Table B-4. Estimated Measures of Reliability for Shipment Characteristics by Mode of Transportation and Shipment Size for CBSA of Origin: 2002
    
    
           Monday, July 2, 2012
    
          
        
        
Table B-4. Estimated Measures of Reliability for Shipment Characteristics by Mode of Transportation and Shipment Size for CBSA of Origin: 2002
[Estimates are based on data from the Commodity Flow Survey. Because of rounding, estimates may not be additive]
Excel | CSV
All modes
 
 
 
  | Shipment Weight | Value | Tons | Ton-miles | CV of average miles per shipment | 
 
  | CV | Std. error of percent | CV | Std. error of percent | CV | Std. error of percent | 
 
  | All shipment sizes | 5.8 | – | 8.3 | – | 12.6 | – | 22.2 | 
 
  | Less than 50 lbs | 25.0 | 0.7 | 24.8 | – | 16.9 | – | 32.9 | 
 
  | 50 to 99 lbs | 34.0 | 0.5 | 23.1 | – | 23.6 | – | 22.7 | 
 
  | 100 to 499 lbs | 13.7 | 0.5 | 26.2 | 0.1 | 14.7 | – | 27.9 | 
 
  | 500 to 749 lbs | 22.0 | 0.3 | 18.4 | – | 42.4 | – | 25.0 | 
 
  | 750 to 999 lbs | 15.3 | 0.2 | 15.1 | – | 25.1 | – | 31.0 | 
 
  | 1,000 to 9,999 lbs | 15.2 | 2.2 | 13.7 | 0.4 | 12.2 | 0.2 | 19.0 | 
 
  | 10,000 to 49,999 lbs | 6.9 | 1.9 | 18.7 | 4.9 | 13.7 | 3.3 | 20.8 | 
 
  | 50,000 to 99,999 lbs | 23.4 | 1.4 | 30.7 | 3.8 | 13.0 | 0.7 | 19.7 | 
 
  | 100,000 lbs or more | 14.1 | 2.2 | 15.9 | 5.7 | 16.7 | 3.6 | 14.0 | 
Single modes
 
 
 
  | Shipment Weight | Value | Tons | Ton-miles | CV of average miles per shipment | 
 
  | CV | Std. error of percent | CV | Std. error of percent | CV | Std. error of percent | 
 
  | All shipment sizes | 5.6 | – | 8.9 | – | 13.1 | – | 23.9 | 
 
  | Less than 50 lbs | 45.2 | 0.7 | 38.6 | – | 20.2 | – | S | 
 
  | 50 to 99 lbs | 43.1 | 0.4 | 30.0 | – | 24.3 | – | 18.6 | 
 
  | 100 to 499 lbs | 15.0 | 0.5 | 29.9 | 0.1 | 13.0 | – | 27.9 | 
 
  | 500 to 749 lbs | 25.5 | 0.3 | 21.9 | – | 44.0 | – | 24.3 | 
 
  | 750 to 999 lbs | 14.7 | 0.1 | 15.6 | – | 26.3 | – | 32.3 | 
 
  | 1,000 to 9,999 lbs | 15.0 | 2.3 | 13.8 | 0.4 | 12.2 | 0.2 | 18.2 | 
 
  | 10,000 to 49,999 lbs | 7.2 | 2.2 | 19.0 | 4.9 | 13.9 | 3.2 | 20.6 | 
 
  | 50,000 to 99,999 lbs | 23.6 | 1.6 | 30.9 | 4.1 | 13.2 | 0.7 | 19.7 | 
 
  | 100,000 lbs or more | 14.7 | 2.7 | 16.6 | 5.9 | 17.3 | 3.5 | 14.0 | 
Truck
 
 
 
  | Shipment Weight | Value | Tons | Ton-miles | CV of average miles per shipment | 
 
  | CV | Std. error of percent | CV | Std. error of percent | CV | Std. error of percent | 
 
  | All shipment sizes | 5.8 | – | 13.2 | – | 12.3 | – | 22.9 | 
 
  | Less than 50 lbs | 47.3 | 0.8 | 38.9 | – | 24.1 | – | S | 
 
  | 50 to 99 lbs | 44.3 | 0.5 | 30.1 | – | 26.2 | – | 17.2 | 
 
  | 100 to 499 lbs | 15.3 | 0.5 | 30.0 | 0.1 | 13.0 | – | 27.6 | 
 
  | 500 to 749 lbs | 25.3 | 0.4 | 21.9 | – | 44.7 | 0.2 | 24.8 | 
 
  | 750 to 999 lbs | 14.8 | 0.2 | 15.6 | – | 26.4 | – | 32.4 | 
 
  | 1,000 to 9,999 lbs | 14.7 | 2.8 | 13.8 | 0.7 | 12.4 | 0.6 | 18.3 | 
 
  | 10,000 to 49,999 lbs | 7.2 | 2.7 | 19.0 | 5.5 | 13.8 | 2.0 | 20.5 | 
 
  | 50,000 to 99,999 lbs | 24.3 | 1.8 | 31.2 | 4.9 | 15.1 | 1.6 | 19.7 | 
 
  | 100,000 lbs or more | 26.2 | 1.0 | 40.9 | 4.8 | 13.3 | 0.5 | S | 
Rail
 
 
 
  | Shipment Weight | Value | Tons | Ton-miles | CV of average miles per shipment | 
 
  | CV | Std. error of percent | CV | Std. error of percent | CV | Std. error of percent | 
 
  | All shipment sizes | 12.9 | – | 24.9 | – | 15.5 | – | 4.5 | 
 
  | Less than 50 lbs | S | S | S | S | S | S | 31.6 | 
 
  | 50 to 99 lbs | S | S | S | S | S | S | 31.6 | 
 
  | 100 to 499 lbs | S | S | S | S | S | S | 31.6 | 
 
  | 500 to 749 lbs | – | – | – | – | – | – | – | 
 
  | 750 to 999 lbs | – | – | – | – | – | – | – | 
 
  | 1,000 to 9,999 lbs | S | S | S | S | S | S | 21.9 | 
 
  | 10,000 to 49,999 lbs | 45.1 | 0.6 | 47.9 | 0.1 | 49.3 | 0.3 | 19.8 | 
 
  | 50,000 to 99,999 lbs | 25.0 | 0.4 | 42.5 | 0.2 | 29.7 | 0.2 | 12.5 | 
 
  | 100,000 lbs or more | 12.7 | 0.6 | 24.9 | 0.3 | 15.6 | 0.4 | 4.6 | 
All other Single modes
 
 
 
  | Shipment Weight | Value | Tons | Ton-miles | CV of average miles per shipment | 
 
  | CV | Std. error of percent | CV | Std. error of percent | CV | Std. error of percent | 
 
  | All shipment sizes | 22.3 | – | 22.2 | – | 24.9 | – | 10.2 | 
 
  | Less than 50 lbs | 34.3 | 0.5 | S | S | S | S | 4.8 | 
 
  | 50 to 99 lbs | 46.9 | – | 30.3 | – | 37.5 | – | 22.1 | 
 
  | 100 to 499 lbs | 40.0 | 0.3 | 32.5 | – | 32.7 | – | 8.8 | 
 
  | 500 to 749 lbs | S | S | S | S | S | S | 18.9 | 
 
  | 750 to 999 lbs | S | S | S | S | S | S | 28.1 | 
 
  | 1,000 to 9,999 lbs | S | S | 40.9 | – | S | S | 30.2 | 
 
  | 10,000 to 49,999 lbs | S | S | 41.4 | – | S | S | 38.6 | 
 
  | 50,000 to 99,999 lbs | 48.7 | – | 48.6 | – | S | S | 42.4 | 
 
  | 100,000 lbs or more | 23.0 | 1.2 | 22.2 | – | 24.9 | – | 29.9 | 
Multiple modes
 
 
 
  | Shipment Weight | Value | Tons | Ton-miles | CV of average miles per shipment | 
 
  | CV | Std. error of percent | CV | Std. error of percent | CV | Std. error of percent | 
 
  | All shipment sizes | 14.5 | – | 33.4 | – | 38.9 | – | 16.8 | 
 
  | Less than 50 lbs | 22.7 | 5.0 | 19.8 | 3.4 | 21.8 | 3.7 | 19.1 | 
 
  | 50 to 99 lbs | 27.9 | 2.3 | 27.1 | 2.6 | 34.6 | 2.1 | 13.0 | 
 
  | 100 to 499 lbs | 25.3 | 3.7 | 30.5 | 4.6 | 41.9 | 4.3 | 12.1 | 
 
  | 500 to 749 lbs | 39.1 | 0.2 | 43.6 | 0.8 | 39.4 | – | S | 
 
  | 750 to 999 lbs | 49.0 | 0.4 | S | S | 42.7 | 0.4 | 46.8 | 
 
  | 1,000 to 9,999 lbs | 49.9 | 0.6 | S | S | S | S | S | 
 
  | 10,000 to 49,999 lbs | 29.5 | 1.8 | 40.8 | 3.8 | 48.1 | 9.0 | 9.3 | 
 
  | 50,000 to 99,999 lbs | S | S | S | S | S | S | 31.6 | 
 
  | 100,000 lbs or more | 31.5 | 4.2 | 38.5 | 14.3 | 47.5 | 16.5 | 32.3 | 
Parcel, USPS or courier
 
 
 
  | Shipment Weight | Value | Tons | Ton-miles | CV of average miles per shipment | 
 
  | CV | Std. error of percent | CV | Std. error of percent | CV | Std. error of percent | 
 
  | All shipment sizes | 16.5 | – | 22.2 | – | 28.9 | – | 16.5 | 
 
  | Less than 50 lbs | 22.7 | 5.3 | 19.9 | 6.5 | 21.8 | 7.0 | 19.1 | 
 
  | 50 to 99 lbs | 27.9 | 2.6 | 28.2 | 2.2 | 34.7 | 1.9 | 11.7 | 
 
  | 100 to 499 lbs | 25.8 | 4.3 | 34.5 | 6.5 | 42.0 | 6.1 | 14.1 | 
 
  | 500 to 749 lbs | 39.2 | 0.2 | 49.4 | 1.3 | 39.8 | 0.6 | S | 
 
  | 750 to 999 lbs | S | S | S | S | 44.6 | 2.8 | 46.1 | 
 
  | 1,000 to 9,999 lbs | S | S | S | S | S | S | 31.6 | 
 
  | 10,000 to 49,999 lbs | – | – | – | – | – | – | – | 
 
  | 50,000 to 99,999 lbs | – | – | – | – | – | – | – | 
 
  | 100,000 lbs or more | – | – | – | – | – | – | – | 
All other multiple modes
 
 
 
  | Shipment Weight | Value | Tons | Ton-miles | CV of average miles per shipment | 
 
  | CV | Std. error of percent | CV | Std. error of percent | CV | Std. error of percent | 
 
  | All shipment sizes | 16.3 | – | 35.6 | – | 41.2 | – | S | 
 
  | Less than 50 lbs | S | S | S | S | S | S | 31.6 | 
 
  | 50 to 99 lbs | S | S | S | S | S | S | S | 
 
  | 100 to 499 lbs | S | S | S | S | S | S | S | 
 
  | 500 to 749 lbs | S | S | S | S | S | S | S | 
 
  | 750 to 999 lbs | S | S | S | S | S | S | 31.5 | 
 
  | 1,000 to 9,999 lbs | S | S | S | S | S | S | S | 
 
  | 10,000 to 49,999 lbs | 29.5 | 12.3 | 40.8 | 14.4 | 48.1 | 16.5 | 9.3 | 
 
  | 50,000 to 99,999 lbs | S | S | S | S | S | S | 31.6 | 
 
  | 100,000 lbs or more | 31.5 | 11.8 | 38.5 | 14.5 | 47.5 | 16.3 | 32.3 | 
Other and unknown modes
 
 
 
  | Shipment Weight | Value | Tons | Ton-miles | CV of average miles per shipment | 
 
  | CV | Std. error of percent | CV | Std. error of percent | CV | Std. error of percent | 
 
  | All shipment sizes | 46.1 | – | 34.1 | – | 27.3 | – | S | 
 
  | Less than 50 lbs | 42.0 | 9.0 | 49.9 | 0.1 | S | S | 47.4 | 
 
  | 50 to 99 lbs | S | S | 48.3 | 0.2 | 46.2 | – | S | 
 
  | 100 to 499 lbs | 27.2 | 2.9 | 42.9 | 2.8 | 38.5 | 0.6 | S | 
 
  | 500 to 749 lbs | S | S | 43.0 | 2.8 | S | S | S | 
 
  | 750 to 999 lbs | S | S | S | S | 47.6 | 0.3 | 37.6 | 
 
  | 1,000 to 9,999 lbs | 26.2 | 9.0 | S | S | 46.5 | 6.0 | S | 
 
  | 10,000 to 49,999 lbs | S | S | 46.6 | 10.1 | 45.1 | 10.4 | S | 
 
  | 50,000 to 99,999 lbs | S | S | S | S | S | S | 37.6 | 
 
  | 100,000 lbs or more | S | S | 35.9 | 16.8 | 36.9 | 11.0 | 21.2 | 
 KEY: 
– Represents data cell equal to zero or less than
  1 unit of measure. 
    S Estimate does not meet publication standards because of high sampling
  variability or poor response quality.
    CV Coefficient of variation of number
NOTE: The Introduction and appendixes give
  information onf confidentiality protection, sampling error, nonsampling
  error, sample design, and definitions.
  Links to this information on the Internet may be found at www.census.gov/cfs.
SOURCE: Bureau of Transportation Statistics (USDOT)
  and U.S. Census Bureau, 2002 Commodity Flow Survey, Metropolitan Data,
  December 2004.