Table 1-3: New Hampshire Toll Roads: 2001
Tuesday, January 3, 2012
Table 1-3: New Hampshire Toll Roads: 2001
Facility | Financing or operating authority | Location | Length in miles | Toll collection direction | Electronic collection system |
---|---|---|---|---|---|
Interstate | |||||
New Hampshire Turnpike | NHDOT | From MA state line to Portsmouth Traffic Circle | 15.2 | Both ways | No |
F.E. Everett Turnpike | NHDOT | From junction I-293 and State Route 101 in Bedford to junction State Route 9 in Concord | 19.5 | Both ways | No |
Noninterstate | |||||
F.E. Everett Turnpike | NHDOT | From MA state line to junction I-293 and State Route 101 in Bedford | 20.8 | Both ways | No |
Henry Bourque Highway Rt.3 | NHDOT | From NH Route 101A to Daniel Webster Highway | 1.4 | Both ways | No |
Spaulding Turnpike | NHDOT | From Portsmouth to junction State Route 125 in Milton | 33.2 | U | No |
Mt. Washington Summit Road | Mt. Washington Summit Road Co. | From State Route 16 to Mt. Washington Summit | 7.0 | U | U |
KEY FOR DATA ON THIS PAGE: NHDOT = New Hampshire Department of Transportation; U = data are unavailable.
SOURCE FOR DATA ON THIS PAGE: U.S. Department of Transportation, Federal Highway Administration, Toll Facilities in the United States: Bridges-Roads-Tunnels-Ferries, Washington, DC: June 2001, available at http://www.fhwa.dot.gov/ohim/tollpage.htm as of Feb. 18, 2002.