake
                Tahoe region under this subparagraph.

            ``(D) Activities.--Highway projects included in
        transportation plans developed under this paragraph--
                ``(i) shall be selected for funding in a manner that
            facilitates the participation of the Federal land
            management agencies that have jurisdiction over land in the
            Lake Tahoe region; and
                ``(ii) may, in accordance with chapter 2 of title 23,
            be funded using funds allocated under section 202 of such
            title.
        ``(4) Reservation of rights.--The right to alter, amend, or
    repeal interstate compacts entered into under this subsection is
    expressly reserved.
    ``(g) MPO Consultation in Plan and TIP Coordination.--
        ``(1) Nonattainment areas.--If more than one metropolitan
    planning organization has authority within a metropolitan area or
    an area which is designated as a nonattainment area for ozone or
    carbon monoxide under the Clean Air Act, each metropolitan planning
    organization shall consult with the other metropolitan planning
    organizations designated for such area and the State in the
    coordination of plans and TIPs required by this section.
        ``(2) Transportation improvements located in multiple mpos.--If
    a transportation improvement, funded from the Highway Trust Fund or
    authorized under this chapter, is located within the boundaries of
    more than one metropolitan planning area, the metropolitan planning
    organizations shall coordinate plans and TIPs regarding the
    transportation improvement.
        ``(3) Relationship with other planning officials.--The
    Secretary shall encourage each metropolitan planning organization
    to consult with officials responsible for other types of planning
    activities that are affected by transportation in the area
    (including State and local planned growth, economic development,
    environmental protection, airport operations, and freight
    movements) or to coordinate its planning process, to the maximum
    extent practicable, with such planning activities. Under the
    metropolitan planning process, transportation plans and TIPs shall
    be developed with due consideration of other related planning
    activities within the metropolitan area, and the process shall
    provide for the design and delivery of transportation services
    within the metropolitan area that are provided by--
            ``(A) recipients of assistance under this chapter;
            ``(B) governmental agencies and nonprofit organizations
        (including representatives of the agencies and organizations)
        that receive Federal assistance from a source other than the
        Department of Transportation to provide nonemergency
        transportation services; and
            ``(C) recipients of assistance under section 204 of title
        23.
    ``(h) Scope of Planning Process.--
        ``(1) In general.--The metropolitan planning process for a
    metropolitan planning area under this section shall provide for
    consideration of projects and strategies that will--
            ``(A) support the economic vitality of the metropolitan
        area, especially by enabling global competitiveness,
        productivity, and efficiency;
            ``(B) increase the safety of the transportation system for
        motorized and nonmotorized users;
            ``(C) increase the security of the transportation system
        for motorized and nonmotorized users;
            ``(D) increase the accessibility and mobility of people and
        for freight;
            ``(E) protect and enhance the environment, promote energy
        conservation, improve the quality of life, and promote
        consistency between transportation improvements and State and
        local planned growth and economic development patterns;
            ``(F) enhance the integration and connectivity of the
        transportation system, across and between modes, for people and
        freight;
            ``(G) promote efficient system management and operation;
        and
            ``(H) emphasize the preservation of the existing
        transportation system.
        ``(2) Failure to consider factors.--The failure to consider any
    factor specified in paragraph (1) shall not be reviewable by any
    court under this chapter, title 23, subchapter II of chapter 5 of
    title 5, or chapter 7 of title 5 in any matter affecting a
    transportation plan, a TIP, a project or strategy, or the
    certification of a planning process.
    ``(i) Development of Transportation Plan.--
        ``(1) In general.--Each metropolitan planning organization
    shall prepare a transportation plan for its metropolitan planning
    area in accordance with the requirements of this subsection. The
    metropolitan planning organization shall prepare and update such
    plan every 4 years (or more frequently, if the metropolitan
    planning organization elects to update more frequently) in the case
    of each of the following:
            ``(A) Any area designated as nonattainment, as defined in
        section 107(d) of the Clean Air Act (42 U.S.C. 7407(d)).
            ``(B) Any area that was nonattainment and subsequently
        designated to attainment in accordance with section 107(d)(3)
        of that Act (42 U.S.C. 7407(d)(3)) and that is subject to a
        maintenance plan under section 175A of that Act (42 U.S.C.
        7505a).
    In the case of any other area required to have a transportation
    plan in accordance with the requirements of this subsection, the
    metropolitan planning organization shall prepare and update such
    plan every 5 years unless the metropolitan planning organization
    elects to update more frequently.
        ``(2) Transportation plan.--A transportation plan under this
    section shall be in a form that the Secretary determines to be
    appropriate and shall contain, at a minimum, the following:
            ``(A) Identification of transportation facilities.--An
        identification of transportation facilities (including major
        roadways, transit, multimodal and intermodal facilities, and
        intermodal connectors) that should function as an integrated
        metropolitan transportation system, giving emphasis to those
        facilities that serve important national and regional
        transportation functions. In formulating the transportation
        plan, the metropolitan planning organization shall consider
        factors described in subsection (h) as such factors relate to a
        20-year forecast period.
            ``(B) Mitigation activities.--
                ``(i) In general.--A long-range transportation plan
            shall include a discussion of types of potential
            environmental mitigation activities and potential areas to
            carry out these activities, including activities that may
            have the greatest potential to restore and maintain the
            environmental functions affected by the plan.
                ``(ii) Consultation.--The discussion shall be developed
            in consultation with Federal, State, and tribal wildlife,
            land management, and regulatory agencies.
            ``(C) Financial plan.--A financial plan that demonstrates
        how the adopted transportation plan can be implemented,
        indicates resources from public and private sources that are
        reasonably expected to be made available to carry out the plan,
        and recommends any additional financing strategies for needed
        projects and programs. The financial plan may include, for
        illustrative purposes, additional projects that would be
        included in the adopted transportation plan if reasonable
        additional resources beyond those identified in the financial
        plan were available. For the purpose of developing the
        transportation plan, the metropolitan planning organization,
        transit operator, and State shall cooperatively develop
        estimates of funds that will be available to support plan
        implementation.
            ``(D) Operational and management strategies.--Operational
        and management strategies to improve the performance of
        existing transportation facilities to relieve vehicular
        congestion and maximize the safety and mobility of people and
        goods.
            ``(E) Capital investment and other strategies.--Capital
        investment and other strategies to preserve the existing and
        projected future metropolitan transportation infrastructure and
        provide for multimodal capacity increases based on regional
        priorities and needs.
            ``(F) Transportation and transit enhancement activities.--
        Proposed transportation and transit enhancement activities.
        ``(3) Coordination with clean air act agencies.--In
    metropolitan areas which are in nonattainment for ozone or carbon
    monoxide under the Clean Air Act, the metropolitan planning
    organization shall coordinate the development of a transportation
    plan with the process for development of the transportation control
    measures of the State implementation plan required by the Clean Air
    Act.
        ``(4) Consultation.--
            ``(A) In general.--In each metropolitan area, the
        metropolitan planning organization shall consult, as
        appropriate, with State and local agencies responsible for land
        use management, natural resources, environmental protection,
        conservation, and historic preservation concerning the
        development of a long-range transportation plan.
            ``(B) Issues.--The consultation shall involve, as
        appropriate--
                ``(i) comparison of transportation plans with State
            conservation plans or maps, if available; or
                ``(ii) comparison of transportation plans to
            inventories of natural or historic resources, if available.
        ``(5) Participation by interested parties.--
            ``(A) In general.--Each metropolitan planning organization
        shall provide citizens, affected public agencies,
        representatives of public transportation employees, freight
        shippers, providers of freight transportation services, private
        providers of transportation, representatives of users of public
        transportation, representatives of users of pedestrian walkways
        and bicycle transportation facilities, representatives of the
        disabled, and other interested parties with a reasonable
        opportunity to comment on the transportation plan.
            ``(B) Contents of participation plan.--A participation
        plan--
                ``(i) shall be developed in consultation with all
            interested parties; and
                ``(ii) shall provide that all interested parties have
            reasonable opportunities to comment on the contents of the
            transportation plan.
            ``(C) Methods.--In carrying out subparagraph (A), the
        metropolitan planning organization shall, to the maximum extent
        practicable--
                ``(i) hold any public meetings at convenient and
            accessible locations and times;
                ``(ii) employ visualization techniques to describe
            plans; and
                ``(iii) make public information available in
            electronically accessible format and means, such as the
            World Wide Web, as appropriate to afford reasonable
            opportunity for consideration of public information under
            subparagraph (A).
        ``(6) Publication.--A transportation plan involving Federal
    participation shall be published or otherwise made readily
    available by the metropolitan planning organization for public
    review, including (to the maximum extent practicable) in
    electronically accessible formats and means, such as the World Wide
    Web, approved by the metropolitan planning organization and
    submitted for information purposes to the Governor at such times
    and in such manner as the Secretary shall establish.
        ``(7) Selection of projects from illustrative list.--
    Notwithstanding paragraph (2)(C), a State or metropolitan planning
    organization shall not be required to select any project from the
    illustrative list of additional projects included in the financial
    plan under paragraph (2)(C).
    ``(j) Metropolitan Tip.--
        ``(1) Development.--
            ``(A) In general.--In cooperation with the State and any
        affected public transportation operator, the metropolitan
        planning organization designated for a metropolitan area shall
        develop a TIP for the area for which the organization is
        designated.
            ``(B) Opportunity for comment.--In developing the TIP, the
        metropolitan planning organization, in cooperation with the
        State and any affected public transportation operator, shall
        provide an opportunity for participation by interested parties
        in the development of the program, in accordance with
        subsection (i)(5).
            ``(C) Funding estimates.--For the purpose of developing the
        TIP, the metropolitan planning organization, public
        transportation agency, and State shall cooperatively develop
        estimates of funds that are reasonably expected to be available
        to support program implementation.
            ``(D) Updating and approval.--The TIP shall be updated at
        least once every 4 years and shall be approved by the
        metropolitan planning organization and the Governor.
        ``(2) Contents.--
            ``(A) Priority list.--The TIP shall include a priority list
        of proposed federally supported projects and strategies to be
        carried out within each 4-year period after the initial
        adoption of the TIP.
            ``(B) Financial plan.--The TIP shall include a financial
        plan that--
                ``(i) demonstrates how the TIP can be implemented;
                ``(ii) indicates resources from public and private
            sources that are reasonably expected to be available to
            carry out the program;
                ``(iii) identifies innovative financing techniques to
            finance projects, programs, and strategies; and
                ``(iv) may include, for illustrative purposes,
            additional projects that would be included in the approved
            TIP if reasonable additional resources beyond those
            identified in the financial plan were available.
            ``(C) Descriptions.--Each project in the TIP shall include
        sufficient descriptive material (such as type of work, termini,
        length, and other similar factors) to identify the project or
        phase of the project.
        ``(3) Included projects.--
            ``(A) Projects under this chapter and title 23.--A TIP
        developed under this subsection for a metropolitan area shall
        include the projects within the area that are proposed for
        funding under this chapter and chapter 1 of title 23.
            ``(B) Projects under chapter 2 of title 23.--
                ``(i) Regionally significant projects.--Regionally
            significant projects proposed for funding under chapter 2
            of title 23 shall be identified individually in the
            transportation improvement program.
                ``(ii) Other projects.--Projects proposed for funding
            under chapter 2 of title 23 that are not determined to be
            regionally significant shall be grouped in one line item or
            identified individually in the transportation improvement
            program.
            ``(C) Consistency with long-range transportation plan.--
        Each project shall be consistent with the long-range
        transportation plan developed under subsection (i) for the
        area.
            ``(D) Requirement of anticipated full funding.--The program
        shall include a project, or an identified phase of a project,
        only if full funding can reasonably be anticipated to be
        available for the project within the time period contemplated
        for completion of the project.
        ``(4) Notice and comment.--Before approving a TIP, a
    metropolitan planning organization, in cooperation with the State
    and any affected public transportation operator, shall provide an
    opportunity for participation by interested parties in the
    development of the program, in accordance with subsection (i)(5).
        ``(5) Selection of projects.--
            ``(A) In general.--Except as otherwise provided in
        subsection (k)(4) and in addition to the TIP development
        required under paragraph (1), the selection of federally funded
        projects in metropolitan areas shall be carried out, from the
        approved TIP--
                ``(i) by--

                    ``(I) in the case of projects under title 23, the
                State; and
                    ``(II) in the case of projects under this chapter,
                the designated recipients of public transportation
                funding; and

                ``(ii) in cooperation with the metropolitan planning
            organization.
            ``(B) Modifications to project priority.--Notwithstanding
        any other provision of law, action by the Secretary shall not
        be required to advance a project included in the approved TIP
        in place of another project in the program.
        ``(6) Selection of projects from illustrative list.--
            ``(A) No required selection.--Notwithstanding paragraph
        (2)(B)(iv), a State or metropolitan planning organization shall
        not be required to select any project from the illustrative
        list of additional projects included in the financial plan
        under paragraph (2)(B)(iv).
            ``(B) Required action by the secretary.--Action by the
        Secretary shall be required for a State or metropolitan
        planning organization to select any project from the
        illustrative list of additional projects included in the
        financial plan under paragraph (2)(B)(iv) for inclusion in an
        approved TIP.
        ``(7) Publication.--
            ``(A) Publication of tips.--A TIP involving Federal
        participation shall be published or otherwise made readily
        available by the metropolitan planning organization for public
        review.
            ``(B) Publication of annual listings of projects.--An
        annual listing of projects, including investments in pedestrian
        walkways and bicycle transportation facilities, for which
        Federal funds have been obligated in the preceding year shall
        be published or otherwise made available by the cooperative
        effort of the State, transit operator, and metropolitan
        planning organization for public review. The listing shall be
        consistent with the categories identified in the TIP.
            ``(C) Rulemaking.--Not later than 180 days after the date
        of enactment of the Federal Public Transportation Act of 2005,
        the Secretary shall issue regulations setting standards for the
        listing required by subparagraph (B) and specifying the types
        of data to be included in such list, including sufficient
        information about each project to identify its type, location,
        and amount obligated.
    ``(k) Transportation Management Areas.--
        ``(1) Identification and designation.--
            ``(A) Required identification.--The Secretary shall
        identify as a transportation management area each urbanized
        area (as defined by the Bureau of the Census) with a population
        of over 200,000 individuals.
            ``(B) Designations on request.--The Secretary shall
        designate any additional area as a transportation management
        area on the request of the Governor and the metropolitan
        planning organization designated for the area.
        ``(2) Transportation plans.--In a metropolitan planning area
    serving a transportation management area, transportation plans
    shall be based on a continuing and comprehensive transportation
    planning process carried out by the metropolitan planning
    organization in cooperation with the State and public
    transportation operators.
        ``(3) Congestion management process.--Within a metropolitan
    planning area serving a transportation management area, the
    transportation planning process under this section shall address
    congestion management through a process that provides for effective
    management and operation, based on a cooperatively developed and
    implemented metropolitan-wide strategy, of new and existing
    transportation facilities eligible for funding under this chapter
    and title 23 through the use of travel demand reduction and
    operational management strategies. The Secretary shall establish an
    appropriate phase-in schedule for compliance with the requirements
    of this section but no sooner than one year after the
    identification of a transportation management area.
        ``(4) Selection of projects.--
            ``(A) In general.--All federally funded projects carried
        out within the boundaries of a metropolitan planning area
        serving a transportation management area under title 23
        (excluding projects carried out on the National Highway System
        and projects carried out under the bridge program or the
        Interstate maintenance program) or under this chapter shall be
        selected for implementation from the approved TIP by the
        metropolitan planning organization designated for the area in
        consultation with the State and any affected public
        transportation operator.
            ``(B) National highway system projects.--Projects carried
        out within the boundaries of a metropolitan planning area
        serving a transportation management area on the National
        Highway System and projects carried out within such boundaries
        under the bridge program or the Interstate maintenance program
        under title 23 shall be selected for implementation from the
        approved TIP by the State in cooperation with the metropolitan
        planning organization designated for the area.
        ``(5) Certification.--
            ``(A) In general.--The Secretary shall--
                ``(i) ensure that the metropolitan planning process of
            a metropolitan planning organization serving a
            transportation management area is being carried out in
            accordance with applicable provisions of Federal law; and
                ``(ii) subject to subparagraph (B), certify, not less
            often than once every 4 years, that the requirements of
            this paragraph are met with respect to the metropolitan
            planning process.
            ``(B) Requirements for certification.--The Secretary may
        make the certification under subparagraph (A) if--
                ``(i) the transportation planning process complies with
            the requirements of this section and other applicable
            requirements of Federal law; and
                ``(ii) there is a TIP for the metropolitan planning
            area that has been approved by the metropolitan planning
            organization and the Governor.
            ``(C) Effect of failure to certify.--
                ``(i) Withholding of project funds.--If a metropolitan
            planning process of a metropolitan planning organization
            serving a transportation management area is not certified,
            the Secretary may withhold up to 20 percent of the funds
            attributable to the metropolitan planning area of the
            metropolitan planning organization for projects funded
            under this chapter and title 23.
                ``(ii) Restoration of withheld funds.--The withheld
            funds shall be restored to the metropolitan planning area
            at such time as the metropolitan planning process is
            certified by the Secretary.
            ``(D) Review of certification.--In making certification
        determinations under this paragraph, the Secretary shall
        provide for public involvement appropriate to the metropolitan
        area under review.
    ``(l) Abbreviated Plans for Certain Areas.--
        ``(1) In general.--Subject to paragraph (2), in the case of a
    metropolitan area not designated as a transportation management
    area under this section, the Secretary may provide for the
    development of an abbreviated transportation plan and TIP for the
    metropolitan planning area that the Secretary determines is
    appropriate to achieve the purposes of this section, taking into
    account the complexity of transportation problems in the area.
        ``(2) Nonattainment areas.--The Secretary may not permit
    abbreviated plans or TIPs for a metropolitan area that is in
    nonattainment for ozone or carbon monoxide under the Clean Air Act.
    ``(m) Additional Requirements for Certain Nonattainment Areas.--
        ``(1) In general.--Notwithstanding any other provisions of this
    chapter or title 23, for transportation management areas classified
    as nonattainment for ozone or carbon monoxide pursuant to the Clean
    Air Act, Federal funds may not be advanced in such area for any
    highway project that will result in a significant increase in the
    carrying capacity for single-occupant vehicles unless the project
    is addressed through a congestion management process.
        ``(2) Applicability.--This subsection applies to a
    nonattainment area within the metropolitan planning area boundaries
    determined under subsection (e).
    ``(n) Limitation on Statutory Construction.--Nothing in this
section shall be construed to confer on a metropolitan planning
organization the authority to impose legal requirements on any
transportation facility, provider, or project not eligible under this
chapter or title 23.
    ``(o) Funding.--Funds set aside under section 5305(g) of this title
or section 104(f) of title 23 shall be available to carry out this
section.
    ``(p) Continuation of Current Review Practice.--Since plans and
TIPs described in this section are subject to a reasonable opportunity
for public comment, since individual projects included in plans and
TIPs are subject to review under the National Environmental Policy Act
of 1969 (42 U.S.C. 4321 et seq.), and since decisions by the Secretary
concerning plans and TIPs described in this section have not been
reviewed under such Act as of January 1, 1997, any decision by the
Secretary concerning a plan or TIP described in this section shall not
be considered to be a Federal action subject to review under such
Act.''.
    (b) Schedule for Implementation.--The Secretary shall issue
guidance on a schedule for implementation of the changes made by this
section, taking into consideration the established planning update
cycle for States and metropolitan planning organizations. The Secretary
shall not require a State or metropolitan planning organization to
deviate from its established planning update cycle to implement changes
made by this section. Beginning July 1, 2007, State or metropolitan
planning organization plan or program updates shall reflect changes
made by this section.
    (c) Chapter Analysis.--The analysis for chapter 53 is amended by
striking the item relating to section 5303 and inserting the following:

``5303. Metropolitan transportation planning.''.

SEC. 3006. STATEWIDE TRANSPORTATION PLANNING.

    (a) In General.--Section 5304 is amended to read as follows:

``Sec. 5304. Statewide transportation planning

    ``(a) General Requirements.--
        ``(1) Development of plans and programs.--To accomplish the
    objectives stated in section 5303(a), each State shall develop a
    statewide transportation plan and a statewide transportation
    improvement program for all areas of the State, subject to section
    5303.
        ``(2) Contents.--The statewide transportation plan and the
    transportation improvement program developed for each State shall
    provide for the development and integrated management and operation
    of transportation systems and facilities (including accessible
    pedestrian walkways and bicycle transportation facilities) that
    will function as an intermodal transportation system for the State
    and an integral part of an intermodal transportation system for the
    United States.
        ``(3) Process of development.--The process for developing the
    statewide plan and the transportation improvement program shall
    provide for consideration of all modes of transportation and the
    policies stated in section 5303(a), and shall be continuing,
    cooperative, and comprehensive to the degree appropriate, based on
    the complexity of the transportation problems to be addressed.
    ``(b) Coordination With Metropolitan Planning; State Implementation
Plan.--A State shall--
        ``(1) coordinate planning carried out under this section with
    the transportation planning activities carried out under section
    5303 for metropolitan areas of the State and with statewide trade
    and economic development planning activities and related multistate
    planning efforts; and
        ``(2) develop the transportation portion of the State
    implementation plan as required by the Clean Air Act (42 U.S.C.
    7401 et seq.).
    ``(c) Interstate Agreements.--
        ``(1) In general.--The consent of Congress is granted to 2 or
    more States entering into agreements or compacts, not in conflict
    with any law of the United States, for cooperative efforts and
    mutual assistance in support of activities authorized under this
    section related to interstate areas and localities in the States
    and establishing authorities the States consider desirable for
    making the agreements and compacts effective.
        ``(2) Reservation of rights.--The right to alter, amend, or
    repeal interstate compacts entered into under this subsection is
    expressly reserved.
    ``(d) Scope of Planning Process.--
        ``(1) In general.--Each State shall carry out a statewide
    transportation planning process that provides for consideration and
    implementation of projects, strategies, and services that will--
            ``(A) support the economic vitality of the United States,
        the States, nonmetropolitan areas, and metropolitan areas,
        especially by enabling global competitiveness, productivity,
        and efficiency;
            ``(B) increase the safety of the transportation system for
        motorized and nonmotorized users;
            ``(C) increase the security of the transportation system
        for motorized and nonmotorized users;
            ``(D) increase the accessibility and mobility of people and
        freight;
            ``(E) protect and enhance the environment, promote energy
        conservation, improve the quality of life, and promote
        consistency between transportation improvements and State and
        local planned growth and economic development patterns;
            ``(F) enhance the integration and connectivity of the
        transportation system, across and between modes throughout the
        State, for people and freight;
            ``(G) promote efficient system management and operation;
        and
            ``(H) emphasize the preservation of the existing
        transportation system.
        ``(2) Failure to consider factors.--The failure to consider any
    factor specified in paragraph (1) shall not be reviewable by any
    court under this chapter, title 23, subchapter II of chapter 5 of
    title 5, or chapter 7 of title 5 in any matter affecting a
    statewide transportation plan, the transportation improvement
    program, a project or strategy, or the certification of a planning
    process.
    ``(e) Additional Requirements.--In carrying out planning under this
section, each State shall consider, at a minimum--
        ``(1) with respect to nonmetropolitan areas, the concerns of
    affected local officials with responsibility for transportation;
        ``(2) the concerns of Indian tribal governments and Federal
    land management agencies that have jurisdiction over land within
    the boundaries of the State; and
        ``(3) coordination of transportation plans, the transportation
    improvement program, and planning activities with related planning
    activities being carried out outside of metropolitan planning areas
    and between States.
    ``(f) Long-Range Statewide Transportation Plan.--
        ``(1) Development.--Each State shall develop a long-range
    statewide transportation plan, with a minimum 20-year forecast
    period for all areas of the State, that provides for the
    development and implementation of the intermodal transportation
    system of the State.
        ``(2) Consultation with governments.--
            ``(A) Metropolitan areas.--The statewide transportation
        plan shall be developed for each metropolitan area in the State
        in cooperation with the metropolitan planning organization
        designated for the metropolitan area under section 5303.
            ``(B) Nonmetropolitan areas.--With respect to
        nonmetropolitan areas, the statewide transportation plan shall
        be developed in consultation with affected nonmetropolitan
        officials with responsibility for transportation. The Secretary
        shall not review or approve the consultation process in each
        State.
            ``(C) Indian tribal areas.--With respect to each area of
        the State under the jurisdiction of an Indian tribal
        government, the statewide transportation plan shall be
        developed in consultation with the tribal government and the
        Secretary of the Interior.
            ``(D) Consultation, comparison, and consideration.--
                ``(i) In general.--The long-range transportation plan
            shall be developed, as appropriate, in consultation with
            State, tribal, and local agencies responsible for land use
            management, natural resources, environmental protection,
            conservation, and historic preservation.
                ``(ii) Comparison and consideration.--Consultation
            under clause (i) shall involve comparison of transportation
            plans to State and tribal conservation plans or maps, if
            available, and comparison of transportation plans to
            inventories of natural or historic resources, if available.
        ``(3) Participation by interested parties.--
            ``(A) In general.--In developing the statewide
        transportation plan, the State shall provide citizens, affected
        public agencies, representatives of public transportation
        employees, freight shippers, private providers of
        transportation, representatives of users of public
        transportation, representatives of users of pedestrian walkways
        and bicycle transportation facilities, representatives of the
        disabled, providers of freight transportation services, and
        other interested parties with a reasonable opportunity to
        comment on the proposed plan.
            ``(B) Methods.--In carrying out subparagraph (A), the State
        shall, to the maximum extent practicable--
                ``(i) hold any public meetings at convenient and
            accessible locations and times;
                ``(ii) employ visualization techniques to describe
            plans; and
                ``(iii) make public information available in
            electronically accessible format and means, such as the
            World Wide Web, as appropriate to afford reasonable
            opportunity for consideration of public information under
            subparagraph (A).
        ``(4) Mitigation activities.--
            ``(A) In general.--A long-range transportation plan shall
        include a discussion of potential environmental mitigation
        activities and potential areas to carry out these activities,
        including activities that may have the greatest potential to
        restore and maintain the environmental functions affected by
        the plan.
            ``(B) Consultation.--The discussion shall be developed in
        consultation with Federal, State, and tribal wildlife, land
        management, and regulatory agencies.
        ``(5) Financial plan.--The statewide transportation plan may
    include a financial plan that demonstrates how the adopted
    statewide transportation plan can be implemented, indicates
    resources from public and private sources that are reasonably
    expected to be made available to carry out the plan, and recommends
    any additional financing strategies for needed projects and
    programs. The financial plan may include, for illustrative
    purposes, additional projects that would be included in the adopted
    statewide transportation plan if reasonable additional resources
    beyond those identified in the financial plan were available.
        ``(6) Selection of projects from illustrative list.--A State
    shall not be required to select any project from the illustrative
    list of additional projects included in the financial plan
    described in paragraph (5).
        ``(7) Existing system.--The statewide transportation plan
    should include capital, operations and management strategies,
    investments, procedures, and other measures to ensure the
    preservation and most efficient use of the existing transportation
    system.
        ``(8) Publication of long-range transportation plans.--Each
    long-range transportation plan prepared by a State shall be
    published or otherwise made available, including (to the maximum
    extent practicable) in electronically accessible formats and means,
    such as the World Wide Web.
    ``(g) Statewide Transportation Improvement Program.--
        ``(1) Development.--Each State shall develop a statewide
    transportation improvement program for all areas of the State. Such
    program shall cover a period of 4 years and be updated every 4
    years or more frequently if the Governor elects to update more
    frequently.
        ``(2) Consultation with governments.--
            ``(A) Metropolitan areas.--With respect to each
        metropolitan area in the State, the program shall be developed
        in cooperation with the metropolitan planning organization
        designated for the metropolitan area under section 5303.
            ``(B) Nonmetropolitan areas.--With respect to each
        nonmetropolitan area in the State, the program shall be
        developed in consultation with affected nonmetropolitan local
        officials with responsibility for transportation. The Secretary
        shall not review or approve the specific consultation process
        in the State.
            ``(C) Indian tribal areas.--With respect to each area of
        the State under the jurisdiction of an Indian tribal
        government, the program shall be developed in consultation with
        the tribal government and the Secretary of the Interior.
        ``(3) Participation by interested parties.--In developing the
    program, the State shall provide citizens, affected public
    agencies, representatives of public transportation employees,
    freight shippers, private providers of transportation, providers of
    freight transportation services, representatives of users of public
    transportation, representatives of users of pedestrian walkways and
    bicycle transportation facilities, representatives of the disabled,
    and other interested parties with a reasonable opportunity to
    comment on the proposed program.
        ``(4) Included projects.--
            ``(A) In general.--A transportation improvement program
        developed under this subsection for a State shall include
        federally supported surface transportation expenditures within
        the boundaries of the State.
            ``(B) Listing of projects.--An annual listing of projects
        for which funds have been obligated in the preceding year in
        each metropolitan planning area shall be published or otherwise
        made available by the cooperative effort of the State, transit
        operator, and the metropolitan planning organization for public
        review. The listing shall be consistent with the funding
        categories identified in each metropolitan transportation
        improvement program.
            ``(C) Projects under chapter 2 of title 23.--
                ``(i) Regionally significant projects.--Regionally
            significant projects proposed for funding under chapter 2
            of title 23 shall be identified individually in the
            transportation improvement program.
                ``(ii) Other projects.--Projects proposed for funding
            under chapter 2 of title 23 that are not determined to be
            regionally significant shall be grouped in 1 line item or
            identified individually in the transportation improvement
            program.
            ``(D) Consistency with statewide transportation plan.--Each
        project shall be--
                ``(i) consistent with the statewide transportation plan
            developed under this section for the State;
                ``(ii) identical to the project or phase of the project
            as described in an approved metropolitan transportation
            plan; and
                ``(iii) in conformance with the applicable State air
            quality implementation plan developed under the Clean Air
            Act, if the project is carried out in an area designated as
            nonattainment for ozone, particulate matter, or carbon
            monoxide under that Act.
            ``(E) Requirement of anticipated full funding.--The
        transportation improvement program shall include a project, or
        an identified phase of a project, only if full funding can
        reasonably be anticipated to be available for the project
        within the time period contemplated for completion of the
        project.
            ``(F) Financial plan.--The transportation improvement
        program may include a financial plan that demonstrates how the
        approved transportation improvement program can be implemented,
        indicates resources from public and private sources that are
        reasonably expected to be made available to carry out the
        transportation improvement program, and recommends any
        additional financing strategies for needed projects and
        programs. The financial plan may include, for illustrative
        purposes, additional projects that would be included in the
        adopted transportation plan if reasonable additional resources
        beyond those identified in the financial plan were available.
            ``(G) Selection of projects from illustrative list.--
                ``(i) No required selection.--Notwithstanding
            subparagraph (F), a State shall not be required to select
            any project from the illustrative list of additional
            projects included in the financial plan under subparagraph
            (F).
                ``(ii) Required action by the secretary.--Action by the
            Secretary shall be required for a State to select any
            project from the illustrative list of additional projects
            included in the financial plan under subparagraph (F) for
            inclusion in an approved transportation improvement
            program.
            ``(H) Priorities.--The transportation improvement program
        shall reflect the priorities for programming and expenditures
        of funds, including transportation enhancement activities,
        required by this chapter and title 23.
        ``(5) Project selection for areas of less than 50,000
    population.--Projects carried out in areas with populations of less
    than 50,000 individuals shall be selected, from the approved
    transportation improvement program (excluding projects carried out
    on the National Highway System and projects carried out under the
    bridge program or the Interstate maintenance program under title 23
    or sections 5310, 5311, 5316, and 5317 of this title) by the State
    in cooperation with the affected nonmetropolitan local officials
    with responsibility for transportation. Projects carried out in
    areas with populations of less than 50,000 individuals on the
    National Highway System or under the bridge program or the
    Interstate maintenance program under title 23 or sections 5310,
    5311, 5316, and 5317 of this title shall be selected, from the
    approved statewide transportation improvement program, by the State
    in consultation with the affected nonmetropolitan local officials
    with responsibility for transportation.
        ``(6) Transportation improvement program approval.--Every 4
    years, a transportation improvement program developed under this
    subsection shall be reviewed and approved by the Secretary if based
    on a current planning finding.
        ``(7) Planning finding.--A finding shall be made by the
    Secretary at least every 4 years that the transportation planning
    process through which statewide transportation plans and programs
    are developed is consistent with this section and section 5303.
        ``(8) Modifications to project priority.--Notwithstanding any
    other provision of law, action by the Secretary shall not be
    required to advance a project included in the approved
    transportation improvement program in place of another project in
    the program.
    ``(h) Funding.--Funds set aside pursuant to section 5305(g) of this
title and section 104(i) of title 23 shall be available to carry out
this section.
    ``(i) Treatment of Certain State Laws as Congestion Management
Processes.--For purposes of this section and section 5303, and sections
134 and 135 of title 23, State laws, rules, or regulations pertaining
to congestion management systems or programs may constitute the
congestion management process under this section and section 5303, and
sections 134 and 135 of title 23, if the Secretary finds that the State
laws, rules, or regulations are consistent with, and fulfill the intent
of, the purposes of this section, section 5303, and sections 134 and
135 of title 23, as appropriate.
    ``(j) Continuation of Current Review Practice.--Since the statewide
transportation plan and the transportation improvement program
described in this section are subject to a reasonable opportunity for
public comment, since individual projects included in the statewide
transportation plans and the transportation improvement program are
subject to review under the National Environmental Policy Act of 1969
(42 U.S.C. 4321 et seq.), and since decisions by the Secretary
concerning statewide transportation plans or the transportation
improvement program described in this section have not been reviewed
under such Act as of January 1, 1997, any decision by the Secretary
concerning a metropolitan or statewide transportation plan or the
transportation improvement program described in this section shall not
be considered to be a Federal action subject to review under such
Act.''.
    (b) Schedule for Implementation.--The Secretary shall issue
guidance on a schedule for implementation of the changes made by this
section, taking into consideration the established planning update
cycle for States and metropolitan planning organizations. The Secretary
shall not require a State or metropolitan planning organization to
deviate from its established planning update cycle to implement changes
made by this section. Beginning July 1, 2007, State or metropolitan
planning organization plan or program updates shall reflect changes
made by this section.
    (c) Chapter Analysis.--The analysis for chapter 53 is amended by
striking the item relating to section 5304 and inserting the following:

``5304. Statewide transportation planning.''.

SEC. 3007. PLANNING PROGRAMS.

    (a) In General.--Section 5305 is amended to read as follows:

``Sec. 5305. Planning programs

    ``(a) State Defined.--In this section, the term `State' means a
State of the United States, the District of Columbia, and Puerto Rico.
    ``(b) General Authority.--
        ``(1) Grants and agreements.--Under criteria established by the
    Secretary, the Secretary may award grants to States, authorities of
    the States, metropolitan planning organizations, and local
    governmental authorities, and make agreements with other
    departments, agencies, or instrumentalities of the Government to--
            ``(A) develop transportation plans and programs;
            ``(B) plan, engineer, design, and evaluate a public
        transportation project; and
            ``(C) conduct technical studies relating to public
        transportation.
        ``(2) Eligible activities.--Activities eligible under paragraph
    (1) include the following:
            ``(A) Studies related to management, planning, operations,
        capital requirements, and economic feasibility.
            ``(B) Evaluating previously financed projects.
            ``(C) Peer reviews and exchanges of technical data,
        information, assistance, and related activities in support of
        planning and environmental analyses among metropolitan planning
        organizations and other transportation planners.
            ``(D) Other similar and related activities preliminary to
        and in preparation for constructing, acquiring, or improving
        the operation of facilities and equipment.
    ``(c) Purpose.--To the extent practicable, the Secretary shall
ensure that amounts appropriated or made available under section 5338
to carry out this section and sections 5303, 5304, and 5306 are used to
support balanced and comprehensive transportation planning that
considers the relationships among land use and all transportation
modes, without regard to the programmatic source of the planning
amounts.
    ``(d) Metropolitan Planning Program.--
        ``(1) Apportionment to states.--
            ``(A) In general.--The Secretary shall apportion 80 percent
        of the amounts made available under subsection (g)(1) among the
        States to carry out sections 5303 and 5306 in the ratio that--
                ``(i) the population of urbanized areas in each State,
            as shown by the latest available decennial census of
            population; bears to
                ``(ii) the total population of urbanized areas in all
            States, as shown by that census.
            ``(B) Minimum apportionment.--Notwithstanding subparagraph
        (A), a State may not receive less than 0.5 percent of the
        amount apportioned under this paragraph.
        ``(2) Allocation to mpo's.--Amounts apportioned to a State
    under paragraph (1) shall be made available, not later than 30 days
    after the date of apportionment, to metropolitan planning
    organizations in the State designated under this section under a
    formula that--
            ``(A) considers population of urbanized areas;
            ``(B) provides an appropriate distribution for urbanized
        areas to carry out the cooperative processes described in this
        section;
            ``(C) the State develops in cooperation with the
        metropolitan planning organizations; and
            ``(D) the Secretary approves.
        ``(3) Supplemental amounts.--
            ``(A) In general.--The Secretary shall apportion 20 percent
        of the amounts made available under subsection (g)(1) among the
        States to supplement allocations made under paragraph (1) for
        metropolitan planning organizations.
            ``(B) Formula.--The Secretary shall apportion amounts
        referred to in subparagraph (A) under a formula that reflects
        the additional cost of carrying out planning, programming, and
        project selection responsibilities under sections 5303 and 5306
        in certain urbanized areas.
    ``(e) State Planning and Research Program.--
        ``(1) Apportionment to states.--
            ``(A) In general.--The Secretary shall apportion the
        amounts made available under subsection (g)(2) among the States
        for grants and contracts to carry out this section and sections
        5304, 5306, 5315, and 5322 in the ratio that--
                ``(i) the population of urbanized areas in each State,
            as shown by the latest available decennial census; bears to
                ``(ii) the population of urbanized areas in all States,
            as shown by that census.
            ``(B) Minimum apportionment.--Notwithstanding subparagraph
        (A), a State may not receive less than 0.5 percent of the
        amount apportioned under this paragraph.
        ``(2) Supplemental amounts.--A State, as the State considers
    appropriate, may authorize part of the amount made available under
    this subsection to be used to supplement amounts made available
    under subsection (d).
    ``(f) Government's Share of Costs.--The Government's share of the
cost of an activity funded using amounts made available under this
section may not exceed 80 percent of the cost of the activity unless
the Secretary determines that it is in the interests of the Government
not to require a State or local match.
    ``(g) Allocation of Funds.--Of the funds made available by or
appropriated to carry out this section under section 5338(c) for fiscal
years 2005 through 2009--
        ``(1) 82.72 percent shall be available for the metropolitan
    planning program under subsection (d); and
        ``(2) 17.28 percent shall be available to carry out subsection
    (e).
    ``(h) Availability of Funds.--Funds apportioned under this section
to a State that have not been obligated in the 3-year period beginning
after the last day of the fiscal year for which the funds are
authorized shall be reapportioned among the States.''.
    (b) Chapter Analysis.--The analysis for chapter 53 is amended by
striking the item relating to section 5305 and inserting the following:

``5305. Planning programs.''.

SEC. 3008. PRIVATE ENTERPRISE PARTICIPATION.

    Section 5306(a) is amended by inserting ``, as determined by local
policies, criteria, and decisionmaking,'' after ``feasible''.

SEC. 3009. URBANIZED AREA FORMULA GRANTS.

    (a) Technical Amendments.--Section 5307 is amended--
        (1) by striking subsections (h), (j) and (k); and
        (2) by redesignating subsections (i), (l), (m), and (n) as
    subsections (h), (i), (j), and (k), respectively.
    (b) Definitions.--
        (1) Associated capital maintenance items.--Section 5307(a)(1)
    is amended--
            (A) by striking ``means equipment, tires,'' and inserting
        ``means--
            ``(A) equipment, tires,'';
            (B) in subparagraph (A) (as so designated) by striking the
        period at the end and inserting ``; and''; and
            (C) by adding at the end the following:
            ``(B) reconstruction of equipment and material, each of
        which after reconstruction will have a fair market value of at
        least .5 percent of the current fair market value of rolling
        stock comparable to the rolling stock for which the equipment
        and material will be used.''.
        (2) Designated recipient.--Section 5307(a)(2)(A) is amended to
    read as follows:
            ``(A) an entity designated, in accordance with the planning
        process under sections 5303, 5304, and 5306, by the chief
        executive officer of a State, responsible local officials, and
        publicly owned operators of public transportation, to receive
        and apportion amounts under section 5336 that are attributable
        to transportation management areas identified under section
        5303; or''.
    (c) General Authority.--Section 5307(b) is amended--
        (1) by striking paragraph (1) and inserting the following:
        ``(1) Grants.--The Secretary may make grants under this section
    for--
            ``(A) capital projects and associated capital maintenance
        items;
            ``(B) planning;
            ``(C) transit enhancements;
            ``(D) operating costs of equipment and facilities for use
        in public transportation in an urbanized area with a population
        of less than 200,000;
            ``(E) operating costs of equipment and facilities for use
        in public transportation in a portion or portions of an
        urbanized area with a population of at least 200,000, but not
        more than 225,000, if--
                ``(i) the urbanized area includes parts of more than
            one State;
                ``(ii) the portion of the urbanized area includes only
            one State;
                ``(iii) the population of the portion of the urbanized
            area is less than 30,000; and
                ``(iv) the grants will not be used to provide public
            transportation outside of the portion of the urbanized
            area; and
            ``(F) operating costs of equipment and facilities for use
        in public transportation for local governmental authorities in
        areas which adopted transit operating and financing plans that
        became a part of the Houston, Texas, urbanized area as a result
        of the 2000 decennial census of population, but lie outside the
        service area of the principal public transportation agency that
        serves the Houston urbanized area.'';
        (2) by striking paragraph (2) and inserting the following:
        ``(2) Special rule for fiscal years 2005 through 2007.--
            ``(A) Increased flexibility.--The Secretary may award
        grants under this section, from funds made available to carry
        out this section for each of the fiscal years 2005 through
        2007, to finance the operating cost of equipment and facilities
        for use in mass transportation in an urbanized area with a
        population of at least 200,000, as determined by the 2000
        decennial census of population, if--
                ``(i) the urbanized area had a population of less than
            200,000, as determined by the 1990 decennial census of
            population;
                ``(ii) a portion of the urbanized area was a separate
            urbanized area with a population of less than 200,000, as
            determined by the 1990 decennial census of population;
                ``(iii) the area was not designated as an urbanized
            area, as determined by the 1990 decennial census of
            population; or
                ``(iv) a portion of the area was not designated as an
            urbanized area, as determined by the 1990 decennial census,
            and received assistance under section 5311 in fiscal year
            2002.
            ``(B) Maximum amounts in fiscal year 2005.--In fiscal year
        2005--
                ``(i) amounts made available to any urbanized area
            under clause (i) or (ii) of subparagraph (A) shall be not
            more than the amount apportioned in fiscal year 2002 to the
            urbanized area with a population of less than 200,000, as
            determined in the 1990 decennial census of population;
                ``(ii) amounts made available to any urbanized area
            under subparagraph (A)(iii) shall be not more than the
            amount apportioned to the urbanized area under this section
            for fiscal year 2003; and
                ``(iii) each portion of any area not designated as an
            urbanized area, as determined by the 1990 decennial census,
            and eligible to receive funds under subparagraph (A)(iv),
            shall receive an amount of funds to carry out this section
            that is not less than the amount the portion of the area
            received under section 5311 for fiscal year 2002.
            ``(C) Maximum amounts in fiscal year 2006.--In fiscal year
        2006--
                ``(i) amounts made available to any urbanized area
            under clause (i) or (ii) of subparagraph (A) shall be not
            more than 50 percent of the amount apportioned in fiscal
            year 2002 to the urbanized area with a population of less
            than 200,000, as determined in the 1990 decennial census of
            population;
                ``(ii) amounts made available to any urbanized area
            under subparagraph (A)(iii) shall be not more than 50
            percent of the amount apportioned to the urbanized area
            under this section for fiscal year 2003; and
                ``(iii) each portion of any area not designated as an
            urbanized area, as determined by the 1990 decennial census,
            and eligible to receive funds under subparagraph (A)(iv),
            shall receive an amount of funds to carry out this section
            that is not less than 50 percent of the amount the portion
            of the area received under section 5311 for fiscal year
            2002.
            ``(D) Maximum amounts in fiscal year 2007.--In fiscal year
        2007--
                ``(i) amounts made available to any urbanized area
            under clause (i) or (ii) of subparagraph (A) shall be not
            more than 25 percent of the amount apportioned in fiscal
            year 2002 to the urbanized area with a population of less
            than 200,000, as determined in the 1990 decennial census of
            population;
                ``(ii) amounts made available to any urbanized area
            under subparagraph (A)(iii) shall be not more than 25
            percent of the amount apportioned to the urbanized area
            under this section for fiscal year 2003; and
                ``(iii) each portion of any area not designated as an
            urbanized area, as determined by the 1990 decennial census,
            and eligible to receive funds under subparagraph (A)(iv),
            shall receive an amount of funds to carry out this section
            that is not less than 25 percent of the amount the portion
            of the area received under section 5311 in fiscal year
            2002.''; and
        (3) by striking paragraph (4).
    (d) Grant Recipient Requirements.--Section 5307(d)(1) is amended--
        (1) in subparagraph (A) by inserting ``, including safety and
    security aspects of the program'' after ``program'';
        (2) in subparagraph (E)--
            (A) by striking ``and'' at the end of clause (ii);
            (B) by inserting ``and'' at the end of clause (iii); and
            (C) by adding at the end the following:
                ``(iv) will comply with sections 5323 and 5325;'';
        (3) in subparagraph (H) by striking ``sections 5301(a) and (d),
    5303-5306, and 5310(a)-(d) of this title'' and inserting ``section
    5301(a), section 5301(d), and sections 5303 through 5306'';
        (4) in subparagraph (I) by striking ``and'' at the end;
        (5) by adding at the end the following:
            ``(K) in the case of a recipient for an urbanized area with
        a population of at least 200,000--
                ``(i) will expend not less than 1 percent of the amount
            the recipient receives each fiscal year under this section
            for transit enhancements, as defined in section 5302(a);
            and
                ``(ii) will submit an annual report listing projects
            carried out in the preceding fiscal year with those funds;
            and''.
    (e) Government's Share of Costs.--Section 5307(e) is amended to
read as follows:
    ``(e) Government's Share of Costs.--
        ``(1) Capital projects.--A grant for a capital project
    (including associated capital maintenance items) under this section
    shall be for 80 percent of the net project cost of the project. The
    recipient may provide additional local matching amounts.
        ``(2) Operating expenses.--A grant for operating expenses under
    this section may not exceed 50 percent of the net project cost of
    the project.
        ``(3) Remaining costs.--Subject to paragraph (4), the remainder
    of the net project cost shall be provided--
            ``(A) in cash from non-Government sources other than
        revenues from providing public transportation services;
            ``(B) from revenues derived from the sale of advertising
        and concessions;
            ``(C) from an undistributed cash surplus, a replacement or
        depreciation cash fund or reserve, or new capital; and
            ``(D) from amounts received under a service agreement with
        a State or local social service agency or private social
        service organization.
        ``(4) Use of certain funds.--The prohibitions on the use of
    funds for matching requirements under section 403(a)(5)(C)(vii) of
    the Social Security Act (42 U.S.C. 603(a)(5)(C)(vii)) shall not
    apply to the remainder.''.
    (f) Undertaking Projects in Advance.--Section 5307(g) is amended by
striking paragraph (4).
    (g) Relationship to Other Laws.--Section 5307(k) (as redesignated
by subsection (a)(2) of this section) is amended to read as follows:
    ``(k) Relationship to Other Laws.--
        ``(1) Applicable provisions.--Sections 5301, 5302, 5303, 5304,
    5306, 5315(c), 5318, 5319, 5323, 5325, 5327, 5329, 5330, 5331,
    5332, 5333, and 5335 apply to this section and to any grant made
    under this section.
        ``(2) Inapplicable provisions.--
            ``(A) In general.--Except as provided by this section, no
        other provision of this chapter applies to this section or to a
        grant made under this section.
            ``(B) Title 5.--The provision of assistance under this
        chapter shall not be construed as bringing within the
        application of chapter 15 of title 5 any nonsupervisory
        employee of a public transportation system (or any other agency
        or entity performing related functions) to which such chapter
        is otherwise inapplicable.''.
    (h) Treatment.--Section 5307 is amended by adding at the end the
following:
    ``(l) Treatment.--For the purposes of this section, the United
States Virgin Islands shall be treated as an urbanized area, as defined
in section 5302.''.
    (i) Contracted Paratransit Pilot.--
        (1) In general.--Notwithstanding section 5302(a)(1)(I) of title
    49, United States Code, for fiscal years 2005 through 2009, a
    recipient of assistance under section 5307 of such title in
    urbanized areas with a population of 558,329 or 747,003 according
    to the 2000 decennial census of population may use not more than 20
    percent of such recipient's annual formula apportionment under
    section 5307 of such title for the provision of nonfixed route
    paratransit services in accordance with section 223 of the
    Americans with Disabilities Act of 1990 (42 U.S.C. 12143), but only
    if the grant recipient is in compliance with applicable
    requirements of that Act, including both fixed route and demand
    responsive service and the service is acquired by contract.
        (2) Report.--Not later than January 1, 2009, the Secretary
    shall submit to the Committee on Transportation and Infrastructure
    of the House of Representatives and the Committee on Banking,
    Housing, and Urban Affairs of the Senate a report on the
    implementation of this subsection and any recommendations of the
    Secretary regarding the application of this subsection.

SEC. 3010. CLEAN FUELS GRANT PROGRAM.

    (a) In General.--Section 5308 is amended to read as follows:

``Sec. 5308. Clean fuels grant program

    ``(a) Definitions.--In this section, the following definitions
apply:
        ``(1) Clean fuel bus.--The term `clean fuel bus' means a
    passenger vehicle used to provide public transportation that--
            ``(A) is powered by--
                ``(i) compressed natural gas;
                ``(ii) liquefied natural gas;
                ``(iii) biodiesel fuels;
                ``(iv) batteries;
                ``(v) alcohol-based fuels;
                ``(vi) hybrid electric;
                ``(vii) fuel cell;
                ``(viii) clean diesel, to the extent allowed under this
            section; or
                ``(ix) other low or zero emissions technology; and
            ``(B) the Administrator of the Environmental Protection
        Agency has certified sufficiently reduces harmful emissions.
        ``(2) Eligible project.--The term `eligible project'--
            ``(A) means a project in a nonattainment or maintenance
        area described in paragraph (4)(A) for--
                ``(i) purchasing or leasing clean fuel buses, including
            buses that employ a lightweight composite primary
            structure;
                ``(ii) constructing or leasing clean fuel buses or
            electrical recharging facilities and related equipment for
            such buses; or
                ``(iii) constructing new or improving existing public
            transportation facilities to accommodate clean fuel buses;
            and
            ``(B) at the discretion of the Secretary, may include a
        project located in a nonattainment or maintenance area
        described in paragraph (4)(A) relating to clean fuel,
        biodiesel, hybrid electric, or zero emissions technology buses
        that exhibit equivalent or superior emissions reductions to
        existing clean fuel or hybrid electric technologies.
        ``(3) Maintenance area.--The term `maintenance area' has the
    meaning such term has under section 101 of title 23.
        ``(4) Recipient.--
            ``(A) In general.--The term `recipient' means a designated
        recipient (as defined in section 5307(a)(2)) for an area that,
        and a recipient for an urbanized area with a population of less
        than 200,000 that--
                ``(i) is designated as a nonattainment area for ozone
            or carbon monoxide under section 107(d) of the Clean Air
            Act (42 U.S.C. 7407(d)); or
                ``(ii) is a maintenance area for ozone or carbon
            monoxide.
            ``(B) Smaller urbanized areas.--In the case of an urbanized
        area with a population of less than 200,000, the State in which
        the area is located shall act as the recipient for the area
        under this section.
    ``(b) Authority.--The Secretary shall make grants in accordance
with this section to recipients to finance eligible projects.
    ``(c) Clean Diesel Buses.--Not more than 25 percent of the amount
made available by or appropriated under section 5338 in each fiscal
year to carry out this section may be made available to fund clean
diesel buses.
    ``(d) Grant Requirements.--
        ``(1) In general.--A grant under this section shall be subject
    to the requirements of section 5307.
        ``(2) Government's share of costs for certain projects.--
    Section 5323(i) applies to projects carried out under this section.
    ``(e) Availability of Funds.--Any amount made available or
appropriated under this section--
        ``(1) shall remain available to a project for 2 years after the
    fiscal year for which the amount is made available or appropriated;
    and
        ``(2) that remains unobligated at the end of the period
    described in paragraph (1) shall be added to the amount made
    available in the following fiscal year.''.
    (b) Conforming Amendment.--The analysis for chapter 53 is amended
by striking the item relating to section 5308 and inserting the
following:

``5308. Clean fuels grant program.''.

SEC. 3011. CAPITAL INVESTMENT GRANTS.

    (a) In General.--Section 5309 is amended to read as follows:

``Sec. 5309. Capital investment grants

    ``(a) Definitions.--In this section, the following definitions
apply:
        ``(1) Alternatives analysis.--The term `alternatives analysis'
    means a study conducted as part of the transportation planning
    process required under sections 5303 and 5304, which includes--
            ``(A) an assessment of a wide range of public
        transportation alternatives designed to address a
        transportation problem in a corridor or subarea;
            ``(B) sufficient information to enable the Secretary to
        make the findings of project justification and local financial
        commitment required under this section;
            ``(C) the selection of a locally preferred alternative; and
            ``(D) the adoption of the locally preferred alternative as
        part of the long-range transportation plan required under
        section 5303.
        ``(2) Major new fixed guideway capital project.--The term
    `major new fixed guideway capital project' means a new fixed
    guideway capital project for which the Federal assistance provided
    or to be provided under this section is $75,000,000 or more.
        ``(3) New fixed guideway capital project.--The term `new fixed
    guideway capital project' means a minimum operable segment of a
    capital project for a new fixed guideway system or extension to an
    existing fixed guideway system.
    ``(b) General Authority.--The Secretary may make grants under this
section to assist State and local governmental authorities in
financing--
        ``(1) new fixed guideway capital projects under subsections (d)
    and (e), including the acquisition of real property, the initial
    acquisition of rolling stock for the systems, the acquisition of
    rights-of-way, and relocation, for fixed guideway corridor
    development for projects in the advanced stages of alternatives
    analysis or preliminary engineering;
        ``(2) capital projects to modernize existing fixed guideway
    systems;
        ``(3) capital projects to replace, rehabilitate, and purchase
    buses and related equipment and to construct bus-related
    facilities, including programs of bus and bus-related projects for
    assistance to subrecipients that are public agencies, private
    companies engaged in public transportation, or private nonprofit
    organizations; and
        ``(4) the development of corridors to support new fixed
    guideway capital projects under subsections (d) and (e), including
    protecting rights-of-way through acquisition, construction of
    dedicated bus and high occupancy vehicle lanes and park and ride
    lots, and other nonvehicular capital improvements that the
    Secretary may decide would result in increased public
    transportation usage in the corridor.
    ``(c) Grant Requirements.--
        ``(1) In general.--The Secretary may not approve a grant for a
    project under this section unless the Secretary determines that--
            ``(A) the project is part of an approved transportation
        plan and program of projects required under sections 5303,
        5304, and 5306; and
            ``(B) the applicant has, or will have--
                ``(i) the legal, financial, and technical capacity to
            carry out the project, including safety and security
            aspects of the project;
                ``(ii) satisfactory continuing control over the use of
            the equipment or facilities; and
                ``(iii) the capability and willingness to maintain the
            equipment or facilities.
        ``(2) Certification.--An applicant that has submitted the
    certifications required under subparagraphs (A), (B), (C), and (H)
    of section 5307(d)(1) shall be deemed to have provided sufficient
    information upon which the Secretary may make the determinations
    required under this subsection.
        ``(3) Grantee requirements.--The Secretary shall require that
    any grant awarded under this section to a recipient be subject to
    all terms, conditions, requirements, and provisions that the
    Secretary determines to be necessary or appropriate for the
    purposes of this section, including requirements for the
    disposition of net increases in the value of real property
    resulting from the project assisted under this section.
    ``(d) Major Capital Investment Grants of $75,000,000 or More.--
        ``(1) Full funding grant agreement.--
            ``(A) In general.--A major new fixed guideway capital
        project shall be carried out through a full funding grant
        agreement.
            ``(B) Criteria.--The Secretary shall enter into a full
        funding grant agreement, based on the evaluations and ratings
        required under this subsection, with each grantee receiving
        assistance for a major new fixed guideway capital project
        that--
                ``(i) is authorized for final design and construction;
            and
                ``(ii) has been rated as medium, medium-high, or high,
            in accordance with paragraph (5)(B).
        ``(2) Approval of grants.--The Secretary may approve a grant
    under this section for a major new fixed guideway capital project
    only if the Secretary, based upon evaluations and considerations
    set forth in paragraph (3), determines that the project is--
            ``(A) based on the results of an alternatives analysis and
        preliminary engineering;
            ``(B) justified based on a comprehensive review of its
        mobility improvements, environmental benefits, cost
        effectiveness, operating efficiencies, economic development
        effects, and public transportation supportive land use policies
        and future patterns; and
            ``(C) supported by an acceptable degree of local financial
        commitment (including evidence of stable and dependable
        financing sources) to construct, maintain, and operate the
        system or extension, and maintain and operate the entire public
        transportation system without requiring a reduction in existing
        public transportation services or level of service to operate
        the proposed project.
        ``(3) Evaluation of project justification.--In making the
    determinations under paragraph (2)(B) for a major capital
    investment grant, the Secretary shall analyze, evaluate, and
    consider--
            ``(A) the results of the alternatives analysis and
        preliminary engineering for the proposed project;
            ``(B) the reliability of the forecasting methods used to
        estimate costs and utilization made by the recipient and the
        contractors to the recipient;
            ``(C) the direct and indirect costs of relevant
        alternatives;
            ``(D) factors such as--
                ``(i) congestion relief;
                ``(ii) improved mobility;
                ``(iii) air pollution;
                ``(iv) noise pollution;
                ``(v) energy consumption; and
                ``(vi) all associated ancillary and mitigation costs
            necessary to carry out each alternative analyzed;
            ``(E) reductions in local infrastructure costs and other
        benefits achieved through compact land use development, such as
        positive impacts on the capacity, utilization, or longevity of
        other surface transportation assets and facilities;
            ``(F) the cost of suburban sprawl;
            ``(G) the degree to which the project increases the
        mobility of the public transportation dependent population or
        promotes economic development;
            ``(H) population density and current transit ridership in
        the transportation corridor;
            ``(I) the technical capability of the grant recipient to
        construct the project;
            ``(J) any adjustment to the project justification necessary
        to reflect differences in local land, construction, and
        operating costs; and
            ``(K) other factors that the Secretary determines to be
        appropriate to carry out this subsection.
        ``(4) Evaluation of local financial commitment.--
            ``(A) In general.--In evaluating a project under paragraph
        (2)(C), the Secretary shall require that--
                ``(i) the proposed project plan provides for the
            availability of contingency amounts that the Secretary
            determines to be reasonable to cover unanticipated cost
            increases;
                ``(ii) each proposed local source of capital and
            operating financing is stable, reliable, and available
            within the proposed project timetable; and
                ``(iii) local resources are available to recapitalize
            and operate the overall proposed public transportation
            system, including essential feeder bus and other services
            necessary to achieve the projected ridership levels without
            requiring a reduction in existing public transportation
            services or level of service to operate the proposed
            project.
            ``(B) Evaluation criteria.--In assessing the stability,
        reliability, and availability of proposed sources of local
        financing under paragraph (2)(C), the Secretary shall
        consider--
                ``(i) the reliability of the forecasting methods used
            to estimate costs and utilization made by the recipient and
            the contractors to the recipient;
                ``(ii) existing grant commitments;
                ``(iii) the degree to which financing sources are
            dedicated to the proposed purposes;
                ``(iv) any debt obligation that exists, or is proposed
            by the recipient, for the proposed project or other public
            transportation purpose; and
                ``(v) the extent to which the project has a local
            financial commitment that exceeds the required non-Federal
            share of the cost of the project.
            ``(C) Consideration of fiscal capacity of state and local
        governments.--If the Secretary gives priority to financing
        projects under this subsection that include more than the non-
        Federal share required under subsection (h), the Secretary
        shall give equal consideration to differences in the fiscal
        capacity of State and local governments.
        ``(5) Project advancement and ratings.--
            ``(A) Project advancement.--A proposed project under this
        subsection shall not advance from alternatives analysis to
        preliminary engineering or from preliminary engineering to
        final design and construction unless the Secretary determines
        that the project meets the requirements of this section and
        there is a reasonable likelihood that the project will continue
        to meet such requirements.
            ``(B) Ratings.--In making a determination under
        subparagraph (A), the Secretary shall evaluate and rate the
        project on a 5-point scale (high, medium-high, medium, medium-
        low, or low) based on the results of the alternatives analysis,
        the project justification criteria, and the degree of local
        financial commitment, as required under this subsection. In
        rating the projects, the Secretary shall provide, in addition
        to the overall project rating, individual ratings for each of
        the criteria established by regulation.
        ``(6) Policy guidance.--
            ``(A) Publication.--The Secretary shall publish policy
        guidance regarding the new fixed guideway capital project
        review and evaluation process and criteria--
                ``(i) not later than 120 days after the date of
            enactment of the Federal Public Transportation Act of 2005;
            and
                ``(ii) each time significant changes are made by the
            Secretary to the process and criteria, but not less
            frequently than once every 2 years.
            ``(B) Public comment and response.--The Secretary shall--
                ``(i) invite public comment to the policy guidance
            published under subparagraph (A); and
                ``(ii) publish a response to the comments received
            under clause (i).
    ``(e) Capital Investment Grants Less Than $75,000,000.--
        ``(1) In general.--
            ``(A) Applicability of requirements.--Except as provided by
        subparagraph (B), a new fixed guideway capital project shall be
        subject to the requirements of this subsection if the Federal
        assistance provided or to be provided under this section for
        the project is less than $75,000,000 and the total estimated
        net capital cost of the project is less than $250,000,000.
            ``(B) Projects receiving less than $25,000,000 in federal
        assistance.--If the assistance provided under this section with
        respect to a new fixed guideway capital project is less than
        $25,000,000, the requirements of this subsection shall not
        apply to the project until such date as the final regulation to
        be issued under paragraph (9) takes effect.
        ``(2) Selection criteria.--The Secretary may provide Federal
    assistance under this subsection with respect to a proposed project
    only if the Secretary finds that the project is--
            ``(A) based on the results of planning and alternatives
        analysis;
            ``(B) justified based on a review of its public
        transportation supportive land use policies, cost
        effectiveness, and effect on local economic development; and
            ``(C) supported by an acceptable degree of local financial
        commitment.
        ``(3) Planning and alternatives.--In evaluating a project under
    paragraph (2)(A), the Secretary shall analyze and consider the
    results of planning and alternatives analysis for the project.
        ``(4) Project justification.--For purposes of making the
    finding under paragraph (2)(B), the Secretary shall--
            ``(A) determine the degree to which the project is
        consistent with local land use policies and is likely to
        achieve local developmental goals;
            ``(B) determine the cost effectiveness of the project at
        the time of the initiation of revenue service;
            ``(C) determine the degree to which the project will have a
        positive effect on local economic development;
            ``(D) consider the reliability of the forecasting methods
        used to estimate costs and ridership associated with the
        project; and
            ``(E) consider other factors that the Secretary determines
        appropriate to carry out this subsection.
        ``(5) Local financial commitment.--
            ``(A) In general.--For purposes of paragraph (2)(C), the
        Secretary shall require that each proposed local source of
        capital and operating financing is stable, reliable, and
        available within the proposed project timetable.
            ``(B) Consideration of fiscal capacity of state and local
        governments.--If the Secretary gives priority to financing
        projects under this subsection that include more than the non-
        Federal share required under subsection (h), the Secretary
        shall give equal consideration to differences in the fiscal
        capacity of State and local governments.
        ``(6) Advancement of project to development and construction.--
            ``(A) General rule.--A proposed project under this
        subsection may advance from planning and alternatives analysis
        to project development and construction only if the Secretary
        finds that the project meets the requirements of this
        subsection and there is a reasonable likelihood that the
        project will continue to meet such requirements.
            ``(B) Evaluation.--In making the findings under
        subparagraph (A), the Secretary shall evaluate and rate the
        project as high, medium-high, medium, medium-low, or low based
        on the results of the analysis of the project justification
        criteria and the degree of local financial commitment, as
        required by this subsection.
        ``(7) Contents of project construction grant agreement.--A
    project construction grant agreement under this subsection shall
    specify the scope of the project to be constructed, the estimated
    net project cost of the project, the schedule under which the
    project shall be constructed, the maximum amount of funding to be
    obtained under this subsection, the proposed schedule for
    obligation of future Federal grants, and the sources of funding
    from other than the Government. The agreement may include a
    commitment on the part of the Secretary to provide funding for the
    project in future fiscal years.
        ``(8) Limitation on entry into construction grant agreement.--
    The Secretary may enter into a project construction grant agreement
    for a project under this subsection only if the project is
    authorized for construction and has been rated as high, medium-
    high, or medium under this subsection.
        ``(9) Regulations.--Not later than 240 days after the date of
    enactment of the Federal Public Transportation Act of 2005, the
    Secretary shall issue regulations establishing an evaluation and
    rating process for proposed projects under this subsection that is
    based on the results of project justification and local financial
    commitment, as required under this subsection.
        ``(10) Fixed guideway capital project.--In this subsection, the
    term `fixed guideway capital project' includes a corridor-based bus
    capital project if--
            ``(A) a substantial portion of the project operates in a
        separate right-of-way dedicated for public transit use during
        peak hour operations; or
            ``(B) the project represents a substantial investment in a
        defined corridor as demonstrated by features such as park-and-
        ride lots, transit stations, bus arrival and departure signage,
        intelligent transportation systems technology, traffic signal
        priority, off-board fare collection, advanced bus technology,
        and other features that support the long-term corridor
        investment.
        ``(11) Impact report.--
            ``(A) In general.--Not later than 120 days after the date
        of enactment of the Federal Public Transportation Act of 2005,
        the Federal Transit Administration shall submit to the
        Committee on Banking, Housing, and Urban Affairs of the Senate
        and the Committee on Transportation and Infrastructure of the
        House of Representatives a report on the methodology to be used
        in evaluating the land use and economic development impacts of
        non-fixed guideway or partial fixed guideway projects.
            ``(B) Contents.--The report submitted under subparagraph
        (A) shall address any qualitative and quantitative differences
        between fixed guideway and non-fixed guideway projects with
        respect to land use and economic development impacts.
    ``(f) Previously Issued Letter of Intent or Full Funding Grant
Agreement.--Subsections (d) and (e) do not apply to projects for which
the Secretary has issued a letter of intent or entered into a full
funding grant agreement before the date of enactment of the Federal
Public Transportation Act of 2005. Subsection (e) also does not apply
to projects for which the Secretary has received an application for
final design before such date of enactment.
    ``(g) Letters of Intent, Full Funding Grant Agreements, and Early
Systems Work Agreements.--
        ``(1) Letters of intent.--
            ``(A) Amounts intended to be obligated.--The Secretary may
        issue a letter of intent to an applicant announcing an
        intention to obligate, for a capital project under this
        section, an amount from future available budget authority
        specified in law that is not more than the amount stipulated as
        the financial participation of the Secretary in the project.
        When a letter is issued for fixed guideway projects, the amount
        shall be sufficient to complete at least an operable segment.
            ``(B) Treatment.--The issuance of a letter under
        subparagraph (A) is deemed not to be an obligation under
        sections 1108(c), 1108(d), 1501, and 1502(a) of title 31 or an
        administrative commitment.
        ``(2) Full funding grant agreements.--
            ``(A) Terms.--The Secretary may make a full funding grant
        agreement with an applicant. The agreement shall--
                ``(i) establish the terms of participation by the
            Government in a project under this section;
                ``(ii) establish the maximum amount of Government
            financial assistance for the project;
                ``(iii) cover the period of time for completing the
            project, including a period extending beyond the period of
            an authorization; and
                ``(iv) make timely and efficient management of the
            project easier according to the law of the United States.
            ``(B) Special financial rules.--
                ``(i) In general.--A full funding grant agreement under
            this paragraph obligates an amount of available budget
            authority specified in law and may include a commitment,
            contingent on amounts to be specified in law in advance for
            commitments under this paragraph, to obligate an additional
            amount from future available budget authority specified in
            law.
                ``(ii) Statement of contingent commitment.--The
            agreement shall state that the contingent commitment is not
            an obligation of the Government.
                ``(iii) Interest and other financing costs.--Interest
            and other financing costs of efficiently carrying out a
            part of the project within a reasonable time are a cost of
            carrying out the project under a full funding grant
            agreement, except that eligible costs may not be more than
            the cost of the most favorable financing terms reasonably
            available for the project at the time of borrowing. The
            applicant shall certify, in a way satisfactory to the
            Secretary, that the applicant has shown reasonable
            diligence in seeking the most favorable financing terms.
                ``(iv) Completion of operable segment.--The amount
            stipulated in an agreement under this paragraph for a fixed
            guideway project shall be sufficient to complete at least
            an operable segment.
            ``(C) Before and after study.--
                ``(i) In general.--A full funding grant agreement under
            this paragraph shall require the applicant to conduct a
            study that--

                    ``(I) describes and analyzes the impacts of the new
                fixed guideway capital project on transit services and
                transit ridership;
                    ``(II) evaluates the consistency of predicted and
                actual project characteristics and performance; and
                    ``(III) identifies sources of differences between
                predicted and actual outcomes.

                ``(ii) Information collection and analysis plan.--

                    ``(I) Submission of plan.--Applicants seeking an
                agreement under this paragraph shall submit a complete
                plan for the collection and analysis of information to
                identify the impacts of the new fixed guideway capital
                project and the accuracy of the forecasts prepared
                during the development of the project. Preparation of
                this plan shall be included in the full funding grant
                agreement as an eligible activity.
                    ``(II) Contents of plan.--The plan submitted under
                subclause (I) shall provide for--

                        ``(aa) the collection of data on the current
                    transit system regarding transit service levels and
                    ridership patterns, including origins and
                    destinations, access modes, trip purposes, and
                    rider characteristics;
                        ``(bb) documentation of the predicted scope,
                    service levels, capital costs, operating costs, and
                    ridership of the project;
                        ``(cc) collection of data on the transit system
                    2 years after the opening of the new fixed guideway
                    capital project, including analogous information on
                    transit service levels and ridership patterns and
                    information on the as-built scope and capital costs
                    of the project; and
                        ``(dd) analysis of the consistency of predicted
                    project characteristics with the after data.
            ``(D) Collection of data on current system.--To be eligible
        for a full funding grant agreement under this paragraph,
        recipients shall have collected data on the current system,
        according to the plan required, before the beginning of
        construction of the proposed new start project. Collection of
        this data shall be included in the full funding grant agreement
        as an eligible activity.
        ``(3) Early system work agreements.--
            ``(A) Conditions.--The Secretary may make an early systems
        work agreement with an applicant if a record of decision under
        the National Environmental Policy Act of 1969 (42 U.S.C. 4321
        et seq.) has been issued on the project and the Secretary finds
        there is reason to believe--
                ``(i) a full funding grant agreement for the project
            will be made; and
                ``(ii) the terms of the work agreement will promote
            ultimate completion of the project more rapidly and at less
            cost.
            ``(B) Contents.--
                ``(i) In general.--A work agreement under this
            paragraph obligates an amount of available budget authority
            specified in law and shall provide for reimbursement of
            preliminary costs of carrying out the project, including
            land acquisition, timely procurement of system elements for
            which specifications are decided, and other activities the
            Secretary decides are appropriate to make efficient, long-
            term project management easier.
                ``(ii) Period covered.--A work agreement under this
            paragraph shall cover the period of time the Secretary
            considers appropriate. The period may extend beyond the
            period of current authorization.
                ``(iii) Interest and other financing costs.--Interest
            and other financing costs of efficiently carrying out the
            work agreement within a reasonable time are a cost of
            carrying out the agreement, except that eligible costs may
            not be more than the cost of the most favorable financing
            terms reasonably available for the project at the time of
            borrowing. The applicant shall certify, in a way
            satisfactory to the Secretary, that the applicant has shown
            reasonable diligence in seeking the most favorable
            financing terms.
                ``(iv) Failure to carry out project.--If an applicant
            does not carry out the project for reasons within the
            control of the applicant, the applicant shall repay all
            Government payments made under the work agreement plus
            reasonable interest and penalty charges the Secretary
            establishes in the agreement.
        ``(4) Limitation on amounts.--
            ``(A) Major capital investment grants contingent commitment
        authority.--The total estimated amount of future obligations of
        the Government and contingent commitments to incur obligations
        covered by all outstanding letters of intent, full funding
        grant agreements, and early systems work agreements under this
        subsection for major new fixed guideway capital projects may be
        not more than the greater of the amount authorized under
        sections 5338(a)(3) and 5338(c) for such projects or an amount
        equivalent to the last 3 fiscal years of funding allocated
        under subsections (m)(1)(A) and (m)(2)(A)(ii) for such
        projects, less an amount the Secretary reasonably estimates is
        necessary for grants under this section for those of such
        projects that are not covered by a letter or agreement. The
        total amount covered by new letters and contingent commitments
        included in full funding grant agreements and early systems
        work agreements for such projects may be not more than a
        limitation specified in law.
            ``(B) Other contingent commitment authority.--The total
        estimated amount of future obligations of the Government and
        contingent commitments to incur obligations covered by all
        project construction grant agreements and early system work
        agreements under this subsection for small capital projects
        described in subsection (e) may be not more than the greater of
        the amount allocated under subsection (m)(2)(A)(i) for such
        projects or an amount equivalent to the last fiscal year of
        funding allocated under such subsection for such projects, less
        an amount the Secretary reasonably estimates is necessary for
        grants under this section for those of such projects that are
        not covered by an agreement. The total amount covered by new
        contingent commitments included in project construction grant
        agreements and early systems work agreements for such projects
        may be not more than a limitation specified in law.
            ``(C) Inclusion of certain commitments.--Future obligations
        of the Government and contingent commitments made against the
        contingent commitment authority under section 3032(g)(2) of the
        Intermodal Surface Transportation Efficiency Act of 1991 (106
        Stat. 2125) for the San Francisco BART to the Airport project
        for fiscal years 2002, 2003, 2004, 2005, and 2006 shall be
        charged against section 3032(g)(2) of that Act.
            ``(D) Appropriation required.--An obligation may be made
        under this subsection only when amounts are appropriated for
        the obligation.
        ``(5) Notification of congress.--At least 60 days before
    issuing a letter of intent or entering into a full funding grant
    agreement or project construction grant agreement under this
    section, the Secretary shall notify, in writing, the Committees on
    Transportation and Infrastructure and Appropriations of the House
    of Representatives and the Committees on Banking, Housing, and
    Urban Affairs and Appropriations of the Senate of the proposed
    letter or agreement. The Secretary shall include with the
    notification a copy of the proposed letter or agreement as well as
    the evaluations and ratings for the project.
    ``(h) Government's Share of Net Project Cost.--
        ``(1) In general.--Based on engineering studies, studies of
    economic feasibility, and information on the expected use of
    equipment or facilities, the Secretary shall estimate the net
    project cost. A grant for the project shall be for 80 percent of
    the net capital project cost, unless the grant recipient requests a
    lower grant percentage.
        ``(2) Adjustment for completion under budget.--The Secretary
    may adjust the final net project cost of a new fixed guideway
    capital project evaluated under subsections (d) and (e) to include
    the cost of eligible activities not included in the originally
    defined project if the Secretary determines that the originally
    defined project has been completed at a cost that is significantly
    below the original estimate.
        ``(3) Maximum government share.--The Secretary may provide a
    higher grant percentage than requested by the grant recipient if--
            ``(A) the Secretary determines that the net project cost of
        the project is not more than 10 percent higher than the net
        project cost estimated at the time the project was approved for
        advancement into preliminary engineering; and
            ``(B) the ridership estimated for the project is not less
        than 90 percent of the ridership estimated for the project at
        the time the project was approved for advancement into
        preliminary engineering.
        ``(4) Remainder of net project cost.--The remainder of net
    project costs shall be provided from an undistributed cash surplus,
    a replacement or depreciation cash fund or reserve, or new capital.
        ``(5) Limitation on statutory construction.--Nothing in this
    section, including paragraph (1) and subsections (d)(4)(B)(v) and
    (e)(5), shall be construed as authorizing the Secretary to require
    a non-Federal financial commitment for a project that is more than
    20 percent of the net capital project cost.
        ``(6) Special rule for rolling stock costs.--In addition to
    amounts allowed pursuant to paragraph (1), a planned extension to a
    fixed guideway system may include the cost of rolling stock
    previously purchased if the applicant satisfies the Secretary that
    only amounts other than amounts of the Government were used and
    that the purchase was made for use on the extension. A refund or
    reduction of the remainder may be made only if a refund of a
    proportional amount of the grant of the Government is made at the
    same time.
        ``(7) Limitation on applicability.--This subsection does not
    apply to projects for which the Secretary has entered into a full
    funding grant agreement before the date of enactment of the Federal
    Public Transportation Act of 2005.
    ``(i) Undertaking Projects in Advance.--
        ``(1) In general.--The Secretary may pay the Government's share
    of the net capital project cost to a State or local governmental
    authority that carries out any part of a project described in this
    section without the aid of amounts of the Government and according
    to all applicable procedures and requirements if--
            ``(A) the State or local governmental authority applies for
        the payment;
            ``(B) the Secretary approves the payment; and
            ``(C) before carrying out the part of the project, the
        Secretary approves the plans and specifications for the part in
        the same way as other projects under this section.
        ``(2) Financing costs.--
            ``(A) In general.--The cost of carrying out part of a
        project includes the amount of interest earned and payable on
        bonds issued by the State or local governmental authority to
        the extent proceeds of the bonds are expended in carrying out
        the part.
            ``(B) Limitation on amount of interest.--The amount of
        interest under this paragraph may not be more than the most
        favorable interest terms reasonably available for the project
        at the time of borrowing.
            ``(C) Certification.--The applicant shall certify, in a
        manner satisfactory to the Secretary, that the applicant has
        shown reasonable diligence in seeking the most favorable
        financial terms.
    ``(j) Availability of Amounts.--
        ``(1) In general.--An amount made available or appropriated
    under section 5338(a)(3)(C)(iii), 5338(a)(3)(C)(iv), 5338(b)(2)(E),
    or 5338(c) for replacement, rehabilitation, and purchase of buses
    and related equipment and construction of bus-related facilities or
    for new fixed guideway capital projects shall remain available for
    3 fiscal years, including the fiscal year in which the amount is
    made available or appropriated. Any of such amounts that are
    unobligated at the end of the 3-fiscal-year period may be used by
    the Secretary for any purpose under this section.
        ``(2) Use of deobligated amounts.--An amount available under
    this section that is deobligated may be used for any purpose under
    this section.
    ``(k) Reports on New Starts.--
        ``(1) Annual report on funding recommendations.--Not later than
    the first Monday in February of each year, the Secretary shall
    submit to the Committees on Transportation and Infrastructure and
    Appropriations of the House of Representatives and the Committees
    on Banking, Housing, and Urban Affairs and Appropriations of the
    Senate a report that includes--
            ``(A) a proposal of allocations of amounts to be available
        to finance grants for new fixed guideway capital projects among
        applicants for these amounts;
            ``(B) evaluations and ratings, as required under
        subsections (d) and (e), for each such project that is
        authorized by the Federal Public Transportation Act of 2005;
        and
            ``(C) recommendations of such projects for funding based on
        the evaluations and ratings and on existing commitments and
        anticipated funding levels for the next 3 fiscal years based on
        information currently available to the Secretary.
        ``(2) Annual gao review.--The Comptroller General shall--
            ``(A) conduct an annual review of--
                ``(i) the processes and procedures for evaluating,
            rating, and recommending new fixed guideway capital
            projects; and
                ``(ii) the Secretary's implementation of such processes
            and procedures; and
            ``(B) report to Congress on the results of such review by
        May 31 of each year.
    ``(l) Other Reports.--
        ``(1) Before and after study reports.--Not later than the first
    Monday of August of each year, the Secretary shall submit to the
    committees referred to in subsection (k)(1) a report containing a
    summary of the results of the studies conducted under subsection
    (g)(2)(C).
        ``(2) Contractor performance assessment report.--
            ``(A) In general.--Not later than 180 days after the
        enactment of the Federal Public Transportation Act of 2005, and
        each year thereafter, the Secretary shall submit to the
        committees referred to in subsection (k)(1) a report analyzing
        the consistency and accuracy of cost and ridership estimates
        made by each contractor to public transportation agencies
        developing new fixed guideway capital projects.
            ``(B) Contents.--The report submitted under subparagraph
        (A) shall compare the cost and ridership estimates made at the
        time projects are approved for entrance into preliminary
        engineering with--
                ``(i) estimates made at the time projects are approved
            for entrance into final design;
                ``(ii) costs and ridership when the project commences
            revenue operation; and
                ``(iii) costs and ridership when the project has been
            in operation for 2 years.
            ``(C) Considerations.--In making comparisons under
        subparagraph (B), the Secretary shall consider factors having
        an impact on costs and ridership not under the control of the
        contractor. The Secretary shall also consider the role taken by
        each contractor in the development of the project.
        ``(3) Contractor performance incentive report.--Not later than
    180 days after the enactment of the Federal Public Transportation
    Act of 2005, the Secretary shall submit to the committees referred
    to in subsection (k)(1) a report on the suitability of allowing
    contractors to public transportation agencies that undertake new
    fixed guideway capital projects under this section to receive
    performance incentive awards if a project is completed for less
    than the original estimated cost.
    ``(m) Allocating Amounts.--
        ``(1) Fiscal year 2005.--Of the amounts made available or
    appropriated for fiscal year 2005 under section 5338(a)(3)--
            ``(A) $1,437,829,600 shall be allocated for new fixed
        capital projects under subsection (d);
            ``(B) $1,204,684,800 shall be allocated for capital
        projects for fixed guideway modernization; and
            ``(C) $669,600,000 shall be allocated for capital projects
        for buses and bus-related equipment and facilities.
        ``(2) Fiscal years 2006 through 2009.--The amounts made
    available or appropriated for fiscal years 2006 through 2009 under
    sections 5338(b) and 5338(c) shall be allocated as follows:
            ``(A) Major capital investment grants.--Of the amounts
        appropriated under section 5338(c)--
                ``(i) $200,000,000 for each of fiscal years 2007
            through 2009 shall be allocated for projects for new fixed
            guideway capital projects of less than $75,000,000 in
            accordance with subsection (e); and
                ``(ii) the remainder shall be allocated for major new
            fixed guideway capital projects in accordance with
            subsection (d).
            ``(B) Fixed guideway modernization.--The amounts made
        available under section 5338(b)(2)(D) shall be allocated for
        capital projects for fixed guideway modernization.
            ``(C) Buses and bus-related equipment and facilities.--The
        amounts made available under section 5338(b)(2)(E) shall be
        allocated for capital projects for buses and bus-related
        equipment and facilities.
        ``(3) Fixed guideway modernization.--The amounts made available
    for fixed guideway modernization under section 5338(b)(2)(D) for
    fiscal year 2006 and each fiscal year thereafter shall be allocated
    in accordance with section 5337.
        ``(4) Preliminary engineering and alternatives analysis.--Not
    more that 8 percent of the allocation described in paragraph (1)(A)
    may be expended on alternatives analysis and preliminary
    engineering.
        ``(5) Preliminary engineering.--Not more than 8 percent of the
    allocation described in paragraph (2)(A) may be expended on
    preliminary engineering.
        ``(6) Funding for ferry boats.--Of the amounts described in
    paragraphs (1)(A) and (2)(A)--
            ``(A) $10,400,000 shall be available in fiscal year 2005
        for capital projects in Alaska and Hawaii for new fixed
        guideway systems and extension projects utilizing ferry boats,
        ferry boat terminals, or approaches to ferry boat terminals;
            ``(B) $15,000,000 shall be available in each of fiscal
        years 2006 through 2009 for capital projects in Alaska and
        Hawaii for new fixed guideway ferry systems and extension
        projects utilizing ferry boats, ferry boat terminals, or
        approaches to ferry boat terminals; and
            ``(C) $5,000,000 shall be available for each of fiscal
        years 2006 though 2009 for payments to the Denali Commission
        under the terms of section 307(e) of the Denali Commission Act
        of 1998 (42 U.S.C. 3121 note) for docks, waterfront development
        projects, and related transportation infrastructure.
        ``(7) Bus and bus facility grants.--The amounts made available
    under paragraphs (1)(C) and (2)(C) shall be allocated as follows:
            ``(A) Ferry boat systems.--$10,000,000 shall be available
        in each of fiscal years 2006 through 2009 for ferry boats or
        ferry terminal facilities. Of such funds, the following amounts
        shall be set aside for each fiscal year:
                ``(i) $2,500,000 for the San Francisco Water Transit
            Authority.
                ``(ii) $2,500,000 for the Massachusetts Bay
            Transportation Authority Ferry System.
                ``(iii) $1,000,000 for the Camden, New Jersey Ferry
            System.
                ``(iv) $1,000,000 for the Governor's Island, New York
            Ferry System
                ``(v) $1,000,000 for the Philadelphia Penn's Landing
            Ferry Terminal.
                ``(vi) $1,000,000 for the Staten Island Ferry.
                ``(vii) $650,000 for the Maine State Ferry Service,
            Rockland.
                ``(viii) $350,000 for the Swans Island, Maine Ferry
            Service.
            ``(B) Fuel cell bus program.--The following amounts shall
        be set aside for the national fuel cell bus technology
        development program under section 3039 of the Federal Public
        Transportation Act of 2005:
                ``(i) $11,250,000 for fiscal year 2006.
                ``(ii) $11,500,000 for fiscal year 2007.
                ``(iii) $12,750,000 for fiscal year 2008.
                ``(iv) $13,500,000 for fiscal year 2009.
            ``(C) Projects not in urbanized areas.--Not less than 5.5
        percent shall be available in each fiscal year for projects
        that are not in urbanized areas.
            ``(D) Intermodal terminals.--Not less than $35,000,000
        shall be available in each fiscal year for intermodal terminal
        projects, including the intercity bus portion of such projects.
            ``(E) Bus testing.--$3,000,000 shall be available in each
        fiscal year for bus testing under section 5318.
        ``(8) Bus and bus facility grant considerations.--In making
    grants under paragraphs (1)(C) and (2)(C), the Secretary shall
    consider the age and condition of buses, bus fleets, related
    equipment, and bus-related facilities.''.
    (b) Chapter Analysis.--The analysis for chapter 53 is amended by
striking the item relating to section 5309 and inserting the following:

``5309. Capital investment grants.''.

    (c) Public-Private Partnership Pilot Program.--
        (1) Establishment.--The Secretary may establish and implement a
    pilot program to demonstrate the advantages and disadvantages of
    public-private partnerships for certain new fixed guideway capital
    projects.
        (2) Limitation on the number of facilities.--The Secretary may
    permit the establishment of 3 public-private partnerships for new
    fixed guideway capital projects.
        (3) Eligibility.--To be eligible to participate in the public-
    private partnership program, a recipient shall submit to the
    Secretary an application that contains, at a minimum, the
    following:
            (A) An identification of the new fixed guideway capital
        project that has not entered into a full funding grant
        agreement or project construction grant agreement with the
        Federal Transit Administration.
            (B) A schedule and finance plan for the construction of and
        operation of the proposed project.
            (C) An analysis of the costs, benefits, and efficiencies of
        the proposed public-private partnership agreement.
        (4) Selection criteria.--The Secretary may approve the
    application of a recipient under this subsection if the Secretary
    determines that--
            (A) State and local laws permit public-private agreements
        for all phases of project development, construction, and
        operation of the project;
            (B) the recipient is unable to advance the project due to
        fiscal constraints; and
            (C) the plan implementing the public-private partnership is
        justified.
        (5) Program term.--The Secretary may approve an application of
    a recipient for a public-private partnership for fiscal years 2006
    through 2009.
        (6) Report to congress.--Not later than 2 years after the date
    of enactment of this Act, the Secretary shall transmit to the
    Committee on Transportation and Infrastructure of the House of
    Representatives and the Committee on Banking, Housing, and Urban
    Affairs of the Senate, a report containing an assessment of the
    costs, benefits, and efficiencies of a public-private partnership
    program for new fixed guideway capital projects.
    (d) Restrictions on Use of Bus Category Funds for Fixed Guideway
Projects.--Funds provided to grantees under the bus and bus facility
category for fixed guideway ferry and gondola projects in the
Department of Transportation and Related Agencies Appropriations Acts
for any of fiscal years 1998 through 2005, or accompanying committee
reports, that remain available and unobligated may be used for new
fixed guideway capital projects under section 5309 of title 49, United
States Code. Funds made available to the same grantees for similar
projects under the bus and bus facility category of section 5309 of
title 49, United States Code, in fiscal years 2006 through 2009 may be
used for fixed guideway projects under that section.
    (e) Miami Metrorail.--The Secretary shall credit funds provided by
the Florida department of transportation for the extension of the Miami
Metrorail System from Earlington Heights to the Miami Intermodal Center
to satisfy the matching requirements of section 5309(h)(4) of title 49,
United Stated Code, for the Miami North Corridor and Miami East-West
Corridor projects.
    (f) Adjustments.--The adjustments made in the Federal Transit
Administrator's Dear Colleague letter of April 29, 2005, to require a
``medium'' for the cost-effectiveness rating, in order for fixed
guideway projects to be recommended for funding by the Federal Transit
Administration, shall not apply to the following:
        (1) San Francisco Muni--Third Street LRT Phase I/II.
        (2) Santa Clara Valley Transit Authority--Silicon Valley Rapid
    Transit Corridor.
        (3) Washington County, Oregon--Wilsonville to Beaverton
    Commuter Rail.
        (4) Dulles Corridor Metrorail Project--Extension to Wiehle
    Avenue.

SEC. 3012. FORMULA GRANTS FOR SPECIAL NEEDS OF ELDERLY INDIVIDUALS AND
              INDIVIDUALS WITH DISABILITIES.

    (a) In General.--Section 5310 is amended to read as follows:

``Sec. 5310. Formula grants for special needs of elderly individuals
            and individuals with disabilities

    ``(a) General Authority.--
        ``(1) Grants.--The Secretary may make grants to States and
    local governmental authorities under this section for public
    transportation capital projects planned, designed, and carried out
    to meet the special needs of elderly individuals and individuals
    with disabilities.
        ``(2) Subrecipients.--A State that receives a grant under this
    section may allocate the amounts provided under the grant to--
            ``(A) a private nonprofit organization, if the public
        transportation service provided under paragraph (1) is
        unavailable, insufficient, or inappropriate; or
            ``(B) a governmental authority that--
                ``(i) is approved by the State to coordinate services
            for elderly individuals and individuals with disabilities;
            or
                ``(ii) certifies that there are not any nonprofit
            organizations readily available in the area to provide the
            services described under paragraph (1).
        ``(3) Acquiring public transportation services.--A public
    transportation capital project under this section may include
    acquisition of public transportation services as an eligible
    capital expense.
        ``(4) Administrative expenses.--A State or local governmental
    authority may use not more than 10 percent of the amounts
    apportioned to the State under this section to administer, plan,
    and provide technical assistance for a project funded under this
    section.
    ``(b) Apportionment and Transfers.--
        ``(1) Formula.--The Secretary shall apportion amounts made
    available to carry out this section under a formula the Secretary
    administers that considers the number of elderly individuals and
    individuals with disabilities in each State.
        ``(2) Transfer of funds.--Any funds apportioned to a State
    under paragraph (1) may be transferred by the State to the
    apportionments made under sections 5311(c) and 5336 if such funds
    are only used for eligible projects selected under this section.
    ``(c) Government's Share of Costs.--
        ``(1) Capital projects.--
            ``(A) In general.--A grant for a capital project under this
        section shall be for 80 percent of the net capital costs of the
        project, as determined by the Secretary.
            ``(B) Exception.--A State described in section 120(b) of
        title 23 shall receive an increased Government share in
        accordance with the formula under that section.
        ``(2) Remainder.--The remainder of the net project costs--
            ``(A) may be provided from an undistributed cash surplus, a
        replacement or depreciation cash fund or reserve, a service
        agreement with a State or local social service agency or a
        private social service organization, or new capital;
            ``(B) may be derived from amounts appropriated or otherwise
        made available to a department or agency of the Government
        (other than the Department of Transportation) that are eligible
        to be expended for transportation; and
            ``(C) notwithstanding subparagraph (B), may be derived from
        amounts made available to carry out the Federal lands highway
        program established by section 204 of title 23.
        ``(3) Use of certain funds.--For purposes of paragraph (2)(B),
    the prohibitions on the use of funds for matching requirements
    under section 403(a)(5)(C)(vii) of the Social Security Act (42
    U.S.C. 603(a)(5)(C)(vii)) shall not apply to Federal or State funds
    to be used for transportation purposes.
    ``(d) Grant Requirements.--
        ``(1) In general.--A grant under this section shall be subject
    to all requirements of a grant under section 5307 to the extent the
    Secretary determines appropriate.
        ``(2) Certification requirements.--
            ``(A) Fund transfers.--A grant recipient under this section
        that transfers funds to a project funded under section 5336 in
        accordance with subsection (b)(2) shall certify that the
        project for which the funds are requested has been coordinated
        with private nonprofit providers of services under this
        section.
            ``(B) Project selection and plan development.--Beginning in
        fiscal year 2007, each grant recipient under this section shall
        certify that--
                ``(i) the projects selected were derived from a locally
            developed, coordinated public transit-human services
            transportation plan; and
                ``(ii) the plan was developed through a process that
            included representatives of public, private, and nonprofit
            transportation and human services providers and
            participation by the public.
            ``(C) Allocations to subrecipients.--Each grant recipient
        under this section shall certify that allocations of the grant
        to subrecipients, if any, are distributed on a fair and
        equitable basis.
    ``(e) State Program of Projects.--
        ``(1) In general.--Amounts made available to carry out this
    section may be used for transportation projects to assist in
    providing transportation services for elderly individuals and
    individuals with disabilities that are included in a State program
    of projects.
        ``(2) Submission and approval.--A State shall submit to the
    Secretary annually for approval a program of projects. The program
    shall contain an assurance that the program provides for maximum
    feasible coordination of transportation services assisted under
    this section with transportation services assisted by other
    Government sources.
    ``(f) Leasing Vehicles.--Vehicles acquired under this section may
be leased to local governmental authorities to improve transportation
services designed to meet the special needs of elderly individuals and
individuals with disabilities.
    ``(g) Meal Delivery for Homebound Individuals.--Public
transportation service providers receiving assistance under this
section or section 5311(c) may coordinate and assist in regularly
providing meal delivery service for homebound individuals if the
delivery service does not conflict with providing public transportation
service or reduce service to public transportation passengers.
    ``(h) Transfers of Facilities and Equipment.--With the consent of
the recipient in possession of a facility or equipment acquired with a
grant under this section, a State may transfer the facility or
equipment to any recipient eligible to receive assistance under this
chapter if the facility or equipment will continue to be used as
required under this section.''.
    (b) Elderly Individuals and Individuals With Disabilities Pilot
Program.--
        (1) In general.--In fiscal year 2006, the Secretary shall
    establish a pilot program that will allow Wisconsin, Alaska,
    Minnesota, Oregon, and 3 other States selected by the Secretary to
    use not more than 33 percent of the funds apportioned to each State
    to carry out section 5310 of title 49, United States Code, for
    operating costs associated with public transportation projects
    planned, designed, and carried out to meet the special needs of
    elderly individuals and individuals with disabilities under such
    section. The Secretary may base the selection of participating
    States on a State's exemplary coordination of public transit-human
    services transportation. The Secretary may require participants to
    collect data necessary to support the report to Congress required
    by paragraph (7).
        (2) Planning coordination.--Recipients of funds made available
    consistent with this subsection shall certify that--
            (A) the projects selected were derived from a locally
        developed, coordinated public transit-human services
        transportation plan; and
            (B) the plan was developed through a process that included
        representatives of public, private, and nonprofit
        transportation and human services providers and participation
        by the public.
        (3) Government's share of costs.--Operating assistance under
    this subsection may not exceed 50 percent of the net operating
    costs of the project, as determined by the Secretary. The credit
    for any non-Federal share provided under this subsection shall not
    reduce nor replace State funds required to match Federal funds for
    formula grants for the special needs of elderly individuals and
    individuals with disabilities program authorized under section 5310
    of title 49, United States Code.
        (4) Remainder.--The remainder of the net project costs--
            (A) may be provided from an undistributed cash surplus, a
        replacement or depreciation cash fund or reserve, a service
        agreement with a State or local social service agency or a
        private social service organization, or new capital; and
            (B) may be derived from amounts appropriated to or made
        available to a department or agency of the Government (other
        than the Department of Transportation) that are eligible to be
        expended for transportation.
        (5) Use of certain funds.--For purposes of paragraph (4)(B),
    the prohibitions on the use of funds for matching requirements
    under section 403(a)(5)(C)(vii) of the Social Security Act (42
    U.S.C. 603(a)(5)(C)(vii)) shall not apply to Federal or State funds
    to be used for transportation purposes.
        (6) Eligible activities.--Projects eligible under the pilot
    program may include the collection of data necessary to support the
    report to Congress required by paragraph (7).
        (7) Report.--Not later than 2 years after the date of enactment
    of this Act, the Secretary shall transmit to the Committee on
    Transportation and Infrastructure of the House of Representatives
    and the Committee on Banking, Housing, and Urban Affairs of the
    Senate a report on the pilot program, which may include--
            (A) the extent to which funds were used to subsidize
        existing paratransit service provided in compliance with the
        Americans with Disabilities Act of 1990;
            (B) whether States participating in the pilot program use
        the funds to provide services to persons with disabilities that
        exceed those services required by the Americans with
        Disabilities Act of 1990 differently than States not in the
        pilot program;
            (C) whether States participating in this pilot program use
        the funds to provide services to individuals with disabilities
        that exceed those services required by the Americans with
        Disabilities Act of 1990 to the detriment of other eligible
        projects;
            (D) the percentage of funds used to assist elderly
        individuals;
            (E) the percentage of funds used to assist individuals with
        disabilities;
            (F) the extent to which States participating in this pilot
        program serve a wider range of elderly, low income, and persons
        with disabilities populations;
            (G) whether the pilot program improves services to elderly
        individuals and individuals with disabilities;
            (H) the extent to which States participating in the pilot
        program were able to expand the range of transportation
        alternatives available to elderly individuals and individuals
        with disabilities; and
            (I) whether the pilot program facilitates or discourages
        coordination with or integration of other funding sources.
        (8) Sunset.--This subsection shall cease to be effective on
    September 30, 2009.
    (c) Chapter Analysis.--The analysis for chapter 53 is amended by
striking the item relating to section 5310 and inserting the following:

``5310. Formula grants for special needs of elderly individuals and
          individuals with disabilities.''.

SEC. 3013. FORMULA GRANTS FOR OTHER THAN URBANIZED AREAS.

    (a) Definitions.--Section 5311(a) is amended to read as follows:
    ``(a) Definitions.--As used in this section, the following
definitions shall apply:
        ``(1) Recipient.--The term `recipient' means a State or Indian
    tribe that receives a Federal transit program grant directly from
    the Federal Government.
        ``(2) Subrecipient.--The term `subrecipient' means a State or
    local governmental authority, a nonprofit organization, or an
    operator of public transportation or intercity bus service that
    receives Federal transit program grant funds indirectly through a
    recipient.''.
    (b) General Authority.--Section 5311(b) is amended to read as
follows:
    ``(b) General Authority.--
        ``(1) Grants authorized.--Except as provided by paragraph (2),
    the Secretary may award grants under this section to recipients
    located in areas other than urbanized areas for--
            ``(A) public transportation capital projects;
            ``(B) operating costs of equipment and facilities for use
        in public transportation; and
            ``(C) the acquisition of public transportation services,
        including service agreements with private providers of public
        transportation services.
        ``(2) State program.--
            ``(A) In general.--A project eligible for a grant under
        this section shall be included in a State program for public
        transportation service projects, including agreements with
        private providers of public transportation service.
            ``(B) Submission to secretary.--Each State shall submit to
        the Secretary annually the program described in subparagraph
        (A).
            ``(C) Approval.--The Secretary may not approve the program
        unless the Secretary determines that--
                ``(i) the program provides a fair distribution of
            amounts in the State, including Indian reservations; and
                ``(ii) the program provides the maximum feasible
            coordination of public transportation service assisted
            under this section with transportation service assisted by
            other Federal sources.
        ``(3) Rural transportation assistance program.--
            ``(A) In general.--The Secretary shall carry out a rural
        transportation assistance program in other than urbanized
        areas.
            ``(B) Grants and contracts.--In carrying out this
        paragraph, the Secretary may use not more than 2 percent of the
        amount made available to carry out this section to make grants
        and contracts for transportation research, technical
        assistance, training, and related support services in other
        than urbanized areas.
            ``(C) Projects of a national scope.--Not more than 15
        percent of the amounts available under subparagraph (B) may be
        used by the Secretary to carry out projects of a national
        scope, with the remaining balance provided to the States.
        ``(4) Data collection.--Each recipient under this section shall
    submit an annual report to the Secretary containing information on
    capital investment, operations, and service provided with funds
    received under this section, including--
            ``(A) total annual revenue;
            ``(B) sources of revenue;
            ``(C) total annual operating costs;
            ``(D) total annual capital costs;
            ``(E) fleet size and type, and related facilities;
            ``(F) revenue vehicle miles; and
            ``(G) ridership.''.
    (c) Apportionments.--Section 5311(c) is amended to read as follows:
    ``(c) Apportionments.--
        ``(1) Public transportation on indian reservations.--Of the
    amounts made available or appropriated for each fiscal year
    pursuant to subsections (a)(1)(C)(v) and (b)(2)(G) of section 5338,
    the following amounts shall be apportioned for grants to Indian
    tribes for any purpose eligible under this section, under such
    terms and conditions as may be established by the Secretary:
            ``(A) $8,000,000 for fiscal year 2006.
            ``(B) $10,000,000 for fiscal year 2007.
            ``(C) $12,000,000 for fiscal year 2008.
            ``(D) $15,000,000 for fiscal year 2009.
        ``(2) Remaining amounts.--Of the amounts made available or
    appropriated for each fiscal year pursuant to subsections
    (a)(1)(C)(v) and (b)(2)(G) of section 5338 that are not apportioned
    under paragraph (1)--
            ``(A) 20 percent shall be apportioned to the States in
        accordance with paragraph (3); and
            ``(B) 80 percent shall be apportioned to the States in
        accordance with paragraph (4).
        ``(3) Apportionments based on land area in nonurbanized
    areas.--
            ``(A) In general.--Subject to subparagraph (B), each State
        shall receive an amount that is equal to the amount apportioned
        under paragraph (2)(A) multiplied by the ratio of the land area
        in areas other than urbanized areas in that State and divided
        by the land area in all areas other than urbanized areas in the
        United States, as shown by the most recent decennial census of
        population.
            ``(B) Maximum apportionment.--No State shall receive more
        than 5 percent of the amount apportioned under this paragraph.
        ``(4) Apportionments based on population in nonurbanized
    areas.--Each State shall receive an amount equal to the amount
    apportioned under paragraph (2)(B) multiplied by the ratio of the
    population of areas other than urbanized areas in that State
    divided by the population of all areas other than urbanized areas
    in the United States, as shown by the most recent decennial census
    of population.''.
    (d) Use for Administration, Planning, and Technical Assistance.--
Section 5311(e) is amended--
        (1) in the subsection heading by inserting ``, Planning,''
    after ``Administration'';
        (2) by striking ``(1) The Secretary'' and inserting ``The
    Secretary'';
        (3) by striking paragraph (2); and
        (4) by striking ``recipient'' and inserting ``subrecipient''.
    (e) Intercity Bus Transportation.--Section 5311(f) is amended--
        (1) in paragraph (1)--
            (A) by striking ``(1) A State'' and inserting the
        following:
        ``(1) In general.--A State'';
            (B) by striking ``after September 30, 1993,''; and
            (C) by moving subparagraphs (A) through (D) 2 ems to the
        right; and
        (2) in paragraph (2)--
            (A) by striking ``(2) A State'' and inserting the
        following:
        ``(2) Certification.--A State''; and
            (B) by striking ``Secretary of Transportation'' and
        inserting ``Secretary, after consultation with affected
        intercity bus service providers,''.
    (f) Government Share of Costs.--Section 5311(g) is amended to read
as follows:
    ``(g) Government Share of Costs.--
        ``(1) Capital projects.--
            ``(A) In general.--Except as provided by subparagraph (B),
        a grant awarded under this section for any purpose other than
        operating assistance shall be for 80 percent of the net capital
        costs of the project, as determined by the Secretary.
            ``(B) Exception.--A State described in section 120(b) of
        title 23 shall receive a Government share of the net capital
        costs in accordance with the formula under that section.
        ``(2) Operating assistance.--
            ``(A) In general.--Except as provided by subparagraph (B),
        a grant made under this section for operating assistance may
        not exceed 50 percent of the net operating costs of the
        project, as determined by the Secretary.
            ``(B) Exception.--A State described in section 120(b) of
        title 23 shall receive a Government share of the net operating
        costs equal to 62.5 percent of the Government share provided
        for under paragraph (1)(B).
        ``(3) Remainder.--The remainder of net project costs--
            ``(A) may be provided from an undistributed cash surplus, a
        replacement or depreciation cash fund or reserve, a service
        agreement with a State or local social service agency or a
        private social service organization, or new capital;
            ``(B) may be derived from amounts appropriated or otherwise
        made available to a department or agency of the Government
        (other than the Department of Transportation) that are eligible
        to be expended for transportation; and
            ``(C) notwithstanding subparagraph (B), may be derived from
        amounts made available to carry out the Federal lands highway
        program established by section 204 of title 23.
        ``(4) Use of certain funds.--For purposes of paragraph (3)(B),
    the prohibitions on the use of funds for matching requirements
    under section 403(a)(5)(C)(vii) of the Social Security Act (42
    U.S.C. 603(a)(5)(C)(vii)) shall not apply to Federal or State funds
    to be used for transportation purposes.
        ``(5) Limitation on operating assistance.--A State carrying out
    a program of operating assistance under this section may not limit
    the level or extent of use of the Government grant for the payment
    of operating expenses.''.
    (g) Relationship to Other Laws.--Section 5311 is amended--
        (1) by striking subsection (h); and
        (2) by redesignating subsections (i) and (j) as subsections (h)
    and (i), respectively.
    (h) Waiver Condition.--Section 5311(j)(1) is amended by striking
``but the Secretary of Labor may waive the application of section
5333(b)'' and inserting ``if the Secretary of Labor utilizes a special
warranty that provides a fair and equitable arrangement to protect the
interests of employees''.
    (i) Correction to Chapter Analysis.--The analysis for chapter 53 is
amended by striking the item relating to section 5311 and inserting the
following:

``5311. Formula grants for other than urbanized areas.''.

SEC. 3014. RESEARCH, DEVELOPMENT, DEMONSTRATION, AND DEPLOYMENT
              PROJECTS.

    (a) In General.--Section 5312(a) is amended to read as follows:
    ``(a) Research, Development, Demonstration, and Deployment
Projects.--
        ``(1) In general.--The Secretary may make grants, contracts,
    cooperative agreements, and other agreements (including agreements
    with departments, agencies, and instrumentalities of the United
    States Government) for research, development, demonstration, and
    deployment projects, and evaluation of technology of national
    significance to public transportation, that the Secretary
    determines will improve public transportation service or help
    public transportation service meet the total transportation needs
    at a minimum cost.
        ``(2) Information.--The Secretary may request and receive
    appropriate information from any source.
        ``(3) Savings provision.--This subsection does not limit the
    authority of the Secretary under any other law.''.
    (b) Joint Partnership Program for Deployment of Innovation.--
Section 5312 is amended by striking subsections (b) and (c) and
redesignating subsections (d) and (e) as subsections (b) and (c),
respectively.
    (c) International Mass Transportation Program.--Section 5312(c)(2)
(as redesignated by subsection (b) of this section) is amended by
striking ``public and private'' and inserting ``public or private''.
    (d) Funding.--Section 5312(c)(3) (as redesignated by subsection (b)
of this section) is amended by striking ``shall be accounted for
separately within the Mass Transit Account of the Highway Trust Fund
and''.
    (e) Conforming Amendments.--
        (1) Section heading.--Section 5312 is amended by striking the
    section heading and inserting the following:

``Sec. 5312. Research, development, demonstration, and deployment
            projects''.

        (2) Chapter analysis.--The analysis for chapter 53 is amended
    by striking the item relating to section 5312 and inserting the
    following:

``5312. Research, development, demonstration, and deployment
          projects.''.

SEC. 3015. TRANSIT COOPERATIVE RESEARCH PROGRAM.

    (a) In General.--Section 5313 is amended--
        (1) by striking subsection (b);
        (2) in subsection (a)--
            (A) in paragraph (1) by striking ``(1) The amounts made
        available under paragraphs (1) and (2)(C)(ii) of section
        5338(c) of this title'' and inserting ``The amounts made
        available under subsections (a)(5)(C)(iii) and (d)(1) of
        section 5338''; and
            (B) in paragraph (2) by striking ``(2) The Secretary'' and
        inserting the following:
    ``(b) Federal Assistance.--The Secretary''; and
        (3) by striking subsection (c) and inserting the following:
    ``(c) Government's Share.--If there would be a clear and direct
financial benefit to an entity under a grant or contract financed under
this section, the Secretary shall establish a Government share
consistent with that benefit.''.
    (b) Conforming Amendments.--
        (1) Section heading.--Section 5313 is amended by striking the
    section heading and inserting the following:

``Sec. 5313. Transit cooperative research program''.

        (2) Chapter analysis.--The analysis for chapter 53 is amended
    by striking the item relating to section 5313 and inserting the
    following:

``5313. Transit cooperative research program.''.

SEC. 3016. NATIONAL RESEARCH AND TECHNOLOGY PROGRAMS.

    (a) In General.--Section 5314 is amended--
        (1) by striking the section heading and inserting the
    following:

``Sec. 5314. National research programs'';

        (2) in subsection (a)(1)--
            (A) by striking ``subsections (d) and (h)(7) of section
        5338 of this title'' and inserting ``section 5338(d)'';
            (B) by striking ``and contracts'' and inserting ``,
        contracts, cooperative agreements, or other agreements'';
            (C) by striking ``5303-5306,''; and
            (D) by striking ``5317,'';
        (3) in subsection (a)(2) by striking ``Of the amounts'' and all
    that follows through ``$3,000,000 to'' and inserting ``The
    Secretary shall'';
        (4) by striking subsection (a)(4)(B);
        (5) by redesignating subsection (a)(4)(C) as subsection
    (a)(4)(B);
        (6) by adding at the end of subsection (a) the following:
        ``(6) Medical transportation demonstration grants.--
            ``(A) Grants authorized.--The Secretary may award
        demonstration grants, from funds made available under paragraph
        (1), to eligible entities to provide transportation services to
        individuals to access dialysis treatments and other medical
        treatments for renal disease.
            ``(B) Eligible entities.--An entity shall be eligible to
        receive a grant under this paragraph if the entity--
                ``(i) meets the conditions described in section
            501(c)(3) of the Internal Revenue Code of 1986; or
                ``(ii) is an agency of a State or unit of local
            government.
            ``(C) Use of funds.--Grant funds received under this
        paragraph may be used to provide transportation services to
        individuals to access dialysis treatments and other medical
        treatments for renal disease.
            ``(D) Application.--
                ``(i) In general.--Each eligible entity desiring a
            grant under this paragraph shall submit an application to
            the Secretary at such time, at such place, and containing
            such information as the Secretary may reasonably require.
                ``(ii) Selection of grantees.--In awarding grants under
            this paragraph, the Secretary shall give preference to
            eligible entities from communities with--

                    ``(I) high incidence of renal disease; and
                    ``(II) limited access to dialysis facilities.

            ``(E) Rulemaking.--The Secretary shall issue regulations to
        implement and administer the grant program established under
        this paragraph.
            ``(F) Report.--The Secretary shall submit a report on the
        results of the demonstration projects funded under this
        paragraph to the Committee on Banking, Housing, and Urban
        Affairs of the Senate and the Committee on Transportation and
        Infrastructure of the House of Representatives.''.
        (7) in subsection (b) by striking ``or contract'' and all that
    follows through ``section,'' and inserting ``, contract,
    cooperative agreement, or other agreement under subsection (a) or
    section 5312,''; and
    (b) National Technical Assistance Center for Senior
Transportation.--Section 5314 is amended by adding at the end the
following:
    ``(c) National Technical Assistance Center for Senior
Transportation.--
        ``(1) Establishment.--The Secretary shall award grants to a
    national not-for-profit organization for the establishment and
    maintenance of a national technical assistance center.
        ``(2) Eligibility.--An organization shall be eligible to
    receive a grant under paragraph (1) if the organization--
            ``(A) focuses significantly on serving the needs of the
        elderly;
            ``(B) has demonstrated knowledge and expertise in senior
        transportation policy and planning issues;
            ``(C) has affiliates in a majority of the States;
            ``(D) has the capacity to convene local groups to consult
        on operation and development of senior transportation programs;
        and
            ``(E) has established close working relationships with the
        Federal Transit Administration and the Administration on Aging.
        ``(3) Use of funds.--The national technical assistance center
    established under this section shall--
            ``(A) gather best practices from throughout the Nation and
        provide such practices to local communities that are
        implementing senior transportation programs;
            ``(B) work with teams from local communities to identify
        how the communities are successfully meeting the transportation
        needs of senior citizens and any gaps in services in order to
        create a plan for an integrated senior transportation program;
            ``(C) provide resources on ways to pay for senior
        transportation services;
            ``(D) create a web site to publicize and circulate
        information on senior transportation programs;
            ``(E) establish a clearinghouse for print, video, and audio
        resources on senior mobility; and
            ``(F) administer the demonstration grant program
        established under paragraph (4).
        ``(4) Grants authorized.--
            ``(A) In general.--The national technical assistance center
        established under this section, in consultation with the
        Federal Transit Administration, shall award senior
        transportation demonstration grants to--
                ``(i) local transportation organizations;
                ``(ii) State agencies;
                ``(iii) units of local government; and
                ``(iv) nonprofit organizations.
            ``(B) Use of funds.--Grant funds received under this
        paragraph may be used to--
                ``(i) evaluate the state of transportation services for
            senior citizens;
                ``(ii) recognize barriers to mobility that senior
            citizens encounter in their communities;
                ``(iii) establish partnerships and promote coordination
            among community stakeholders, including public, not-for-
            profit, and for-profit providers of transportation services
            for senior citizens;
                ``(iv) identify future transportation needs of senior
            citizens within local communities; and
                ``(v) establish strategies to meet the unique needs of
            healthy and frail senior citizens.
            ``(C) Selection of grantees.--The Secretary shall select
        grantees under this paragraph based on a fair representation of
        various geographical locations throughout the United States.''.
    (c) Alternative Fuels Study.--
        (1) Study.--The Secretary shall conduct a study of the actions
    necessary to facilitate the purchase of increased volumes of
    alternative fuels (as defined in section 301 of the Energy Policy
    Act of 1992 (42 U.S.C. 13211)) for use in public transit vehicles.
        (2) Scope of study.--The study conducted under this subsection
    shall focus on the incentives necessary to increase the use of
    alternative fuels in public transit vehicles, including buses,
    fixed guideway vehicles, and ferries.
        (3) Contents.--The study shall consider--
            (A) the environmental benefits of increased use of
        alternative fuels in transit vehicles;
            (B) existing opportunities available to transit system
        operators that encourage the purchase of alternative fuels for
        transit vehicle operation;
            (C) existing barriers to transit system operators that
        discourage the purchase of alternative fuels for transit
        vehicle operation, including situations where alternative fuels
        that do not require capital improvements to transit vehicles
        are disadvantaged over fuels that do require such improvements;
        and
            (D) the necessary levels and type of support necessary to
        encourage additional use of alternative fuels for transit
        vehicle operation.
        (4) Recommendations.--The study shall recommend regulatory and
    legislative alternatives that will result in the increased use of
    alternative fuels in transit vehicles.
        (5) Report.--Not later than 1 year after the date of enactment
    of this Act, the Secretary shall submit to the Committee on
    Banking, Housing, and Urban Affairs of the Senate and the Committee
    on Transportation and Infrastructure of the House of
    Representatives a report containing the results of the study
    completed under this subsection.
    (d) Conforming Amendment.--The analysis for chapter 53 is amended
by striking the item relating to section 5314 and inserting the
following:

``5314. National research programs.''.

SEC. 3017. NATIONAL TRANSIT INSTITUTE.

    (a) Establishment and Duties.--Section 5315 is amended by striking
subsections (a) and (b) and inserting the following:
    ``(a) Establishment.--The Secretary shall award grants to Rutgers
University to conduct a national transit institute.
    ``(b) Duties.--
        ``(1) In general.--In cooperation with the Federal Transit
    Administration, State transportation departments, public
    transportation authorities, and national and international
    entities, the institute established under subsection (a) shall
    develop and conduct training and educational programs for Federal,
    State, and local transportation employees, United States citizens,
    and foreign nationals engaged or to be engaged in Government-aid
    public transportation work.
        ``(2) Training and educational programs.--The training and
    educational programs developed under paragraph (1) may include
    courses in recent developments, techniques, and procedures related
    to--
            ``(A) intermodal and public transportation planning;
            ``(B) management;
            ``(C) environmental factors;
            ``(D) acquisition and joint use rights-of-way;
            ``(E) engineering and architectural design;
            ``(F) procurement strategies for public transportation
        systems;
            ``(G) turnkey approaches to delivering public
        transportation systems;
            ``(H) new technologies;
            ``(I) emission reduction technologies;
            ``(J) ways to make public transportation accessible to
        individuals with disabilities;
            ``(K) construction, construction management, insurance, and
        risk management;
            ``(L) maintenance;
            ``(M) contract administration;
            ``(N) inspection;
            ``(O) innovative finance;
            ``(P) workplace safety; and
            ``(Q) public transportation security.''.
    (b) Availability of Amounts.--Section 5315(d) is amended by
striking ``mass'' each place it appears.

SEC. 3018. JOB ACCESS AND REVERSE COMMUTE FORMULA GRANTS.

    (a) In General.--Chapter 53 is amended by inserting after section
5315 the following:

``Sec. 5316. Job access and reverse commute formula grants

    ``(a) Definitions.--In this section, the following definitions
apply:
        ``(1) Access to jobs project.--The term `access to jobs
    project' means a project relating to the development and
    maintenance of transportation services designed to transport
    welfare recipients and eligible low-income individuals to and from
    jobs and activities related to their employment, including--
            ``(A) transportation projects to finance planning, capital,
        and operating costs of providing access to jobs under this
        chapter;
            ``(B) promoting public transportation by low-income
        workers, including the use of public transportation by workers
        with nontraditional work schedules;
            ``(C) promoting the use of transit vouchers for welfare
        recipients and eligible low-income individuals; and
            ``(D) promoting the use of employer-provided
        transportation, including the transit pass benefit program
        under section 132 of the Internal Revenue Code of 1986.
        ``(2) Eligible low-income individual.--The term `eligible low-
    income individual' means an individual whose family income is at or
    below 150 percent of the poverty line (as that term is defined in
    section 673(2) of the Community Services Block Grant Act (42 U.S.C.
    9902(2)), including any revision required by that section) for a
    family of the size involved.
        ``(3) Recipient.--The term `recipient' means a designated
    recipient (as defined in section 5307(a)(2)) and a State that
    receives a grant under this section directly.
        ``(4) Reverse commute project.--The term `reverse commute
    project' means a public transportation project designed to
    transport residents of urbanized areas and other than urbanized
    areas to suburban employment opportunities, including any projects
    to--
            ``(A) subsidize the costs associated with adding reverse
        commute bus, train, carpool, van routes, or service from
        urbanized areas and other than urbanized areas to suburban
        workplaces;
            ``(B) subsidize the purchase or lease by a nonprofit
        organization or public agency of a van or bus dedicated to
        shuttling employees from their residences to a suburban
        workplace; or
            ``(C) otherwise facilitate the provision of public
        transportation services to suburban employment opportunities.
        ``(5) Subrecipient.--The term `subrecipient' means a State or
    local governmental authority, nonprofit organization, or operator
    of public transportation services that receives a grant under this
    section indirectly through a recipient.
        ``(6) Welfare recipient.--The term `welfare recipient' means an
    individual who has received assistance under a State or tribal
    program funded under part A of title IV of the Social Security Act
    at any time during the 3-year period before the date on which the
    applicant applies for a grant under this section.
    ``(b) General Authority.--
        ``(1) Grants.--The Secretary may make grants under this section
    to a recipient for access to jobs and reverse commute projects
    carried out by the recipient or a subrecipient.
        ``(2) Administrative expenses.--A recipient may use not more
    than 10 percent of the amounts apportioned to the recipient under
    this section to administer, plan, and provide technical assistance
    for a project funded under this section.
    ``(c) Apportionments.--
        ``(1) Formula.--The Secretary shall apportion amounts made
    available for a fiscal year to carry out this section as follows:
            ``(A) 60 percent of the funds shall be apportioned among
        designated recipients (as defined in section 5307(a)(2)) for
        urbanized areas with a population of 200,000 or more in the
        ratio that--
                ``(i) the number of eligible low-income individuals and
            welfare recipients in each such urbanized area; bears to
                ``(ii) the number of eligible low-income individuals
            and welfare recipients in all such urbanized areas.
            ``(B) 20 percent of the funds shall be apportioned among
        the States in the ratio that--
                ``(i) the number of eligible low-income individuals and
            welfare recipients in urbanized areas with a population of
            less than 200,000 in each State; bears to
                ``(ii) the number of eligible low-income individuals
            and welfare recipients in urbanized areas with a population
            of less than 200,000 in all States.
            ``(C) 20 percent of the funds shall be apportioned among
        the States in the ratio that--
                ``(i) the number of eligible low-income individuals and
            welfare recipients in other than urbanized areas in each
            State; bears to
                ``(ii) the number of eligible low-income individuals
            and welfare recipients in other than urbanized areas in all
            States.
        ``(2) Use of apportioned funds.--Except as provided in
    paragraph (3)--
            ``(A) funds apportioned under paragraph (1)(A) shall be
        used for projects serving urbanized areas with a population of
        200,000 or more;
            ``(B) funds apportioned under paragraph (1)(B) shall be
        used for projects serving urbanized areas with a population of
        less than 200,000; and
            ``(C) funds apportioned under paragraph (1)(C) shall be
        used for projects serving other than urbanized areas.
        ``(3) Exceptions.--A State may use funds apportioned under
    paragraphs (1)(B) and (1)(C)--
            ``(A) for projects serving areas other than the area
        specified in paragraph (2)(B) or (2)(C), as the case may be, if
        the Governor of the State certifies that all of the objectives
        of this section are being met in the specified area; or
            ``(B) for projects anywhere in the State if the State has
        established a statewide program for meeting the objectives of
        this section.
    ``(d) Competitive Process for Grants to Subrecipients.--
        ``(1) Areawide solicitations.--A recipient of funds apportioned
    under subsection (c)(1)(A) shall conduct, in cooperation with the
    appropriate metropolitan planning organization, an areawide
    solicitation for applications for grants to the recipient and
    subrecipients under this section.
        ``(2) Statewide solicitation.--A recipient of funds apportioned
    under subsection (c)(1)(B) or (c)(1)(C) shall conduct a statewide
    solicitation for applications for grants to the recipient and
    subrecipients under this section.
        ``(3) Application.--Recipients and subrecipients seeking to
    receive a grant from funds apportioned under subsection (c) shall
    submit to the recipient an application in the form and in
    accordance with such requirements as the recipient shall establish.
        ``(4) Grant awards.--The recipient shall award grants under
    paragraphs (1) and (2) on a competitive basis.
    ``(e) Transfers.--
        ``(1) In general.--A State may transfer any funds apportioned
    to it under subsection (c)(1)(B) or (c)(1)(C), or both, to an
    apportionment under section 5311(c) or 5336, or both.
        ``(2) Limited to eligible projects.--Any apportionment
    transferred under this subsection shall be made available only for
    eligible job access and reverse commute projects as described in
    this section.
        ``(3) Consultation.--A State may make a transfer of an amount
    under this subsection only after consulting with responsible local
    officials and publicly owned operators of public transportation in
    each area for which the amount originally was awarded under
    subsection (d)(4).
    ``(f) Grant Requirements.--
        ``(1) In general.--A grant under this section shall be subject
    to the requirements of section 5307.
        ``(2) Fair and equitable distribution.--A recipient of a grant
    under this section shall certify to the Secretary that allocations
    of the grant to subrecipients are distributed on a fair and
    equitable basis.
    ``(g) Coordination.--
        ``(1) In general.--The Secretary shall coordinate activities
    under this section with related activities under programs of other
    Federal departments and agencies.
        ``(2) With nonprofit providers.--A State that transfers funds
    to an apportionment under section 5336 pursuant to subsection (e)
    shall certify to the Secretary that any project for which the funds
    are requested under this section has been coordinated with
    nonprofit providers of services.
        ``(3) Project selection and planning.--A recipient of funds
    under this section shall certify to the Secretary that--
            ``(A) the projects selected were derived from a locally
        developed, coordinated public transit-human services
        transportation plan; and
            ``(B) the plan was developed through a process that
        included representatives of public, private, and nonprofit
        transportation and human services providers and participation
        by the public.
    ``(h) Government's Share of Costs.--
        ``(1) Capital projects.--A grant for a capital project under
    this section may not exceed 80 percent of the net capital costs of
    the project, as determined by the Secretary.
        ``(2) Operating assistance.--A grant made under this section
    for operating assistance may not exceed 50 percent of the net
    operating costs of the project, as determined by the Secretary.
        ``(3) Remainder.--The remainder of the net project costs--
            ``(A) may be provided from an undistributed cash surplus, a
        replacement or depreciation cash fund or reserve, a service
        agreement with a State or local social service agency or a
        private social service organization, or new capital; and
            ``(B) may be derived from amounts appropriated to or made
        available to a department or agency of the Government (other
        than the Department of Transportation) that are eligible to be
        expended for transportation.
        ``(4) Use of certain funds.--For purposes of paragraph (3)(B),
    the prohibitions on the use of funds for matching requirements
    under section 403(a)(5)(C)(vii) of the Social Security Act (42
    U.S.C. 603(a)(5)(C)(vii)) shall not apply to Federal or State funds
    to be used for transportation purposes.
        ``(5) Limitation on operating assistance.--A recipient carrying
    out a program of operating assistance under this section may not
    limit the level or extent of use of the Government grant for the
    payment of operating expenses.
    ``(i) Program Evaluation.--
        ``(1) Comptroller general.--Beginning one year after the date
    of enactment of the Federal Public Transportation Act of 2005, and
    every 2 years thereafter, the Comptroller General shall--
            ``(A) conduct a study to evaluate the grant program
        authorized by this section; and
            ``(B) transmit to the Committee on Transportation and
        Infrastructure of the House of Representatives and the
        Committee on Banking, Housing, and Urban Affairs of the Senate
        a report describing the results of the study under subparagraph
        (A).
        ``(2) Department of transportation.--Not later than 3 years
    after the date of enactment of Federal Public Transportation Act of
    2005, the Secretary shall--
            ``(A) conduct a study to evaluate the effectiveness of the
        grant program authorized by this section and the effectiveness
        of recipients making grants to subrecipients under this
        section; and
            ``(B) transmit to the committees referred to in paragraph
        (1)(B) a report describing the results of the study under
        subparagraph (A).''.
    (b) Conforming Amendment.--The analysis for chapter 53 is amended
by inserting after the item relating to section 5315 the following:

``5316. Job access and reverse commute formula grants.''.

    (c) Repeal.--Effective October 1, 2005, section 3037 of the
Transportation Equity Act for the 21st Century (49 U.S.C. 5309 note;
112 Stat. 387) is repealed.

SEC. 3019. NEW FREEDOM PROGRAM.

    (a) In General.--Chapter 53 is amended by inserting after section
5316 the following:

``Sec. 5317. New freedom program

    ``(a) Definitions.--In this section, the following definitions
apply:
        ``(1) Recipient.--The term `recipient' means a designated
    recipient (as defined in section 5307(a)(2)) and a State that
    receives a grant under this section directly.
        ``(2) Subrecipient.--The term `subrecipient' means a State or
    local governmental authority, nonprofit organization, or operator
    of public transportation services that receives a grant under this
    section indirectly through a recipient.
    ``(b) General Authority.--
        ``(1) Grants.--The Secretary may make grants under this section
    to a recipient for new public transportation services and public
    transportation alternatives beyond those required by the Americans
    with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) that assist
    individuals with disabilities with transportation, including
    transportation to and from jobs and employment support services.
        ``(2) Administrative expenses.--A recipient may use not more
    than 10 percent of the amounts apportioned to the recipient under
    this section to administer, plan, and provide technical assistance
    for a project funded under this section.
    ``(c) Apportionments.--
        ``(1) Formula.--The Secretary shall apportion amounts made
    available to carry out this section as follows:
            ``(A) 60 percent of the funds shall be apportioned among
        designated recipients (as defined in section 5307(a)(2)) for
        urbanized areas with a population of 200,000 or more in the
        ratio that--
                ``(i) the number of individuals with disabilities in
            each such urbanized area; bears to
                ``(ii) the number of individuals with disabilities in
            all such urbanized areas.
            ``(B) 20 percent of the funds shall be apportioned among
        the States in the ratio that--
                ``(i) the number of individuals with disabilities in
            urbanized areas with a population of less than 200,000 in
            each State; bears to
                ``(ii) the number of individuals with disabilities in
            urbanized areas with a population of less than 200,000 in
            all States.
            ``(C) 20 percent of the funds shall be apportioned among
        the States in the ratio that--
                ``(i) the number of individuals with disabilities in
            other than urbanized areas in each State; bears to
                ``(ii) the number of individuals with disabilities in
            other than urbanized areas in all States.
        ``(2) Use of apportioned funds.--Funds apportioned under
    paragraph (1) shall be used for projects as follows:
            ``(A) Funds apportioned under paragraph (1)(A) shall be
        used for projects serving urbanized areas with a population of
        200,000 or more.
            ``(B) Funds apportioned under paragraph (1)(B) shall be
        used for projects serving urbanized areas with a population of
        less than 200,000.
            ``(C) Funds apportioned under paragraph (1)(C) shall be
        used for projects serving other than urbanized areas.
        ``(3) Transfers.--
            ``(A) In general.--A State may transfer any funds
        apportioned to it under paragraph (1)(B) or (1)(C), or both, to
        an apportionment under section 5311(c) or 5336, or both.
            ``(B) Limited to eligible projects.--Any funds transferred
        pursuant to this paragraph shall be made available only for
        eligible projects selected under this section.
            ``(C) Consultation.--A State may make a transfer of an
        amount under this subsection only after consulting with
        responsible local officials and publicly owned operators of
        public transportation in each area for which the amount
        originally was awarded under subsection (d)(4).
    ``(d) Competitive Process for Grants to Subrecipients.--
        ``(1) Areawide solicitations.--A recipient of funds apportioned
    under subsection (c)(1)(A) shall conduct, in cooperation with the
    appropriate metropolitan planning organization, an areawide
    solicitation for applications for grants to the recipient and
    subrecipients under this section.
        ``(2) Statewide solicitation.--A recipient of funds apportioned
    under subsection (c)(1)(B) or (c)(1)(C) shall conduct a statewide
    solicitation for applications for grants to the recipient and
    subrecipients under this section.
        ``(3) Application.--Recipients and subrecipients seeking to
    receive a grant from funds apportioned under subsection (c) shall
    submit to the recipient an application in the form and in
    accordance with such requirements as the recipient shall establish.
        ``(4) Grant awards.--The recipient shall award grants under
    paragraphs (1) and (2) on a competitive basis.
    ``(e) Grant Requirements.--
        ``(1) In general.--A grant under this section shall be subject
    to all the requirements of section 5310 to the extent the Secretary
    considers appropriate.
        ``(2) Fair and equitable distribution.--A recipient of a grant
    under this section shall certify that allocations of the grant to
    subrecipients are distributed on a fair and equitable basis.
    ``(f) Coordination.--
        ``(1) In general.--The Secretary shall coordinate activities
    under this section with related activities under programs of other
    Federal departments and agencies.
        ``(2) With nonprofit providers.--A recipient that transfers
    funds to an apportionment under section 5336 pursuant to subsection
    (c)(2) shall certify that the project for which the funds are
    requested under this section has been coordinated with nonprofit
    providers of services.
        ``(3) Project selection and planning.--Beginning in fiscal year
    2007, a recipient of funds under this section shall certify that--
            ``(A) the projects selected were derived from a locally
        developed, coordinated public transit-human services
        transportation plan; and
            ``(B) the plan was developed through a process that
        included representatives of public, private, and nonprofit
        transportation and human services providers and participation
        by the public.
    ``(g) Government's Share of Costs.--
        ``(1) Capital projects.--A grant for a capital project under
    this section may not exceed 80 percent of the net capital costs of
    the project, as determined by the Secretary.
        ``(2) Operating assistance.--A grant made under this section
    for operating assistance may not exceed 50 percent of the net
    operating costs of the project, as determined by the Secretary.
        ``(3) Remainder.--The remainder of the net project costs--
            ``(A) may be provided from an undistributed cash surplus, a
        replacement or depreciation cash fund or reserve, a service
        agreement with a State or local social service agency or a
        private social service organization, or new capital; and
            ``(B) may be derived from amounts appropriated to or made
        available to a department or agency of the Government (other
        than the Department of Transportation) that are eligible to be
        expended for transportation.
        ``(4) Use of certain funds.--For purposes of paragraph (3)(B),
    the prohibitions on the use of funds for matching requirements
    under section 403(a)(5)(C)(vii) of the Social Security Act (42
    U.S.C. 603(a)(5)(C)(vii)) shall not apply to Federal or State funds
    to be used for transportation purposes.
        ``(5) Limitation on operating assistance.--A recipient carrying
    out a program of operating assistance under this section may not
    limit the level or extent of use of the Government grant for the
    payment of operating expenses.''.
    (b) Conforming Amendment.--The analysis for chapter 53 is amended
by inserting after the item relating to section 5316 the following:

``5317. New freedom program.''.

SEC. 3020. BUS TESTING FACILITY.

    (a) Facility.--Section 5318(a) is amended to read as follows:
    ``(a) Facility.--The Secretary shall maintain one facility for
testing a new bus model for maintainability, reliability, safety,
performance (including braking performance), structural integrity, fuel
economy, emissions, and noise.''.
    (b) Availability of Amounts To Pay for Testing.--Section 5318(d) is
amended by striking ``under section 5309(m)(1)(C) of this title'' and
inserting ``to carry out this section''.
    (c) Acquiring New Bus Models.--Section 5318(e) is amended to read
as follows:
    ``(e) Acquiring New Bus Models.--Amounts appropriated or made
available under this chapter may be obligated or expended to acquire a
new bus model only if a bus of that model has been tested at the
facility maintained by the Secretary under subsection (a).''.

SEC. 3021. ALTERNATIVE TRANSPORTATION IN PARKS AND PUBLIC LANDS.

    (a) In General.--Chapter 53 is amended by striking section 5320 and
inserting the following:

``Sec. 5320. Alternative transportation in parks and public lands

    ``(a) In General.--
        ``(1) Authorization.--
            ``(A) In general.--The Secretary, in consultation with the
        Secretary of the Interior, may award a grant or enter into a
        contract, cooperative agreement, interagency agreement, intra--
        agency agreement, or other agreement to carry out a qualified
        project under this section to enhance the protection of
        national parks and public lands and increase the enjoyment of
        those visiting the parks and public lands by--
                ``(i) ensuring access to all, including persons with
            disabilities;
                ``(ii) improving conservation and park and public land
            opportunities in urban areas through partnering with State
            and local governments; and
                ``(iii) improving park and public land transportation
            infrastructure.
            ``(B) Consultation with other agencies.--To the extent that
        projects are proposed or funded in eligible areas that are not
        within the jurisdiction of the Department of the Interior, the
        Secretary of the Interior shall consult with the heads of the
        relevant Federal land management agencies in carrying out the
        responsibilities under this section.
        ``(2) Use of funds.--A grant, cooperative agreement,
    interagency agreement, intra--agency agreement, or other agreement
    for a qualified project under this section shall be available to
    finance the leasing of equipment and facilities for use in public
    transportation, subject to any regulation that the Secretary may
    prescribe limiting the grant or agreement to leasing arrangements
    that are more cost-effective than purchase or construction.
        ``(3) Alternative transportation facilities and services.--
    Projects receiving assistance under this section shall provide
    alternative transportation facilities and services that complement
    and enhance existing transportation services in national parks and
    public lands in a manner that is consistent with Department of
    Interior and other public land management policies regarding
    private automobile access to and in such parks and lands.
    ``(b) Definitions.--In this section, the following definitions
apply:
        ``(1) Eligible area.--The term `eligible area' means any
    federally owned or managed park, refuge, or recreational area that
    is open to the general public, including--
            ``(A) a unit of the National Park System;
            ``(B) a unit of the National Wildlife Refuge System;
            ``(C) a recreational area managed by the Bureau of Land
        Management;
            ``(D) a recreation area managed by the Bureau of
        Reclamation; and
            ``(E) a unit of the National Forest System.
        ``(2) Federal land management agency.--The term `Federal land
    management agency' means a Federal agency that manages an eligible
    area.
        ``(3) Alternative transportation.--The term `alternative
    transportation' means transportation by bus, rail, or any other
    publicly or privately owned conveyance that provides to the public
    general or special service on a regular basis, including
    sightseeing service. Such term also includes a nonmotorized
    transportation system (including the provision of facilities for
    pedestrians, bicycles, and nonmotorized watercraft).
        ``(4) Qualified participant.--The term `qualified participant'
    means--
            ``(A) a Federal land management agency; or
            ``(B) a State, tribal, or local governmental authority with
        jurisdiction over land in the vicinity of an eligible area
        acting with the consent of the Federal land management agency,
        alone or in partnership with a Federal land management agency
        or other governmental or nongovernmental participant.
        ``(5) Qualified project.--The term `qualified project' means a
    planning or capital project in or in the vicinity of an eligible
    area that--
            ``(A) is an activity described in section 5302(a)(1)(A),
        5303, 5304, 5305, or 5309(b);
            ``(B) involves--
                ``(i) the purchase of rolling stock that incorporates
            clean fuel technology or the replacement of buses of a type
            in use on the date of enactment of the Federal Public
            Transportation Act of 2005 with clean fuel vehicles; or
                ``(ii) the deployment of alternative transportation
            vehicles that introduce innovative technologies or methods;
            ``(C) relates to the capital costs of coordinating the
        Federal land management agency public transportation systems
        with other public transportation systems;
            ``(D) provides a nonmotorized transportation system
        (including the provision of facilities for pedestrians,
        bicycles, and nonmotorized watercraft);
            ``(E) provides waterborne access within or in the vicinity
        of an eligible area, as appropriate to and consistent with this
        section; or
            ``(F) is any other alternative transportation project
        that--
                ``(i) enhances the environment;
                ``(ii) prevents or mitigates an adverse impact on a
            natural resource;
                ``(iii) improves Federal land management agency
            resource management;
                ``(iv) improves visitor mobility and accessibility and
            the visitor experience;
                ``(v) reduces congestion and pollution (including noise
            pollution and visual pollution); or
                ``(vi) conserves a natural, historical, or cultural
            resource (excluding rehabilitation or restoration of a non-
            transportation facility).
    ``(c) Federal Agency Cooperative Arrangements.--The Secretary shall
develop cooperative arrangements with the Secretary of the Interior
that provide for--
        ``(1) technical assistance in alternative transportation;
        ``(2) interagency and multidisciplinary teams to develop
    Federal land management agency alternative transportation policy,
    procedures, and coordination; and
        ``(3) the development of procedures and criteria relating to
    the planning, selection, and funding of qualified projects and the
    implementation and oversight of the program of projects in
    accordance with this section.
    ``(d) Limitation on Use of Available Amounts.--
        ``(1) In general.--The Secretary, in consultation with the
    Secretary of the Interior, may use not more than 10 percent of the
    amount made available for a fiscal year under section 5338(b)(2)(J)
    to carry out planning, research, and technical assistance under
    this section, including the development of technology appropriate
    for use in a qualified project.
        ``(2) Additional amounts.--Amounts made available under this
    subsection are in addition to amounts otherwise available to the
    Secretary to carry out planning, research, and technical assistance
    under this chapter or any other provision of law.
        ``(3) Maximum amount.--No qualified project shall receive more
    than 25 percent of the total amount made available to carry out
    this section under section 5338(b)(2)(J) for any fiscal year.
    ``(e) Planning Process.--In undertaking a qualified project under
this section--
        ``(1) if the qualified participant is a Federal land management
    agency--
            ``(A) the Secretary, in cooperation with the Secretary of
        the Interior, shall develop transportation planning procedures
        that are consistent with--
                ``(i) the metropolitan planning provisions under
            section 5303;
                ``(ii) the statewide planning provisions under section
            5304; and
                ``(iii) the public participation requirements under
            section 5307(d); and
            ``(B) in the case of a qualified project that is at a unit
        of the National Park System, the planning process shall be
        consistent with the general management plans of the unit of the
        National Park System; and
        ``(2) if the qualified participant is a State or local
    governmental authority, or more than one State or local
    governmental authority in more than one State, the qualified
    participant shall--
            ``(A) comply with the metropolitan planning provisions
        under section 5303;
            ``(B) comply with the statewide planning provisions under
        section 5304;
            ``(C) comply with the public participation requirements
        under section 5307(d); and
            ``(D) consult with the appropriate Federal land management
        agency during the planning process.
    ``(f) Cost Sharing.--
        ``(1) Government's share.--The Secretary, in cooperation with
    the Secretary of the Interior, shall establish the Government's
    share of the net project cost to be provided to a qualified
    participant under this section.
        ``(2) Considerations.--In establishing the Government's share
    of the net project cost to be provided under this section, the
    Secretary shall consider--
            ``(A) visitation levels and the revenue derived from user
        fees in the eligible area in which the qualified project is
        carried out;
            ``(B) the extent to which the qualified participant
        coordinates with a public transportation authority or private
        entity engaged in public transportation;
            ``(C) private investment in the qualified project,
        including the provision of contract services, joint development
        activities, and the use of innovative financing mechanisms;
            ``(D) the clear and direct benefit to the qualified
        participant; and
            ``(E) any other matters that the Secretary considers
        appropriate to carry out this section.
        ``(3) Special rule.--Notwithstanding any other provision of
    law, funds appropriated to any Federal land management agency may
    be counted toward the remainder of the net project cost.
    ``(g) Selection of Qualified Projects.--
        ``(1) In general.--The Secretary of the Interior, after
    consultation with and in cooperation with the Secretary, shall
    determine the final selection and funding of an annual program of
    qualified projects in accordance with this section.
        ``(2) Considerations.--In determining whether to include a
    project in the annual program of qualified projects, the Secretary
    of the Interior shall consider--
            ``(A) the justification for the qualified project,
        including the extent to which the qualified project would
        conserve resources, prevent or mitigate adverse impact, and
        enhance the environment;
            ``(B) the location of the qualified project, to ensure that
        the selected qualified projects--
                ``(i) are geographically diverse nationwide; and
                ``(ii) include qualified projects in eligible areas
            located in both urban areas and rural areas;
            ``(C) the size of the qualified project, to ensure that
        there is a balanced distribution;
            ``(D) the historical and cultural significance of a
        qualified project;
            ``(E) safety;
            ``(F) the extent to which the qualified project would--
                ``(i) enhance livable communities;
                ``(ii) reduce pollution (including noise pollution, air
            pollution, and visual pollution);
                ``(iii) reduce congestion; and
                ``(iv) improve the mobility of people in the most
            efficient manner; and
            ``(G) any other matters that the Secretary of the Interior
        considers appropriate to carry out this section, including--
                ``(i) visitation levels;
                ``(ii) the use of innovative financing or joint
            development strategies; and
                ``(iii) coordination with gateway communities.
    ``(h) Qualified Projects Carried Out in Advance.--
        ``(1) In general.--When a qualified participant carries out any
    part of a qualified project without assistance under this section
    in accordance with all applicable procedures and requirements, the
    Secretary, in consultation with the Secretary of the Interior, may
    pay the share of the net capital project cost of a qualified
    project if--
            ``(A) the qualified participant applies for the payment;
            ``(B) the Secretary approves the payment; and
            ``(C) before carrying out that part of the qualified
        project, the Secretary approves the plans and specifications in
        the same manner as plans and specifications are approved for
        other projects assisted under this section.
        ``(2) Financing costs.--
            ``(A) In general.--The cost of carrying out part of a
        qualified project under paragraph (1) includes the amount of
        interest earned and payable on bonds issued by a State or local
        governmental authority, to the extent that proceeds of the bond
        are expended in carrying out that part.
            ``(B) Limitation on amount of interest.--The rate of
        interest under this paragraph may not exceed the most favorable
        rate reasonably available for the qualified project at the time
        of borrowing.
            ``(C) Certification.--The qualified participant shall
        certify, in a manner satisfactory to the Secretary, that the
        qualified participant has exercised reasonable diligence in
        seeking the most favorable interest rate.
    ``(i) Relationship to Other Laws.--
        ``(1) Section 5307.--A qualified participant under this section
    shall be subject to the requirements of sections 5307 and 5333(a)
    to the extent the Secretary determines to be appropriate.
        ``(2) Other requirements.--A qualified participant under this
    section shall be subject to any other requirements that the
    Secretary determines to be appropriate to carry out this section,
    including requirements for the distribution of proceeds on
    disposition of real property and equipment resulting from a
    qualified project assisted under this section.
        ``(3) Project management plan.--If the amount of assistance
    anticipated to be required for a qualified project under this
    section is not less than $25,000,000--
            ``(A) the qualified project shall, to the extent the
        Secretary considers appropriate, be carried out through a full
        funding grant agreement in accordance with section 5309(g); and
            ``(B) the qualified participant shall prepare a project
        management plan in accordance with section 5327(a).
    ``(j) Asset Management.--The Secretary, in consultation with the
Secretary of the Interior, may transfer the interest of the Department
of Transportation in, and control over, all facilities and equipment
acquired under this section to a qualified participant for use and
disposition in accordance with any property management regulations that
the Secretary determines to be appropriate.
    ``(k) Coordination of Research and Deployment of New
Technologies.--
        ``(1) Grants and other assistance.--The Secretary, in
    cooperation with the Secretary of the Interior, may undertake, or
    make grants, cooperative agreements, contracts (including
    agreements with departments, agencies, and instrumentalities of the
    Federal Government) or other agreements for research, development,
    and deployment of new technologies in eligible areas that will--
            ``(A) conserve resources;
            ``(B) prevent or mitigate adverse environmental impact;
            ``(C) improve visitor mobility, accessibility, and
        enjoyment; and
            ``(D) reduce pollution (including noise pollution and
        visual pollution).
        ``(2) Information.--The Secretary may request and receive
    appropriate information from any source.
        ``(3) Funding.--Grants, cooperative agreements, contracts, and
    other agreements under paragraph (1) shall be awarded from amounts
    allocated under subsection (d)(1).
    ``(l) Innovative Financing.--A qualified project receiving
financial assistance under this section shall be eligible for funding
through a State infrastructure bank or other innovative financing
mechanism available to finance an eligible project under this chapter.
    ``(m) Reports.--
        ``(1) In general.--The Secretary, in consultation with the
    Secretary of the Interior, shall annually submit a report on the
    allocation of amounts made available to assist qualified projects
    under this section to--
            ``(A) the Committee on Banking, Housing, and Urban Affairs
        of the Senate;
            ``(B) the Committee on Transportation and Infrastructure of
        the House of Representatives; and
            ``(C) the Committee on Resources of the House of
        Representatives and the Committee on Energy and Natural
        Resources of the Senate.
        ``(2) Annual reports.--The report required under paragraph (1)
    shall be included in the report submitted under section
    5309(k)(1).''.
    (b) Conforming Amendment.--The analysis for chapter 53 is amended
by striking the item relating to section 5320 and inserting the
following:

``5320. Alternative transportation in parks and public lands.''.

SEC. 3022. HUMAN RESOURCES PROGRAMS.

    Section 5322 is amended--
        (1) by inserting ``(a) In General.--'' before ``The
    Secretary''; and
        (2) by adding at the end the following:
    ``(b) Fellowships.--
        ``(1) Authority to make grants.--The Secretary may make grants
    to States, local governmental authorities, and operators of public
    transportation systems to provide fellowships to train personnel
    employed in managerial, technical, and professional positions in
    the public transportation field.
        ``(2) Terms.--
            ``(A) Period of training.--A fellowship under this
        subsection may not be for more than 1 year of training in an
        institution that offers a program applicable to the public
        transportation industry.
            ``(B) Selection of individuals.--A recipient of a grant for
        a fellowship under this subsection shall select an individual
        on the basis of demonstrated ability and for the contribution
        the individual reasonably can be expected to make to an
        efficient public transportation operation.
            ``(C) Amount.--A grant for a fellowship under this
        subsection may not be more than the lesser of $65,000 or 75
        percent of the sum of--
                ``(i) tuition and other charges to the fellowship
            recipient;
                ``(ii) additional costs incurred by the training
            institution and billed to the grant recipient; and
                ``(iii) the regular salary of the fellowship recipient
            for the period of the fellowship to the extent the salary
            is actually paid or reimbursed by the grant recipient.''.

SEC. 3023. GENERAL PROVISIONS ON ASSISTANCE.

    (a) Interests in Property.--Section 5323(a) is amended--
        (1) by striking paragraph (1) and inserting the following:
        ``(1) In general.--Financial assistance provided under this
    chapter to a State or a local governmental authority may be used to
    acquire an interest in, or to buy property of, a private company
    engaged in public transportation, for a capital project for
    property acquired from a private company engaged in public
    transportation after July 9, 1964, or to operate a public
    transportation facility or equipment in competition with, or in
    addition to, transportation service provided by an existing public
    transportation company, only if--
            ``(A) the Secretary determines that such financial
        assistance is essential to a program of projects required under
        sections 5303, 5304, and 5306;
            ``(B) the Secretary determines that the program provides
        for the participation of private companies engaged in public
        transportation to the maximum extent feasible; and
            ``(C) just compensation under State or local law will be
        paid to the company for its franchise or property.''; and
        (2) in paragraph (2) by striking ``(2) A governmental
    authority'' and inserting the following:
        ``(2) Limitation.--A governmental authority''.
    (b) Notice and Public Hearing.--Section 5323(b) is amended to read
as follows:
    ``(b) Notice and Public Hearing.--
        ``(1) In general.--For a capital project that will
    substantially affect a community, or the public transportation
    service of a community, an applicant shall--
            ``(A) provide an adequate opportunity for public review and
        comment on the project;
            ``(B) after providing notice, hold a public hearing on the
        project if the project affects significant economic, social, or
        environmental interests;
            ``(C) consider the economic, social, and environmental
        effects of the project; and
            ``(D) find that the project is consistent with official
        plans for developing the community.
        ``(2) Notice.--Notice of a hearing under this subsection--
            ``(A) shall include a concise description of the proposed
        project; and
            ``(B) shall be published in a newspaper of general
        circulation in the geographic area the project will serve.
        ``(3) Application requirements.--An application for a grant
    under this chapter for a capital project described in paragraph (1)
    shall include--
            ``(A) a certification that the applicant has complied with
        the requirements of this subsection; and
            ``(B) in the environmental record for the project, evidence
        that the applicant has complied with the requirements of this
        subsection.''.
    (c) Fares not Required.--Section 5323(c) is amended to read as
follows:
    ``(c) Fares not Required.--This chapter does not require that
elderly individuals and individuals with disabilities be charged a
fare.''.
    (d) Condition on Charter Bus Transportation Service.--Section
5323(d) is amended--
        (1) by striking ``(1) Financial assistance'' and inserting the
    following:
        ``(1) Agreements.--Financial assistance''; and
        (2) by striking paragraph (2) and inserting the following:
        ``(2) Violations.--
            ``(A) Investigations.--On receiving a complaint about a
        violation of the agreement required under paragraph (1), the
        Secretary shall investigate and decide whether a violation has
        occurred.
            ``(B) Enforcement of agreements.--If the Secretary decides
        that a violation has occurred, the Secretary shall correct the
        violation under terms of the agreement.
            ``(C) Additional remedies.--In addition to any remedy
        specified in the agreement, the Secretary shall bar a recipient
        or an operator from receiving Federal transit assistance in an
        amount the Secretary considers appropriate if the Secretary
        finds a pattern of violations of the agreement.''.
    (e) Bond Proceeds Eligible for Local Share.--Section 5323(e) is
amended to read as follows:
    ``(e) Bond Proceeds Eligible for Local Share.--
        ``(1) Use as local matching funds.--Notwithstanding any other
    provision of law, a recipient of assistance under section 5307 or
    5309 may use the proceeds from the issuance of revenue bonds as
    part of the local matching funds for a capital project.
        ``(2) Maintenance of effort.--The Secretary shall approve of
    the use of the proceeds from the issuance of revenue bonds for the
    remainder of the net project cost only if the Secretary finds that
    the aggregate amount of financial support for public transportation
    in the urbanized area provided by the State and affected local
    governmental authorities during the next 3 fiscal years, as
    programmed in the State transportation improvement program under
    section 5304, is not less than the aggregate amount provided by the
    State and affected local governmental authorities in the urbanized
    area during the preceding 3 fiscal years.
        ``(3) Debt service reserve.--The Secretary may reimburse an
    eligible recipient for deposits of bond proceeds in a debt service
    reserve that the recipient establishes pursuant to section
    5302(a)(1)(K) from amounts made available to the recipient under
    section 5309.
        ``(4) Pilot program for urbanized areas.--
            ``(A) In general.--The Secretary shall establish a pilot
        program to reimburse not to exceed 10 eligible recipients for
        deposits of bond proceeds in a debt service reserve that the
        recipient establishes pursuant to section 5302(a)(1)(K) from
        amounts made available to the recipient under section 5307.
            ``(B) Report.--Not later than July 31, 2008, the Secretary
        shall submit to the Committee on Banking, Housing, and Urban
        Affairs of the Senate and the Committee on Transportation and
        Infrastructure of the House of Representatives a report on the
        status and effectiveness of the pilot program established under
        subparagraph (A).''.
    (f) Schoolbus Transportation.--Section 5323(f) is amended--
        (1) by striking ``(1) Financial assistance'' and inserting the
    following:
        ``(1) Agreements.--Financial assistance'';
        (2) in paragraph (1) by moving subparagraphs (A), (B), and (C)
    2 ems to the right; and
        (3) by striking paragraph (2) and inserting the following:
        ``(2) Violations.--If the Secretary finds that an applicant,
    governmental authority, or publicly owned operator has violated the
    agreement required under paragraph (1), the Secretary shall bar a
    recipient or an operator from receiving Federal transit assistance
    in an amount the Secretary considers appropriate.''.
    (g) Buying Buses Under Other Laws.--Section 5323(g) is amended by
striking ``103(e)(4) and 142(a) or (c)'' each place it appears and
inserting ``133 and 142''.
    (h) Government's Share of Costs for Certain Projects.--Section
5323(i) is amended--
        (1) in the subsection heading by striking ``Government'' and
    inserting ``Government's'';
        (2) by striking ``A grant'' and inserting the following:
        ``(1) Equipment for ada and clean air act compliance.--A
    grant'';
        (3) by inserting ``or facilities'' after ``equipment'' each
    place it appears; and
        (4) by adding at the end the following:
        ``(2) Certain state owned railroads.--The Government share for
    financial assistance under this chapter to a State-owned railroad
    (as defined in section 603 of the Rail Safety and Service
    Improvement Act of 1982 (45 U.S.C. 1202)) shall be the same as the
    Government share under section 120(b) of title 23 for Federal-aid
    highway funds apportioned to the State in which the railroad
    operates.''.
    (i) Buy America.--
        (1) Public interest waiver.--Section 5323(j) is amended--
            (A) by redesignating paragraphs (3) through (7) as
        paragraphs (4) through (8), respectively; and
            (B) by inserting after paragraph (2) the following:
        ``(3) Written justification for public interest waiver.--When
    issuing a waiver based on a public interest determination under
    paragraph (2)(A), the Secretary shall issue a detailed written
    justification as to why the waiver is in the public interest. The
    Secretary shall publish such justification in the Federal Register
    and provide the public with a reasonable period of time for notice
    and comment.''.
        (2) Ineligibility for contracts.--Section 5323(j)(6) (as so
    redesignated) is amended by striking ``Intermodal Surface
    Transportation Efficiency Act of 1991 (Public Law 102-240, 105
    Stat. 1914)'' and inserting ``Federal Public Transportation Act of
    2005''.
        (3) Administrative review.--Section 5323(j) is amended by
    adding at the end the following:
        ``(9) Administrative review.--A party adversely affected by an
    agency action under this subsection shall have the right to seek
    review under section 702 of title 5.''.
        (4) Repeal of general waiver.--Subsections (b) and (c) of
    Appendix A of section 661.7 of title 49, Code of Federal
    Regulations, shall cease to be in effect beginning on the date of
    enactment of this Act.
        (5) Rulemaking.--Not later than 180 days after the date of
    enactment of this Act, the Secretary shall issue a final rule on
    implementation of the requirements of section 5323(j) of title 49,
    United States Code (in this paragraph referred to as the ``Buy
    America requirements''). The purposes of the regulations shall be
    as follows:
            (A) Microprocessor waiver.--To clarify that any waiver from
        the Buy America requirements issued under section 5323(j)(2) of
        such title for a microprocessor, computer, or microcomputer
        applies only to a device used solely for the purpose of
        processing or storing data and does not extend to a product
        containing a microprocessor, computer, or microcomputer.
            (B) Definitions.--To define the terms ``end product'',
        ``negotiated procurement'', and ``contractor'' for purposes of
        part 661 of title 49, Code of Federal Regulations. In defining
        the terms, the Secretary shall develop a list of representative
        items that are subject to the Buy America requirements, and
        shall address the procurement of systems under the definition
        to ensure that major system procurements are not used to
        circumvent the Buy America requirements.
            (C) Post-award waivers.--To permit a grantee to request a
        non-availability waiver from the Buy America requirements under
        section 661.7c of title 49, Code of Federal Regulations, after
        contract award in any case in which the contractor has made a
        certification of compliance with the requirements in good
        faith.
            (D) Certification under negotiated procurement process.--In
        any case in which a negotiated procurement process is used,
        compliance with the Buy America requirements shall be
        determined on the basis of the certification submitted with the
        final offer.
    (j) Relationship to Other Laws.--Section 5323(l) is amended to read
as follows:
    ``(l) Relationship to Other Laws.--Section 1001 of title 18 applies
to a certificate, submission, or statement provided under this chapter.
The Secretary may terminate financial assistance under this chapter and
seek reimbursement directly, or by offsetting amounts, available under
this chapter if the Secretary determines that a recipient of such
financial assistance has made a false or fraudulent statement or
related act in connection with a Federal transit program.''.
    (k) Preaward and Postdelivery Review of Rolling Stock Purchases.--
Section 5323(m) is amended by adding at the end the following:
``Rolling stock procurements of 20 vehicles or fewer made for the
purpose of serving other than urbanized areas and urbanized areas with
populations of 200,000 or fewer shall be subject to the same
requirements as established for procurements of 10 or fewer buses under
the post-delivery purchaser's requirements certification process under
section 663.37(c) of title 49, Code of Federal Regulations.''.
    (l) Grant Requirements.--Section 5323(o) is amended by striking
``the Transportation Infrastructure Finance and Innovation Act of
1998'' and inserting ``chapter 6 (other than section 609) of title
23''.
    (m) Alternative Fueling Facilities.--Section 5323 is amended by
adding at the end the following:
    ``(p) Alternative Fueling Facilities.--A recipient of assistance
under this chapter may allow the incidental use of federally funded
alternative fueling facilities and equipment by nontransit public
entities and private entities if--
        ``(1) the incidental use does not interfere with the
    recipient's public transportation operations;
        ``(2) all costs related to the incidental use are fully
    recaptured by the recipient from the nontransit public entity or
    private entity;
        ``(3) the recipient uses revenues received from the incidental
    use in excess of costs for planning, capital, and operating
    expenses that are incurred in providing public transportation; and
        ``(4) private entities pay all applicable excise taxes on
    fuel.''.

SEC. 3024. SPECIAL PROVISIONS FOR CAPITAL PROJECTS.

    (a) In General.--Section 5324 is amended to read as follows:

``Sec. 5324. Special provisions for capital projects

    ``(a) Relocation and Real Property Requirements.--The Uniform
Relocation Assistance and Real Property Acquisition Policies Act of
1970 (42 U.S.C. 4601 et seq.) shall apply to financial assistance for
capital projects under this chapter.
    ``(b) Consideration of Economic, Social, and Environmental
Interests.--
        ``(1) Cooperation and consultation.--In carrying out the policy
    of section 5301(e), the Secretary shall cooperate and consult with
    the Secretary of the Interior and the Administrator of the
    Environmental Protection Agency on each project that may have a
    substantial impact on the environment.
        ``(2) Public participation in environmental reviews.--In
    performing environmental reviews, the Secretary shall review each
    transcript of a hearing submitted under section 5323(b) to
    establish that an adequate opportunity to present views was given
    to all parties having a significant economic, social, or
    environmental interest in the project, and that the project
    application includes a record of--
            ``(A) the environmental impact of the proposal;
            ``(B) adverse environmental effects that cannot be avoided;
            ``(C) alternatives to the proposal; and
            ``(D) irreversible and irretrievable impacts on the
        environment.
        ``(3) Approval of applications for assistance.--
            ``(A) Findings by the secretary.--The Secretary may approve
        an application for financial assistance for a capital project
        in accordance with this chapter only if the Secretary makes
        written findings, after reviewing the application and the
        transcript of any hearing held before a State or local
        governmental authority under section 5323(b), that--
                ``(i) an adequate opportunity to present views was
            given to all parties having a significant economic, social,
            or environmental interest;
                ``(ii) the preservation and enhancement of the
            environment and the interest of the community in which the
            project is located were considered; and
                ``(iii) no adverse environmental effect is likely to
            result from the project, or no feasible and prudent
            alternative to the effect exists and all reasonable steps
            have been taken to minimize the effect.
            ``(B) Hearing.--If a hearing has not been conducted or the
        Secretary decides that the record of the hearing is inadequate
        for making the findings required by this subsection, the
        Secretary shall conduct a hearing on an environmental issue
        raised by the application after giving adequate notice to
        interested persons.
            ``(C) Availability of findings.--The Secretary's findings
        under subparagraph (A) shall be made a matter of public record.
    ``(c) Railroad Corridor Preservation.--
        ``(1) In general.--The Secretary may assist an applicant to
    acquire railroad right-of-way before the completion of the
    environmental reviews for any project that may use the right-of-way
    if the acquisition is otherwise permitted under Federal law. The
    Secretary may establish restrictions on such an acquisition as the
    Secretary determines to be necessary and appropriate.
        ``(2) Environmental reviews.--Railroad right-of-way acquired
    under this subsection may not be developed in anticipation of the
    project until all required environmental reviews for the project
    have been completed.''.
    (b) Chapter Analysis.--The analysis for chapter 53 is amended by
striking the item relating to section 5324 and inserting the following:

``5324. Special provisions for capital projects.''.

SEC. 3025. CONTRACT REQUIREMENTS.

    (a) In General.--Section 5325 is amended to read as follows:

``Sec. 5325. Contract requirements

    ``(a) Competition.--Recipients of assistance under this chapter
shall conduct all procurement transactions in a manner that provides
full and open competition as determined by the Secretary.
    ``(b) Architectural, Engineering, and Design Contracts.--
        ``(1) Procedures for awarding contract.--A contract or
    requirement for program management, architectural engineering,
    construction management, a feasibility study, and preliminary
    engineering, design, architectural, engineering, surveying,
    mapping, or related services for a project for which Federal
    assistance is provided under this chapter shall be awarded in the
    same way as a contract for architectural and engineering services
    is negotiated under chapter 11 of title 40 or an equivalent
    qualifications-based requirement of a State.
        ``(2) Effect of state laws.--Paragraph (1) does not apply to
    the extent a State has adopted by law, before the date of enactment
    of the Federal Public Transportation Act of 2005, an equivalent
    State qualifications-based requirement for contracting for
    architectural, engineering, and design services.
        ``(3) Additional requirements.--When awarding a contract
    described in paragraph (1), recipients of assistance under this
    chapter shall comply with the following requirements:
            ``(A) Performance of audits.--Any contract or subcontract
        awarded under this chapter shall be performed and audited in
        compliance with cost principles contained in part 31 of title
        48, Code of Federal Regulations (commonly known as the Federal
        Acquisition Regulation).
            ``(B) Indirect cost rates.--A recipient of funds under a
        contract or subcontract awarded under this chapter shall accept
        indirect cost rates established in accordance with the Federal
        Acquisition Regulation for 1-year applicable accounting periods
        by a cognizant Federal or State government agency, if such
        rates are not currently under dispute.
            ``(C) Application of rates.--After a firm's indirect cost
        rates are accepted under subparagraph (B), the recipient of the
        funds shall apply such rates for the purposes of contract
        estimation, negotiation, administration, reporting, and
        contract payment, and shall not be limited by administrative or
        de facto ceilings.
            ``(D) Prenotification; confidentiality of data.--A
        recipient requesting or using the cost and rate data described
        in subparagraph (C) shall notify any affected firm before such
        request or use. Such data shall be confidential and shall not
        be accessible or provided by the group of agencies sharing cost
        data under this subparagraph, except by written permission of
        the audited firm. If prohibited by law, such cost and rate data
        shall not be disclosed under any circumstances.
    ``(c) Efficient Procurement.--A recipient may award a procurement
contract under this chapter to other than the lowest bidder if the
award furthers an objective consistent with the purposes of this
chapter, including improved long-term operating efficiency and lower
long-term costs.
    ``(d) Design-Build Projects.--
        ``(1) Term defined.--In this subsection, the term `design-build
    project'--
            ``(A) means a project under which a recipient enters into a
        contract with a seller, firm, or consortium of firms to design
        and build a public transportation system, or an operable
        segment of such system, that meets specific performance
        criteria; and
            ``(B) may include an option to finance, or operate for a
        period of time, the system or segment or any combination of
        designing, building, operating, or maintaining such system or
        segment.
        ``(2) Financial assistance for capital costs.--Federal
    financial assistance under this chapter may be provided for the
    capital costs of a design-build project after the recipient
    complies with Government requirements.
    ``(e) Multiyear Rolling Stock.--
        ``(1) Contracts.--A recipient procuring rolling stock with
    Government financial assistance under this chapter may make a
    multiyear contract to buy the rolling stock and replacement parts
    under which the recipient has an option to buy additional rolling
    stock or replacement parts for not more than 5 years after the date
    of the original contract.
        ``(2) Cooperation among recipients.--The Secretary shall allow
    at least two recipients to act on a cooperative basis to procure
    rolling stock in compliance with this subsection and other
    Government procurement requirements.
    ``(f) Acquiring Rolling Stock.--A recipient of financial assistance
under this chapter may enter into a contract to expend that assistance
to acquire rolling stock--
        ``(1) based on--
            ``(A) initial capital costs; or
            ``(B) performance, standardization, life cycle costs, and
        other factors; or
        ``(2) with a party selected through a competitive procurement
    process.
    ``(g) Examination of Records.--Upon request, the Secretary and the
Comptroller General, or any of their representatives, shall have access
to and the right to examine and inspect all records, documents, and
papers, including contracts, related to a project for which a grant is
made under this chapter.
    ``(h) Grant Prohibition.--A grant awarded under this chapter or the
Federal Public Transportation Act of 2005 may not be used to support a
procurement that uses an exclusionary or discriminatory specification.
    ``(i) Bus Dealer Requirements.--No State law requiring buses to be
purchased through in-State dealers shall apply to vehicles purchased
with a grant under this chapter.
    ``(j) Awards to Responsible Contractors.--
        ``(1) In general.--Federal financial assistance under this
    chapter may be provided for contracts only if a recipient awards
    such contracts to responsible contractors possessing the ability to
    successfully perform under the terms and conditions of a proposed
    procurement.
        ``(2) Criteria.--Before making an award to a contractor under
    paragraph (1), a recipient shall consider--
            ``(A) the integrity of the contractor;
            ``(B) the contractor's compliance with public policy;
            ``(C) the contractor's past performance, including the
        performance reported in the Contractor Performance Assessment
        Reports required under section 5309(l)(2); and
            ``(D) the contractor's financial and technical
        resources.''.
    (b) Conforming Amendment.--Section 5326 and the item relating to
section 5326 in the analysis for chapter 53 are repealed.

SEC. 3026. PROJECT MANAGEMENT OVERSIGHT AND REVIEW.

    (a) Project Management Plan Requirements.--Section 5327(a) is
amended--
        (1) in paragraph (11) by striking ``and'' at the end;
        (2) in paragraph (12) by striking the period at the end and
    inserting ``; and''; and
        (3) by adding at the end the following:
        ``(13) safety and security management.''.
    (b) Limitations.--Section 5327(c) is amended to read as follows:
    ``(c) Limitations.--
        ``(1) Limitations on use of available amounts.--Of the amounts
    made available to carry out this chapter for a fiscal year, the
    Secretary may use not more than the following amounts to make
    contracts for the activities described in paragraph (2):
            ``(A) 0.5 percent of amounts made available to carry out
        section 5305.
            ``(B) 0.75 percent of amounts made available to carry out
        section 5307.
            ``(C) 1 percent of amounts made available to carry out
        section 5309.
            ``(D) 0.5 percent of amounts made available to carry out
        section 5310.
            ``(E) 0.5 percent of amounts made available to carry out
        section 5311.
            ``(F) 0.5 percent of amounts made available to carry out
        section 5320.
        ``(2) Activities.--Paragraph (1) shall apply to the following:
            ``(A) Activities to oversee the construction of a major
        project.
            ``(B) Activities to review and audit the safety and
        security, procurement, management, and financial compliance of
        a recipient or subrecipient of funds under sections 5305, 5307,
        5309, 5310, 5311, and 5320.
            ``(C) Activities to provide technical assistance to correct
        deficiencies identified in compliance reviews and audits
        carried out under this section.
        ``(3) Limitations on applicability.--Subsections (a), (b), and
    (e) do not apply to contracts under this section for activities
    described in paragraphs (2)(B) and (2)(C).
        ``(4) Government's share of costs.--The Government shall pay
    the entire cost of carrying out a contract under this subsection.
        ``(5) Availability of certain funds.--Beginning in fiscal year
    2006, funds available under paragraph (1)(C) shall be made
    available to the Secretary before allocating the funds appropriated
    to carry out any project under a full funding grant agreement or
    project construction grant agreement.''.

SEC. 3027. PROJECT REVIEW.

    Section 5328(a) is amended--
        (1) in paragraph (1) by striking ``(1) When the Secretary of
    Transportation allows a new fixed guideway project to advance into
    the alternatives analysis stage of project review, the Secretary
    shall cooperate with the applicant in'' and inserting the
    following:
        ``(1) Alternatives analysis.--The Secretary shall cooperate
    with an applicant undertaking an alternatives analysis required by
    subsections (d) and (e) of section 5309 in the''; and
        (2) in paragraph (2)--
            (A) by striking ``(2) After'' and inserting the following:
        ``(2) Advancement to preliminary engineering stage.--After'';
    and
            (B) by striking ``is consistent with section 5309(e)'' and
        inserting ``meets the requirements of subsection (d) or (e) of
        section 5309'';
        (3) in paragraph (3)--
            (A) by striking ``(3) The Secretary'' and inserting the
        following:
        ``(3) Record of decision.--The Secretary'';
            (B) by striking ``of construction''; and
            (C) by adding before the period at the end the following:
        ``if the Secretary determines that the project meets the
        requirements of subsection (d) or (e) of section 5309''; and
        (4) by striking paragraph (4) and inserting the following:
        ``(4) Funding agreements.--The Secretary shall enter into a
    full funding grant agreement or project construction grant
    agreement, as appropriate, between the Government and the project
    sponsor if the Secretary determines that the project meets the
    requirements of subsection (d) or (e) of section 5309.''.

SEC. 3028. INVESTIGATIONS OF SAFETY HAZARDS AND SECURITY RISKS.

    (a) In General.--Section 5329 is amended to read as follows:

``Sec. 5329. Investigations of safety hazards and security risks

    ``(a) In General.--The Secretary may conduct investigations into
safety hazards and security risks associated with a condition in
equipment, a facility, or an operation financed under this chapter to
establish the nature and extent of the condition and how to eliminate,
mitigate, or correct it.
    ``(b) Submission of Corrective Plan.--If the Secretary establishes
that a safety hazard or security risk warrants further protective
measures, the Secretary shall require the local governmental authority
receiving amounts under this chapter to submit a plan for eliminating,
mitigating, or correcting it.
    ``(c) Withholding Financial Assistance.--Financial assistance under
this chapter, in an amount to be determined by the Secretary, may be
withheld until a plan is approved and carried out.''.
    (b) Public Transportation Security.--
        (1) In general.--Not later than 45 days after the date of
    enactment of this Act, the Secretary shall execute an annex to the
    memorandum of understanding between the Secretary and the Secretary
    of Homeland Security, dated September 28, 2004, to define and
    clarify the respective roles and responsibilities of the Department
    of Transportation and the Department of Homeland Security relating
    to public transportation security.
        (2) Contents.--The annex to be executed under paragraph (1)
    shall--
            (A) establish a process to develop security standards for
        public transportation agencies;
            (B) create a method of direct coordination with public
        transportation agencies on security matters;
            (C) address any other issues determined to be appropriate
        by the Secretary and the Secretary of Homeland Security; and
            (D) include a formal and permanent mechanism to ensure
        coordination and involvement by the Department of
        Transportation, as appropriate, in public transportation
        security.
    (c) Rulemaking.--Not later than 180 days after the date of
enactment of this Act, the Secretary and the Secretary of Homeland
Security shall issue jointly final regulations to establish the
characteristics of and requirements for public transportation security
grants, including funding priorities, eligible activities, methods for
awarding grants, and limitations on administrative expenses.
    (d) Chapter Analysis.--The analysis for chapter 53 is amended by
striking the item relating to section 5329 and inserting the following:

``5329. Investigations of safety hazards and security risks.''.

SEC. 3029. STATE SAFETY OVERSIGHT.

    (a) In General.--Section 5330 is amended--
        (1) by striking the section heading and all that follows
    through subsection (a) and inserting the following:

``Sec. 5330. State safety oversight

    ``(a) Application.--This section shall only apply to--
        ``(1) States that have rail fixed guideway public
    transportation systems that are not subject to regulation by the
    Federal Railroad Administration; and
        ``(2) States that are designing rail fixed guideway public
    transportation systems that will not be subject to regulation by
    the Federal Railroad Administration.'';
        (2) in subsection (d) by striking ``may'' and inserting ``shall
    ensure uniform safety standards and enforcement or shall''; and
        (3) by striking subsection (f).
    (b) Chapter Analysis.--The analysis for chapter 53 is amended by
striking the item relating to section 5330 and inserting the following:

``5330. State safety oversight.''.

SEC. 3030. CONTROLLED SUBSTANCES AND ALCOHOL MISUSE TESTING.

    (a) Definitions.--Section 5331(a)(3) is amended by striking the
period at the end and inserting the following: ``or section 2303a,
7101(i), or 7302(e) of title 46. The Secretary may also decide that a
form of public transportation is covered adequately, for employee
alcohol and controlled substances testing purposes, under the alcohol
and controlled substance statutes or regulations of an agency within
the Department of Transportation or the Coast Guard.''.
    (b) Technical Corrections.--Subsections (b)(1) and (g) of section
5331 are each amended by striking ``or section 103(e)(4) of title 23''.
    (c) Regulations.--Section 5331(f) is amended by striking paragraph
(3).

SEC. 3031. EMPLOYEE PROTECTIVE ARRANGEMENTS.

    Section 5333(b) is amended--
        (1) in paragraph (1) by striking ``5318(d), 5323(a)(1), (b),
    (d), and (e), 5328, 5337, and 5338(b)'' each place it appears and
    inserting ``5316, 5318, 5323(a)(1), 5323(b), 5323(d), 5328, 5337,
    and 5338(b)''; and
        (2) by adding at the end the following:
    ``(4) Fair and equitable arrangements to protect the interests of
employees utilized by the Secretary of Labor for assistance to purchase
like-kind equipment or facilities, and grant amendments which do not
materially revise or amend existing assistance agreements, shall be
certified without referral.
    ``(5) When the Secretary is called upon to issue fair and equitable
determinations involving assurances of employment when one private
transit bus service contractor replaces another through competitive
bidding, such decisions shall be based on the principles set forth in
the Department of Labor's decision of September 21, 1994, as clarified
by the supplemental ruling of November 7, 1994, with respect to grant
NV-90-X021. This paragraph shall not serve as a basis for objections
under section 215.3(d) of title 29, Code of Federal Regulations.''.

SEC. 3032. ADMINISTRATIVE PROCEDURES.

    Section 5334 is amended--
        (1) in subsection (a)--
            (A) in paragraph (9) by striking ``and'' at the end;
            (B) in paragraph (10) by striking the period at the end and
        inserting ``; and''; and
            (C) by adding at the end the following:
        ``(11) issue regulations as necessary to carry out the purposes
    of this chapter.'';
        (2) by striking subsection (i);
        (3) by redesignating subsections (b) through (h) as subsections
    (c) through (i), respectively;
        (4) by inserting after subsection (a) the following:
    ``(b) Prohibitions Against Regulating Operations and Charges.--
        ``(1) In general.--Except for purposes of national defense or
    in the event of a national or regional emergency, the Secretary may
    not regulate the operation, routes, or schedules of a public
    transportation system for which a grant is made under this chapter,
    nor may the Secretary regulate the rates, fares, tolls, rentals, or
    other charges prescribed by any provider of public transportation.
        ``(2) Limitation on statutory construction.--Nothing in this
    subsection shall be construed to prevent the Secretary from
    requiring a recipient of funds under this chapter to comply with
    the terms and conditions of its Federal assistance agreement.'';
    and
        (5) by striking subsection (c)(4) (as redesignated by paragraph
    (3) of this subsection) and inserting the following:
    ``(4) The Secretary of Transportation shall comply with this
section (except subsection (i)) and sections 5318(e), 5323(a)(2),
5325(a), 5325(b), and 5325(f) when proposing or carrying out a
regulation governing an activity under this chapter, except for a
routine matter or a matter with no significant impact.''; and
        (6) by adding at the end the following:
    ``(k) Notification of Pending Discretionary Grants.--Not less than
3 full business days before announcement of award by the Secretary of
any discretionary grant, letter of intent, or full funding grant
agreement totaling $1,000,000 or more, the Secretary shall notify the
Committees on Banking, Housing, and Urban Affairs and Appropriations of
the Senate and Committees on Transportation and Infrastructure and
Appropriations of the House of Representatives.
    ``(l) Agency Statements.--
        ``(1) In general.--The Administrator of the Federal Transit
    Administration shall follow applicable rulemaking procedures under
    section 553 of title 5 before the Federal Transit Administration
    issues a statement that imposes a binding obligation on recipients
    of Federal assistance under this chapter.
        ``(2) Binding obligation defined.--In this subsection, the term
    `binding obligation' means a substantive policy statement, rule, or
    guidance document issued by the Federal Transit Administration that
    grants rights, imposes obligations, produces significant effects on
    private interests, or effects a significant change in existing
    policy.''.

SEC. 3033. NATIONAL TRANSIT DATABASE.

    (a) In General.--Section 5335 is amended--
        (1) by striking the section heading and inserting the
    following:

``Sec. 5335. National transit database'';

        (2) by striking subsection (b); and
        (3) in subsection (a)--
            (A) in paragraph (1), by striking ``(1)''; and
            (B) in paragraph (2), by striking ``(2) The Secretary may
        make a grant under section 5307 of this title'' and inserting
        the following:
    ``(b) Reporting and Uniform Systems.--The Secretary may award a
grant under section 5307 or 5311''.
    (b) Chapter Analysis.--The analysis for chapter 53 is amended by
striking the item relating to section 5335 and inserting the following:

``5335. National transit database.''.

SEC. 3034. APPORTIONMENTS OF FORMULA GRANTS.

    (a) Apportionments.--Section 5336 is amended--
        (1) by striking subsections (d), (h), and (k);
        (2) by redesignating subsections (e), (f), (g), (i), and (j) as
    subsections (d), (e), (f), (g), and (h), respectively;
        (3) by adding at the end the following:
    ``(i) Apportionments.--Of the amounts made available for each
fiscal year under subsections (a)(1)(C)(vi) and (b)(2)(B) of section
5338--
        ``(1) one percent shall be apportioned, in fiscal year 2006 and
    each fiscal year thereafter, to certain urbanized areas with
    populations of less than 200,000 in accordance with subsection (j);
    and
        ``(2) any amount not apportioned under paragraph (1) shall be
    apportioned to urbanized areas in accordance with subsections (a)
    through (c).''; and
        (4) in subsection (a), by striking ``Of the amount made
    available or appropriated under section 5338(a) of this title'' and
    inserting ``Of the amount apportioned under subsection (i)(2)''.
    (b) Small Transit Intensive Cities Formula.--Section 5336 is
amended by adding at the end the following:
    ``(j) Small Transit Intensive Cities Formula.--
        ``(1) Definitions.--In this subsection, the following
    definitions apply:
            ``(A) Eligible area.--The term `eligible area' means an
        urbanized area with a population of less than 200,000 that
        meets or exceeds in one or more performance categories the
        industry average for all urbanized areas with a population of
        at least 200,000 but not more than 999,999, as determined by
        the Secretary in accordance with subsection (c)(2).
            ``(B) Performance category.--The term `performance
        category' means each of the following:
                ``(i) Passenger miles traveled per vehicle revenue
            mile.
                ``(ii) Passenger miles traveled per vehicle revenue
            hour.
                ``(iii) Vehicle revenue miles per capita.
                ``(iv) Vehicle revenue hours per capita.
                ``(v) Passenger miles traveled per capita.
                ``(vi) Passengers per capita.
        ``(2) Apportionment.--
            ``(A) Apportionment formula.--The amount to be apportioned
        under subsection (i)(1) shall be apportioned among eligible
        areas in the ratio that--
                ``(i) the number of performance categories for which
            each eligible area meets or exceeds the industry average in
            urbanized areas with a population of at least 200,000 but
            not more than 999,999; bears to
                ``(ii) the aggregate number of performance categories
            for which all eligible areas meet or exceed the industry
            average in urbanized areas with a population of at least
            200,000 but not more than 999,999.
            ``(B) Data used in formula.--The Secretary shall calculate
        apportionments under this subsection for a fiscal year using
        data from the national transit database used to calculate
        apportionments for that fiscal year under this section.''.
    (c) Study on Incentives in Formula Programs.--Section 5336 is
amended by adding at the end the following:
    ``(c) Study on Incentives in Formula Programs.--
        ``(1) Study.--The Secretary shall conduct a study to assess the
    feasibility and appropriateness of developing and implementing an
    incentive funding system under sections 5307 and 5311 for operators
    of public transportation.
        ``(2) Report.--
            ``(A) In general.--Not later than 2 years after the date of
        enactment of the Federal Public Transportation Act of 2005, the
        Secretary shall submit a report on the results of the study
        conducted under paragraph (1) to the Committee on Banking,
        Housing, and Urban Affairs of the Senate and the Committee on
        Transportation and Infrastructure of the House of
        Representatives.
            ``(B) Contents.--The report submitted under subparagraph
        (A) shall include--
                ``(i) an analysis of the availability of appropriate
            measures to be used as a basis for the distribution of
            incentive payments;
                ``(ii) the optimal number and size of any incentive
            programs;
                ``(iii) what types of systems should compete for
            various incentives;
                ``(iv) how incentives should be distributed; and
                ``(v) the likely effects of the incentive funding
            system.''.
    (d) Technical Amendments.--Section 5336 is amended--
        (1) in subsection (a), by striking ``of this title'' and
    inserting ``to carry out section 5307'';
        (2) in paragraph (2), by inserting before the period at the end
    the following: ``, except that the amount apportioned to the
    Anchorage urbanized area under subsection (b) shall be available to
    the Alaska Railroad for any costs related to its passenger
    operations'';
        (3) in subsection (b)(1), by inserting ``and, beginning in
    fiscal year 2006, 60 percent of the directional route miles
    attributable to the Alaska Railroad passenger operations'' after
    ``recipient''; and
        (4) in subsection (h), by striking ``a grant made under'' each
    place it appears and inserting ``a grant made with funds
    apportioned under''.

SEC. 3035. APPORTIONMENTS BASED ON FIXED GUIDEWAY FACTORS.

    (a) In General.--Section 5337 is amended--
        (1) by striking the section designation and heading and
    inserting the following:

``Sec. 5337. Apportionment based on fixed guideway factors'';

    and
        (2) by adding at the end the following:
    ``(f) Adjustment.--For purposes of this section, an urbanized area
with a population of 55,997, according to the most recent decennial
census, shall be treated as an urbanized area eligible for assistance
under section 5336(b)(2)(A) to which amounts were apportioned under
this section for fiscal year 1997. For the purposes of subsection
(e)(1), the number of fixed guideway revenue vehicle miles of service
and number of fixed guideway route miles for that urbanized area as of
the date of enactment of the Federal Public Transportation Act of 2005
shall be considered to have been used to determine apportionments for
fiscal year 1997.''.
    (b) Conforming Amendment.--The analysis for chapter 53 is amended
by striking the item relating to section 5337 and inserting the
following:

``5337. Apportionment based on fixed guideway factors.''.

SEC. 3036. AUTHORIZATIONS.

    Section 5338 is amended to read as follows:

``Sec. 5338. Authorizations

    ``(a) Fiscal Year 2005.--
        ``(1) Formula grants.--
            ``(A) Trust fund.--For fiscal year 2005, $3,499,927,776
        shall be available from the Mass Transit Account of the Highway
        Trust Fund to carry out sections 5307, 5308, 5310, and 5311 and
        section 3038 of the Transportation Equity Act for the 21st
        Century (49 U.S.C. 5310 note).
            ``(B) General fund.--In addition to the amounts made
        available under subparagraph (A), there is authorized to be
        appropriated $499,989,824 for fiscal year 2005 to carry out
        sections 5307, 5308, 5310, and 5311 and section 3038 of the
        Transportation Equity Act for the 21st Century (49 U.S.C. 5310
        note).
            ``(C) Allocation of funds.--Of the amounts made available
        or appropriated under this paragraph--
                ``(i) $4,811,150 shall be available to the Alaska
            Railroad for improvements to its passenger operations under
            section 5307;
                ``(ii) $5,208,000 shall be available to provide over-
            the-road bus accessibility grants under section 3038 of the
            Transportation Equity Act for the 21st Century (49 U.S.C.
            5310 note) to operators of intercity, fixed-route over-the-
            road buses;
                ``(iii) $1,686,400 shall be available to provide over-
            the-road bus accessibility grants under section 3038 of the
            Transportation Equity Act for the 21st Century (49 U.S.C.
            5310 note) to operators of over-the-road buses providing
            other than intercity, fixed-route service;
                ``(iv) $94,526,689 shall be available to provide
            transportation services to elderly individuals and
            individuals with disabilities under section 5310;
                ``(v) $250,889,588 shall be available to provide
            financial assistance for other than urbanized areas under
            section 5311;
                ``(vi) $3,593,195,773 shall be available to provide
            financial assistance for urbanized areas under section
            5307; and
                ``(vii) $49,600,000 shall be available to carry out the
            clean fuels program under section 5308.
        ``(2) Job access and reverse commute.--
            ``(A) Trust fund.--For fiscal year 2005, $108,500,000 shall
        be available from the Mass Transit Account of the Highway Trust
        Fund to carry out section 3037 of the Transportation Equity Act
        for the 21st Century (49 U.S.C. 5309 note).
            ``(B) General fund.--In addition to the amounts made
        available under subparagraph (A), there is authorized to be
        appropriated $15,500,000 for fiscal year 2005 to carry out
        section 3037 of the Transportation Equity Act of the 21st
        Century (49 U.S.C. 5309 note).
        ``(3) Capital program grants.--
            ``(A) Trust fund.--For fiscal year 2005, $2,898,100,224
        shall be available from the Mass Transit Account of the Highway
        Trust Fund to carry out section 5309.
            ``(B) General fund.--In addition to the amounts made
        available under subparagraph (A), there is authorized to be
        appropriated $414,014,176 for fiscal year 2005 to carry out
        sections 5308, 5309, and 5318 and section 3015(b) of the
        Transportation Equity Act for the 21st Century (112 Stat. 361).
            ``(C) Allocation of funds.--Of the amounts made available
        or appropriated under this paragraph--
                ``(i) $49,600,000 shall be available to carry out the
            clean fuels program under section 5308;
                ``(ii) $669,600,000 shall be available for capital
            projects to replace, rehabilitate, and purchase bus and
            related equipment and to construct bus-related facilities
            under section 5309;
                ``(iii) $1,204,684,800 shall be available for fixed
            guideway modernization under section 5309;
                ``(iv) $1,437,829,600 shall be available for capital
            projects for new fixed guideway systems and extensions to
            existing fixed guideway systems under section 5309;
                ``(v) $10,213,632 shall be available for capital
            projects in Alaska and Hawaii under section 5309;
                ``(vi) $2,976,000 shall be available to carry out bus
            testing under section 5318; and
                ``(vii) $4,811,200 shall be available to carry out the
            fuel cell bus and bus facilities program under section
            3015(b) of the Transportation Equity Act for the 21st
            Century (112 Stat. 361).
        ``(4) Planning.--
            ``(A) Trust fund.--For fiscal year 2005, $63,364,000 shall
        be available from the Mass Transit Account of the Highway Trust
        Fund to carry out sections 5303, 5304, 5305, and 5313(b), as in
        effect on the day before the date of enactment of the Federal
        Public Transportation Act of 2005.
            ``(B) General fund.--In addition to the amounts made
        available under subparagraph (A), there is authorized to be
        appropriated $9,052,000 for fiscal year 2005 to carry out
        sections 5303, 5304, 5305, and 5313(b), as in effect on the day
        before the date of enactment of the Federal Public
        Transportation Act of 2005.
            ``(C) Allocation of funds.--Of the amounts made available
        or appropriated under this paragraph--
                ``(i) 82.72 percent shall be allocated for metropolitan
            planning under section 5305; and
                ``(ii) 17.28 percent shall be allocated for State
            planning under section 5305.
        ``(5) Research.--
            ``(A) Trust fund.--For fiscal year 2005, $47,740,000 shall
        be available from the Mass Transit Account of the Highway Trust
        Fund to carry out sections 5311(b)(2), 5312, 5313(a), 5314,
        5315, and 5322.
            ``(B) General fund.--In addition to the amounts made
        available under subparagraph (A), there is authorized to be
        appropriated $6,820,000 for fiscal year 2005 to carry out
        sections 5311(b)(2), 5312, 5313(a), 5314, 5315, and 5322.
            ``(C) Allocation of funds.--Of the funds made available or
        appropriated under this paragraph--
                ``(i) not less than $3,968,000 shall be available to
            carry out programs under the National Transit Institute
            under section 5315, of which not more than $992,000 shall
            be available to carry out section 5315(a)(16);
                ``(ii) not less than $5,208,000 shall be available to
            provide rural transportation assistance under section
            5311(b)(2);
                ``(iii) not less than $8,184,000 shall be available to
            carry out transit cooperative research programs under
            section 5313(a);
                ``(iv) not less than $2,976,000 shall be available to
            carry out Project Action under section 5312; and
                ``(v) the remainder shall be available to carry out
            national research and technology programs under sections
            5312, 5314, and 5322.
        ``(6) University transportation research.--
            ``(A) Trust fund.--For fiscal year 2005, $5,208,000 shall
        be available from the Mass Transit Account of the Highway Trust
        Fund to carry out section 5505.
            ``(B) General fund.--In addition to amounts made available
        under subparagraph (A), there is authorized to be appropriated
        $744,000 for fiscal year 2005 to carry out section 5505.
            ``(C) Allocation of funds.--Of the amounts made available
        or appropriated under this paragraph--
                ``(i) $1,984,000 shall be available for grants under
            section 5505(d) to the center identified in section
            5505(j)(4)(A), as in effect on the day before the date of
            enactment of the Federal Public Transportation Act of 2005;
            and
                ``(ii) $1,984,000 shall be available for grants under
            section 5505(d) to the center identified in section
            5505(j)(4)(F), as in effect on the day before the date of
            enactment of the Federal Public Transportation Act of 2005.
            ``(D) Special rule.--Nothing in this paragraph shall be
        construed to limit the transportation research conducted by the
        centers receiving financial assistance under this section.
        ``(7) Administration.--
            ``(A) Trust fund.--For fiscal year 2005, $67,704,000 shall
        be available from the Mass Transit Account of the Highway Trust
        Fund to carry out section 5334.
            ``(B) General fund.--In addition to amounts made available
        under subparagraph (A), there is authorized to be appropriated
        $9,672,000 for fiscal year 2005 to carry out section 5334.
        ``(8) Availability of amounts.--Amounts made available or
    appropriated under paragraphs (1) through (6) shall remain
    available until expended.
    ``(b) Formula and Bus Grants.--
        ``(1) In general.--There shall be available from the Mass
    Transit Account of the Highway Trust Fund to carry out sections
    5305, 5307, 5308, 5309, 5310, 5311, 5316, 5317, 5320, 5335, 5339,
    and 5340 and section 3038 of the Federal Transit Act of 1998 (112
    Stat. 387 et seq.)--
            ``(A) $6,979,931,000 for fiscal year 2006;
            ``(B) $7,262,775,000 for fiscal year 2007;
            ``(C) $7,872,893,000 for fiscal year 2008; and
            ``(D) $8,360,565,000 for fiscal year 2009.
        ``(2) Allocation of funds.--Of the amounts made available under
    paragraph (1)--
            ``(A) $95,000,000 for fiscal year 2006, $99,000,000 for
        fiscal year 2007, $107,000,000 for fiscal year 2008, and
        $113,500,000 for fiscal year 2009 shall be available to carry
        out section 5305;
            ``(B) $3,466,681,000 for fiscal year 2006, $3,606,175,000
        for fiscal year 2007, $3,910,843,000 for fiscal year 2008, and
        $4,160,365,000 for fiscal year 2009 shall be allocated in
        accordance with section 5336 to provide financial assistance
        for urbanized areas under section 5307;
            ``(C) $43,000,000 for fiscal year 2006, $45,000,000 for
        fiscal year 2007, $49,000,000 for fiscal year 2008, and
        $51,500,000 for fiscal year 2009 shall be available to carry
        out section 5308;
            ``(D) $1,391,000,000 for fiscal year 2006, $1,448,000,000
        for fiscal year 2007, $1,570,000,000 for fiscal year 2008, and
        $1,666,500,000 for fiscal year 2009 shall be allocated in
        accordance with section 5337 to provide financial assistance
        under section 5309(m)(2)(B);
            ``(E) $822,250,000 for fiscal year 2006, $855,500,000 for
        fiscal year 2007, $927,750,000 for fiscal year 2008, and
        $984,000,000 for fiscal year 2009 shall be available to carry
        out section 5309(m)(2)(C);
            ``(F) $112,000,000 for fiscal year 2006, $117,000,000 for
        fiscal year 2007, $127,000,000 for fiscal year 2008, and
        $133,500,000 for fiscal year 2009 shall be available to provide
        financial assistance for services for elderly persons and
        persons with disabilities under section 5310;
            ``(G) $388,000,000 for fiscal year 2006, $404,000,000 for
        fiscal year 2007, $438,000,000 for fiscal year 2008, and
        $465,000,000 for fiscal year 2009 shall be available to provide
        financial assistance for other than urbanized areas under
        section 5311;
            ``(H) $138,000,000 for fiscal year 2006, $144,000,000 for
        fiscal year 2007, $156,000,000 for fiscal year 2008, and
        $164,500,000 for fiscal year 2009 shall be available to carry
        out section 5316;
            ``(I) $78,000,000 for fiscal year 2006, $81,000,000 for
        fiscal year 2007, $87,500,000 for fiscal year 2008, and
        $92,500,000 for fiscal year 2009 shall be available to carry
        out section 5317;
            ``(J) $22,000,000 for fiscal year 2006, $23,000,000 for
        fiscal year 2007, $25,000,000 for fiscal year 2008, and
        $26,900,000 for fiscal year 2009 shall be available to carry
        out section 5320;
            ``(K) $3,500,000 in fiscal year 2006; $3,500,000 in fiscal
        year 2007; $3,500,000 in fiscal year 2008; and $3,500,000 in
        fiscal year 2009 shall be available to carry out section 5335;
            ``(L) $25,000,000 in fiscal year 2006; $25,000,000 in
        fiscal year 2007; $25,000,000 in fiscal year 2008; and
        $25,000,000 in fiscal year 2009 shall be available to carry out
        section 5339;
            ``(M) $388,000,000 for fiscal year 2006, $404,000,000 for
        fiscal year 2007, $438,000,000 for fiscal year 2008, and
        $465,000,000 for fiscal year 2009 shall be allocated in
        accordance with section 5340 to provide financial assistance
        for urbanized areas under section 5307 and other than urbanized
        areas under section 5311; and
            ``(N) $7,500,000 for fiscal year 2006, $7,600,000 for
        fiscal year 2007, $8,300,000 for fiscal year 2008, and
        $8,800,000 for fiscal year 2009 shall be available to carry out
        section 3038 of the Transportation Equity Act for the 21st
        Century (49 U.S.C. 5310 note).
    ``(c) Capital Investment Grants.--There are authorized to be
appropriated to carry out section 5309(m)(2)(A)--
        ``(1) $1,503,000,000 for fiscal year 2006;
        ``(2) $1,566,000,000 for fiscal year 2007;
        ``(3) $1,700,000,000 for fiscal year 2008; and
        ``(4) $1,809,250,000 for fiscal year 2009.
    ``(d) Research and University Research Centers.--
        ``(1) In general.--There is authorized to be appropriated to
    carry out transit cooperative research programs under section 5313,
    the National Transit Institute under section 5315, university
    research centers under section 5506, and national research programs
    under sections 5312, 5313, 5314, and 5322 $58,000,000 for fiscal
    year 2006, $61,000,000 for fiscal year 2007, $65,500,000 for fiscal
    year 2008, and $69,750,000 for fiscal year 2009, of which--
            ``(A) $9,000,000 for fiscal year 2006, $9,300,000 for
        fiscal year 2007, $9,600,000 for fiscal year 2008, and
        $10,000,000 for fiscal year 2009 shall be allocated to carry
        out transit cooperative research programs under section 5313;
            ``(B) $4,300,000 shall be allocated for each fiscal year to
        carry out programs under the National Transit Institute under
        section 5315, of which not more than $1,000,000 for each fiscal
        year shall be used to carry out section 5315(a)(16);
            ``(C) $7,000,000 shall be allocated for each fiscal year to
        carry out the university centers program under section 5506;
            ``(D) $3,000,000 shall be allocated for each fiscal year to
        carry out Project Action under section 5314(a)(2);
            ``(E) $1,000,000 shall be allocated for each fiscal year to
        carry out the National Technical Assistance Center under
        section 5314(c); and
            ``(F) any funds made available under this paragraph that
        are not allocated under subparagraphs (A) through (E) shall be
        allocated to carry out national research programs under
        sections 5312, 5313, 5314, and 5322.
        ``(2) University centers program.--
            ``(A) Allocation.--Of the amounts allocated under paragraph
        (1)(C), the following amounts shall be available to provide
        transportation research, training, and curriculum development:
                ``(i) $2,000,000 for each of fiscal years 2006 through
            2009 for the University of Tennessee--Knoxville National
            Transportation Research Center.
                ``(ii) $1,500,000 for each of fiscal years 2006 through
            2009 for Texas A&M University--Texas Transportation
            Institute.
                ``(iii) $1,000,000 for each of fiscal years 2006
            through 2009 for Morgan State University.
                ``(iv) $400,000 for each of fiscal years 2006 and 2007
            for the Small Urban and Rural Transit Center at North
            Dakota State University.
                ``(v) $550,000 for each of fiscal years 2006 and 2007
            and $650,000 for each of fiscal years 2008 and 2009 for the
            University Transportation Center at the University of
            Alabama.
                ``(vi) $450,000 for each of fiscal years 2006 and 2007
            and $550,000 for each of fiscal years 2008 and 2009 for the
            Injury Control Research Center at the University of Alabama
            Birmingham.
                ``(vii) $550,000 for each of fiscal years 2006 and 2007
            and $650,000 for each of fiscal years 2008 and 2009 for the
            Jackson State University Intermodal Transportation
            Institute at the Jackson State University.
                ``(viii) $550,000 for each of fiscal years 2006 and
            2007 and $650,000 for each of fiscal years 2008 and 2009
            for the University Transportation Center at the University
            of Denver/Mississippi State University.
            ``(B) Requirements.--The universities specified in
        subparagraph (A) shall be considered to be university
        transportation centers under section 5506 and shall be subject
        to the requirements of subsections (b), (h), (i), (k), (l), and
        (m) of such section.
    ``(e) Administration.--There is authorized to be appropriated to
carry out section 5334--
        ``(1) $82,000,000 for fiscal year 2006;
        ``(2) $85,000,000 for fiscal year 2007;
        ``(3) $92,500,000 for fiscal year 2008; and
        ``(4) $98,500,000 for fiscal year 2009.
    ``(f) Grants as Contractual Obligations.--
        ``(1) Grants financed from highway trust fund.--A grant or
    contract that is approved by the Secretary and financed with
    amounts made available from the Mass Transit Account of the Highway
    Trust Fund pursuant to this section is a contractual obligation of
    the Government to pay the Federal share of the cost of the project.
        ``(2) Grants financed from general fund.--A grant or contract
    that is approved by the Secretary and financed with amounts
    appropriated in advance from the General Fund of the Treasury
    pursuant to this section is a contractual obligation of the
    Government to pay the Federal share of the cost of the project only
    to the extent that amounts are appropriated for such purpose by an
    Act of Congress.
    ``(g) Availability of Amounts.--Amounts made available by or
appropriated under subsections (b), (c), and (d) shall remain available
until expended.''.

SEC. 3037. ALTERNATIVES ANALYSIS PROGRAM.

    (a) In General.--Section 5339 is amended to read as follows:

``Sec. 5339. Alternatives analysis program

    ``(a) Grants and Agreements.--Under criteria established by the
Secretary, the Secretary may award grants to States, authorities of the
States, metropolitan planning organizations, and local governmental
authorities to develop alternatives analyses as defined by section
5309(a)(1).
    ``(b) Government's Share of Costs.--The Government's share of the
cost of an activity funded using amounts made available under this
section may not exceed 80 percent of the cost of the activity.
    ``(c) Availability of Funds.--An amount made available or
appropriated under section 5338(b)(2)(L) for this section shall remain
available for 3 fiscal years, including the fiscal year in which the
amount is made available or appropriated. Any of such amounts that are
unobligated at the end of the 3-fiscal-year period may be used by the
Secretary for any purpose under this section.''.
    (b) Conforming Amendment.--The analysis for chapter 53 is amended
by striking the item relating to section 5339 and inserting the
following:

``5339. Alternatives analysis program.''.

    (c) Projects.--For each of fiscal years 2006 and 2007, of the funds
authorized under this section, funds shall be made available to the
following projects in not less than the amounts specified:
        (1) Minnesota Red Rock Corridor/Rush Line/Central Corridors
    studies, $2,000,000.
        (2) Trans-Hudson Midtown corridor study, $1,500,000.
        (3) Lane County, Oregon Bus Rapid Transit Phase II corridor
    study, $500,000.
        (4) Portland Streetcar, Oregon corridor study, $1,500,000.
        (5) San Gabriel Valley-Gold Line Foothill Extension corridor
    study, $1,250,000.
        (6) Monmouth-Ocean-Middlesex Counties, New Jersey corridor
    study, $1,250,000.
        (7) Metra BNSF Naperville to Aurora corridor study, $1,250,000.
        (8) Madison and Dane Counties, Wisconsin Transport 2020
    corridor study, $750,000.
        (9) Sound Transit I-90 Long-Range Plan corridor studies,
    $750,000.
        (10) Middle Rio Grande Coalition of governments, Albuquerque to
    Santa Fe corridor study, $500,000.
        (11) Piedmont Authority Regional Transportation East-West
    corridor study, $1,000,000.
        (12) Baltimore Red Line/Green Line Transit Project study,
    $1,500,000.
        (13) Metra-West Line Extension, Elgin to Rockford study,
    $1,000,000.
        (14) Madison-Ridgeland Transportation Commission, Mississippi,
    Madison Light Rail Transportation Corridor study, $350,000.
        (15) South Carolina Department of Transportation Light Rail
    study, $300,000.
        (16) Provo Orem BRT study, $500,000.
        (17) Sevierville County Transportation Board, Sevier County BRT
    study, $500,000.
        (18) New Jersey Transit Access to the Region's Core study,
    $2,500,000.

SEC. 3038. APPORTIONMENTS BASED ON GROWING STATES FORMULA FACTORS.

    (a) In General.--Chapter 53 is amended by adding at the end the
following:

``Sec. 5340. Apportionments based on growing States and high density
            States formula factors

    ``(a) Definition.--In this section, the term `State' shall mean
each of the 50 States of the United States.
    ``(b) Allocation.--Of the amounts made available for each fiscal
year under section 5338(b)(2)(M), the Secretary shall apportion--
        ``(1) 50 percent to States and urbanized areas in accordance
    with subsection (c); and
        ``(2) 50 percent to States and urbanized areas in accordance
    with subsection (d).
    ``(c) Growing State Apportionments.--
        ``(1) Apportionment among states.--The amounts apportioned
    under subsection (b)(1) shall provide each State with an amount
    equal to the total amount apportioned multiplied by a ratio equal
    to the population of that State forecast for the year that is 15
    years after the most recent decennial census, divided by the total
    population of all States forecast for the year that is 15 years
    after the most recent decennial census. Such forecast shall be
    based on the population trend for each State between the most
    recent decennial census and the most recent estimate of population
    made by the Secretary of Commerce.
        ``(2) Apportionments between urbanized areas and other than
    urbanized areas in each state.--
            ``(A) In general.--The Secretary shall apportion amounts to
        each State under paragraph (1) so that urbanized areas in that
        State receive an amount equal to the amount apportioned to that
        State multiplied by a ratio equal to the sum of the forecast
        population of all urbanized areas in that State divided by the
        total forecast population of that State. In making the
        apportionment under this subparagraph, the Secretary shall
        utilize any available forecasts made by the State. If no
        forecasts are available, the Secretary shall utilize data on
        urbanized areas and total population from the most recent
        decennial census.
            ``(B) Remaining amounts.--Amounts remaining for each State
        after apportionment under subparagraph (A) shall be apportioned
        to that State and added to the amount made available for grants
        under section 5311.
        ``(3) Apportionments among urbanized areas in each state.--The
    Secretary shall apportion amounts made available to urbanized areas
    in each State under paragraph (2)(A) so that each urbanized area
    receives an amount equal to the amount apportioned under paragraph
    (2)(A) multiplied by a ratio equal to the population of each
    urbanized area divided by the sum of populations of all urbanized
    areas in the State. Amounts apportioned to each urbanized area
    shall be added to amounts apportioned to that urbanized area under
    section 5336, and made available for grants under section 5307.
    ``(d) High Density State Apportionments.--Amounts to be apportioned
under subsection (b)(2) shall be apportioned as follows:
        ``(1) Eligible states.--The Secretary shall designate as
    eligible for an apportionment under this subsection all States with
    a population density in excess of 370 persons per square mile.
        ``(2) State urbanized land factor.--For each State qualifying
    for an apportionment under paragraph (1), the Secretary shall
    calculate an amount equal to--
            ``(A) the total land area of the State (in square miles);
        multiplied by
            ``(B) 370; multiplied by
            ``(C)(i) the population of the State in urbanized areas;
        divided by
            ``(ii) the total population of the State.
        ``(3) State apportionment factor.--For each State qualifying
    for an apportionment under paragraph (1), the Secretary shall
    calculate an amount equal to the difference between the total
    population of the State less the amount calculated in paragraph
    (2).
        ``(4) State apportionment.--Each State qualifying for an
    apportionment under paragraph (1) shall receive an amount equal to
    the amount to be apportioned under this subsection multiplied by
    the amount calculated for the State under paragraph (3) divided by
    the sum of the amounts calculated under paragraph (3) for all
    States qualifying for an apportionment under paragraph (1).
        ``(5) Apportionments among urbanized areas in each state.--The
    Secretary shall apportion amounts made available to each State
    under paragraph (4) so that each urbanized area receives an amount
    equal to the amount apportioned under paragraph (4) multiplied by a
    ratio equal to the population of each urbanized area divided by the
    sum of populations of all urbanized areas in the State. Amounts
    apportioned to each urbanized area shall be added to amounts
    apportioned to that urbanized area under section 5336, and made
    available for grants under section 5307.''.
    (b) Conforming Amendment.--The analysis for chapter 53 is amended
by adding at the end the following:

``5340. Apportionments based on growing States and high density States
          formula factors.''.

SEC. 3039. OVER-THE-ROAD BUS ACCESSIBILITY PROGRAM.

    (a) In General.--Section 3038 of the Transportation Equity Act for
the 21st Century (49 U.S.C. 5310 note; 112 Stat. 392) is amended--
        (1) by striking the section heading and inserting the
    following:

``SEC. 3038. OVER-THE-ROAD BUS ACCESSIBILITY PROGRAM.'';

        (2) by striking subsection (e) and inserting the following:
    ``(e) Federal Share of Costs.--The Federal share of costs under
this section shall be provided from funds made available to carry out
this section and shall be determined in accordance with section 5323(i)
of title 49, United States Code.''; and
        (3) by striking subsection (g) and inserting the following:
    ``(g) Funding.--
        ``(1) Intercity, fixed route over-the-road bus service.--Of the
    amounts made available to carry out this section in each fiscal
    year, 75 percent shall be available for operators of over-the-road
    buses used substantially or exclusively in intercity, fixed-route
    over-the-road bus service to finance the incremental capital and
    training costs of the Department of Transportation's final rule
    regarding accessibility of over-the-road buses. Such amounts shall
    remain available until expended.
        ``(2) Other over-the-road bus service.--Of the amounts made
    available to carry out this section in each fiscal year, 25 percent
    shall be available for operators of other over-the-road bus service
    to finance the incremental capital and training costs of the
    Department of Transportation's final rule regarding accessibility
    of over-the-road buses. Such amounts shall remain available until
    expended.''.
    (b) Conforming Amendments.--The table of contents contained in
section 1(b) of the Transportation Equity Act for the 21st Century (112
Stat. 107) is amended by striking the item relating to section 3038 and
inserting the following:

``3038. Over-the-road bus accessibility program.''.

SEC. 3040. OBLIGATION CEILING.

    Notwithstanding any other provision of law, the total of all
obligations from amounts made available from the Mass Transit Account
of the Highway Trust Fund by, and amounts appropriated under,
subsections (a) through (f) of section 5338 of title 49, United States
Code, shall not exceed--
        (1) $7,646,336,000 for fiscal year 2005, of which not more than
    $6,690,544,000 shall be from the Mass Transit Account;
        (2) $8,622,931,000 for fiscal year 2006, of which not more than
    $6,979,931,000 shall be from the Mass Transit Account;
        (3) $8,974,775,000 for fiscal year 2007, of which not more than
    $7,262,775,000 shall be from the Mass Transit Account;
        (4) $9,730,893,000 for fiscal year 2008, of which not more than
    $7,871,895,000 shall be from the Mass Transit Account; and
        (5) $10,338,065,000 for fiscal year 2009, of which not more
    than $8,360,565,000 shall be from the Mass Transit Account.

SEC. 3041. ADJUSTMENTS FOR FISCAL YEAR 2005.

    (a) In General.--Notwithstanding any other provision of law, the
Secretary shall ensure that the total apportionments and allocations
made for fiscal year 2005 to each grant recipient under the Federal
Transit Administration programs shall not exceed the amount made
available under section 5338 of title 49, United States Code, as
amended by this title, for fiscal year 2005 plus prior year balances.
    (b) Fixed Guideway Modernization Adjustment.--In making the
apportionments described in subsection (a), the Secretary shall adjust
the amount apportioned for fiscal year 2005 to each urbanized area for
fixed guideway modernization to reflect the apportionment method set
forth in section 5337(a) of title 49, United States Code.
    (c) Reconciliation.--Funds authorized by or made available under
section 5338, as amended by this title, for fiscal year 2005--
        (1) shall not be subject to the across-the-board rescissions in
    section 122 of division J of Public Law 108-477;
        (2) shall be transferred or made available for the purposes as
    indicated in division H of Public Law 108-477, as amended by Public
    Law 109-13; and
        (3) shall be administered consistent with the applicable
    formula authorized under Public Law 105-178, as amended.

SEC. 3042. TERRORIST ATTACKS AND OTHER ACTS OF VIOLENCE AGAINST PUBLIC
              TRANSPORTATION SYSTEMS.

    (a) In General.--Section 1993 of title 18, United States Code, is
amended--
        (1) in the section heading by striking ``mass'' and inserting
    ``public'';
        (2) by striking ``mass'' each place the term appears and
    inserting ``public'';
        (3) in subsection (a)(5) by inserting ``controlling,'' after
    ``operating,''; and
        (4) in subsection (c)(5) by striking ``5302(a)(7) of title 49,
    United States Code,'' and inserting ``5302(a) of title 49,''.
    (b) Chapter Analysis.--The analysis for chapter 97 of title 18,
United States Code, is amended by striking the item relating to section
1993 and inserting the following:

``1993. Terrorist attacks and other acts of violence against public
          transportation systems.''.

SEC. 3043. PROJECT AUTHORIZATIONS FOR NEW FIXED GUIDEWAY CAPITAL
              PROJECTS.

    (a) Existing Full Funding Grant Agreements.--The following projects
are authorized for final design and construction for existing full
funding grant agreements in not less than the amount specified for each
fiscal year:
        (1) Atlanta--North Springs Extension $263,287 for fiscal year
    2005.
        (2) Baltimore--Central LRT Double Tracking $28,777,920 for
    fiscal year 2005 and $12,655,664 for fiscal year 2006.
        (3) Charlotte--South Corridor LRT $29,760,000 for fiscal year
    2005, $55,000,000 for fiscal year 2006, and $69,405,565 for fiscal
    year 2007.
        (4) Chicago--Chicago Transit Authority Douglas Branch
    Reconstruction $84,320,000 for fiscal year 2005 and $45,825,190 for
    fiscal year 2006.
        (5) Chicago--Chicago Transit Authority Ravenswood Expansion
    Project $39,680,000 for fiscal year 2005, $40,000,000 for fiscal
    year 2006, $40,000,000 for fiscal year 2007, $40,000,000 for fiscal
    year 2008, and $65,152,615 for fiscal year 2009.
        (6) Cleveland--Euclid Corridor Transportation Project
    $24,800,000 for fiscal year 2005 and $24,774,513 for fiscal year
    2006.
        (7) Denver Southeast Corridor LRT $79,360,000 for fiscal year
    2005, $80,000,000 for fiscal year 2006, $80,000,000 for fiscal year
    2007, and $77,192,758 for fiscal year 2008.
        (8) Fort Lauderdale--Tri-Rail Commuter Rail Upgrade $11,210,695
    for fiscal year 2005.
        (9) Los Angeles--Metro Gold Line Eastside Extension $59,520,000
    for fiscal year 2005, $80,000,000 for fiscal year 2006,
    $100,000,000 for fiscal year 2007, $80,000,000 for fiscal year
    2008, and $80,000,000 for fiscal year 2009.
        (10) Los Angeles--North Hollywood MOS-3 $663,339 in fiscal year
    2005.
        (11) Metra North Central Corridor Commuter Rail $24,084,000 for
    fiscal year 2005 and $16,529,452 for fiscal year 2006.
        (12) Metra South West Corridor Commuter Rail $15,500,000 for
    fiscal year 2005 and $11,781,395 for fiscal year 2006.
        (13) Metra Union Pacific West Line Extension $12,000,000 for
    fiscal year 2005 and $14,285,749 for fiscal year 2006.
        (14) Minneapolis--Hiawatha Corridor LRT $33,111,257 for fiscal
    year 2005.
        (15) New Jersey Urban Core--Hudson-Bergen LRT $313,896.
        (16) New Jersey Urban Core--Hudson-Bergen LRT MOS-2 $99,200,000
    for fiscal year 2005, $100,000,000 for fiscal year 2006,
    $100,000,000 for fiscal year 2007, and $53,202,995 for fiscal year
    2008.
        (17) New Jersey Urban Core--Newark-Elizabeth Rail Link MOS-1
    $1,342,076 for fiscal year 2005.
        (18) New Orleans MOS-1 Canal Street $16,455,206 for fiscal year
    2005.
        (19) Phoenix--Central Phoenix/East Valley LRT $74,400,000 for
    fiscal year 2005, $90,000,000 for fiscal year 2006, $90,000,000 for
    fiscal year 2007, $90,000,000 for fiscal year 2008, and $90,000,000
    for fiscal year 2009.
        (20) Pittsburgh--North Shore LRT Connector $54,560,000 in
    fiscal year 2005, $55,000,000 in fiscal year 2006, $55,000,000 in
    fiscal year 2007, and $14,421,944 in fiscal year 2008.
        (21) Pittsburgh--Stage II LRT Reconstruction $1,120,854 for
    fiscal year 2005.
        (22) Portland--Interstate MAX LRT Extension $23,292,160 fiscal
    year 2005 and $18,292,550 for fiscal year 2006.
        (23) St. Louis--Metrolink Extension St. Clair County, IL
    $53,383 for fiscal year 2005.
        (24) Salt Lake City--CBD to University LRT $1,127,405 for
    fiscal year 2005.
        (25) Salt Lake City--Medical Center $8,682,141 for fiscal year
    2005.
        (26) San Diego--Mission Valley East LRT Extension $80,986,880
    for fiscal year 2005 and $8,353,424 for fiscal year 2006.
        (27) San Diego--Oceanside Escondido Rail Corridor $54,560,000
    fiscal year 2005 and $12,651,061 for fiscal year 2006.
        (28) San Francisco--BART Extension to San Francisco Airport
    $99,200,000 fiscal year 2005 and $82,655,680 for fiscal year 2006.
        (29) San Juan--Tren Urbano $44,263,040 fiscal year 2005 and
    $10,555,900 for fiscal year 2006.
        (30) Seattle--Central Link Initial Segment LRT $79,360,000 for
    fiscal year 2005, $80,000,000 for fiscal year 2006, $80,000,000 for
    fiscal year 2007, $70,000,000 for fiscal year 2008, and $24,028,149
    for fiscal year 2009.
        (31) Washington DC/MD--Largo Metrorail Extension $75,432,887
    for fiscal year 2005.
    (b) Final Design and Construction.--The following projects are
authorized for final design and construction for fiscal years 2005
through 2009 under paragraphs (1)(A) and (2)(A) of section 5309(m) of
title 49, United States Code:
        (1) Baltimore--MARC Commuter Rail Improvements.
        (2) Boston--Silver Line BRT Phase III.
        (3) Central Florida Commuter Rail System.
        (4) Charlotte--South Corridor LRT.
        (5) Dallas Area Rapid Transit--Northwest-Southeast LRT
    Extension.
        (6) Delaware--Wilmington-Newark Commuter Rail Improvements.
        (7) Denver--West Corridor LRT.
        (8) El Paso--Rapid Transit (SMART) Starter Line.
        (9) Harrisburg--Corridor One Commuter Rail (MOS-1).
        (10) Houston Advanced Transit Program Light Rail.
        (11) Kansas City, Missouri--Southtown BRT.
        (12) Las Vegas--Resort Corridor Downtown Extension Project.
        (13) Los Angeles MTA--Exposition LRT.
        (14) Miami-Dade Transit--North Corridor.
        (15) Minneapolis--North Star Corridor.
        (16) Nashua--Commuter Rail.
        (17) Nashville, Tennessee Commuter Rail.
        (18) New Britain-Hartford Busway Project.
        (19) New Orleans--Desire Corridor Streetcar.
        (20) New York--Long Island Railroad East Side Access Project.
        (21) New York--Second Avenue Subway.
        (22) Norfolk Light Rail.
        (23) Northern Virginia--Dulles Corridor Extension to Wiehle
    Avenue (Phase 1).
        (24) Orange County, California--Rapid Transit Project.
        (25) Philadelphia--Schuylkill Valley MetroRail.
        (26) Pittsburgh--North Shore Connector.
        (27) Portland, Oregon--South Corridor I-205/Portland Mall LRT.
        (28) Providence--South County Commuter Rail.
        (29) Sacramento--South Corridor LRT Extension (Phase 2),
    Meadowview to Consumnes River College.
        (30) Salt Lake City--Weber County to Salt Lake City Commuter
    Rail.
        (31) San Diego--Mid-Coast Extension.
        (32) San Francisco Muni--Third Street LRT-Phase I/II.
        (33) San Gabriel Valley--Gold Line Foothill Extension Phase I/
    Phase II, Los Angeles to Montclair.
        (34) Santa Clara Valley Transit Authority--Silicon Valley Rapid
    Transit Corridor.
        (35) Tampa Bay--Regional Rail.
        (36) Triangle Transit Authority, North Carolina--Regional Rail
    Project.
        (37) Washington County, Oregon--Wilsonville to Beaverton
    Commuter Rail.
        (38) Wasilla-Girdwood, Alaska--Commuter Rail.
    (c) Preliminary Engineering.--The following projects are authorized
for preliminary engineering for fiscal years 2005 through 2009 under
paragraphs (1)(A) and (2)(A) of section 5309(m) of title 49, United
States Code:
        (1) Alameda, California--Fixed Guideway Corridor Project.
        (2) Alameda, California--Transit Improvements and Multimodal
    Center.
        (3) Albuquerque--High Capacity Corridor.
        (4) Ann Arbor/Downtown Detroit--Transit Improvement Project.
        (5) Atlanta--East Line 1-20 Corridor Project.
        (6) Atlanta--MARTA Memorial Drive Bus Rapid Transit.
        (7) Atlanta--GRTA I-75 Corridor, Downtown Atlanta--Cherokee
    County.
        (8) Atlanta--Interstate 285 Transit Corridor.
        (9) Atlanta--Georgia 400 North Line Corridor Project.
        (10) Atlanta--Belt Line C-Loop.
        (11) Atlanta--I-20 East Line I-20 Corridor Project.
        (12) Atlanta--West Line I-20 Corridor Project.
        (13) Austin--San Antonio I-35 Commuter Rail.
        (14) Austin--Rapid Bus Project.
        (15) Austin--Urban Commuter Rail.
        (16) Baltimore Red Line/Green Line Transit Project.
        (17) Baton Rouge--Bus Rapid Transit.
        (18) Bayonne, New Jersey--Hudson Bergen LRT Extension to NY
    Harbor.
        (19) Bernalillo-Santa Fe--New Mexico Commuter Rail.
        (20) Birmingham, Alabama--Transit Corridor.
        (21) Boise--Downtown Circulator.
        (22) Boise, Idaho--Valley Regional Transit Rail Corridor
    Preservation.
        (23) Boston--Assembly Square Orange Line Station.
        (24) Boston--Lechmere Transit Improvement to Somerville and
    Medford.
        (25) Boston--North Shore Corridor and Blue Line Extension.
        (26) Boston--North/South Rail Link.
        (27) Boston--Urban Ring BRT.
        (28) Bridgeport, Connecticut--Bridgeport Intermodal Facility.
        (29) Broward County, Florida--Bus Rapid Transit.
        (30) Camden, New Jersey--North Ferry Terminal.
        (31) Carrollton, Texas--Regional Intermodal Passenger Rail
    Facility Project.
        (32) Cedar Rapids, Iowa--River Rail Project.
        (33) Central Phoenix--East Valley Corridor LRT Extensions.
        (34) Charlotte--Charlotte Multimodal Station.
        (35) Charlotte--North Corridor Project.
        (36) Charlotte--Northeast Corridor Project.
        (37) Charlotte--South Corridor LRT Extension to Rock Hill,
    South Carolina.
        (38) Charlotte--Southeast Corridor Project.
        (39) Charlotte--West Corridor Project.
        (40) Charlotte--Center City Streetcar Project.
        (41) Chicago--Cermack Road BRT.
        (42) Chicago CTA--Red Line Extension.
        (43) Chicago CTA--Chicago Transit Hub (Circle Line-Ogden
    Streetcar).
        (44) Chicago CTA--Orange Line Extension (Midway Airport to Ford
    City).
        (45) Chicago CTA--Yellow Line Extension (Dempster-Old Orchard).
        (46) Chicago--Ogden Avenue Corridor.
        (47) Chicago--Pace Golf Road Bus Rapid Transit.
        (48) Chula Vista, California--Bus Rapid Transit.
        (49) Clark County, Washington--MAX Extension.
        (50) Cleveland-Akron-Canton (Northeast Ohio) Commuter Rail.
        (51) Columbia, South Carolina--Light Rail.
        (52) Columbus--North Corridor LRT Project.
        (53) Contra-Costa--BART Extension.
        (54) Corpus Christi--Downtown Rail Trolley.
        (55) Dallas Area Rapid Transit--Dallas Central Business
    District.
        (56) Dallas Area Rapid Transit--Rowlett LRT Extension.
        (57) Dallas Area Rapid Transit--Beltline to DFW Airport.
        (58) Dayton--Aviation Heritage Corridor Streetcar Project.
        (59) Dayton--Aviation Heritage Corridor Streetcar Project Phase
    I.
        (60) Denton County Transportation Authority, Texas--Fixed
    Guideway Project.
        (61) Denver--Gold Line Extension to Arvada.
        (62) Denver--RR Right-of-Way Acquisition.
        (63) Denver--United States Route 36 Transit Corridor.
        (64) Denver--North Metro Corridor to Thornton.
        (65) Denver--East Corridor to DIA Airport.
        (66) Denver--I-225 Transit Corridor.
        (67) Denver--Southeast Corridor Extension to Lone-Tree/
    Ridgegate.
        (68) Denver--Southwest Corridor Extension to C470/Lucent
    Boulevard.
        (69) Detroit--Center City Loop.
        (70) Detroit--Woodward Corridor.
        (71) District of Columbia--Light Rail Starter Line.
        (72) Erie, Pennsylvania--Ferry Acquisition.
        (73) Fitchburg, Massachusetts--Commuter Rail Extensions and
    Improvements.
        (74) Florence-Myrtle Beach, South Carolina--Transit Corridor.
        (75) Fort Lauderdale--Downtown Rail Link.
        (76) Fort Lauderdale--Transit Project from NW 215th and 79th
    Streets.
        (77) Fort Worth--Cottonbelt Commuter Rail to DFW.
        (78) Fort Worth--Trinity Railway Express Commuter Rail
    Extensions.
        (79) Galveston--Rail Trolley Extension.
        (80) Glendale, California--Downtown Streetcar.
        (81) Grand Rapids--Fixed Guideway Corridor Project.
        (82) Guam--Tumon Bay-Airport Light Rail.
        (83) Harrisburg, Pennsylvania--Corridor One MOS-2 (East
    Mechanicsburg to Carlisle).
        (84) Harrison County, Mississippi--Canal Road Intermodal
    Connector.
        (85) Henderson-Las Vegas-North Las Vegas--Regional Fixed
    Guideway Project.
        (86) Honolulu--Rapid Transit Project.
        (87) Houston--Commuter Rail Service in Harris & Fort Bend
    Counties.
        (88) Houston--Advanced Transportation Technology System.
        (89) Indianapolis--System of Metropolitan Area Rapid Transit.
        (90) Jacksonville--East-Southwest BRT.
        (91) Jacksonville--North-Southeast BRT.
        (92) Kansas City, Missouri-Lawrence, Kansas--Commuter Rail.
        (93) Kenosha-Racine-Milwaukee Metra Commuter Rail Extension
    (Wisconsin).
        (94) Kenosha, Wisconsin Streetcar Expansion Project.
        (95) King County, Washington--I-405 Corridor Bus Rapid Transit.
        (96) Lake Tahoe--Passenger Ferry Service.
        (97) Lakeville, Minnesota--Cedar Avenue Corridor Bus Rapid
    Transit.
        (98) Lane County, Oregon--Bus Rapid Transit, Phase 2.
        (99) Las Vegas--Boulder Highway MAX Bus Rapid Transit.
        (100) Little Rock--River Rail Streetcar Extensions.
        (101) Little Rock--West Little Rock Commuter Rail.
        (102) Livermore, California--BART Rail Extension to Livermore.
        (103) Long Island Railroad--Nassau Hub.
        (104) Lorain-Cleveland Commuter Rail.
        (105) LOSSAN Del Mar-San Diego--Rail Corridor Improvements.
        (106) Lovejoy to Griffin, Georgia Commuter Rail.
        (107) Madison, Wisconsin--Madison Streetcar.
        (108) Madison, Wisconsin--Light Rail Transportation.
        (109) Madison and Dane Counties, Wisconsin--Transport 2020
    Commuter Rail.
        (110) Maryland--I-270 Corridor Cities Transitway.
        (111) Maryland--Route 5 Corridor to Waldorf.
        (112) Maryland--Silver Spring Capacity Improvements.
        (113) Massachusetts--Commuter Rail Extensions to Worcester and
    New Bedford.
        (114) Memphis--Downtown Airport Corridor.
        (115) Memphis--Intermodal Terminal.
        (116) Memphis Regional Rail Plan.
        (117) Metra BNSF Naperville to Aurora Corridor Extension and
    Improvements.
        (118) Metra South Suburban Airport Commuter Rail Extension.
        (119) Metra SouthEast Service Line Commuter Rail.
        (120) Metra STAR Line Inter-Suburban Commuter Rail.
        (121) Metra UP Northwest Line Core Capacity Upgrades.
        (122) Metra UP West Line Core Capacity Upgrades.
        (123) Metra-West Line Extension, Elgin to Rockford.
        (124) Miami-Dade Transit--Douglas Road Extension.
        (125) Miami-Dade Transit--East-West Corridor.
        (126) Miami-Dade Transit--Kendall Corridor.
        (127) Miami-Dade Transit--Northeast Corridor.
        (128) Miami-Dade Transit--South Dade Corridor.
        (129) Miami-Dade Transit--Miami Intermodal Center to Earlington
    Heights.
        (130) Miami--Downtown Streetcar Project.
        (131) Middletown-South Fallsburg, New York, Passenger Rail.
        (132) Milwaukee--Downtown Dedicated Guideway Transit Connector.
        (133) Minneapolis--Northwest Corridor Busway.
        (134) Minneapolis-St. Paul--Central Corridor Transit Project.
        (135) Minneapolis-St. Paul-Hinckley, Minnesota--Rush Line
    Corridor.
        (136) Missouri/Kansas--Interstate 35 Transit Corridor.
        (137) Monterey County, California--Commuter Rail.
        (138) Montgomery and Prince George's Counties, Maryland--Bi-
    County Transitway (Purple Line).
        (139) Nashua-Manchester--Commuter Rail Extension.
        (140) Nashville--Area Transit Corridors.
        (141) Nashville--Southeast Rail Corridor.
        (142) Nashville Tennessee Commuter Rail.
        (143) Nassau and Queens Counties, New York--LIRR Main Line
    Third Track Project.
        (144) New Bedford-Fall River, Massachusetts--Commuter Rail
    Extension.
        (145) New Haven, Connecticut-Hartford, Connecticut-Springfield,
    Massachusetts Commuter Line.
        (146) New Jersey Trans-Hudson Midtown Corridor.
        (147) New Jersey Transit--Northeast Corridor Trans-Hudson
    Commuter Rail Improvements.
        (148) New Jersey Transit--Morris/Essex/Boonton Trans-Hudson
    Commuter Rail Improvements.
        (149) New Jersey Transit--New York Susquehanna and Western RR
    Commuter Extension.
        (150) New Jersey Transit--Phillipsburg Extension.
        (151) New Jersey Transit--West Trenton Line Commuter Line
    Service Extension.
        (152) New Jersey-Pennsylvania Lackawanna Cutoff Rail
    Restoration.
        (153) New Jersey Urban Core.
        (154) New Orleans--Airport-CBD Commuter Rail.
        (155) New Orleans--Riverfront Streetcar Downriver Extension.
        (156) New Orleans--Riverfront Streetcar Upriver Extension.
        (157) New York--Governors Island Transportation Access.
        (158) New York--Long Island Sound (Long Island) Ferry Service.
        (159) New York--Long Island Sound (Westchester) Ferry Service.
        (160) New York--NYC Bus Rapid Transit.
        (161) New York--NYC Highline.
        (162) New York--Penn Station Access Project.
        (163) New York--Rockaway-Brooklyn Army Terminal-Manhattan Ferry
    Service.
        (164) New York--Staten Island to Manhattan High-Speed Ferry
    Service Extension.
        (165) New York--Stewart Airport Rail Access.
        (166) New York--Tappan Zee I-287 Corridor.
        (167) New York--West Harlem Waterfront Ferry Improvements.
        (168) Newburg, New York--LRT System.
        (169) Northern Indiana--Commuter District Line.
        (170) Northern Indiana--West Lake Commuter Rail Link (South
    Shore Commuter Rail).
        (171) Norfolk--Naval Station Corridor.
        (172) Norfolk-Petersburg--United States Route 460 Commuter Rail
    Project.
        (173) Northern Virginia--Crystal City Potomac Yards Transit.
        (174) Northern Virginia--Columbia Pike Rapid Transit Project.
        (175) Northern Virginia--Dulles Corridor Extension, Phase 2.
        (176) Northern Virginia--Richmond Highway (Route 1) Rapid
    Transit Project.
        (177) Oakland--Telegraph Avenue/International Blvd./East 14th
    Street BRT.
        (178) Ogden--Intermodal-Weber State University Transit
    Connection.
        (179) Orange County, California--Bus Rapid Transit.
        (180) Orlando-Orange County, Florida--Light Rail Project.
        (181) Ottawa, Illinois--Illinois Valley Commuter Rail
    Extension.
        (182) Pawtucket, Rhode Island--Commuter Rail Station.
        (183) Philadelphia--Elwyn to Wawa Train Service Restoration.
        (184) Philadelphia--Navy Yard Transit Extension.
        (185) Philadelphia--52nd Street City Connector Project.
        (186) Philadelphia--Route 100 Rapid Trolley Extension.
        (187) Philadelphia--Broad Street Subway Line Extension.
        (188) Piedmont Authority Regional Transportation--East-West
    Rail Transit Corridor Project.
        (189) Pinellas Mobility Initiative Bus Rapid Transit.
        (190) Pittsburgh--Keystone West Passenger Rail Corridor in
    Blair, Cambria, West Moreland, and Allegheny Counties.
        (191) Pittsburgh--East-West Corridor Rapid Transit.
        (192) Pittsburgh--Martin Luther King, Jr., Busway Extension.
        (193) Pittsburgh--Oakland Technology Corridor.
        (194) Portland Streetcar Extensions.
        (195) Portland-Yarmouth-Brunswick-Lewiston/Auburn Passenger
    Rail.
        (196) Providence--South County Commuter Rail Phase II.
        (197) Provo-Orem Utah--Bus Rapid Transit.
        (198) Quakertown-Stoney Creek, Pennsylvania--Rail Restoration.
        (199) Raritan Valley, New Jersey--Commuter Rail.
        (200) Reno, Nevada--Virginia Street Bus Rapid Transit Project.
        (201) Riverside County, California--Perris Valley Line
    Metrolink Extension.
        (202) Roaring Fork Valley, Colorado--Bus Rapid Transit.
        (203) Rock Island, Illinois--Quad Cities Rapid Transit System.
        (204) Sacramento--Downtown Streetcar Project.
        (205) Sacramento--Regional Rail, Auburn to Oakland.
        (206) Sacramento--Downtown/Natomas Airport Transit Corridor.
        (207) Salt Lake City--Airport to University LRT.
        (208) Salt Lake City--Delta Center to Gateway Intermodal Center
    LRT Extension.
        (209) Salt Lake City--Draper to Sandy LRT Extension.
        (210) Salt Lake-Provo--Commuter Rail Extension.
        (211) Salt Lake City--TRAX Capacity Improvements.
        (212) Salt Lake City--West Valley City LRT Extension.
        (213) Salt Lake City--West Valley City 3500 South BRT.
        (214) Salt Lake City--West Jordan LRT Extension.
        (215) Salt Lake City to South Davis Transit Connection.
        (216) San Antonio--Bus Rapid Transit.
        (217) San Diego--First Bus Rapid Transit.
        (218) San Diego--San Diego Imperial County Mag-Lev Rail Airport
    Corridor Project.
        (219) San Diego--Sprinter Rail Line Extension Project.
        (220) San Francisco--BART Extension to Livermore.
        (221) San Francisco--BART Extension to Oakland International
    Airport.
        (222) San Francisco--MUNI Geary Boulevard Bus Rapid Transit.
        (223) San Francisco--Oyster Point Ferry Terminal.
        (224) San Francisco--Transbay Terminal/Caltrain Downtown
    Extension Project.
        (225) San Joaquin, California--Regional Rail Commission Central
    Valley Rail Service.
        (226) San Joaquin Regional Rail Commission Commuter Rail
    (Altamont Commuter Express).
        (227) San Juan Tren Urbano--Extension from Rio Piedras to
    Carolina.
        (228) San Juan--Tren Urbano Minillas Extension.
        (229) Santa Fe--El Dorado Rail Link.
        (230) Seattle--Monorail Project Post--Green Line Extensions.
        (231) Seattle--Link LRT Extensions.
        (232) Seattle--Sound Transit Commuter Rail.
        (233) Seattle--Sound Transit Regional Express Bus.
        (234) Sevierville to Pigeon Ford, Tennessee--Bus Rapid Transit.
        (235) Sonoma/Marin (SMART) Commuter Rail, California.
        (236) Southern California High Speed Regional Transit.
        (237) Southern New Jersey to Philadelphia Transit Project.
        (238) St. Louis Metro Link--Scott AFB to Mid America Airport.
        (239) St. Louis--East/West Gateway.
        (240) St. Louis--Metro Link Northside Daniel Boone Project.
        (241) St. Louis--Metro South Corridor.
        (242) St. Louis--University Downtown Trolley.
        (243) St. Paul--Red Rock Corridor Commuter Rail Project.
        (244) Stamford, Connecticut--Boston Post Road Intermodal Center
    and Capacity Expansion Project.
        (245) Stamford, Connecticut--Urban Transitway Phase II.
        (246) Tampa--Bus Rapid Transit Improvements.
        (247) Tampa--Streetcar Extension to Downtown Tampa.
        (248) Toledo, Ohio--CBD to Zoo.
        (249) Toledo, Ohio--University Corridor.
        (250) Trenton Trolley.
        (251) Tri-Rail Dolphin Extension.
        (252) Tri-Rail Florida East Coast Commuter Rail Extension.
        (253) Tri-Rail Jupiter Extension.
        (254) Tri-Rail Scripps Corridor Extension Project.
        (255) Tucson--Old Pueblo Trolley Expansion.
        (256) Vancouver--Interstate MAX Extension to Clark County,
    Washington.
        (257) Virginia Beach--Bus Rapid Transit.
        (258) Virginia Railway Express Capacity Improvements.
        (259) Washington, D.C.--Woodrow Wilson Bridge Transit Projects.
        (260) Washington State Ferries and Ferry Facilities.
        (261) Washington State--Issaquah Valley Trolley Project.
        (262) Williamsburg-Newport News--Peninsula Rail Transit.
        (263) Wilmington, Delaware--Commuter Rail to Middletown.
        (264) Winston-Salem--Downtown Streetcar System.
    (d) Project Authorizations.--Subject to the requirements of
sections 5309(d) and 5309(e) of title 49, United States Code, the
following projects are authorized for the following amounts:
        (1) Ann Arbor/Downtown Detroit Transit Improvement Project,
    $100,000,000.
        (2) Baltimore Red Line/Green Line Transit Project,
    $102,300,000.
        (3) Bernalillo--Santa Fe--New Mexico Commuter Rail,
    $75,000,000.
        (4) Birmingham-Jefferson Transit Authority--I-65 South BRT,
    $100,000,000.
        (5) Boston--Assembly Square Orange Line Station, $25,000,000.
        (6) Boston--Silver Line BRT Phase II, $20,000,000.
        (7) Bridgeport, Connecticut--Bridgeport Intermodal Transit
    Center, $28,000,000.
        (8) Dallas Area Rapid Transit--NW/SW Light Rail Transit Minimal
    Operable Segment, $260,000,000.
        (9) Delaware--Wilmington-Newark Commuter Rail Improvements,
    $14,000,000.
        (10) Denver Regional Transit District--West Corridor,
    $270,000,000.
        (11) Grand Rapids--Fixed Guideway Corridor Project,
    $14,400,000.
        (12) Harrison County, Mississippi HOV/BRT Canal Road Intermodal
    Connector, $70,000,000.
        (13) Henderson-Las Vegas-North Las Vegas--Regional Fixed
    Guideway Project, $32,000,000.
        (14) Houston--Advanced Transportation Technology System in
    Harris County, $245,000,000.
        (15) Kenosha-Racine-Milwaukee Metra Commuter Rail Extension
    (Wisconsin), $80,000,000.
        (16) Lake Tahoe--Passenger Ferry Service, $8,000,000.
        (17) Lane County, Oregon--Bus Rapid Transit, Phase 2,
    $31,000,000.
        (18) Las Vegas--Boulder Highway MAX Bus Rapid Transit,
    $12,000,000.
        (19) Las Vegas--Resort Corridor Downtown Extension Project,
    $16,000,000.
        (20) Long Island Railroad--Nassau Hub, $10,000,000.
        (21) Los Angeles County Metropolitan Transportation Authority
    (LACMTA): Mid-City/Exposition Light Rail Transit Project,
    $11,000,000.
        (22) Metro Gold Line Foothill Extension Construction Authority:
    Gold Line Foothill Light Rail Transit Project, $6,000,000.
        (23) Miami--Downtown Streetcar Project, $50,000,000.
        (24) Minneapolis--North Star Corridor, $80,000,000.
        (25) Mississippi--I-69 HOV/BRT, $70,000,000.
        (26) Nashville--Commuter Rail, $6,200,000.
        (27) New Bedford-Fall River, Massachusetts--Commuter Rail
    Extension, $10,000,000.
        (28) New Britain-Hartford Busway Project, $55,000,000.
        (29) New Jersey Transit/Northeast Corridor Trans-Hudson
    Commuter Rail Improvements, $80,000,000.
        (30) New Orleans--Airport-CBD Commuter Rail, $5,000,000.
        (31) New Orleans--Desire Corridor Streetcar, $69,700,000.
        (32) New York--Penn Station Access Project, $15,000,000.
        (33) New York--Stewart Airport Rail Access, $40,000,000.
        (34) Providence--South County Commuter Rail, Phase II,
    $60,000,000.
        (35) Providence--South County Commuter Rail, $36,000,000.
        (36) Pennsylvania--New Jersey Lackawanna Cutoff Rail
    Restoration, $120,000,000.
        (37) Philadelphia--Schuylkill Valley Metro, $250,000,000.
        (38) Reno, Nevada--Virginia Street Bus Rapid Transit,
    $12,000,000.
        (39) Sacramento--South Corridor LRT Extension (Phase 2),
    Meadowview to Consumnes River College, $11,000,000.
        (40) Sacramento Regional Transit District: Downtown Natoma
    Airport Transit Corridor, $5,000,000.
        (41) San Diego--Mid-Coast Light Rail Transit Extension,
    $11,000,000.
        (42) San Francisco Muni Third St. Light Rail Transit-Phase I/
    II, $15,000,000.
        (43) Santa Clara Valley Transportation Authority--Silicon
    Valley Rapid Transit Corridor Project, $11,000,000.
        (44) Santa Fe--El Dorado Rail Link, $5,400,000.
        (45) Sonoma Marin Area Rail Transit (SMART) Project,
    $5,000,000.
        (46) St. Louis--Metro South Corridor Metrolink Light Rail
    Extension, $135,000,000.
        (47) St. Louis--North Side and Daniel Boone Corridors Metrolink
    Light Rail Extensions, $275,000,000.
        (48) Stamford, Connecticut Urban Transitway, Phase II,
    $22,800,000.
        (49) Tampa--Streetcar Extension to Downtown Tampa, $3,000,000.
        (50) Utah--Regional Commuter Rail, $200,000,000.
        (51) Washington State Ferries, $25,000,000.
        (52) Wilmington, Delaware--Commuter Rail to Middletown,
    $24,900,000.
    (e) Rules Relating to Funding.--
        (1) Subsection (a) projects.--
            (A) In general.--The Secretary is authorized to expend
        funds made available under section 5309(m) of title 49, United
        States Code, for final design and construction of projects
        authorized by subsection (a) as existing full funding grant
        agreements.
            (B) Minimum funding levels.--The Secretary shall make
        available not less than the following amounts for projects
        authorized by subsection (a): $1,157,400,426 for fiscal year
        2005, $838,360,578 for fiscal year 2006, $614,405,565 for
        fiscal year 2007, $424,817,697 for fiscal year 2008, and
        $259,180,764 for fiscal year 2009.
        (2) Subsection (b) projects.--
            (A) In general.--Projects authorized by subsection (b) for
        final design and construction are also authorized for
        alternatives analysis and preliminary engineering.
            (B) Minimum funding levels.--The Secretary shall make
        available not less than the following amounts for projects
        authorized by subsection (b): $165,402,806 for fiscal year
        2005, $544,399,422 for fiscal year 2006, $826,314,435 for
        fiscal year 2007, $1,139,182,303 for fiscal year 2008, and
        $1,405,329,236 for fiscal year 2009.
            (C) Priority.--In making funds available under subparagraph
        (B), the Secretary shall first make such funds available for
        any full funding grant agreement executed by the Secretary in
        fiscal year 2005 after the date of enactment of this Act and
        for any full funding grant agreement executed by the Secretary
        in the amount indicated in fiscal years 2005 through 2009 in
        the amount indicated in the ``Schedule of Federal Funds for the
        Project'' included in such agreement.
        (3) Subsection (c) projects.--
            (A) In general.--Effective October 1, 2007, projects
        authorized by subsection (c) for preliminary engineering are
        also authorized for final design and construction.
            (B) Maximum funding levels.--The Secretary shall make
        available not more than the following amounts for projects
        authorized by subsection (c): $115,026,368 for fiscal year
        2005, $120,240,000 for fiscal year 2006, and $125,280,000 in
        fiscal year 2007.
            (C) Maximum funding levels for preliminary engineering.--In
        fiscal years 2008 and 2009, the Secretary shall make available
        not more than the following amounts for projects authorized by
        subsection (b), and projects authorized by subsection (c), to
        conduct preliminary engineering activities: $136,000,000 in
        fiscal year 2008 and $144,740,000 in fiscal year 2009.
    (f) New Jersey Urban Core Project.--Section 3031(d) of the
Intermodal Surface Transportation Efficiency Act of 1991 (112 Stat.
380; 105 Stat. 2122) is amended--
        (1) by striking ``associated components to and at the
    contiguous New Jersey Meadowlands Sports Complex),'' and inserting
    ``to and at the contiguous New Jersey Meadowlands Sports Complex),
    including a connection to the Hudson River Waterfront
    Transportation System, the Lackawanna Cutoff,''; and
        (2) by striking ``in Lakewood to Freehold to Matawan or
    Jamesburg, New Jersey, as described in section 3035(p) of the
    Intermodal Surface Transportation Efficiency Act of 1991 (105 Stat.
    2131)'' and inserting ``from Lakehurst to the Northeast Corridor or
    the New Jersey Coast Line''.
    (g) New Jersey Trans-Hudson Midtown Corridor.--Not later than 90
days after the date of enactment of this Act, the Secretary shall
permit New Jersey Transit to enter into preliminary engineering on the
New Jersey Trans-Hudson Midtown Corridor project. When evaluating the
local share of such project in the new starts rating process, the
Secretary shall give consideration to project elements of the New
Jersey Trans-Hudson Midtown Corridor advanced with 100 percent non-
Federal funds, including the purchase of bi-level rail equipment and
the New Jersey Transit Light Rail River Line. Based upon the project's
evaluations and ratings required under section 5309(d) of title 49,
United States Code, the Secretary shall give strong consideration to
the project for a full funding grant agreement.
    (h) Houston Metro.--
        (1) Local share.--Notwithstanding any other provision of law,
    for the purpose of calculating the non-Federal share of the net
    project cost of any new fixed guideway capital project currently
    included in the Advanced Transit Program (``Metro Solutions Plan'')
    sponsored by the Metropolitan Transit Authority of Harris County,
    Texas, the Secretary shall include $324,000,000 in State and local
    funds expended for the design and construction of the Red Line
    Light Rail Transit system that operates in Harris County, Texas.
        (2) Special rule.--No provision of this Act shall be construed
    to override or nullify the will of the voters who approved the
    Metro Solutions Plan as described on the ballot and in the
    accompanying Board resolutions, nor shall any provision of this Act
    be construed to override or nullify the terms and conditions of
    Metro Board Resolution No. 2003-77 or any applicable provision of
    State law or the charter of the City of Houston as in effect as of
    the date of enactment of this Act.
        (3) Amendment.--Section 178 of Public Law 108-447, division H
    (118 Stat. 3230), is amended by striking ``49 USC 5309(e)(1)(A), 23
    CFR 771.123, and 49 CFR 611.7.'' and inserting ``49 U.S.C. 5309 and
    49 CFR 611.7: Provided, That such projects shall retain their
    status in preliminary engineering should bus rapid transit be
    chosen as the locally preferred alternative during that phase.''.
    (i) Exemption.--The Metra BNSF Naperville to Aurora Extension
Project authorized under subsection (c) shall be exempted from all
requirements related to criteria for grants for new fixed guideway
capital projects under section 5309(d) of title 49, United States Code,
and from regulations required under that section.
    (j) Rail Cars.--The project authorized by subsection (a)(31)
includes an additional 52 rapid rail cars and project scope changes
from amounts authorized by the Transportation Equity Act for the 21st
Century.

SEC. 3044. PROJECTS FOR BUS AND BUS-RELATED FACILITIES AND CLEAN FUELS
              GRANT PROGRAM.

    (a) Projects.--Of the amounts made available to carry out section
5309(m)(2)(C) of title 49, United States Code, for each of fiscal years
2006 through 2009, the Secretary shall make funds available for the
following projects in not less than the amounts specified for the
fiscal year:


----------------------------------------------------------------------------------------------------------------
       Project Description               FY 06               FY 07               FY 08               FY 09
----------------------------------------------------------------------------------------------------------------
1. Glendale, CA Purchase of CNG   $88,833             $92,696             $100,420            $104,283
 Buses for Glendale Beeline
 Transit System.................

2. Detroit Fare Collection        $769,120            $802,560            $869,440            $902,880
 System.........................

3. Lares, PR--Trolley buses--for  $50,762             $52,969             $57,383             $59,590
 the purchase of two trolley
 buses that will offer
 transportation through the
 urban zone in the Municipality
 of Lares.......................

4. Des Plaines, Wauconda, Cook    $153,824            $160,512            $173,888            $180,576
 and Lake Counties, IL Rand Road
 Transit Signal Priority........

5. Indianapolis, IN Downtown      $2,691,920          $2,808,960          $3,043,040          $3,160,080
 transit center.................

6. Los Angeles, CA, Construction  $151,901            $158,506            $171,714            $178,319
 of Intermodal Transit Center at
 California State University Los
 Angeles........................

7. Columbus, OH--Central Ohio     $1,153,680          $1,203,840          $1,304,160          $1,354,320
 Transit Authority Paratransit
 Facility.......................

8. Silver Spring, MD Construct    $701,822            $732,336            $793,364            $823,878
 Silver Spring Transit Center in
 downtown Silver Spring.........

9. Detroit, MI Enclosed heavy-    $865,260            $902,880            $978,120            $1,015,740
 duty maintenance facility with
 full operational functions for
 up to 300 buses................

10. Bronx, NY Wildlife            $84,123             $87,780             $95,095             $98,753
 Conservation Society intermodal
 transportation facility at the
 Bronx Zoo......................

11. Development of Gold Country   $178,882            $186,659            $202,214            $209,992
 Stage Transit Transfer Center,
 Nevada County, CA..............

12. Hoboken, NJ Rehabilitation    $730,664            $762,432            $825,968            $857,736
 of Hoboken Intermodal Terminal.

13. Newark, NJ Penn Station       $192,280            $200,640            $217,360            $225,720
 Intermodal Improvements
 including the rehabilitation of
 boarding areas.................

14. Orlando, Florida--LYNX Bus    $173,052            $180,576            $195,624            $203,148
 Fleet Expansion Program........

15. Fairfax County, VA Richmond   $384,560            $401,280            $434,720            $451,440
 Highway (U.S. Route 1) Public
 Transportation Improvements....

16. Portland, OR Renovation of    $19,228             $20,064             $21,736             $22,572
 Union Station, including
 structural reinforcement and
 public safety upgrades.........

17. Davis, CA Davis Multimodal    $192,280            $200,640            $217,360            $225,720
 Station to improve entrance to
 Amtrak Depot and parking lot,
 provide additional parking and
 improve service................

18. Reno-Sparks, Nevada--         $769,120            $802,560            $869,440            $902,880
 Intermodal Transportation
 Terminals and Related
 Development....................

19. Bar Harbor, ME Purchase new   $57,684             $60,192             $65,208             $67,716
 buses to enhance commuting near
 the Jackson Labs...............

20. Bronx, NY Establish an        $192,280            $200,640            $217,360            $225,720
 intermodal transportation
 facility at the Wildlife
 Conservation Society Bronx Zoo.

21. Hingham, MA Hingham Marine    $1,730,520          $1,805,760          $1,956,240          $2,031,480
 Intermodal Center Improvements:
 Enhance public transportation
 infrastructure/parking.........

22. Philadelphia, PA              $961,400            $1,003,200          $1,086,800          $1,128,600
 Philadelphia Zoo Intermodal
 Transportation project w/
 parking consolidation,
 pedestrian walkways, public
 transportation complements and
 landscape improvements to
 surface parking lots...........

23. Construct intermodal          $96,140             $100,320            $108,680            $112,860
 transportation and parking
 facility, City of Winter Park,
 Florida........................

24. Roma, TX Bus Facility.......  $100,947            $105,336            $114,114            $118,503

25. New York City, NY First       $192,280            $200,640            $217,360            $225,720
 Phase Implementation of Bus
 Rapid Transit System...........

26. Scottsdale, Arizona--Plan,    $480,700            $501,600            $543,400            $564,300
 design, and construct
 intermodal center..............

27. Sonoma County, CA Purchase    $96,140             $100,320            $108,680            $112,860
 of CNG buses...................

28. Camden, NJ Construction of    $192,280            $200,640            $217,360            $225,720
 the Camden County Intermodal
 Facility in Cramer Hill........

29. Sandy Hook, NJ National Park  $192,280            $200,640            $217,360            $225,720
 Service Construct year-round
 ferry dock at Sandy Hook Unit
 of Gateway National Recreation
 Area...........................

30. Sevier County, Tennessee--    $48,070             $50,160             $54,340             $56,430
 U.S. 441 bus rapid transit.....

31. St. Augustine, Florida--      $192,280            $200,640            $217,360            $225,720
 Intermodal Transportation and
 Parking Facility...............

32. Torrington, CT Construct bus- $384,560            $401,280            $434,720            $451,440
 related facility (Northwestern
 Connecticut Central Transit
 District)......................

33. Warren, PA--Construct         $288,420            $300,960            $326,040            $338,580
 Intermodal Transportation
 Center and related pedestrian
 and landscape improvements.....

34. Toledo, OH TARTA/ TARPS       $1,442,100          $1,504,800          $1,630,200          $1,692,900
 Passenger Intermodal Facility
 construction...................

35. Union City, CA Intermodal     $817,190            $852,720            $923,780            $959,310
 Station, Phase 1: Modify BART
 station........................

36. Los Angeles, CA Wilshire-     $192,280            $200,640            $217,360            $225,720
 Vermont subway station
 reconstruction.................

37. Lancaster, PA--bus            $182,666            $190,608            $206,492            $214,434
 replacement....................

38. Monmouth County, NJ           $384,560            $401,280            $434,720            $451,440
 Construction of main bus
 facility for Freehold Township,
 including a terminal and repair
 shop...........................

39. Monrovia, California--        $576,840            $601,920            $652,080            $677,160
 Transit Village Project........

40. Duluth, MN Downtown Duluth    $384,560            $401,280            $434,720            $451,440
 Area Transit facility
 improvements...................

41. Brooklyn, NY New Urban        $184,589            $192,614            $208,666            $216,691
 Center--Broadway Junction
 Intermodal Center..............

42. Medford, MA Downtown          $384,560            $401,280            $434,720            $451,440
 revitalization featuring
 construction of a 200 space
 Park and Ride Facility.........

43. Needles, California--El       $384,560            $401,280            $434,720            $451,440
 Garces Intermodal Facility.....

44. Bridgeport, Connecticut--     $96,140             $100,320            $108,680            $112,860
 Greater Bridgeport Transit
 Authority Bus Facility.........

45. Palm Springs, California--    $96,140             $100,320            $108,680            $112,860
 Sunline Transit bus purchase...

46. National Park Service Design  $192,280            $200,640            $217,360            $225,720
 and construct 2.1-mile segment
 to complete Sandy Hook multiuse
 pathway in Sandy Hook, NJ......

47. Phoenix, AZ Construct City    $192,280            $200,640            $217,360            $225,720
 of Phoenix para-transit
 facility (Dial-a-Ride).........

48. Project provides for the      $192,280            $200,640            $217,360            $225,720
 engineering and construction of
 a transportation center in
 Paoli, Chester County..........

49. Columbus, Georgia--Buses and  $186,319            $194,420            $210,622            $218,723
 Bus Facilities.................

50. Cleveland, Ohio--University   $1,634,380          $1,705,440          $1,847,560          $1,918,620
 Circle intermodal facility.....

51. Cleveland, OH acquisition of  $192,280            $200,640            $217,360            $225,720
 buses Greater Cleveland
 Regional Transit Authority.....

52. Greensboro, North Carolina--  $1,111,378          $1,159,699          $1,256,341          $1,304,662
 Replacement buses..............

53. Johnson Co., KS Bus and bus   $384,560            $401,280            $434,720            $451,440
 related facilities (I-35
 corridor), Johnson Co. Transit.

54. City of Alameda, CA Plan,     $384,560            $401,280            $434,720            $451,440
 design, and construct
 intermodal facility............

55. New Orleans, LA Intermodal    $96,140             $100,320            $108,680            $112,860
 Riverfront Center..............

56. Brooklyn, NY--Rehabilitation  $769,120            $802,560            $869,440            $902,880
 of Bay Ridge 86th Street Subway
 Station........................

57. Wilmington, NC Build          $192,280            $200,640            $217,360            $225,720
 Intermodal Center..............

58. Yabucoa, Puerto Rico--        $33,649             $35,112             $38,038             $39,501
 Trolley buses..................

59. Beverly, MA Design and        $384,560            $401,280            $434,720            $451,440
 Construct Beverly Depot
 Intermodal Transportation
 Center.........................

60. Georgia Statewide Bus         $38,456             $40,128             $43,472             $45,144
 Program........................

61. Trenton, New Jersey--Trenton  $288,420            $300,960            $326,040            $338,580
 Train Station Rehabilitation...

62. Trenton, NJ Reconstruction    $1,345,960          $1,404,480          $1,521,520          $1,580,040
 and rehabilitation of the
 Trenton Train Station..........

63. Zapata, Texas Purchase Bus    $60,088             $62,700             $67,925             $70,538
 vehicles.......................

64. Zanesville, OH--bus system    $15,623             $16,302             $17,661             $18,340
 signage and shelters...........

65. York, Pennsylvania--Rabbit    $532,712            $555,873            $602,196            $625,357
 Transit facilities and
 communications equipment.......

66. Canby, OR bus and bus         $28,842             $30,096             $32,604             $33,858
 facilities.....................

67. New Orleans, LA Plan and      $192,280            $200,640            $217,360            $225,720
 construct New Orleans Union
 Passenger Terminal intermodal
 facilities.....................

68. Northern Neck and Middle      $624,910            $652,080            $706,420            $733,590
 Peninsula, Virginia--Bay
 Transit Multimodal Facilities..

69. Broward County, FL Buses and  $1,249,820          $1,304,160          $1,412,840          $1,467,180
 Bus Facilities.................

70. Palm Springs, California--    $192,280            $200,640            $217,360            $225,720
 Sunline Transit: CalStart-
 Weststart fuel cell bus program

71. San Juan, Puerto Rico--Buses  $192,280            $200,640            $217,360            $225,720

72. Hammond, Louisiana--          $38,456             $40,128             $43,472             $45,144
 Passenger Intermodal facility
 at Southeastern University.....

73. West Virginia Construct       $4,614,720          $4,815,360          $5,216,640          $5,417,280
 Beckley Intermodal Gateway
 pursuant to the eligibility
 provisions for projects listed
 under section 3030(d)(3) of
 Public Law 105-178.............

74. Albany-Schenectady, NY Bus    $192,280            $200,640            $217,360            $225,720
 Rapid Transit Improvements in
 NY Route 5 Corridor............

75. Alameda County, CA AC         $96,140             $100,320            $108,680            $112,860
 Transit Bus Rapid Transit
 Corridor Project...............

76. Baldwin Park, CA Construct    $384,560            $401,280            $434,720            $451,440
 vehicle and bicycle parking lot
 and pedestrian rest area at
 transit center.................

77. Niagara Falls, NY             $1,076,768          $1,123,584          $1,217,216          $1,264,032
 Relocation, Development, and
 Enhancement of Niagara Falls
 International Railway Station/
 Intermodal Transportation
 Center.........................

78. Utica, New York--Union        $19,228             $20,064             $21,736             $22,572
 Station Boehlert Center siding
 track improvements.............

79. Ionia County, MI--Purchase    $113,445            $118,378            $128,242            $133,175
 and implementation of
 communication equipment
 improvements...................

80. Flagler County, Florida--bus  $115,368            $120,384            $130,416            $135,432
 facility.......................

81. Easton, Pennsylvania--Design  $384,560            $401,280            $434,720            $451,440
 and construct Intermodal
 Transportation Center..........

82. Yamhill County, OR For the    $21,151             $22,070             $23,910             $24,829
 construction of bus shelters,
 park and ride facilities, and a
 sign-age strategy to increase
 ridership......................

83. Woodland, CA Yolobus          $384,560            $401,280            $434,720            $451,440
 operations, maintenance,
 administration facility
 expansion and improvements to
 increase bus service with
 alternative fuel buses.........

84. Sacramento, CA Construct      $1,345,960          $1,404,480          $1,521,520          $1,580,040
 intermodal station and related
 improvements...................

85. Torrance Transit System, CA   $576,840            $601,920            $652,080            $677,160
 Acquisition of EPA and CARB-
 certified low emission
 replacement buses..............

86. Burlington County, NJ--       $769,120            $802,560            $869,440            $902,880
 BurLink and Burlington County
 Transportation System vehicles
 and equipment..................

87. Niles, OH Acquisition of bus  $38,456             $40,128             $43,472             $45,144
 operational and service
 equipment for Niles Trumbull
 Transit........................

88. Rockport, MA Rockport         $528,770            $551,760            $597,740            $620,730
 Commuter Rail Station
 Improvements...................

89. Cincinnati, Ohio--Metro       $177,859            $185,592            $201,058            $208,791
 Regional Transit Hub Network
 Eastern Neighborhoods..........

90. Buses and bus related         $1,153,680          $1,203,840          $1,304,160          $1,354,320
 facilities throughout the State
 of Connecticut.................

91. Columbus, GA Bus replacement  $57,684             $60,192             $65,208             $67,716

92. Norwalk, CA Transit System    $153,824            $160,512            $173,888            $180,576
 Bus Procurement and Los Angeles
 World Airport Remote Fly-Away
 Facility Project...............

93. Salem, OR bus and bus         $384,560            $401,280            $434,720            $451,440
 facilities.....................

94. Ilwaco, WA Procure shuttles   $19,228             $20,064             $21,736             $22,572
 for Lewis and Clark National
 Historical Park................

95. Gainesville, FL Bus           $769,120            $802,560            $869,440            $902,880
 Replacement....................

96. SEPTA Montgomery County       $961,400            $1,003,200          $1,086,800          $1,128,600
 Intermodal Improvements at
 Glenside and Jenkintown Station
 Parking Garages................

97. Fredericksburg, Virginia--    $480,700            $501,600            $543,400            $564,300
 Improve and repair
 Fredericksburg Station.........

98. Birmingham, AL Expansion of   $384,560            $401,280            $434,720            $451,440
 Downtown Intermodal Facility,
 Phase II.......................

99. Gresham, Oregon Construct a   $269,192            $280,896            $304,304            $316,008
 new light rail station and
 transit plaza on Portland MAX
 system and serve Gresham Civic
 neighborhood...................

100. State of Wisconsin buses     $3,143,778          $3,280,464          $3,553,836          $3,690,522
 and bus facilities.............

101. Emeryville, CA Expand and    $192,280            $200,640            $217,360            $225,720
 Improve Intermodal Transit
 Center at Amtrak Station.......

102. Jersey City, NJ Construct    $384,560            $401,280            $434,720            $451,440
 West Entrance to Pavonia-
 Newport PATH Station...........

103. Longwood, Florida--          $96,140             $100,320            $108,680            $112,860
 Construct Intermodal
 Transportation Facility........

104. Marietta, Ohio Construction  $96,140             $100,320            $108,680            $112,860
 of transportation hub to
 accommodate regional bus
 traffic........................

105. Akron, Ohio--West Market     $124,982            $130,416            $141,284            $146,718
 Street transit center and
 related pedestrian improvements

106. Sandy, Oregon Transit Bus    $134,596            $140,448            $152,152            $158,004
 Facility.......................

107. Jacksonville, FL             $865,260            $902,880            $978,120            $1,015,740
 Paratransit Vehicles...........

108. Carson, CA Purchase two      $96,140             $100,320            $108,680            $112,860
 tripper buses..................

109. Bloomington, IN--Bus and     $924,867            $965,078            $1,045,502          $1,085,713
 transfer facility..............

110. Cobb County, GA Cobb County  $192,280            $200,640            $217,360            $225,720
 Smart Card Technology/Bus
 Facility Improvements..........

111. Construct West Houston and   $384,560            $401,280            $434,720            $451,440
 Fort Bend County, Texas--bus
 transit corridor...............

112. Mariposa, CA--Yosemite       $480,700            $501,600            $543,400            $564,300
 National Park CNG-Hydrogen
 transit buses and facilities...

113. Snohomish County, WA         $576,840            $601,920            $652,080            $677,160
 Community Transit bus purchases
 and facility enhancement.......

114. Geneva, Illinois--Construct  $769,120            $802,560            $869,440            $