Figure 11 Mean VOT versus Number of Trips: Conventional Rail
Figure 11 Mean VOT versus Number of Trips: Conventional RailExcel | CSV | Table Version
Note: For OD 2, Cases 1, 6, and 7 are zero. For OD 3, Cases 1 and 4-7 are zero.
Excel | CSV | Table Version
Note: For OD 2, Cases 1, 6, and 7 are zero. For OD 3, Cases 1 and 4-7 are zero.
(Weighted error)
Excel | CSV | Graphic Version
Total Case A - 0.02 0.275 Case B - 0.05 0.252 Case C - 0.10 0.121 Case D -...Excel | CSV | Table Version
Excel | CSV
Air Conventional rail Highway Total OD 1 0 5,711 1,369 7,080 (0.000) (0.2557) (0.1267...Excel | CSV | Table Version
Note: For Cases 1 and 2, the values are zero.
Excel | CSV
Number of lanes Seoul to Daejeon 6 Daejeon to Daegoo 4 Daegoo to Busan 4Note: All lanes are one direction only...
Excel | CSV | Table Version
Note: For Case 4-7, the values are zero.
(Number of trips)
Excel | CSV | Graphic Version
OD 2 OD 3 Case 1 0 0 Case 2 0 0 Case 3 2 34,182 Case 4 1,034...