Skip to Search Skip to Left Navigation U.S. Department of Transportation (US DOT) Research and Innovative Technology Administration (RITA) Bureau of Transportation Statistics (BTS)Bureau of Transportation Statistics (BTS) - Research and Innovative Technology Administration (RITA) - United States Department of Transportation (USDOT, US DOT or DOT)
  ABOUT RITA | CONTACT US | PRESS ROOM | CAREERS | SITE MAP
Bureau of Transportation Statistics
Data and Statistics
Bookstore
Programs
About BTS
Upcoming Press Releases
External Links
Intelligent Transportation Systems
National Transportation Library
Research, Development and Technology
Transportation Safety Institute
University Transportation Centers
Volpe National Transportation Systems Center
Printable Version

Table 4
Estimation Results for Activity Schedule Structure 3

Excel | CSV

Episode Const Male Young Middle License JbFull Student Single SinPar Couple Cwkid Hinc CGC Wht Drvwk IV
LESS FREQ                               (0.80)
LESS FREQ                               (8.80)
Meal before work -1.58           2.0   -1.82              
Meal before work (-12.7)           (7.50)   (-1.8)              
Shp/PB before work   0.14       -0.45 0.4   0.68           -0.18  
Shp/PB before work   (1.40)       (-4.4) (1.40)   (3.30)           (-1.9)  
Ent before work -1.49           1.4                  
Ent before work (-12.3)           (4.40)                  
Shp/PB at work -1.3   -0.59 -0.25 1.18   -1     0.26 -0.27          
Shp/PB at work (-3.0)   (-3.1) (-2.4) (2.80)   (-1.6)     (2.30) (-2.1)          
Ent at work         -1.41           -0.52          
Ent at work         (-10.8)           (-2.8)          
Meal after work -0.43           1.1       -0.67          
Meal after work (-3.8)           (4.00)       (-5.1)          
MEAL                               1.00
At work   0.12 0.48     0.71   -0.16       -0.14        
At work   (2.00) (5.40)     (9.80)   (-2.3)       (-2.4)        
SHP/PB                               1.00
After work   -0.36 -0.03   0.06               0.08 0.13 0.26  
After work   (-5.1) (-0.3)   (0.50)               (0.80) (1.75) (3.50)  
ENT                               1.00
After work   0.16 0.78 0.26     0.5 0.19     -0.24 0.1 0.11 0.12    
After work   (1.90) (5.70) (2.50)     (2.60) (1.90)     (-2.4) (1.10) (1.00) (1.30)    
RETURN HOME                               0.72
RETURN HOME                               -9.8
Before work           -0.93 1.64   0.57              
Before work           (-11.8) (7.90)   (2.40)              
At work  -0.72 0.22 -0.26   0.68 -0.09         -0.23       0.4  
At work  (-2.5) (2.50) (-1.6)   (2.40) (-0.8)         (-2.4)       (3.90)  
After work     0.3                          
After work     (2.20)                          

L(0): -17805.3

L(b): -16663.7

c2 (df): 2283.1 (56)

r2 [1-L(b)/L(0)]: 0.06

N: 4188

Note: Values in parentheses are t-statistics. See table 3 for definition of explanatory variables.